Items: 132

County: ROBERTSON
Length: 0.7620 MILES
Highway: US 79
District: BRYAN
Control Number: 0204-09-045
DBE Goal: 0.0%
Project: BR 2B24(086)
Guaranty: $100,000.00
Time: 360 WORKING DAYS
Engineer's Estimate: $19,385,140.90
Date: 11/07/2024 (1 year ago)
Contract Number: 11243206
Type: BRIDGE REPLACEMENT
Project ID: A00082318
Project Description: REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, AND BASE
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$19,385,140.90
$18,997,916.10
Over/Under Est: -2% -$387,224.80
Over/Under Est: -1.44% -$279,150.55
Amt Left: 0.57% $108,074.25
Over/Under Est: -0.12% -$23,650.73
Amt Left: 1.91% $363,574.07
Delta: -1.34% -$255,499.82
Over/Under Est: 17.82% $3,454,833.07
Amt Left: 20.22% $3,842,057.87
Delta: -17.97% -$3,478,483.80
Over/Under Est: 51.02% $9,889,996.86
Amt Left: 54.1% $10,277,221.66
Delta: -28.18% -$6,435,163.79
Subcontractor Percentage Amount
TOM-MAC, INC. 4.04% $767,515.81
STATEWIDE MATERIALS TRANSPORT, LTD. 4.01% $761,816.44
CEN TEX HYDROSEED, INC. 1.33% $252,672.28
LINDAMOOD, INC. 0.94% $178,580.41
HIGHWAY 1 LLC 0.70% $132,985.41
WILLOW CITY SIGN & RAIL, INC. 0.54% $102,588.75
SCHNEIDER CONSTRUCTION LLC 0.47% $89,290.21
DORAN STEEL, INC. 0.39% $74,091.87
TOR TEXAS, LLC 0.36% $68,392.50
CAPITAL PUMPING, LP 0.28% $53,194.17
FC TRAFFIC CONTROL, INC. 0.24% $45,595.00
EMERY SAPP & SON'S INC. 0.24% $45,595.00
PENHALL COMPANY 0.14% $26,597.08
PROFESSIONAL TRAFFIC CONTROL LLC 0.02% $3,799.58
Total: 13.70% $2,602,714.51

Bid Items & Bid Tabulations

132 Total 0 of 132
ROBERTSON  |  US 79  |  BRYAN  |  0204-09-045  |  11/07/2024  |  $19,385,140.90  |  BR 2B24(086)  |  BRIDGE REPL  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, LLC
MORTMARA CONSTRUCTION, INC.
PREPARING ROW
STA 81.000 $1,500.000 $1,600.000 $1,500.000 $9,000.000 $25,000.000 $18,850.000
REMOVING CONC (RIPRAP)
SY 3,601.000 $15.000 $10.000 $10.000 $15.000 $9.310 $6.810
REMOVING CONC (DRIVEWAYS)
SY 706.000 $20.000 $10.000 $25.000 $19.000 $14.180 $125.000
REMOVING CONC (CURB)
LF 616.000 $16.000 $3.250 $15.000 $4.000 $6.040 $20.000
REMOVING STAB BASE & ASPH PAV(16")
SY 36,836.000 $11.000 $8.750 $10.000 $9.000 $12.350 $7.000
REMOVING STAB BASE AND ASPH PAV(8")
SY 1,508.000 $8.500 $9.750 $8.000 $12.000 $6.630 $8.500
REMOVING STAB BASE & ASPH PAV (0-6")
SY 1,689.000 $8.000 $4.250 $8.000 $12.000 $5.790 $12.250
EXCAVATION (ROADWAY)
CY 7,765.000 $15.000 $17.000 $10.000 $9.000 $5.390 $3.300
EXCAVATION (CHANNEL)
CY 4,981.000 $15.000 $18.000 $15.000 $23.000 $20.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 45,115.000 $14.000 $23.000 $20.000 $24.000 $36.000 $13.000
FURNISHING AND PLACING TOPSOIL (4")
SY 82,252.000 $1.000 $1.000 $1.000 $1.000 $0.230 $1.000
BLOCK SODDING
SY 8,234.000 $6.000 $7.750 $6.000 $5.750 $6.000 $5.750
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 82,252.000 $0.500 $0.500 $0.400 $0.550 $0.420 $0.540
CELL FBR MLCH SEED(TEMP)(WARM)
SY 41,129.000 $0.450 $0.500 $0.400 $0.520 $0.410 $0.520
CELL FBR MLCH SEED(TEMP)(COOL)
SY 41,129.000 $0.450 $0.500 $0.400 $0.520 $0.410 $0.520
VEGETATIVE WATERING
MG 904.800 $20.000 $47.000 $25.000 $20.000 $36.440 $40.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 62,293.000 $19.000 $17.000 $17.000 $17.000 $13.870 $12.500
CEMENT
TON 1,414.000 $260.000 $270.000 $250.000 $230.000 $230.950 $225.000
CEMENT TREAT (SUBGRADE)(11")
SY 62,293.000 $2.000 $3.250 $2.500 $2.400 $2.740 $3.000
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
CY 983.000 $136.000 $170.000 $200.000 $171.000 $127.650 $175.000
PRIME COAT (MC-30 OR EC-30)
GAL 12,459.000 $6.000 $5.000 $5.000 $4.500 $4.400 $13.130
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 2,261.000 $5.000 $4.750 $3.000 $4.500 $4.000 $7.210
FLEXIBLE PAVEMENT STRUCT REPAIR (36")
SY 130.000 $250.000 $190.000 $270.000 $294.000 $150.000 $300.000
CEM STABIL BKFL
CY 396.000 $105.000 $110.000 $200.000 $179.000 $197.690 $150.000
TRENCH EXCAVATION PROTECTION
LF 511.000 $25.000 $8.750 $15.000 $3.000 $44.720 $120.000
TEMPORARY SPL SHORING
SF 10,192.000 $28.000 $13.000 $25.000 $28.000 $6.470 $95.000
STL H - PILING (HP 14 X 73)
LF 8,662.000 $150.000 $140.000 $150.000 $121.000 $141.330 $111.000
CL C CONC (ABUT)
CY 103.600 $1,300.000 $1,300.000 $1,600.000 $1,600.000 $854.940 $2,700.000
CL C CONC (CAP)
CY 216.100 $1,600.000 $1,700.000 $1,600.000 $1,400.000 $1,109.530 $3,250.000
CL C CONC (COLUMN)
CY 139.600 $1,600.000 $1,900.000 $1,600.000 $1,700.000 $1,305.980 $2,200.000
CL C CONC (FOOTING)
CY 172.800 $800.000 $920.000 $1,600.000 $1,700.000 $1,477.410 $1,350.000
CL E CONC (SEAL SLAB)
CY 294.000 $500.000 $600.000 $1,000.000 $590.000 $459.140 $600.000
CL A CONC (CHANNEL LINING)
CY 959.000 $400.000 $580.000 $750.000 $680.000 $1,085.990 $680.000
REINF CONC SLAB
SF 58,800.000 $30.000 $23.000 $27.000 $27.000 $29.500 $38.000
APPROACH SLAB
CY 121.600 $1,000.000 $930.000 $900.000 $800.000 $639.730 $1,525.000
PRESTR CONC GIRDER (TX46)
LF 6,965.000 $195.000 $210.000 $200.000 $200.000 $197.460 $300.000
RIPRAP (CONC)(5 IN)
CY 5.000 $600.000 $1,300.000 $1,000.000 $1,000.000 $985.830 $1,200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,044.000 $190.000 $120.000 $130.000 $164.000 $176.610 $155.000
RIPRAP (MOW STRIP)(4 IN)
CY 61.000 $600.000 $620.000 $650.000 $800.000 $744.330 $1,150.000
RAIL (TY SSTR)
LF 1,464.000 $100.000 $80.000 $100.000 $110.000 $120.920 $125.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 335.000 $240.000 $280.000 $225.000 $280.000 $185.500 $295.000
CONC BOX CULV (6 FT X 6 FT)
LF 510.000 $950.000 $950.000 $800.000 $760.000 $650.800 $2,500.000
CONC BOX CULV (8 FT X 4 FT)
LF 272.000 $950.000 $1,100.000 $850.000 $860.000 $699.980 $3,100.000
CONC BOX CULV (8 FT X 5 FT)
LF 190.000 $1,050.000 $1,200.000 $900.000 $890.000 $747.150 $3,400.000
CONC BOX CULV (8 FT X 6 FT)
LF 88.000 $1,200.000 $1,200.000 $950.000 $980.000 $831.610 $3,700.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 45.000 $1,950.000 $1,900.000 $2,000.000 $1,750.000 $2,109.830 $5,000.000
CONC BOX CULV (10 FT X 4 FT)
LF 70.000 $1,400.000 $1,500.000 $1,250.000 $1,200.000 $1,040.940 $3,500.000
RC PIPE (CL III)(18 IN)
LF 214.000 $105.000 $78.000 $100.000 $140.000 $99.330 $220.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $20,000.000 $31,000.000 $20,000.000 $22,000.000 $16,243.630 $57,000.000
WINGWALL (PW - 2) (HW=12 FT)
EA 1.000 $80,000.000 $100,000.000 $80,000.000 $66,000.000 $34,135.490 $119,500.000
WINGWALL (SPL)
EA 17.000 $20,000.000 $9,600.000 $15,000.000 $12,000.000 $18,171.500 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $2,000.000 $1,800.000 $2,000.000 $1,200.000 $1,417.870 $5,500.000
REMOV STR (WINGWALL)
EA 1.000 $2,000.000 $7,100.000 $5,000.000 $3,000.000 $1,237.800 $18,000.000
REMOV STR (BOX CULVERT)
LF 709.000 $70.000 $86.000 $75.000 $33.000 $33.610 $250.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $200,000.000 $230,000.000 $150,000.000 $290,000.000 $500,000.000 $130,000.000
REMOV STR (SMALL FENCE)
LF 1,265.000 $2.000 $4.000 $10.000 $3.000 $4.940 $26.000
REMOVE STR (RAIL)
LF 113.000 $25.000 $97.000 $20.000 $26.000 $21.170 $70.000
MOBILIZATION
LS 1.000 $1,946,000.000 $1,655,000.000 $1,500,000.000 $1,000,000.000 $2,227,090.520 $2,800,150.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $4,000.000 $6,800.000 $5,000.000 $3,000.000 $9,522.490 $22,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 403.000 $40.000 $52.000 $40.000 $38.000 $40.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 403.000 $13.000 $14.000 $10.000 $10.000 $11.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 936.000 $35.000 $45.000 $35.000 $25.000 $35.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $10.000 $16.000 $15.000 $10.000 $12.000 $14.000
CONSTRUCTION PERIMETER FENCE
LF 6,945.000 $3.000 $6.500 $4.000 $4.000 $5.000 $3.850
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,073.000 $4.250 $5.500 $5.000 $3.500 $4.200 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,073.000 $1.000 $1.000 $1.000 $1.000 $0.800 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,717.000 $5.000 $5.750 $6.000 $4.500 $4.500 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,717.000 $1.000 $1.250 $1.000 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS (TY 1)
SY 8,923.000 $50.000 $63.000 $75.000 $57.000 $69.670 $250.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,310.000 $50.000 $32.000 $50.000 $40.000 $29.040 $100.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,230.000 $15.000 $4.750 $15.000 $10.000 $9.800 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,230.000 $15.000 $4.750 $15.000 $10.000 $9.800 $16.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,310.000 $15.000 $5.750 $15.000 $17.000 $6.450 $11.000
DRIVEWAYS (CONC)
SY 1,153.000 $105.000 $99.000 $125.000 $80.000 $93.310 $148.000
DRIVEWAYS (ACP)
SY 1,556.000 $90.000 $60.000 $50.000 $58.000 $50.550 $130.000
RUMBLE STRIPS (SHOULDER)
LF 12,393.000 $0.400 $0.250 $0.500 $0.280 $0.110 $0.430
RUMBLE STRIPS (CENTERLINE)
LF 12,064.000 $0.400 $0.250 $0.500 $0.290 $0.110 $0.440
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $28.000 $29.000 $25.000 $23.000 $22.500 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,600.000 $2,500.000 $2,400.000 $2,050.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $2,000.000 $1,600.000 $1,200.000 $1,520.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $3.000 $3.250 $3.000 $3.000 $2.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,400.000 $3,900.000 $3,000.000 $2,900.000 $3,000.000 $2,878.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $230.000 $250.000 $300.000 $175.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,000.000 $1,900.000 $2,500.000 $1,400.000 $2,500.000 $2,880.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $2,000.000 $660.000 $1,500.000 $700.000 $1,200.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,300.000 $1,500.000 $700.000 $900.000 $1,030.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,500.000 $9,000.000 $8,000.000 $8,365.000 $8,720.000
CHAIN LINK FENCE (REMOVE)
LF 2,086.000 $7.000 $6.500 $10.000 $3.500 $6.000 $7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 18.000 $600.000 $760.000 $600.000 $600.000 $585.000 $723.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $625.000 $1,000.000 $650.000 $640.000 $625.000 $869.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,300.000 $900.000 $850.000 $845.000 $1,174.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 4.000 $1,250.000 $1,500.000 $1,000.000 $1,000.000 $960.000 $1,562.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 3.000 $500.000 $640.000 $350.000 $280.000 $275.000 $475.000
REMOVE SM RD SN SUP&AM
EA 41.000 $100.000 $150.000 $100.000 $100.000 $95.000 $130.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $28.000 $16.000 $26.000 $26.000 $25.500 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $39.000 $23.000 $35.000 $36.000 $35.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 10.000 $55.000 $94.000 $70.000 $70.000 $70.000 $45.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 8.000 $100.000 $120.000 $120.000 $115.000 $115.000 $400.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 12,994.000 $1.000 $0.750 $0.500 $0.340 $0.340 $0.340
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 150.000 $1.000 $1.000 $1.000 $0.340 $0.340 $0.340
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 12,836.000 $1.000 $0.750 $0.500 $0.340 $0.340 $0.340
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 24,556.000 $1.000 $1.500 $1.000 $0.770 $0.770 $0.770
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 140.000 $1.000 $3.500 $1.500 $0.770 $0.770 $0.770
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 47.000 $20.000 $16.000 $12.000 $16.000 $16.000 $16.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 25,715.000 $1.000 $1.500 $1.000 $0.770 $0.770 $0.770
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,465.000 $1.250 $0.500 $1.500 $1.500 $1.880 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 940.000 $1.250 $0.500 $1.500 $1.500 $1.930 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 608.000 $1.500 $2.500 $1.200 $1.100 $1.060 $1.060
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 8.000 $70.000 $61.000 $125.000 $72.000 $70.000 $70.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 370.000 $1.000 $0.750 $1.000 $1.450 $1.420 $1.420
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,480.000 $1.000 $0.750 $1.000 $1.450 $1.420 $1.420
REFL PAV MRK TY II (Y) 6" (BRK)
LF 370.000 $1.000 $0.750 $1.000 $1.450 $1.420 $1.420
REFL PAV MRK TY II (Y) 6" (SLD)
LF 1,480.000 $1.000 $0.750 $1.000 $1.450 $1.420 $1.420
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,360.000 $1.000 $1.000 $1.000 $1.070 $1.060 $1.060
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 15,049.000 $1.000 $1.000 $1.000 $1.070 $1.060 $1.060
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,150.000 $1.000 $1.000 $1.000 $1.070 $1.060 $1.060
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 18,068.000 $1.000 $1.000 $1.000 $1.070 $1.060 $1.060
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 34.000 $20.000 $26.000 $15.000 $25.000 $25.000 $25.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $250.000 $370.000 $365.000 $280.000 $275.000 $275.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $550.000 $720.000 $600.000 $480.000 $473.000 $473.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $440.000 $500.000 $780.000 $777.000 $777.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $600.000 $1,700.000 $875.000 $780.000 $777.000 $777.000
REFL PAV MRKR TY I-C
EA 191.000 $6.000 $7.750 $10.000 $7.000 $7.000 $7.000
REFL PAV MRKR TY II-A-A
EA 479.000 $6.000 $7.750 $11.000 $7.000 $7.000 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 39,015.000 $0.500 $0.750 $0.750 $0.350 $0.340 $0.340
PAV SURF PREP FOR MRK (6")
LF 3,700.000 $0.250 $0.250 $2.000 $0.350 $0.340 $0.340
SP MIXES SP-C PG64-22
TON 20,557.000 $110.000 $110.000 $105.000 $129.000 $131.500 $122.750
SP MIXES SP-C SAC-A PG70-22
TON 7,139.000 $135.000 $130.000 $120.000 $147.000 $141.000 $146.500
BONDING COURSE
GAL 18,848.000 $7.000 $4.000 $4.000 $4.000 $3.850 $6.270
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $7,000.000 $10,000.000 $13,000.000 $18,279.890 $26,000.000
TMA (STATIONARY)
DAY 360.000 $300.000 $190.000 $250.000 $250.000 $377.310 $150.000
TMA (MOBILE OPERATION)
DAY 40.000 $300.000 $1,000.000 $500.000 $400.000 $108.890 $1,250.000
Totals: $19,385,140.900 $18,997,916.100 $19,105,990.350 $19,361,490.170 $22,839,974.003 $29,275,137.760