Show Job Controls
Bid Cobra

MCLENNAN FM 2113 (2060-01-037)

Items: 162

County: MCLENNAN
Length: N/A
Highway: FM 2113
District: WACO
Control Number: 2060-01-037
DBE Goal: N/A
Project: F 2021(489)
Guaranty: N/A
Time: 510 WORKING DAYS
Engineer's Estimate: $15,388,382.99
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: WIDEN PAVEMENT AND ADD CURB & GUTTER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$15,388,382.99
$15,387,558.27
Over/Under Est: -0.01% -$824.72
Over/Under Est: 1.4% $214,979.52
Amt Left: 1.4% $215,804.24
Over/Under Est: 3.87% $595,532.95
Amt Left: 3.88% $596,357.67
Delta: -2.44% -$380,553.43
Subcontractor Percentage Amount
KLP COMMERCIAL, L.L.C. 9.38% $1,459,345.22
POTTER TRUCKING 1.91% $297,158.78
CEN TEX HYDROSEED, INC. 1.37% $213,145.30
FLASHER EQUIPMENT COMPANY 0.91% $141,578.27
QMF STEEL, INC. 0.65% $101,127.33
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.41% $63,788.01
WYLIE DRILLING & DRAINAGE, INC. 0.37% $57,564.79
DUSTIN ALLEN, INC. 0.35% $54,453.18
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.30% $46,674.15
TTG UTILITIES, INC. 0.18% $28,004.49
MOBILE ENTERPRISES, INC. 0.09% $14,002.25
HERMANOS STEEL, LLC 0.00% $0.00
Total: 15.92% $2,476,841.77

Bid Items & Bid Tabulations

162 Total 0 of 162
MCLENNAN  |  FM 2113  |  WACO  |  2060-01-037  |  01/07/2022  |  $15,388,382.99  |  F 2021(489)  |  WIDEN PAVMT AND ADD CURB & GUTTER  |  510 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 118.030 $3,244.310 $2,500.000 $2,717.000 $1,600.000
REMOVING CONC (RIPRAP)
SY 1,622.000 $20.950 $8.000 $11.000 $14.000
REMOVING CONC (DRIVEWAYS)
SY 2,762.000 $10.780 $15.000 $16.760 $18.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 5,262.000 $10.280 $5.500 $6.600 $6.000
REMOVING CONCRETE(MOW STRIP)
LF 548.000 $13.860 $7.000 $6.200 $15.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 51,347.000 $8.000 $5.000 $5.000 $6.000
EXCAVATION (ROADWAY)
CY 53,096.000 $11.980 $15.000 $4.500 $12.500
EXCAVATION (CHANNEL)
CY 316.000 $11.120 $20.000 $6.000 $19.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 13,352.000 $14.450 $15.000 $6.000 $12.500
FURNISHING AND PLACING TOPSOIL (4")
SY 56,438.000 $0.540 $1.500 $2.600 $2.000
BLOCK SODDING
SY 15,467.000 $4.640 $5.000 $3.850 $4.200
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 40,971.000 $1.000 $0.160 $0.140 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 42,512.000 $1.000 $0.140 $0.120 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 42,512.000 $1.000 $0.140 $0.120 $0.130
VEGETATIVE WATERING
MG 1,023.000 $32.280 $20.000 $28.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 40,971.000 $2.000 $1.250 $0.850 $1.000
VEGETATION BARRIER
SY 18.000 $2.040 $25.000 $5.000 $50.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 74,031.000 $21.000 $17.000 $16.000 $13.500
LIME TRT (EXST MATL) (12")
SY 78,404.000 $3.060 $5.000 $10.100 $3.700
LIME (HYD, COM, OR QK(SLURRY))
TON 2,116.000 $169.590 $200.000 $180.000 $190.000
PRIME COAT(MC-30 OR AE-P)
GAL 14,800.000 $4.620 $4.000 $4.000 $4.500
ASPH (CRS-2)
GAL 42,671.000 $2.690 $3.000 $2.650 $3.000
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 527.000 $172.350 $125.000 $120.000 $185.000
PLANE ASPH CONC PAV(0" TO 4")
SY 9,157.000 $1.410 $2.500 $1.480 $2.400
CEM STABIL BKFL
CY 2,135.500 $100.000 $125.000 $145.000 $157.000
CUT & RESTORE ASPH PAVING
SY 141.000 $91.090 $70.000 $60.000 $127.000
TRENCH EXCAVATION PROTECTION
LF 11,909.000 $5.280 $5.000 $6.000 $6.500
TEMPORARY SPL SHORING
SF 1,410.000 $28.620 $25.000 $22.000 $30.000
DRILL SHAFT (24 IN)
LF 192.000 $227.350 $250.000 $306.000 $380.000
CL C CONC (ABUT)(EXTEND)
CY 18.100 $2,200.000 $3,000.000 $3,130.000 $2,250.000
CL C CONC (CAP)(EXTEND)
CY 4.500 $5,100.000 $3,000.000 $4,925.000 $5,750.000
CL C CONC (COLUMN)
CY 3.700 $1,573.360 $3,000.000 $4,325.000 $3,350.000
CL C CONC (HEADWALL)
CY 7.500 $831.770 $1,500.000 $800.000 $1,050.000
CL C CONC (RETAINING WALL)
CY 6.000 $897.440 $2,000.000 $2,630.000 $3,000.000
BRIDGE SIDEWALK
SF 1,510.000 $11.400 $15.000 $24.000 $16.700
APPROACH SLAB
CY 114.000 $469.760 $650.000 $1,025.000 $547.000
CONCRETE PAN GIRDER (EXTEND)
CY 67.900 $2,400.000 $1,500.000 $3,550.000 $2,600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.200 $176.930 $550.000 $570.000 $500.000
RIPRAP (CONC)(5 IN)
CY 50.900 $423.690 $475.000 $650.000 $535.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 410.000 $135.810 $120.000 $189.000 $205.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.500 $316.160 $475.000 $500.000 $573.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 306.000 $16.540 $60.000 $26.000 $36.000
RAIL (TY C2P)
LF 201.300 $325.000 $350.000 $518.000 $400.000
RAIL (TY PR11)
LF 279.000 $84.060 $175.000 $155.000 $135.000
RAIL (TY PR22)
LF 149.300 $98.410 $250.000 $306.000 $187.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,122.000 $226.840 $240.000 $245.000 $266.000
CONC BOX CULV (5 FT X 2 FT)
LF 602.000 $250.120 $310.000 $326.000 $354.000
CONC BOX CULV (6 FT X 3 FT)
LF 150.000 $349.590 $420.000 $426.000 $463.000
CONC BOX CULV (8 FT X 4 FT)
LF 70.000 $585.930 $650.000 $610.000 $663.000
RC PIPE (CL III)(18 IN)
LF 573.000 $55.230 $65.000 $51.000 $55.000
RC PIPE (CL III)(24 IN)
LF 7,540.000 $96.950 $75.000 $62.000 $67.000
RC PIPE (CL III)(36 IN)
LF 5,428.000 $219.130 $125.000 $116.000 $126.000
RC PIPE (CL III)(48 IN)
LF 171.000 $176.520 $190.000 $188.000 $204.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $4,209.940 $5,100.000 $4,134.000 $4,500.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 3.000 $13,981.420 $10,000.000 $8,832.000 $9,600.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 8.000 $5,049.980 $4,400.000 $3,207.000 $3,500.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 27.000 $5,029.370 $5,000.000 $3,958.000 $4,300.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 9.000 $5,093.460 $4,700.000 $3,660.000 $4,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 49.000 $6,500.000 $5,400.000 $4,462.000 $4,850.000
INLET (COMPL)(PCO)(4FT)(NONE)
EA 2.000 $5,346.200 $6,700.000 $5,566.000 $6,050.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 2.000 $5,727.520 $5,900.000 $4,775.000 $5,200.000
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 7.000 $5,509.490 $6,500.000 $5,218.000 $5,700.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 14.000 $6,405.170 $6,700.000 $5,433.000 $5,900.000
INLET (COMPL)(PCO)(6FT)(NONE)
EA 1.000 $5,831.900 $7,500.000 $6,096.000 $6,600.000
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 1.000 $6,125.500 $7,600.000 $5,773.000 $6,300.000
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $9,356.260 $7,700.000 $6,287.000 $6,800.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 1.000 $5,952.670 $6,000.000 $5,227.000 $5,600.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 7.000 $4,725.360 $6,900.000 $5,854.000 $6,300.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 1.000 $5,471.110 $8,700.000 $7,720.000 $8,300.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 11.000 $4,220.350 $5,800.000 $3,904.000 $4,200.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 6.000 $5,264.130 $7,200.000 $5,076.000 $5,500.000
INLET (COMPL)(JUNCTION BOX)(7' TO 10')
EA 1.000 $10,000.000 $10,000.000 $8,832.000 $9,600.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $10,801.320 $7,600.000 $8,476.000 $9,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $18,854.530 $15,000.000 $10,225.000 $11,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $12,439.330 $23,500.000 $14,000.000 $15,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 3.000 $28,640.530 $28,000.000 $18,500.000 $20,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $1,039.420 $1,050.000 $1,131.000 $1,200.000
ADJUSTING MANHOLES
EA 19.000 $1,166.180 $1,800.000 $594.000 $650.000
REMOV STR (BOX CULVERT)
EA 4.000 $7,784.380 $3,600.000 $1,137.000 $1,250.000
REMOV STR (MANHOLE)
EA 1.000 $642.440 $500.000 $1,365.000 $1,500.000
REMOV STR (SET)
EA 14.000 $2,500.000 $500.000 $853.000 $900.000
REMOV STR (WINGWALL)
EA 155.000 $1,600.000 $500.000 $300.000 $325.000
REMOV STR (PIPE)
EA 82.000 $345.380 $300.000 $430.000 $465.000
MOBILIZATION
LS 1.000 $1,136,444.000 $1,500,000.000 $1,560,000.000 $1,590,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 34.000 $7,129.780 $10,725.000 $9,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,225.000 $25.120 $35.000 $28.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 1,225.000 $9.200 $3.000 $9.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $10.000 $25.000 $24.000 $16.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $5.870 $3.000 $11.000 $4.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,828.000 $3.620 $3.000 $2.850 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,828.000 $1.150 $0.500 $0.750 $0.750
CONSTRUCTING DETOURS
SY 12,765.000 $46.890 $75.000 $80.000 $95.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 10,040.000 $42.700 $12.000 $10.000 $13.600
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 2,000.000 $9.720 $12.000 $21.000 $13.600
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 12,300.000 $3.840 $6.000 $5.000 $11.750
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,260.000 $3.780 $6.000 $14.000 $11.750
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 10,040.000 $4.760 $8.000 $9.000 $13.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 2,000.000 $4.840 $8.000 $19.000 $13.000
CONC CURB & GUTTER (TY II)
LF 23,695.000 $19.300 $20.000 $20.000 $22.500
CONC CURB (TY C1)
LF 364.000 $111.080 $100.000 $35.000 $200.000
INTERSECTIONS (ACP)
SY 8,284.000 $34.000 $75.000 $80.000 $100.000
DRIVEWAYS (CONC)
SY 3,527.000 $54.220 $95.000 $80.000 $100.000
CONC SIDEWALKS (6")
SY 2,705.000 $58.130 $68.500 $60.000 $65.000
CURB RAMPS (TY 2)
EA 2.000 $1,700.000 $2,000.000 $1,300.000 $2,450.000
CURB RAMPS (TY 7)
EA 2.000 $1,791.630 $2,000.000 $1,300.000 $2,450.000
CURB RAMPS (TY 10)
EA 8.000 $1,495.390 $1,500.000 $1,700.000 $2,450.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $25.560 $45.000 $28.000 $39.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,914.080 $2,500.000 $2,050.000 $3,100.000
REMOVE METAL BEAM GUARD FENCE
LF 525.000 $2.100 $3.000 $2.000 $2.150
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $178.000 $250.000 $200.000 $217.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,740.230 $3,500.000 $2,700.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $211.000 $250.000 $200.000 $217.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 27.000 $220.000 $300.000 $200.000 $215.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $199.110 $400.000 $250.000 $270.000
ALUMINUM SIGNS (TY A)
SF 20.000 $58.000 $30.000 $50.000 $54.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $585.710 $600.000 $600.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 42.000 $620.990 $700.000 $700.000 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $973.360 $1,200.000 $800.000 $870.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 10.000 $150.000 $650.000 $400.000 $430.000
REMOVE SM RD SN SUP&AM
EA 62.000 $81.400 $100.000 $150.000 $150.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 3.000 $228.000 $500.000 $200.000 $215.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 18.000 $106.380 $75.000 $100.000 $108.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 20,310.000 $0.180 $0.350 $0.300 $0.330
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 418.000 $2.670 $4.000 $3.000 $3.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 39,451.000 $0.180 $0.350 $0.300 $0.330
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 1,088.000 $3.370 $4.000 $3.200 $3.480
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 3,217.000 $4.120 $4.000 $3.200 $3.480
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,176.000 $0.830 $1.500 $1.000 $1.090
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 22,500.000 $0.620 $0.650 $0.600 $0.650
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 247.000 $0.860 $1.500 $1.000 $1.090
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 64,339.000 $0.590 $0.650 $0.600 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,191.000 $1.010 $1.500 $1.140 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,469.000 $1.060 $1.500 $1.140 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,772.000 $0.860 $1.500 $1.000 $1.090
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 463.000 $4.200 $4.000 $3.500 $3.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 554.000 $5.450 $6.500 $6.000 $6.520
REFL PAV MRK TY II (W) 8" (DOT)
LF 75.000 $1.000 $2.000 $1.000 $1.090
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 20,774.000 $0.660 $0.600 $0.500 $0.540
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,630.000 $0.810 $0.600 $0.500 $0.540
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 26,497.000 $0.640 $0.600 $0.500 $0.540
PREFAB PAV MRK TY C (W) (ARROW)
EA 16.000 $220.680 $250.000 $190.000 $206.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $311.120 $300.000 $230.000 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $700.000 $1,000.000 $750.000 $815.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 24.000 $39.780 $70.000 $55.000 $60.000
REFL PAV MRKR TY I-C
EA 63.000 $2.730 $5.000 $4.000 $4.350
REFL PAV MRKR TY II-A-A
EA 1,010.000 $2.630 $4.000 $3.500 $3.800
REFL PAV MRKR TY II-C-R
EA 14.000 $3.890 $5.000 $4.000 $4.350
ELIM EXT PAV MRK & MRKS (4")
LF 34,325.000 $0.550 $0.500 $0.450 $0.490
ELIM EXT PAV MRK & MRKS (24")
LF 599.000 $3.290 $4.000 $3.000 $3.260
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $76.310 $150.000 $100.000 $108.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $114.320 $150.000 $100.000 $108.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $5,924.280 $10,000.000 $14,000.000 $12,000.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $588.860 $1,000.000 $1,600.000 $2,000.000
MEMBRANE UNDERSEAL
GAL 2,001.000 $3.250 $3.000 $3.150 $3.250
D-GR HMA TY-B SAC-B PG64-22
TON 14,351.000 $85.180 $75.000 $96.000 $84.000
SP MIXES SP-C SAC-B PG70-22
TON 7,869.000 $86.840 $80.000 $120.000 $99.000
BONDING COURSE
GAL 17,885.000 $3.150 $3.000 $0.010 $3.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $67.510 $150.000 $135.000 $175.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,855.120 $12,000.000 $18,400.000 $10,000.000
TMA (STATIONARY)
DAY 26.000 $90.560 $250.000 $240.000 $500.000
TMA (MOBILE OPERATION)
HR 72.000 $167.180 $75.000 $24.000 $85.000
CURB INLET SEDIMENT PROTECTION
LF 2,130.000 $3.000 $8.000 $32.180 $25.000
Totals: $15,388,382.986 $15,387,558.270 $15,603,362.510 $15,983,915.940