PREPARING ROW
|
STA
|
28.000
|
$7,017.000
|
$8,500.000
|
$49,122.520
|
$10,000.000
|
$10,000.000
|
$26,785.000
|
$6,075.000
|
$57,500.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
3,308.000
|
$19.010
|
$10.000
|
$14.260
|
$20.000
|
$24.750
|
$13.000
|
$14.000
|
$11.300
|
|
|
EXCAV (ROADWAY)
|
CY
|
14,473.000
|
$21.110
|
$8.000
|
$12.990
|
$25.000
|
$32.500
|
$19.000
|
$28.000
|
$18.540
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,020.000
|
$97.530
|
$8.000
|
$15.330
|
$30.000
|
$37.250
|
$17.000
|
$10.500
|
$18.600
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
14,420.000
|
$22.540
|
$26.000
|
$8.160
|
$45.000
|
$49.500
|
$23.000
|
$38.400
|
$18.700
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
53,549.000
|
$2.050
|
$2.500
|
$5.120
|
$4.250
|
$3.500
|
$2.290
|
$1.710
|
$1.710
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
53,549.000
|
$0.310
|
$0.250
|
$0.300
|
$0.400
|
$0.250
|
$0.280
|
$0.280
|
$0.280
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
53,549.000
|
$0.200
|
$0.250
|
$0.190
|
$0.300
|
$0.250
|
$0.180
|
$0.180
|
$0.180
|
|
|
VEGETATIVE WATERING
|
TGL
|
837.000
|
$30.100
|
$40.000
|
$1.060
|
$40.000
|
$78.250
|
$20.000
|
$22.200
|
$37.870
|
|
|
SOIL RET BLKT(CHAN_PERM_4 PSF)
|
SY
|
1,547.000
|
$5.000
|
$7.000
|
$8.020
|
$10.000
|
$9.500
|
$8.000
|
$8.350
|
$8.350
|
|
|
PROOF ROLLING
|
HR
|
2.000
|
$107.850
|
$100.000
|
$5,276.350
|
$110.000
|
$147.250
|
$367.000
|
$72.000
|
$122.050
|
|
|
CEMENT
|
TON
|
41.000
|
$243.100
|
$250.000
|
$209.730
|
$300.000
|
$271.250
|
$281.000
|
$330.000
|
$294.260
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
8,186.000
|
$2.220
|
$5.000
|
$5.280
|
$7.500
|
$6.000
|
$8.000
|
$3.600
|
$7.540
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
15,154.000
|
$117.830
|
$88.000
|
$90.420
|
$95.000
|
$95.500
|
$90.000
|
$93.100
|
$83.000
|
|
|
D-GR HMA TY-C PG70-22 (LEVEL-UP)
|
TON
|
115.000
|
$100.000
|
$125.000
|
$159.500
|
$250.000
|
$134.750
|
$148.000
|
$104.300
|
$141.000
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
4,080.000
|
$129.690
|
$95.000
|
$111.410
|
$125.000
|
$120.500
|
$105.000
|
$107.600
|
$97.000
|
|
|
TACK COAT
|
GAL
|
7,514.000
|
$7.720
|
$5.000
|
$3.960
|
$5.000
|
$5.000
|
$3.000
|
$3.320
|
$3.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
5,886.000
|
$129.690
|
$113.950
|
$109.750
|
$115.000
|
$136.750
|
$110.000
|
$120.800
|
$102.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,052.000
|
$95.790
|
$80.620
|
$77.230
|
$85.000
|
$54.750
|
$102.000
|
$60.290
|
$63.500
|
|
|
PLANE & TEXT ASPH CONC PAV(2")
|
SY
|
26,659.000
|
$3.620
|
$2.100
|
$2.650
|
$2.250
|
$2.750
|
$1.340
|
$1.320
|
$1.080
|
|
|
CEM STABIL BKFL
|
CY
|
279.000
|
$206.420
|
$150.000
|
$120.100
|
$245.000
|
$228.000
|
$262.000
|
$170.000
|
$182.070
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
410.000
|
$47.810
|
$10.000
|
$7.910
|
$10.000
|
$13.000
|
$2.900
|
$5.000
|
$5.670
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,889.000
|
$45.490
|
$25.000
|
$61.640
|
$85.000
|
$60.250
|
$124.000
|
$65.000
|
$42.330
|
|
|
DRILL SHAFT (12 IN)
|
LF
|
7.000
|
$95.720
|
$280.000
|
$242.710
|
$250.000
|
$265.250
|
$260.000
|
$230.000
|
$230.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
180.000
|
$162.060
|
$225.000
|
$189.950
|
$250.000
|
$93.250
|
$157.000
|
$269.290
|
$63.280
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,188.000
|
$321.120
|
$325.000
|
$261.940
|
$320.000
|
$317.750
|
$334.000
|
$341.770
|
$235.210
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,400.000
|
$452.580
|
$400.000
|
$361.740
|
$400.000
|
$416.000
|
$437.000
|
$444.470
|
$324.680
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
40.000
|
$331.050
|
$296.000
|
$474.870
|
$500.000
|
$519.500
|
$459.000
|
$450.000
|
$450.000
|
|
|
CL C CONC (ABUT)
|
CY
|
126.600
|
$1,448.780
|
$1,325.000
|
$1,158.710
|
$1,500.000
|
$1,524.750
|
$1,832.000
|
$1,700.000
|
$1,184.830
|
|
|
CL C CONC (CAP)
|
CY
|
192.300
|
$1,935.630
|
$1,075.000
|
$1,420.600
|
$1,500.000
|
$1,694.500
|
$1,942.000
|
$1,500.000
|
$1,148.600
|
|
|
CL C CONC (COLUMN)
|
CY
|
102.900
|
$1,665.620
|
$782.600
|
$969.140
|
$1,200.000
|
$1,546.750
|
$2,337.000
|
$1,050.000
|
$1,396.120
|
|
|
REINF CONC SLAB
|
SF
|
43,201.000
|
$27.990
|
$20.000
|
$23.090
|
$25.000
|
$30.250
|
$30.000
|
$40.000
|
$32.500
|
|
|
APPROACH SLAB
|
CY
|
172.000
|
$825.980
|
$750.000
|
$568.590
|
$500.000
|
$771.500
|
$882.000
|
$700.000
|
$718.980
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
5,572.000
|
$201.730
|
$185.000
|
$182.780
|
$200.000
|
$229.000
|
$245.000
|
$190.000
|
$214.950
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
55.000
|
$514.330
|
$425.000
|
$554.020
|
$700.000
|
$780.000
|
$1,054.000
|
$720.960
|
$731.660
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
426.000
|
$607.770
|
$425.000
|
$240.680
|
$550.000
|
$575.750
|
$531.000
|
$553.470
|
$529.070
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
58.000
|
$651.900
|
$425.000
|
$498.220
|
$750.000
|
$606.000
|
$1,341.000
|
$582.310
|
$726.250
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
99.000
|
$192.810
|
$165.000
|
$179.910
|
$200.000
|
$161.250
|
$501.000
|
$404.840
|
$170.400
|
|
|
RAIL (TY SSTR)
|
LF
|
864.000
|
$62.010
|
$115.000
|
$68.310
|
$120.000
|
$75.750
|
$77.000
|
$92.270
|
$183.900
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
323.000
|
$185.830
|
$225.000
|
$178.550
|
$225.000
|
$286.250
|
$259.000
|
$250.000
|
$206.600
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,229.000
|
$141.450
|
$84.000
|
$90.030
|
$120.000
|
$80.500
|
$111.000
|
$95.000
|
$89.430
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$7,354.280
|
$12,500.000
|
$10,038.790
|
$15,000.000
|
$4,639.250
|
$11,533.190
|
$10,500.000
|
$11,996.940
|
|
|
REMOV STR (PIPE)
|
LF
|
819.000
|
$99.030
|
$10.000
|
$17.410
|
$40.000
|
$14.000
|
$7.000
|
$8.000
|
$17.910
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$55,321.000
|
$135,000.000
|
$79,145.270
|
$200,000.000
|
$84,000.000
|
$105,500.000
|
$81,000.920
|
$703,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,327,930.340
|
$950,000.000
|
$1,368,518.930
|
$994,128.500
|
$650,000.000
|
$827,490.710
|
$1,407,059.090
|
$1,600,229.240
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$7,729.000
|
$4,000.000
|
$19,786.320
|
$10,000.000
|
$5,642.750
|
$14,923.000
|
$2,830.260
|
$6,659.290
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,165.040
|
$15,000.000
|
$8,681.440
|
$5,000.000
|
$24,900.000
|
$20,793.390
|
$10,129.330
|
$20,451.810
|
|
|
TMA (STATIONARY)
|
DAY
|
34.000
|
$466.800
|
$300.000
|
$237.440
|
$500.000
|
$415.000
|
$450.000
|
$506.470
|
$456.600
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
43.000
|
$709.260
|
$300.000
|
$237.440
|
$800.000
|
$716.250
|
$1,725.000
|
$1,012.930
|
$113.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
650.000
|
$36.310
|
$35.000
|
$31.760
|
$40.000
|
$44.000
|
$38.000
|
$38.150
|
$38.150
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
60.000
|
$104.110
|
$110.000
|
$55.400
|
$110.000
|
$124.500
|
$108.000
|
$107.800
|
$107.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
710.000
|
$14.370
|
$7.000
|
$9.500
|
$10.000
|
$9.250
|
$8.000
|
$8.160
|
$8.160
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
830.000
|
$26.440
|
$18.000
|
$24.690
|
$20.000
|
$23.000
|
$20.000
|
$19.850
|
$19.850
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
830.000
|
$8.220
|
$7.000
|
$7.910
|
$8.000
|
$7.500
|
$7.000
|
$6.510
|
$6.510
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,511.000
|
$3.410
|
$3.000
|
$8.580
|
$3.500
|
$4.000
|
$4.000
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,511.000
|
$1.080
|
$1.500
|
$1.220
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
210.000
|
$9.370
|
$3.500
|
$13.210
|
$4.500
|
$5.250
|
$5.000
|
$4.500
|
$4.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
210.000
|
$1.680
|
$1.000
|
$5.240
|
$1.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,871.000
|
$64.190
|
$85.000
|
$67.970
|
$75.000
|
$86.500
|
$83.000
|
$69.880
|
$74.210
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
10,710.000
|
$38.050
|
$63.000
|
$36.820
|
$30.000
|
$26.750
|
$38.000
|
$45.000
|
$54.070
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
19,440.000
|
$13.630
|
$4.000
|
$8.710
|
$10.000
|
$7.000
|
$6.000
|
$16.000
|
$1.910
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
390.000
|
$13.630
|
$8.000
|
$10.570
|
$15.000
|
$13.250
|
$26.000
|
$25.000
|
$13.740
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
10,800.000
|
$18.110
|
$8.000
|
$11.870
|
$12.000
|
$15.250
|
$9.000
|
$15.000
|
$9.580
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,065.000
|
$81.810
|
$135.000
|
$101.280
|
$90.000
|
$108.000
|
$106.000
|
$111.500
|
$84.430
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (42 )
|
LF
|
40.000
|
$151.450
|
$300.000
|
$142.460
|
$220.000
|
$302.750
|
$913.000
|
$442.140
|
$235.810
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
19,784.000
|
$0.190
|
$0.300
|
$0.300
|
$0.550
|
$0.250
|
$0.450
|
$0.130
|
$0.130
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$25.200
|
$28.690
|
$21.250
|
$35.000
|
$34.250
|
$25.000
|
$28.520
|
$24.900
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,165.980
|
$2,320.740
|
$1,802.930
|
$3,000.000
|
$2,941.750
|
$2,045.000
|
$2,840.330
|
$2,045.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,599.350
|
$1,534.300
|
$1,187.180
|
$2,500.000
|
$1,673.500
|
$1,165.000
|
$1,524.950
|
$1,165.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,170.370
|
$839.800
|
$819.150
|
$1,000.000
|
$981.250
|
$1,260.000
|
$834.680
|
$1,260.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$3.480
|
$6.450
|
$2.370
|
$5.000
|
$5.250
|
$2.000
|
$6.410
|
$2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$297.350
|
$261.480
|
$159.870
|
$350.000
|
$230.750
|
$210.000
|
$259.890
|
$210.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$296.520
|
$417.160
|
$197.860
|
$350.000
|
$230.750
|
$235.000
|
$414.620
|
$235.000
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
|
LF
|
1,916.000
|
$12.800
|
$20.000
|
$11.080
|
$25.000
|
$25.000
|
$22.000
|
$32.050
|
$21.600
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
4.000
|
$3,117.500
|
$1,500.000
|
$2,770.080
|
$3,600.000
|
$4,039.250
|
$3,500.000
|
$6,944.890
|
$3,500.000
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
2,898.000
|
$3.500
|
$5.000
|
$3.760
|
$5.000
|
$3.250
|
$2.850
|
$7.750
|
$2.850
|
|
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$652.950
|
$500.000
|
$617.500
|
$535.000
|
$1,427.670
|
$535.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,096.800
|
$4,041.970
|
$2,613.380
|
$3,800.000
|
$3,693.250
|
$2,860.000
|
$4,017.330
|
$2,860.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$246.790
|
$561.790
|
$235.850
|
$500.000
|
$230.750
|
$325.000
|
$558.400
|
$325.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$767.280
|
$1,500.000
|
$1,341.541
|
$2,000.000
|
$1,469.250
|
$2,770.000
|
$4,345.430
|
$2,770.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$673.490
|
$800.000
|
$791.450
|
$1,500.000
|
$924.500
|
$1,200.000
|
$1,282.130
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
5.000
|
$26,171.280
|
$28,000.000
|
$12,061.740
|
$28,000.000
|
$34,384.250
|
$27,250.000
|
$37,250.740
|
$27,250.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
800.000
|
$20.500
|
$5.000
|
$7.910
|
$8.000
|
$9.000
|
$8.000
|
$8.550
|
$8.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
737.000
|
$20.500
|
$25.000
|
$17.860
|
$30.000
|
$23.000
|
$20.000
|
$21.100
|
$19.750
|
|
|
GATE (TY 1)
|
EA
|
4.000
|
$1,862.600
|
$2,500.000
|
$1,622.480
|
$2,000.000
|
$836.750
|
$725.000
|
$774.620
|
$725.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$2,500.000
|
$3,466.870
|
$3,397.970
|
$5,600.000
|
$3,716.250
|
$3,220.000
|
$3,220.000
|
$3,220.000
|
|
|
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
|
EA
|
4.000
|
$7,925.000
|
$8,277.500
|
$9,180.850
|
$10,000.000
|
$10,041.000
|
$8,700.000
|
$8,700.000
|
$8,700.000
|
|
|
TEMP RD IL SETUP AND REMOVE
|
EA
|
7.000
|
$6,567.380
|
$6,369.370
|
$10,447.180
|
$5,200.000
|
$11,426.000
|
$9,900.000
|
$9,900.000
|
$9,900.000
|
|
|
TEMP RD IL MAINTAIN SYSTEM
|
MO
|
15.000
|
$432.940
|
$5,509.370
|
$780.900
|
$3,200.000
|
$854.000
|
$740.000
|
$740.000
|
$740.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,235.000
|
$35.030
|
$16.120
|
$16.880
|
$18.000
|
$18.500
|
$16.000
|
$16.000
|
$16.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,984.000
|
$1.640
|
$1.500
|
$2.370
|
$2.500
|
$2.750
|
$2.250
|
$2.250
|
$2.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,968.000
|
$1.660
|
$1.880
|
$2.370
|
$3.000
|
$2.750
|
$2.250
|
$2.250
|
$2.250
|
|
|
ELC SRV TY A 240/480 100(NS)AL(T)EX(O)
|
EA
|
1.000
|
$800.000
|
$5,912.500
|
$7,386.890
|
$6,500.000
|
$8,079.000
|
$7,000.000
|
$7,000.000
|
$7,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
110.000
|
$36.400
|
$30.100
|
$60.150
|
$57.000
|
$65.750
|
$30.000
|
$31.670
|
$57.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$836.120
|
$430.000
|
$743.970
|
$705.000
|
$761.750
|
$660.000
|
$696.720
|
$705.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,363.930
|
$430.000
|
$991.950
|
$940.000
|
$1,027.250
|
$890.000
|
$939.520
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$1,145.460
|
$860.000
|
$949.740
|
$900.000
|
$1,263.750
|
$1,095.000
|
$1,155.920
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$99.710
|
$107.500
|
$121.360
|
$115.000
|
$98.000
|
$198.000
|
$89.730
|
$115.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
293.900
|
$8.080
|
$10.210
|
$11.610
|
$45.000
|
$12.750
|
$8.000
|
$11.000
|
$11.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$827.030
|
$725.620
|
$886.430
|
$1,100.000
|
$969.500
|
$680.000
|
$840.000
|
$840.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
18.000
|
$21.250
|
$32.250
|
$14.250
|
$15.000
|
$25.750
|
$23.000
|
$23.750
|
$13.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$35.740
|
$32.250
|
$20.580
|
$20.000
|
$31.750
|
$28.000
|
$29.030
|
$19.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
26.000
|
$10.000
|
$134.370
|
$26.380
|
$25.000
|
$17.250
|
$15.000
|
$15.830
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
270.000
|
$1.480
|
$4.300
|
$1.740
|
$4.000
|
$11.500
|
$2.000
|
$4.380
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
5,630.000
|
$1.560
|
$1.340
|
$1.390
|
$1.250
|
$2.250
|
$0.500
|
$1.370
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
31,296.000
|
$1.560
|
$0.910
|
$1.150
|
$1.000
|
$2.250
|
$0.500
|
$0.930
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
23,638.000
|
$1.560
|
$0.910
|
$1.190
|
$1.000
|
$2.250
|
$0.500
|
$0.930
|
$0.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
962.000
|
$2.870
|
$6.000
|
$1.190
|
$5.000
|
$1.750
|
$10.000
|
$1.630
|
$2.300
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
270.000
|
$0.540
|
$2.680
|
$1.270
|
$2.500
|
$2.250
|
$3.000
|
$2.740
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
641.000
|
$1.110
|
$1.340
|
$0.950
|
$1.000
|
$4.750
|
$1.700
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
370.000
|
$1.090
|
$5.370
|
$3.240
|
$5.000
|
$9.000
|
$2.000
|
$5.480
|
$5.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$619.790
|
$1,881.250
|
$743.970
|
$1,750.000
|
$865.500
|
$2,000.000
|
$1,917.660
|
$1,750.000
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
2,692.000
|
$1.170
|
$0.960
|
$3.170
|
$1.000
|
$4.750
|
$2.000
|
$0.990
|
$0.900
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
11,940.000
|
$1.070
|
$0.910
|
$3.170
|
$1.000
|
$4.750
|
$2.000
|
$0.930
|
$0.850
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
11,883.000
|
$1.070
|
$0.914
|
$3.170
|
$1.000
|
$4.750
|
$2.000
|
$0.930
|
$0.850
|
|
|
PAVEMENT SLER 4"
|
LF
|
270.000
|
$0.540
|
$0.320
|
$0.310
|
$0.500
|
$3.500
|
$2.000
|
$0.330
|
$0.300
|
|
|
PAVEMENT SLER 6"
|
LF
|
26,481.000
|
$0.540
|
$0.320
|
$0.240
|
$0.500
|
$0.750
|
$0.350
|
$0.330
|
$0.300
|
|
|
PAVEMENT SLER 8"
|
LF
|
641.000
|
$1.110
|
$0.430
|
$0.320
|
$0.500
|
$1.000
|
$0.450
|
$0.440
|
$0.400
|
|
|
PAVEMENT SLER 12"
|
LF
|
370.000
|
$1.090
|
$1.610
|
$0.660
|
$1.500
|
$1.000
|
$1.000
|
$1.640
|
$1.500
|
|
|
PAVEMENT SLER (EXIT GORE)
|
EA
|
1.000
|
$619.790
|
$537.500
|
$166.210
|
$500.000
|
$230.750
|
$550.000
|
$547.900
|
$500.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
183.000
|
$7.520
|
$6.980
|
$4.040
|
$6.500
|
$11.500
|
$8.000
|
$7.120
|
$6.500
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
20,403.000
|
$0.990
|
$0.530
|
$0.550
|
$0.500
|
$2.500
|
$0.400
|
$0.550
|
$0.500
|
|
|
ELIM EXT PM & MRKS (EXIT GORE)
|
EA
|
1.000
|
$300.000
|
$1,343.750
|
$308.670
|
$1,250.000
|
$230.750
|
$1,200.000
|
$1,369.760
|
$1,250.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
725.000
|
$7.000
|
$5.375
|
$13.720
|
$15.000
|
$15.000
|
$13.000
|
$13.000
|
$13.000
|
|
|
REMOVAL OF CABLES
|
LF
|
2,175.000
|
$2.000
|
$1.980
|
$0.950
|
$2.000
|
$1.000
|
$0.900
|
$0.900
|
$0.900
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,337.220
|
$2,500.000
|
$2,689.010
|
$2,000.000
|
$3,750.750
|
$3,000.000
|
$4,500.000
|
$6,064.000
|
|
|
LITTER REMOVAL
|
CYC
|
18.000
|
$1,163.260
|
$2,000.000
|
$1,588.100
|
$1,000.000
|
$1,812.000
|
$1,693.000
|
$5,103.950
|
$1,953.860
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
18.000
|
$1,318.000
|
$2,000.000
|
$1,878.350
|
$1,000.000
|
$1,812.000
|
$2,650.000
|
$7,206.300
|
$1,953.860
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
18.000
|
$1,267.500
|
$2,000.000
|
$1,376.930
|
$1,000.000
|
$1,812.000
|
$1,960.000
|
$3,274.480
|
$2,063.880
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
18.000
|
$1,267.500
|
$2,000.000
|
$1,344.500
|
$1,200.000
|
$1,812.000
|
$1,374.000
|
$3,152.480
|
$1,953.860
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.570
|
$9,486.640
|
$15,000.000
|
$1,977.210
|
$35,000.000
|
$3,462.250
|
$76,332.300
|
$2,750.000
|
$19,733.950
|
|
|
UNDERSEAL COURSE
|
GAL
|
10,237.000
|
$18.550
|
$4.300
|
$3.810
|
$4.000
|
$6.250
|
$4.000
|
$3.320
|
$3.850
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$350.000
|
$300.000
|
$395.440
|
$500.000
|
$241.750
|
$500.000
|
$2,505.160
|
$800.000
|
|
Totals: |
$14,708,153.762
|
$12,823,667.136
|
$13,924,761.359
|
$14,399,556.000
|
$14,876,055.482
|
$14,979,000.001
|
$15,018,346.100
|
$16,160,672.998
|