NOLAN SH 70 (0264-01-046)

Items: 80

County: NOLAN
Length: 0.0000 MILES
Highway: SH 70
District: ABILENE
Control Number: 0264-01-046
DBE Goal: 6.0%
Project: BR 2025(073)
Guaranty: $100,000.00
Time: 327 WORKING DAYS
Engineer's Estimate: $7,296,761.78
Date: 10/02/2024 (1 year ago)
Contract Number: 10243215
Type: BRIDGE REPLACEMENT
Project ID: A00194067
Project Description: REPLACE BRIDGE
Mail/Deliver Bids To: N/A
RYAN SAYLES
JEREMY ARREGUIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$7,296,761.78
$7,087,905.47
Over/Under Est: -2.86% -$208,856.31
Over/Under Est: 7.88% $574,832.12
Amt Left: 11.06% $783,688.43
$7,871,856.11
Over/Under Est: 7.88% $575,094.33
Amt Left: 11.06% $783,950.64
Delta: 0.00% -$262.21
$9,641,390.61
Over/Under Est: 32.13% $2,344,628.83
Amt Left: 36.03% $2,553,485.14
Delta: -22.48% -$1,769,534.50
Over/Under Est: 53.02% $3,868,914.22
Amt Left: 57.53% $4,077,770.53
Delta: -15.81% -$1,524,285.39
Subcontractor Percentage Amount
TEXAS SHAFTS, INC. 11.24% $796,680.57
BLACKSMITH VENTURES LLC 4.55% $322,499.70
JB PINNACLE GROUP, LLC 4.14% $293,439.29
TRAFFIC HIGHWAY MAINTENANCE, LLC 2.46% $174,362.47
DUSTIN ALLEN, INC. 2.44% $172,944.89
LINDAMOOD, INC. 2.35% $166,565.78
TORO BRAVO CONSTRUCTION, LLC 0.98% $69,461.47
TEXAS CLEAR CUT LLC 0.85% $60,247.20
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.44% $31,186.78
PENHALL COMPANY 0.13% $9,214.28
ASHTON SAWING AND DRILLING LLC 0.10% $7,087.91
Total: 29.68% $2,103,690.34

Bid Items & Bid Tabulations

80 Total 0 of 80
NOLAN  |  SH 70  |  ABILENE  |  0264-01-046  |  10/02/2024  |  $7,296,761.78  |  BR 2025(073)  |  BRIDGE REPL  |  327 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
C. E. BARKER, LTD.
COPPELL CONSTRUCTION CO., INC.
ALTUS CONSTRUCTION LLC
REECE ALBERT, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 2.000 $6,302.170 $200,000.000 $35,000.000 $391,639.510 $14,542.700 $50,000.000
REMOV CONC (RIPRAP)
SY 300.000 $77.000 $33.620 $31.000 $23.130 $67.210 $30.000
REMOV CONC (FLUME)
SY 35.000 $140.000 $33.620 $100.000 $22.140 $97.970 $30.000
EXCAV (ROADWAY)
CY 4,685.000 $30.000 $26.110 $46.000 $19.840 $44.270 $40.000
EMBANK (FNL)(DC)(TY B)
CY 5,199.000 $55.000 $26.110 $31.000 $16.840 $34.580 $45.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 6,662.000 $1.530 $2.370 $1.250 $1.120 $1.070 $1.500
HYDRO MULCH SEED (TEMP_WARM)
SY 3,331.000 $0.410 $2.370 $1.200 $1.120 $1.070 $1.000
HYDRO MULCH SEED (TEMP_COOL)
SY 3,331.000 $0.380 $2.370 $1.200 $1.120 $1.070 $1.000
VEGETATIVE WATERING
TGL 60.000 $100.000 $27.690 $30.000 $1.180 $177.610 $1.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 7,169.000 $25.190 $18.990 $29.000 $17.000 $30.470 $50.000
GEOGRID BASE REINFORCEMENT (TYPE 1)
SY 434.000 $6.750 $4.450 $60.000 $9.350 $12.060 $5.000
PRIME COAT (MC-30)
GAL 1,434.000 $8.350 $8.310 $11.500 $6.200 $13.300 $15.000
SP MIXES SP-C PG70-22
TON 1,577.000 $200.000 $231.420 $155.000 $263.120 $227.430 $275.000
TACK COAT
GAL 717.000 $5.850 $8.310 $15.500 $5.320 $4.720 $10.000
CEM STABIL BKFL
CY 302.000 $314.100 $178.010 $350.000 $200.910 $476.150 $300.000
TEMPORARY SPL SHORING
SF 150.000 $46.000 $4.150 $350.000 $65.530 $735.840 $300.000
DRILL SHAFT (30 IN)
LF 555.000 $355.000 $409.960 $300.000 $404.410 $506.360 $350.000
DRILL SHAFT (36 IN)
LF 1,993.000 $387.000 $457.000 $450.000 $485.990 $557.230 $380.000
CL C CONC (ABUT)(HPC)
CY 130.800 $2,500.000 $1,875.500 $1,510.000 $1,271.500 $2,441.670 $2,500.000
CL C CONC (CAP)(HPC)
CY 128.300 $2,500.000 $1,820.020 $1,250.000 $2,055.030 $3,005.490 $2,600.000
CL C CONC (COLUMN)(HPC)
CY 73.700 $2,500.000 $1,842.590 $1,800.000 $1,544.600 $2,959.160 $2,800.000
REINF CONC SLAB (HPC)
SF 23,034.000 $40.000 $28.960 $31.750 $41.870 $41.730 $50.000
APPROACH SLAB (HPC)
CY 174.900 $864.000 $875.820 $875.000 $883.790 $1,547.100 $2,000.000
RETAINING WALL (DRILL SHAFT) (FASCIA)
SF 1,307.000 $63.670 $34.810 $105.000 $95.330 $185.540 $200.000
PRESTR CONC GIRDER (TX28)
LF 2,880.500 $248.500 $231.390 $250.000 $232.520 $300.450 $390.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 322.000 $7.500 $41.540 $35.000 $41.360 $78.980 $8.000
RIPRAP (CONC)(4 IN)
CY 56.000 $800.000 $519.200 $815.000 $578.170 $1,687.430 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 64.000 $705.000 $519.200 $750.000 $557.960 $930.170 $800.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,439.000 $205.000 $112.490 $225.000 $156.270 $442.980 $250.000
RAIL (TY SSTR)(HPC)
LF 914.000 $100.000 $169.710 $180.000 $140.980 $204.000 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 276.000 $245.780 $290.750 $350.000 $189.650 $404.370 $250.000
RC PIPE (CL III)(24 IN)
LF 50.000 $135.000 $142.410 $200.000 $136.520 $161.720 $130.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $5,000.000 $2,076.810 $4,500.000 $1,803.900 $3,502.220 $3,000.000
REMOV STR (PIPE)
LF 55.000 $800.000 $41.540 $80.000 $15.950 $42.520 $80.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $73,000.000 $61,847.480 $160,000.000 $61,589.350 $137,293.980 $600,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $335,000.000 $135,526.850 $550,000.000 $134,961.220 $205,295.770 $850,000.000
MOBILIZATION
LS 1.000 $458,713.390 $750,000.000 $750,000.000 $779,342.930 $750,929.310 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $15,000.000 $5,844.740 $20,000.000 $16,249.710 $27,031.460 $21,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,618.350 $36,640.910 $25,000.000 $11,817.970 $6,965.620 $50,000.000
TMA (MOBILE OPERATION)
DAY 12.000 $450.000 $593.380 $350.000 $236.360 $893.040 $400.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,565.000 $5.500 $6.230 $3.000 $3.550 $4.260 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,565.000 $2.250 $1.190 $1.000 $1.180 $1.420 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 786.000 $5.000 $7.420 $3.500 $5.280 $4.740 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 786.000 $2.360 $1.480 $1.000 $1.330 $1.420 $1.000
CONSTRUCTING DETOURS
SY 540.000 $50.000 $178.010 $155.000 $101.290 $103.640 $350.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 9.000 $9,000.000 $6,790.850 $12,500.000 $13,791.570 $2,761.320 $16,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,950.000 $75.000 $97.310 $83.000 $80.440 $101.560 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 420.000 $62.820 $91.380 $96.000 $86.270 $15.450 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $67.890 $90.190 $157.000 $99.270 $64.900 $90.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,420.000 $20.000 $8.310 $12.000 $8.860 $13.600 $30.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 200.000 $9.550 $8.310 $32.000 $7.090 $32.060 $30.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $16.850 $8.310 $65.000 $8.330 $32.060 $30.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,950.000 $22.000 $20.170 $10.000 $15.470 $17.680 $80.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 420.000 $17.250 $20.170 $22.000 $11.520 $20.520 $80.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $25.000 $20.170 $70.000 $14.180 $43.930 $80.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 2,066.000 $0.650 $5.140 $4.000 $1.180 $2.490 $10.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 1,062.000 $1.360 $5.140 $4.000 $1.180 $2.490 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $29.560 $32.040 $23.000 $23.800 $83.150 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,746.470 $2,729.530 $1,600.000 $319.900 $4,054.400 $1,800.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $36,500.000 $35,602.500 $22,650.000 $19,499.650 $47,786.580 $25,000.000
REMOVE METAL BEAM GUARD FENCE
LF 962.500 $8.000 $8.310 $7.000 $2.650 $14.200 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $235.000 $474.700 $400.000 $185.540 $1,065.080 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,615.920 $3,797.600 $3,000.000 $2,969.270 $6,908.820 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $300.000 $474.700 $400.000 $227.900 $1,065.080 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $3,850.000 $2,966.880 $2,500.000 $1,299.980 $1,162.370 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,750.000 $1,186.750 $1,000.000 $856.800 $928.060 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,850.000 $10,384.060 $8,750.000 $13,082.490 $9,896.030 $10,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $700.000 $379.760 $320.000 $378.180 $830.770 $4,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $898.480 $949.400 $800.000 $945.440 $1,753.830 $2,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $680.000 $1,145.210 $965.000 $1,140.430 $1,753.830 $3,000.000
REMOVE SM RD SN SUP&AM
EA 2.000 $165.000 $160.210 $135.000 $159.540 $230.590 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 14.000 $50.000 $14.830 $45.000 $14.770 $26.040 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $51.000 $32.640 $45.000 $32.500 $33.140 $50.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 10,912.000 $0.900 $1.780 $1.500 $1.770 $2.130 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $10.550 $29.670 $25.000 $29.540 $35.500 $25.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 43,182.000 $0.750 $1.780 $1.500 $1.770 $2.130 $2.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,114.000 $1.000 $5.930 $5.000 $5.910 $7.100 $4.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,114.000 $1.000 $5.930 $5.000 $5.910 $7.100 $4.000
REFL PAV MRKR TY II-A-A
EA 39.000 $13.000 $11.870 $10.000 $11.820 $14.200 $20.000
ELIM EXT PM & MRKS (4")
LF 12,194.000 $1.050 $2.670 $2.500 $2.950 $3.200 $2.000
Totals: $7,296,761.780 $7,087,905.497 $7,871,593.900 $7,871,856.125 $9,641,390.630 $11,165,676.000