Bid Cobra

INLET (COMPL)(JUNCTION BOX)(7' TO 10')

Engineer's Estimate

Average: $10,000.00
Maximum: $10,000.00
Minimum: $10,000.00

Bid Information

Average Bid: $9,477.33