Show Job Controls
Bid Cobra

SUTTON IH 10 (0907-27-008)

Items: 38

County: SUTTON
Length: N/A
Highway: IH 10
District: SAN ANGELO
Control Number: 0907-27-008
DBE Goal: 0.0%
Project: F 2024(660)
Guaranty: N/A
Time: 112 WORKING DAYS
Engineer's Estimate: $647,152.64
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: ADVANCED TRAFFIC MANAGEMENT SYSTEM
Mail/Deliver Bids To: N/A
CHUKWUMA OSEMEKE
JESSE MENDOZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$647,152.64
$851,190.57
Over/Under Est: 31.53% $204,037.93
$1,592,946.46
Over/Under Est: 146.15% $945,793.82
Amt Left: 87.14% $741,755.89
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 51.04% $434,447.67
BARRICADES UNLIMITED 3.29% $28,004.17
STRATA FOUNDATION DRILLING, LLC 2.95% $25,110.12
JE CASEY, LLC 2.88% $24,514.29
Total: 60.16% $512,076.25

Bid Items & Bid Tabulations

38 Total 0 of 38
SUTTON  |  IH 10  |  SAN ANGELO  |  0907-27-008  |  06/05/2024  |  $647,152.64  |  F 2024(660)  |  ADVANCED TRAF MGT SYSTEM  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LIGHT IT UP ELECTRIC
MICA CORPORATION
DRILL SHAFT (36 IN)
LF 60.000 $400.000 $600.000 $921.000
DRILL SHAFT (48 IN)
LF 42.000 $650.000 $800.000 $1,020.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 58.000 $237.810 $400.000 $370.000
RIPRAP (CONC)(4 IN)
CY 7.500 $905.460 $975.000 $7,360.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.520 $674.470 $750.000 $1,265.000
MOBILIZATION
LS 1.000 $72,004.200 $90,000.000 $155,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $5,000.000 $18,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $30.370 $35.000 $48.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,673.650 $1,700.000 $3,740.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,473.100 $4,400.000 $8,050.000
CONDT (PVC) (SCH 40) (2")
LF 3,160.000 $19.000 $50.000 $35.050
CONDT (PVC) (SCH 80) (2") (BORE)
LF 290.000 $36.120 $55.000 $78.500
CONDT (RM) (2")
LF 80.000 $39.200 $85.000 $125.150
ELEC CONDR (NO.12) BARE
LF 125.000 $1.380 $2.000 $3.320
ELEC CONDR (NO.12) INSULATED
LF 250.000 $1.730 $2.000 $3.320
ELEC CONDR (NO.8) BARE
LF 265.000 $2.110 $2.500 $3.630
ELEC CONDR (NO.8) INSULATED
LF 2,775.000 $2.260 $2.500 $3.780
ELEC CONDR (NO.6) INSULATED
LF 2,040.000 $2.730 $3.400 $4.090
ELEC CONDR (NO.4) BARE
LF 2,800.000 $2.900 $3.800 $4.890
ELEC CONDR (NO.4) INSULATED
LF 3,820.000 $3.270 $4.250 $5.310
ELEC CONDR (NO.2) BARE
LF 1,120.000 $3.640 $4.850 $5.760
ELEC CONDR (NO.2) INSULATED
LF 3,360.000 $5.000 $5.900 $6.300
GROUND BOX TY C (162911)W/APRON
EA 20.000 $1,612.960 $1,700.000 $3,080.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 4.000 $8,000.000 $10,000.000 $12,835.000
ALUMINUM SIGNS (TY G)
SF 364.000 $40.000 $40.000 $36.650
INSTALL LRSS (STRUCT STEEL)
LB 2,101.080 $9.020 $10.250 $8.900
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 13.000 $30.700 $25.000 $46.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 2.000 $9,000.000 $11,300.000 $14,760.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 2.000 $4,000.000 $6,000.000 $5,705.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $18,000.000 $25,000.000 $197,200.000
ITS POLE (30 FT)(90 MPH)
EA 4.000 $12,682.000 $12,000.000 $21,825.000
ITS POLE (60 FT)(90 MPH)
EA 2.000 $26,000.000 $25,000.000 $45,670.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 2.000 $7,000.000 $9,500.000 $7,360.000
ITS POLE MNT CAB (SPL)(INTEGRATED)(INS)
EA 6.000 $2,000.000 $600.000 $2,830.000
ETHERNET SWITCH (INSTALL ONLY)
EA 4.000 $459.320 $1,600.000 $2,325.000
TMA (STATIONARY)
DAY 12.000 $286.390 $800.000 $775.000
CELLULAR MODEM (INSTALL ONLY)
EA 4.000 $1,465.000 $1,300.000 $2,010.000
TPAS VEH DET SYS (INSTALL ONLY)
EA 4.000 $1,500.000 $500.000 $6,970.000
Totals: $647,152.636 $851,190.570 $1,592,946.462