MADISON FM 39 (0639-02-034)

Items: 94

County: MADISON
Length: N/A
Highway: FM 39
District: BRYAN
Control Number: 0639-02-034
DBE Goal: N/A
Project: F 2022(716)
Guaranty: N/A
Time: 267 WORKING DAYS
Engineer's Estimate: $11,983,466.89
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE RD AND WIDEN SHOULDERS
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$11,983,466.89
$14,087,277.98
Over/Under Est: 17.56% $2,103,811.09
$16,829,519.68
Over/Under Est: 40.44% $4,846,052.79
Amt Left: 19.47% $2,742,241.70
Subcontractor Percentage Amount
SANTA FE CONCRETE SERVICES LLC 10.49% $1,580,820.20
JON TUCKER CONSTRUCTION, LTD. 1.37% $206,456.02
BROCK CONSTRUCTION, LLC 1.02% $153,711.78
CEN TEX HYDROSEED, INC. 1.01% $152,204.80
WILLOW CITY SIGN & RAIL, INC. 0.55% $82,883.80
D. I. J. CONSTRUCTION, INC. 0.35% $52,744.24
SUPERIOR TRAFFIC CONTROL, LLC 0.20% $30,139.57
WEST TEXAS ROCK RESOURCES, LLC 0.09% $13,562.80
LONESTAR TRAFFIC SAFETY, LLC 0.06% $9,041.87
Total: 15.14% $2,281,565.08

Bid Items & Bid Tabulations

94 Total 0 of 94
MADISON  |  FM 39  |  BRYAN  |  0639-02-034  |  06/30/2022  |  $11,983,466.89  |  F 2022(716)  |  REHAB RD AND WIDEN SHOULDERS  |  267 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 401.000 $1,500.000 $1,000.000 $2,000.000
REMOVING CONC (DRIVEWAYS)
SY 447.000 $9.000 $25.000 $29.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 246.000 $9.000 $15.000 $22.000
EXCAVATION (ROADWAY)
CY 17,639.700 $7.000 $15.000 $8.700
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,938.500 $5.000 $15.000 $9.200
BACKFILL (TY A)
STA 401.000 $100.000 $200.000 $230.000
FURNISHING AND PLACING TOPSOIL (4")
STA 400.510 $300.000 $150.000 $170.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 71,202.000 $0.150 $0.150 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 35,601.000 $0.100 $0.140 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 35,601.000 $0.100 $0.140 $0.140
VEGETATIVE WATERING
MG 712.000 $12.500 $10.000 $1.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 194,214.000 $11.000 $14.500 $14.800
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 151,819.000 $3.000 $3.750 $5.150
CEMENT
TON 386.000 $180.000 $225.000 $260.000
CEMENT TREAT (EXIST MATL) (6")
SY 42,405.000 $3.000 $3.000 $5.000
ASPH (RC-250)
GAL 45,906.000 $4.000 $5.000 $6.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 1,360.000 $115.000 $115.000 $130.000
CEM STABIL BKFL
CY 612.000 $61.000 $100.000 $131.000
CUT & RESTORING PAV
SY 208.000 $120.000 $85.000 $158.000
TRENCH EXCAVATION PROTECTION
LF 330.000 $2.500 $10.000 $12.600
TEMPORARY SPL SHORING
SF 4,528.000 $18.000 $10.000 $36.800
RIPRAP (CONC)(CL B)(5 IN)
CY 1,587.700 $470.000 $440.000 $578.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 4.000 $186.000 $350.000 $158.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 20.000 $114.000 $225.000 $210.000
CONC BOX CULV (4 FT X 3 FT)
LF 32.000 $245.000 $600.000 $530.000
CONC BOX CULV (7 FT X 6 FT)
LF 68.000 $600.000 $1,150.000 $1,365.000
CONC BOX CULV (7 FT X 7 FT)
LF 64.000 $1,200.000 $1,200.000 $1,470.000
RC PIPE (CL III)(18 IN)
LF 934.000 $69.000 $80.000 $54.500
RC PIPE (CL III)(24 IN)
LF 365.000 $85.000 $110.000 $131.000
RC PIPE (CL III)(30 IN)
LF 158.000 $105.000 $300.000 $236.000
RC PIPE (CL III)(36 IN)
LF 84.000 $125.000 $325.000 $263.000
RC PIPE (CL III)(48 IN)
LF 76.000 $190.000 $450.000 $315.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $16,000.000 $22,000.000 $14,700.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $21,500.000 $25,000.000 $18,900.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $23,500.000 $28,000.000 $23,100.000
WINGWALL (PW - 1) (HW=9 FT)
EA 3.000 $31,750.000 $30,000.000 $31,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 60.000 $1,000.000 $1,200.000 $1,050.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,200.000 $1,500.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $1,350.000 $2,000.000 $1,600.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 7.000 $1,550.000 $2,400.000 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,200.000 $2,400.000 $3,200.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 7.000 $2,000.000 $3,500.000 $3,700.000
CLEAN EXIST CULVERTS
EA 11.000 $1,885.000 $1,500.000 $2,100.000
REMOV STR (SET)
EA 54.000 $270.000 $350.000 $790.000
REMOV STR (HEADWALL)
EA 6.000 $3,000.000 $4,000.000 $1,300.000
REMOV STR (PIPE)
EA 50.000 $450.000 $250.000 $890.000
REMOVE STR (CONC)
EA 3.000 $584.000 $2,000.000 $2,600.000
MOBILIZATION
LS 1.000 $776,310.920 $1,040,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $6,500.000 $5,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,160.000 $30.000 $30.000 $29.400
ROCK FILTER DAMS (REMOVE)
LF 1,160.000 $7.200 $10.000 $10.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 23,244.000 $2.800 $3.300 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 23,244.000 $0.700 $1.000 $1.100
CONC CURB (TY II)
LF 160.000 $25.000 $45.000 $52.500
CONC CURB (SPECIAL) (TYPE II)
LF 40.000 $7.000 $100.000 $105.000
CONCRETE GUTTER (MODIFIED)
LF 274.000 $33.000 $70.000 $68.250
INTERSECTIONS (ACP)
SY 788.000 $35.000 $55.000 $68.000
DRIVEWAYS (CONC)
SY 447.000 $75.000 $95.000 $137.000
DRIVEWAYS (ACP)
SY 4,641.000 $35.000 $40.000 $59.500
RUMBLE STRIPS (SHOULDER)
LF 80,102.000 $0.160 $0.150 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 40,051.000 $0.300 $0.150 $0.160
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $2.500 $5.000 $1.100
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $325.000 $250.000 $163.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 17.000 $250.000 $305.000 $273.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 76.000 $550.000 $500.000 $570.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $600.000 $650.000 $680.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,000.000 $850.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 10.000 $1,000.000 $1,100.000 $1,100.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $420.000 $425.000 $473.000
REMOVE SM RD SN SUP&AM
EA 109.000 $95.000 $100.000 $52.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 28.000 $30.000 $25.000 $15.800
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 18.000 $65.000 $70.000 $57.750
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 12.000 $90.000 $130.000 $68.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,135.000 $1.000 $1.500 $0.440
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,330.000 $0.600 $1.500 $0.440
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,703.000 $0.850 $1.000 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 140.000 $6.550 $9.000 $7.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 79,665.000 $0.300 $0.500 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,883.000 $0.350 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,614.000 $0.300 $0.500 $0.470
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $205.000 $300.000 $284.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $230.000 $350.000 $368.000
REFL PAV MRKR TY I-C
EA 85.000 $3.250 $6.000 $7.400
REFL PAV MRKR TY II-A-A
EA 1,156.000 $3.100 $6.000 $5.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 320.000 $1.480 $2.000 $10.500
SP MIXES SP-C SAC-A PG64-22
TON 30,298.000 $87.000 $103.000 $125.000
BONDING COURSE
GAL 18,362.000 $2.750 $4.000 $5.800
CEMENT
TON 787.000 $200.000 $227.000 $260.000
ASPHALT BINDER (PG 64-22)
TON 1,888.000 $600.000 $825.000 $910.000
FOAMED ASPHALT TREAT (8") (DC)
SY 194,214.000 $4.300 $3.000 $3.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $8,000.000 $7,500.000 $13,400.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $16.400 $16.000 $26.300
TMA (STATIONARY)
DAY 254.000 $170.000 $150.000 $175.000
TMA (MOBILE OPERATION)
DAY 28.000 $240.000 $250.000 $300.000
Totals: $11,983,466.890 $14,087,277.980 $16,829,519.680