POTTER US 60 (0168-10-081)

Items: 108

County: POTTER
Length: 0.8430 MILES
Highway: US 60
District: AMARILLO
Control Number: 0168-10-081
DBE Goal: 0.0%
Project: BR 2025(516)
Guaranty: $100,000.00
Time: 825 WORKING DAYS
Engineer's Estimate: $16,734,929.85
Date: 10/08/2025 (8 months ago)
Contract Number: 10253003
Type: BRIDGE MAINTENANCE
Project ID: A00197808
Contract Type: Federal
Project Description: REMOVE ACP, HYDRODEMO 1", PARTIAL DEPTH DECK REPAIR, FULL-DEPTH DECK REPAIR, CONCRETE OVERLAY,INSTALL HEADER JOINT, REMOVE AND REPLACE BRIDGE RAIL, SPOT (AREA) CLEAN AND PAINT STEEL BEAMS AND BEARINGS, SUBSTRUCTURE CONCRETE REPAIR, BEARING REPLACE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOE CHAPPELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$16,734,929.85
$17,113,098.10
Over/Under Est: 2.26% $378,168.25
Over/Under Est: 6.62% $1,108,504.55
Amt Left: 4.27% $730,336.30
$18,559,789.35
Over/Under Est: 10.9% $1,824,859.50
Amt Left: 8.45% $1,446,691.25
Delta: -4.01% -$716,354.95
Over/Under Est: 11.55% $1,932,103.47
Amt Left: 9.08% $1,553,935.22
Delta: -0.58% -$107,243.97
Subcontractor Percentage Amount
UNIFIED SPECIALTIES LLC 7.87% $1,346,800.82
TRP CONSTRUCTION GROUP, LLC 3.69% $631,473.32
IVS HYDRO, INC 1.15% $196,800.63
A-CORE CONCRETE CUTTING, INC. 0.77% $131,770.86
BAG REINFORCING LLC 0.33% $56,473.22
ROCKIN C MILLING 0.32% $54,761.91
DUSTIN ALLEN, INC. 0.21% $35,937.51
HOWELL SAND CO. 0.03% $5,133.93
MORRIS COUNTY CONTRACTORS, L.L.C. 0.03% $5,133.93
Total: 14.40% $2,464,286.13

Bid Items & Bid Tabulations

108 Total 0 of 108
POTTER  |  US 60  |  AMARILLO  |  0168-10-081  |  10/08/2025  |  $16,734,929.85  |  BR 2025(516)  |  BRIDGE MAINT  |  825 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
GILVIN-TERRILL, LTD.
GIBSON & ASSOCIATES, INC.
REMOV CONC (RIPRAP)
SY 280.000 $25.000 $20.000 $15.000 $70.000 $16.890
REMOV CONC (APPR SLAB)
SY 729.000 $100.000 $30.000 $15.000 $70.000 $40.000
REMOV CONC (TRAFFIC BARRIER)
LF 976.000 $70.000 $20.000 $25.000 $75.000 $8.140
REMOV CONC (RAIL)
LF 618.000 $70.000 $32.000 $30.000 $75.000 $18.360
EXCAV (CHANNEL)
CY 170.000 $60.000 $40.000 $150.000 $50.000 $24.750
EMBANK (FNL)(OC)(TY B)
CY 1,114.000 $60.000 $30.000 $35.000 $50.000 $43.010
DRILL SEED (PERM_RURAL_CLAY)
SY 2,570.000 $2.000 $1.590 $4.000 $2.000 $2.000
SP MIXES SP-D PG70-28
TON 3,367.000 $295.000 $225.000 $230.000 $250.000 $310.200
TACK COAT
GAL 2,043.000 $10.000 $7.000 $25.000 $6.000 $9.900
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 184.000 $150.000 $120.000 $400.000 $250.000 $478.500
PLANE ASPH CONC PAV(0" TO 4")
SY 9,588.000 $8.000 $11.000 $15.000 $15.000 $8.780
PLANE ASPH CONC PAV(0" TO 6")
SY 1,430.000 $10.000 $11.000 $25.000 $15.000 $10.980
PLANE ASPH CONC PAV(2" TO 4")
SY 20,387.000 $5.000 $6.000 $12.000 $15.000 $2.740
FULL - DEPTH REPAIR CPCD (12")
CY 72.900 $1,200.000 $700.000 $750.000 $1,200.000 $1,100.000
FLOWABLE BACKFILL
CY 74.000 $400.000 $550.000 $450.000 $500.000 $330.000
REINF CONC SLAB
SF 50,676.000 $37.000 $12.250 $45.000 $30.000 $29.700
APPROACH SLAB
CY 313.900 $950.000 $600.000 $600.000 $1,350.000 $1,155.000
CONCRETE PAINT FINISH
SF 62,515.000 $1.500 $0.650 $1.000 $1.000 $0.720
EPOXY WATERPROOF FINISH (TY X)
SF 21,445.000 $10.500 $6.500 $11.000 $9.400 $8.800
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 2,869.000 $180.000 $40.000 $325.000 $100.000 $85.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 958.000 $235.000 $95.000 $325.000 $100.000 $180.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 4,287.000 $230.000 $95.000 $235.000 $100.000 $224.400
PNEUMATICALLY PLACED CONC (REPAIR)
CF 120.000 $225.000 $120.000 $225.000 $150.000 $313.500
RIPRAP (CONC)(4 IN)
CY 383.000 $800.000 $515.000 $700.000 $650.000 $383.900
RIPRAP (CONC)(5 IN)
CY 37.000 $800.000 $760.000 $750.000 $825.000 $812.900
CLEANING AND SEALING EXIST JOINTS (CL5)
LF 122.000 $50.000 $30.000 $75.000 $45.000 $20.900
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
LF 1,012.000 $50.000 $30.000 $85.000 $45.000 $97.900
MULTI-LAYER POLYMER OVERLAY
SY 3,308.000 $56.000 $55.000 $65.000 $50.000 $56.000
CL CO CONC OVRLY(STL FBR REIN)(2.5 IN)
SY 2,605.000 $130.000 $125.000 $125.000 $160.000 $130.000
CL CO CONC OVRLY(STL FBR REIN)(3 IN)
SY 6,983.000 $135.000 $130.000 $130.000 $170.000 $135.000
CL CO CONC OVRLY(STL FBR REIN)(3.5 IN)
SY 1,430.000 $145.000 $135.000 $135.000 $175.000 $150.000
STR STEEL (PEDESTAL)
LB 3,560.000 $7.000 $15.000 $15.000 $40.000 $18.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $44,000.000 $190,000.000 $280,000.000 $250,000.000 $268,794.900
CLEAN AND PAINT EXIST STR (REF NO. 3)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
CLEAN AND PAINT EXIST STR (REF NO. 4)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
CLEAN AND PAINT EXIST STR (REF NO. 5)
EA 1.000 $30,000.000 $190,000.000 $235,000.000 $250,000.000 $222,459.600
CLEAN AND PAINT EXIST STR (REF NO. 6)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
CLEAN AND PAINT EXIST STR (REF NO. 7)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
CLEAN AND PAINT EXIST STR (REF NO. 8)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
CLEAN AND PAINT EXIST STR (REF NO. 9)
EA 1.000 $30,000.000 $190,000.000 $265,000.000 $250,000.000 $243,150.600
RAIL (TY T551)
LF 618.000 $200.000 $90.000 $140.000 $145.000 $153.450
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 656.000 $250.000 $220.000 $350.000 $185.000 $330.000
GABION MATTRESSES (GALV)(6 IN)
SY 106.000 $120.000 $100.000 $350.000 $150.000 $429.000
GABIONS (3' X 3')(GALV)
CY 6.000 $450.000 $600.000 $500.000 $1,500.000 $880.000
GRATE
EA 9.000 $3,500.000 $3,275.000 $2,500.000 $2,150.000 $1,000.000
PIPE (PVC) (SCH 40) (12 IN)
LF 33.000 $150.000 $235.000 $100.000 $200.000 $50.000
HYDRO-DEMOLITION (1/2 IN)
SY 11,018.000 $90.000 $105.000 $85.000 $70.000 $118.000
SHOT BLASTING
SY 3,308.000 $9.000 $4.500 $8.000 $2.000 $9.500
SUPPORT EXIST STRUCT
LS 1.000 $180,000.000 $125,000.000 $200,000.000 $60,000.000 $450,000.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $550,000.000 $2,650,000.000 $100,000.000 $1,650,000.000 $860,000.000
ADJUST STL SHOES
EA 1.000 $11,000.000 $10,000.000 $20,000.000 $11,000.000 $14,500.000
MOBILIZATION
LS 1.000 $1,400,000.000 $1,690,000.000 $1,555,000.000 $1,850,000.000 $2,185,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 39.000 $40,000.000 $50,000.000 $7,500.000 $35,000.000 $12,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $13,030.000 $24,000.000 $7,500.000 $18,500.000 $21,000.000
TMA (STATIONARY)
DAY 380.000 $360.000 $350.000 $50.000 $580.000 $325.000
TMA (MOBILE OPERATION)
HR 416.000 $98.000 $60.000 $325.000 $70.000 $50.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,705.000 $7.750 $3.250 $8.000 $5.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,705.000 $2.750 $1.000 $3.000 $1.000 $6.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 2,340.000 $40.000 $51.000 $29.000 $15.000 $16.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 8,130.000 $25.000 $10.000 $25.000 $15.000 $13.200
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 2,340.000 $40.000 $10.000 $29.000 $15.000 $16.500
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,680.000 $160.000 $120.000 $185.000 $150.000 $160.270
PERM CTB (F-SHAPE) (TY 1)
LF 976.000 $145.000 $75.000 $175.000 $130.000 $138.580
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $8.000 $4.000 $5.000 $5.000 $3.300
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $500.000 $400.000 $300.000 $125.000 $550.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 4.000 $5,000.000 $6,200.000 $10,000.000 $6,200.000 $550.000
CABLE BARRIER (REMOVE)
LF 450.000 $8.000 $11.000 $25.000 $11.000 $11.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 4.000 $600.000 $1,500.000 $2,500.000 $1,500.000 $5,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $400.000 $300.000 $125.000 $2,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $2,500.000 $1,500.000 $2,900.000 $1,200.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,980.000 $1,120.000 $1,300.000 $1,200.000 $1,650.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $30,000.000 $30,000.000 $42,000.000 $32,000.000 $46,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $10,000.000 $7,200.000 $13,000.000 $7,500.000 $9,900.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 210.000 $55.000 $48.690 $250.000 $100.000 $50.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 66,705.000 $1.000 $1.100 $1.500 $1.100 $1.210
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 35,630.000 $1.000 $1.100 $1.500 $1.100 $1.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 90.000 $2.250 $2.250 $0.100 $1.500 $10.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 85.000 $2.500 $2.330 $0.100 $1.500 $10.000
RE PM TY III (W)(6")(SLD)
LF 7,188.000 $2.000 $5.000 $6.500 $5.000 $5.500
RE PM TY III (W)(6")(BRK)
LF 1,820.000 $2.000 $5.000 $6.500 $5.000 $5.500
RE PM TY III (Y)(6")(SLD)
LF 7,188.000 $2.000 $5.000 $6.500 $5.000 $5.500
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 6,020.000 $1.000 $2.100 $2.650 $2.100 $2.310
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 9,890.000 $1.000 $2.100 $2.650 $2.100 $2.310
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 9,900.000 $1.000 $2.100 $2.650 $2.100 $2.310
PAVEMENT SLER 6"
LF 25,810.000 $0.250 $1.000 $1.200 $1.000 $1.100
PREFAB PM TY B (W)(24")(SLD)
LF 48.000 $50.000 $45.000 $60.000 $45.000 $49.500
REFL PAV MRKR TY I-C
EA 6.000 $7.500 $15.000 $20.000 $15.000 $16.500
REFL PAV MRKR TY II-A-A
EA 12.000 $7.500 $15.000 $20.000 $15.000 $16.500
REFL PAV MRKR TY II-C-R
EA 584.000 $7.500 $15.000 $20.000 $15.000 $16.500
ELIM EXT PM & MRKS (4")
LF 59,375.000 $1.000 $1.500 $1.900 $1.500 $1.650
ELIM EXT PM & MRKS (8")
LF 1,115.000 $1.750 $1.750 $2.200 $1.750 $1.930
PAV SURF PREP FOR MRK (6")
LF 42,006.000 $0.100 $1.100 $1.400 $1.100 $1.210
CRACK CLEANING AND SEALING (JCP)
LF 8,313.000 $20.000 $8.000 $15.000 $10.000 $12.050
DEBRIS REMOVAL (SPOT DEBRIS)
MI 1.000 $2,000.000 $2,500.000 $5,000.000 $15,000.000 $5,000.000
DRAIN INLET CLEANING
EA 20.000 $200.000 $650.000 $1,200.000 $500.000 $742.500
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 93.000 $500.000 $650.000 $200.000 $700.000 $2,000.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 1.000 $5,000.000 $7,500.000 $3,500.000 $8,000.000 $9,500.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 13.000 $5,500.000 $2,250.000 $5,000.000 $5,000.000 $900.000
BRIDGE JOINT REPAIR (HEADER)
LF 130.000 $450.000 $100.000 $120.000 $550.000 $350.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 953.000 $500.000 $465.000 $500.000 $550.000 $1,125.000
CARBON FIBER REINF POLYMER PROTECTION
SF 2,920.000 $95.000 $70.000 $80.000 $60.000 $42.900
REPLACING ELASTOMERIC BEARING PADS
EA 48.000 $4,000.000 $2,500.000 $3,000.000 $5,000.000 $6,200.000
STEEL BRIDGE ZONE PAINTING
SF 5,546.000 $57.000 $55.000 $30.000 $30.000 $27.500
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
LF 6,860.000 $12.000 $11.000 $13.000 $11.000 $12.100
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 3,580.000 $13.000 $15.000 $18.000 $15.000 $16.500
PREFB PV MK W/WNTY TY B (Y)(6")(BRK)
LF 100.000 $13.000 $11.000 $14.000 $11.000 $12.100
PREFB PV MK W/WNTY TY B (Y)(6")(SLD)
LF 7,220.000 $12.000 $11.000 $14.000 $11.000 $12.100
BENT CAP/ABUTMENT CAP CLEANING
EA 16.000 $1,500.000 $1,000.000 $500.000 $2,500.000 $874.500
Totals: $16,734,929.850 $17,113,098.100 $17,843,434.400 $18,559,789.350 $18,667,033.320
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
Total: $101,000.00