|
|
|
PREPARING ROW
|
STA
|
549.120
|
$1,500.000
|
$260.000
|
$479.800
|
$369.630
|
$315.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
47.380
|
$20.000
|
$16.000
|
$31.250
|
$27.420
|
$25.000
|
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
2.000
|
$230.000
|
$1,400.000
|
$1,128.390
|
$324.800
|
$1,100.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
10,362.500
|
$8.000
|
$8.000
|
$4.510
|
$7.840
|
$4.400
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
35,494.000
|
$8.500
|
$11.000
|
$10.820
|
$11.220
|
$10.500
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
18,985.000
|
$13.000
|
$17.000
|
$7.480
|
$11.220
|
$7.350
|
|
|
|
BACKFILL (TY B)
|
STA
|
652.000
|
$150.000
|
$82.000
|
$203.730
|
$106.050
|
$237.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
86.500
|
$750.000
|
$780.000
|
$867.550
|
$1,000.000
|
$900.000
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
86.500
|
$650.000
|
$590.000
|
$655.980
|
$610.000
|
$670.000
|
|
|
|
PROOF ROLLING
|
HR
|
56.300
|
$100.000
|
$74.000
|
$59.820
|
$79.800
|
$73.500
|
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
35,105.000
|
$27.500
|
$22.000
|
$27.550
|
$30.120
|
$33.600
|
|
|
|
REWORK BS MTL (TY B) (12")(ORD COMP)
|
SY
|
14,990.000
|
$8.750
|
$2.300
|
$1.910
|
$5.060
|
$3.150
|
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
76,267.000
|
$2.500
|
$1.800
|
$0.910
|
$3.530
|
$3.150
|
|
|
|
REWORKING BS MTL (TY C) (14")(ORD COMP)
|
SY
|
51,627.000
|
$2.250
|
$2.000
|
$0.930
|
$4.560
|
$4.200
|
|
|
|
REWORK BS MTL (TY C)(17")(OC)
|
SY
|
6,160.000
|
$2.200
|
$3.000
|
$1.450
|
$5.700
|
$3.680
|
|
|
|
CEMENT
|
TON
|
4,160.000
|
$175.000
|
$160.000
|
$321.590
|
$299.250
|
$184.000
|
|
|
|
CMT TRT(MX EXST MTL & NW BS)(12")(DC)
|
SY
|
227,156.000
|
$2.900
|
$3.000
|
$1.240
|
$3.080
|
$5.250
|
|
|
|
REINFORMT GRID FOR ASPHALT PVMT OVERLAY
|
SY
|
98,608.000
|
$7.000
|
$6.500
|
$8.630
|
$7.110
|
$8.000
|
|
|
|
ASPH (AC-15P)
|
GAL
|
81,469.000
|
$2.500
|
$2.700
|
$2.450
|
$2.780
|
$2.200
|
|
|
|
ASPH (RC-250)
|
GAL
|
44,583.000
|
$2.900
|
$2.800
|
$3.240
|
$3.520
|
$3.250
|
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,416.000
|
$61.000
|
$66.000
|
$82.690
|
$56.950
|
$67.000
|
|
|
|
AGGR(TY-PD GR-5 SAC-B)
|
CY
|
1,594.000
|
$75.000
|
$110.000
|
$95.270
|
$59.310
|
$70.000
|
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
788.000
|
$61.000
|
$120.000
|
$157.940
|
$55.770
|
$70.000
|
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
32,330.000
|
$52.580
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
D-GR HMA TY-B SAC-B PG 70-22
|
TON
|
56,430.000
|
$62.000
|
$56.000
|
$65.000
|
$63.740
|
$65.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
62,625.000
|
$72.000
|
$75.000
|
$74.500
|
$78.960
|
$75.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
10,576.000
|
$2.000
|
$1.600
|
$1.840
|
$1.280
|
$1.700
|
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
15,108.000
|
$3.500
|
$1.000
|
$2.070
|
$1.280
|
$2.200
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
34,845.000
|
$1.400
|
$0.800
|
$1.930
|
$1.380
|
$2.200
|
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
91,304.000
|
$2.000
|
$1.200
|
$2.320
|
$1.800
|
$2.600
|
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
89,806.000
|
$3.000
|
$3.000
|
$2.860
|
$3.220
|
$5.000
|
|
|
|
PLANE ASPH CONC PAV (0" TO 7")
|
SY
|
63,580.000
|
$3.000
|
$2.300
|
$2.180
|
$3.270
|
$2.600
|
|
|
|
PLANE ASPH CONC PAV (2 1/4")
|
SY
|
15,146.000
|
$1.500
|
$1.100
|
$2.030
|
$1.490
|
$2.200
|
|
|
|
PLANE ASPH CONC PAV (2.75")
|
SY
|
46,934.000
|
$2.000
|
$1.300
|
$1.590
|
$1.700
|
$2.300
|
|
|
|
PLANE ASPH CONC PAV(3 3/4")
|
SY
|
32,089.000
|
$2.000
|
$1.800
|
$2.140
|
$2.540
|
$2.800
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
48.000
|
$125.000
|
$150.000
|
$180.540
|
$146.990
|
$150.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
22.000
|
$225.000
|
$380.000
|
$420.840
|
$146.990
|
$275.000
|
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
2.000
|
$230.000
|
$1,530.000
|
$2,256.780
|
$1,679.900
|
$2,750.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
14.600
|
$450.000
|
$430.000
|
$507.770
|
$435.720
|
$460.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
746.930
|
$500.000
|
$430.000
|
$507.770
|
$435.720
|
$500.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
2,382.600
|
$30.000
|
$21.000
|
$23.530
|
$38.000
|
$40.000
|
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
246.000
|
$210.000
|
$85.000
|
$107.200
|
$94.490
|
$180.000
|
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
410.000
|
$100.000
|
$70.000
|
$118.480
|
$76.650
|
$80.000
|
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
5,115.000
|
$150.000
|
$97.000
|
$118.480
|
$94.490
|
$90.000
|
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
41.400
|
$100.000
|
$88.000
|
$112.840
|
$89.240
|
$85.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
3.130
|
$150.000
|
$3.200
|
$1,241.230
|
$1,049.940
|
$600.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
6.000
|
$150.000
|
$870.000
|
$1,241.230
|
$918.700
|
$660.000
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
26.880
|
$150.000
|
$405.000
|
$564.190
|
$393.730
|
$700.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
32.450
|
$200.000
|
$510.000
|
$677.030
|
$556.470
|
$770.000
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
20.580
|
$200.000
|
$570.000
|
$677.030
|
$614.210
|
$910.000
|
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
10.570
|
$700.000
|
$700.000
|
$846.290
|
$734.960
|
$850.000
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
140.000
|
$900.000
|
$470.000
|
$677.030
|
$551.220
|
$910.000
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
5.250
|
$140.000
|
$320.000
|
$451.360
|
$367.480
|
$220.000
|
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
92.000
|
$150.000
|
$195.000
|
$338.520
|
$209.990
|
$200.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$9,000.000
|
$6,500.000
|
$7,673.040
|
$6,719.600
|
$8,800.000
|
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$7,000.000
|
$6,600.000
|
$7,673.040
|
$6,824.590
|
$8,800.000
|
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$12,000.000
|
$9,000.000
|
$10,719.680
|
$9,449.440
|
$9,350.000
|
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$15,000.000
|
$7,700.000
|
$10,155.500
|
$8,924.470
|
$8,600.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$15,000.000
|
$14,600.000
|
$18,054.210
|
$15,749.060
|
$26,000.000
|
|
|
|
SET (REPLACE PIPE RUNNER ASSEMBLY)
|
EA
|
5.000
|
$1,000.000
|
$2,250.000
|
$2,708.130
|
$2,414.860
|
$2,750.000
|
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
5.000
|
$1,000.000
|
$2,000.000
|
$225.680
|
$2,204.870
|
$1,300.000
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
6.000
|
$5,000.000
|
$4,000.000
|
$4,852.070
|
$4,409.740
|
$6,400.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
8.000
|
$1,600.000
|
$4,050.000
|
$4,513.550
|
$3,989.760
|
$6,600.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
2.000
|
$6,000.000
|
$4,800.000
|
$5,416.270
|
$4,724.720
|
$7,700.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
6.000
|
$7,000.000
|
$4,500.000
|
$5,190.590
|
$4,724.720
|
$7,200.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
5.000
|
$5,000.000
|
$5,200.000
|
$5,980.460
|
$5,354.680
|
$8,000.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$8,400.000
|
$6,000.000
|
$6,770.330
|
$6,194.630
|
$8,800.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
3.000
|
$5,000.000
|
$4,050.000
|
$4,852.070
|
$4,409.740
|
$6,400.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$5,000.000
|
$4,100.000
|
$4,739.230
|
$4,199.750
|
$6,600.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$11,000.000
|
$9,400.000
|
$11,283.880
|
$9,974.410
|
$6,600.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
8.000
|
$9,000.000
|
$4,000.000
|
$4,739.230
|
$4,199.750
|
$11,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
3.000
|
$9,500.000
|
$6,300.000
|
$7,108.850
|
$6,509.610
|
$12,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
3.000
|
$10,000.000
|
$6,430.000
|
$7,673.040
|
$6,824.590
|
$8,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 8 FT)(4: 1) (C)
|
EA
|
4.000
|
$15,000.000
|
$8,440.000
|
$9,591.300
|
$8,819.480
|
$8,800.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
8.000
|
$7,000.000
|
$6,700.000
|
$7,560.200
|
$6,824.590
|
$9,400.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$7,600.000
|
$8,688.580
|
$7,874.530
|
$10,500.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$5,700.000
|
$6,657.490
|
$6,089.640
|
$9,700.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
11.000
|
$6,000.000
|
$5,600.000
|
$6,093.300
|
$5,564.670
|
$9,400.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
7.000
|
$5,000.000
|
$5,500.000
|
$6,206.130
|
$5,669.660
|
$7,700.000
|
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,900.000
|
$2,087.520
|
$1,837.390
|
$2,200.000
|
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$300.000
|
$510.000
|
$564.190
|
$419.980
|
$400.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
43.000
|
$1,750.000
|
$510.000
|
$677.030
|
$629.960
|
$660.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
92.000
|
$21.950
|
$1,520.000
|
$22.570
|
$21.000
|
$8.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
363.440
|
$50.000
|
$35.000
|
$33.850
|
$31.500
|
$16.000
|
|
|
|
REMOVE STR (RAIL)
|
LF
|
106.000
|
$14.000
|
$155.000
|
$141.050
|
$104.990
|
$20.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,779,014.900
|
$890,000.000
|
$1,095,488.000
|
$1,943,927.660
|
$1,500,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
$4,000.000
|
$5,260.000
|
$9,022.200
|
$5,822.970
|
$7,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
5,497.000
|
$40.000
|
$44.000
|
$49.590
|
$43.000
|
$75.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,497.000
|
$10.000
|
$13.000
|
$15.800
|
$13.000
|
$12.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
936.000
|
$28.000
|
$21.000
|
$6.320
|
$21.000
|
$27.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
936.000
|
$8.000
|
$10.000
|
$4.030
|
$9.850
|
$12.000
|
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
2,938.000
|
$75.000
|
$71.000
|
$1.020
|
$68.400
|
$85.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
117,460.000
|
$2.000
|
$2.000
|
$2.310
|
$1.950
|
$3.100
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
117,460.000
|
$0.750
|
$0.600
|
$0.730
|
$0.550
|
$0.550
|
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
5,519.000
|
$55.000
|
$86.000
|
$92.140
|
$79.800
|
$100.000
|
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,620.000
|
$30.000
|
$18.000
|
$21.440
|
$18.900
|
$40.000
|
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
31,050.000
|
$15.000
|
$8.000
|
$11.280
|
$9.450
|
$15.000
|
|
|
|
PTB (STKPL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,640.000
|
$17.000
|
$10.000
|
$13.540
|
$11.550
|
$25.000
|
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,620.000
|
$20.000
|
$15.000
|
$16.930
|
$14.700
|
$20.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,990.000
|
$18.000
|
$22.000
|
$17.980
|
$24.090
|
$42.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
488,067.000
|
$0.150
|
$0.170
|
$0.140
|
$0.130
|
$0.110
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
242,234.000
|
$0.180
|
$0.170
|
$0.140
|
$0.210
|
$0.130
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
16,112.500
|
$25.000
|
$19.000
|
$20.590
|
$18.250
|
$21.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$30.000
|
$62.000
|
$67.700
|
$60.000
|
$70.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
38.000
|
$1,750.000
|
$1,630.000
|
$1,805.420
|
$2,100.000
|
$1,800.000
|
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,000.000
|
$930.000
|
$1,026.830
|
$910.000
|
$1,000.000
|
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
200.000
|
$10.500
|
$11.000
|
$11.280
|
$10.000
|
$11.000
|
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
50.000
|
$10.000
|
$16.000
|
$16.930
|
$15.000
|
$20.000
|
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
2.000
|
$350.000
|
$360.000
|
$394.940
|
$350.000
|
$400.000
|
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$31.000
|
$26.000
|
$27.930
|
$24.750
|
$30.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
94.000
|
$70.000
|
$62.000
|
$67.700
|
$60.000
|
$70.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
8,700.000
|
$2.400
|
$1.300
|
$1.410
|
$1.250
|
$1.400
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
17.000
|
$150.000
|
$102.000
|
$112.840
|
$100.000
|
$125.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$250.000
|
$102.000
|
$112.840
|
$100.000
|
$125.000
|
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
36.000
|
$200.000
|
$102.000
|
$112.840
|
$100.000
|
$125.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
96.000
|
$2,300.000
|
$2,020.000
|
$2,228.570
|
$1,975.000
|
$2,200.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
65.000
|
$250.000
|
$205.000
|
$225.680
|
$25.000
|
$225.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
8.000
|
$11,500.000
|
$7,220.000
|
$8,462.910
|
$7,000.000
|
$8,000.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
200.000
|
$1,500.000
|
$510.000
|
$789.870
|
$600.000
|
$1,200.000
|
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
8.000
|
$800.000
|
$920.000
|
$1,015.550
|
$800.000
|
$1,600.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$800.000
|
$510.000
|
$789.870
|
$600.000
|
$900.000
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
6.000
|
$220.000
|
$230.000
|
$257.270
|
$228.000
|
$240.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$575.000
|
$505.000
|
$558.550
|
$495.000
|
$520.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
25.000
|
$450.000
|
$435.000
|
$482.950
|
$428.000
|
$450.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
59.000
|
$600.000
|
$500.000
|
$545.010
|
$483.000
|
$508.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,200.000
|
$1,200.000
|
$1,314.570
|
$1,165.000
|
$1,225.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
24.000
|
$750.000
|
$910.000
|
$1,009.910
|
$895.000
|
$940.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$80.000
|
$95.000
|
$107.200
|
$95.000
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
39.000
|
$20.000
|
$12.000
|
$13.540
|
$12.000
|
$13.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
51.000
|
$25.000
|
$18.000
|
$20.310
|
$18.000
|
$20.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
81.000
|
$75.000
|
$66.000
|
$73.350
|
$65.000
|
$67.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
88.000
|
$15.000
|
$7.200
|
$7.900
|
$7.000
|
$7.400
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
64.000
|
$33.000
|
$19.000
|
$20.310
|
$18.000
|
$20.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
41,785.000
|
$1.250
|
$1.300
|
$1.560
|
$1.550
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
2,700.000
|
$1.000
|
$0.420
|
$3.390
|
$3.060
|
$0.420
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
642.000
|
$5.000
|
$5.100
|
$7.670
|
$6.940
|
$5.300
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$90.000
|
$102.000
|
$135.410
|
$122.430
|
$110.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
7.000
|
$100.000
|
$102.000
|
$135.410
|
$122.430
|
$110.000
|
|
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
15,660.000
|
$0.150
|
$0.120
|
$0.230
|
$0.200
|
$0.130
|
|
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
254,406.000
|
$0.100
|
$0.120
|
$0.060
|
$0.050
|
$0.130
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
386,167.000
|
$0.110
|
$0.120
|
$0.180
|
$0.160
|
$0.130
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
4,997.000
|
$0.450
|
$1.700
|
$1.350
|
$1.220
|
$1.700
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
5,282.000
|
$0.450
|
$1.700
|
$1.350
|
$1.220
|
$1.700
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
15,939.000
|
$0.400
|
$0.310
|
$0.430
|
$0.390
|
$0.320
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
491,631.000
|
$0.250
|
$0.310
|
$0.320
|
$0.290
|
$0.320
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
92,572.000
|
$0.400
|
$0.310
|
$0.360
|
$0.330
|
$0.320
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
260,761.000
|
$0.250
|
$0.310
|
$0.320
|
$0.290
|
$0.320
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
800.000
|
$3.250
|
$4.100
|
$3.160
|
$2.860
|
$4.200
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
12,698.000
|
$2.750
|
$2.500
|
$2.930
|
$2.650
|
$2.500
|
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
27,720.000
|
$5.000
|
$1.800
|
$1.700
|
$6.250
|
$5.000
|
|
|
|
CONTINUOUS DIAMOND GRINDING CONC PVMT
|
SY
|
15,441.000
|
$5.800
|
$6.700
|
$7.900
|
$9.250
|
$5.500
|
|
|
|
CONTINUOUS DIAMOND GROOVING CONC PVMT
|
SY
|
15,441.000
|
$6.750
|
$5.440
|
$4.510
|
$9.250
|
$6.500
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$22,100.000
|
$9,694.620
|
$7,995.900
|
$15,000.000
|
|
1
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
18,478.000
|
$92.000
|
$54.000
|
$61.000
|
$61.110
|
$68.000
|
|
Totals: |
$26,178,532.540
|
$20,795,394.696
|
$22,781,142.371
|
$24,125,452.443
|
$25,216,504.930
|