PREPARING ROW
|
STA
|
401.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
447.000
|
$9.000
|
$25.000
|
$29.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
246.000
|
$9.000
|
$15.000
|
$22.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,639.700
|
$7.000
|
$15.000
|
$8.700
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
13,938.500
|
$5.000
|
$15.000
|
$9.200
|
|
|
BACKFILL (TY A)
|
STA
|
401.000
|
$100.000
|
$200.000
|
$230.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
400.510
|
$300.000
|
$150.000
|
$170.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
71,202.000
|
$0.150
|
$0.150
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
35,601.000
|
$0.100
|
$0.140
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
35,601.000
|
$0.100
|
$0.140
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
712.000
|
$12.500
|
$10.000
|
$1.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
194,214.000
|
$11.000
|
$14.500
|
$14.800
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
151,819.000
|
$3.000
|
$3.750
|
$5.150
|
|
|
CEMENT
|
TON
|
386.000
|
$180.000
|
$225.000
|
$260.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
42,405.000
|
$3.000
|
$3.000
|
$5.000
|
|
|
ASPH (RC-250)
|
GAL
|
45,906.000
|
$4.000
|
$5.000
|
$6.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
1,360.000
|
$115.000
|
$115.000
|
$130.000
|
|
|
CEM STABIL BKFL
|
CY
|
612.000
|
$61.000
|
$100.000
|
$131.000
|
|
|
CUT & RESTORING PAV
|
SY
|
208.000
|
$120.000
|
$85.000
|
$158.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
330.000
|
$2.500
|
$10.000
|
$12.600
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,528.000
|
$18.000
|
$10.000
|
$36.800
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
1,587.700
|
$470.000
|
$440.000
|
$578.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
4.000
|
$186.000
|
$350.000
|
$158.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
20.000
|
$114.000
|
$225.000
|
$210.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
32.000
|
$245.000
|
$600.000
|
$530.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)
|
LF
|
68.000
|
$600.000
|
$1,150.000
|
$1,365.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
64.000
|
$1,200.000
|
$1,200.000
|
$1,470.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
934.000
|
$69.000
|
$80.000
|
$54.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
365.000
|
$85.000
|
$110.000
|
$131.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
158.000
|
$105.000
|
$300.000
|
$236.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
84.000
|
$125.000
|
$325.000
|
$263.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
76.000
|
$190.000
|
$450.000
|
$315.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$16,000.000
|
$22,000.000
|
$14,700.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$21,500.000
|
$25,000.000
|
$18,900.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$23,500.000
|
$28,000.000
|
$23,100.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
3.000
|
$31,750.000
|
$30,000.000
|
$31,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
60.000
|
$1,000.000
|
$1,200.000
|
$1,050.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,500.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,350.000
|
$2,000.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$1,550.000
|
$2,400.000
|
$2,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,200.000
|
$2,400.000
|
$3,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$3,500.000
|
$3,700.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$1,885.000
|
$1,500.000
|
$2,100.000
|
|
|
REMOV STR (SET)
|
EA
|
54.000
|
$270.000
|
$350.000
|
$790.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$3,000.000
|
$4,000.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
EA
|
50.000
|
$450.000
|
$250.000
|
$890.000
|
|
|
REMOVE STR (CONC)
|
EA
|
3.000
|
$584.000
|
$2,000.000
|
$2,600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$776,310.920
|
$1,040,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$6,500.000
|
$5,000.000
|
$7,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,160.000
|
$30.000
|
$30.000
|
$29.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,160.000
|
$7.200
|
$10.000
|
$10.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
23,244.000
|
$2.800
|
$3.300
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
23,244.000
|
$0.700
|
$1.000
|
$1.100
|
|
|
CONC CURB (TY II)
|
LF
|
160.000
|
$25.000
|
$45.000
|
$52.500
|
|
|
CONC CURB (SPECIAL) (TYPE II)
|
LF
|
40.000
|
$7.000
|
$100.000
|
$105.000
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
274.000
|
$33.000
|
$70.000
|
$68.250
|
|
|
INTERSECTIONS (ACP)
|
SY
|
788.000
|
$35.000
|
$55.000
|
$68.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
447.000
|
$75.000
|
$95.000
|
$137.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,641.000
|
$35.000
|
$40.000
|
$59.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
80,102.000
|
$0.160
|
$0.150
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
40,051.000
|
$0.300
|
$0.150
|
$0.160
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$2.500
|
$5.000
|
$1.100
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$325.000
|
$250.000
|
$163.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
17.000
|
$250.000
|
$305.000
|
$273.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
76.000
|
$550.000
|
$500.000
|
$570.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$600.000
|
$650.000
|
$680.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$850.000
|
$990.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
10.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$420.000
|
$425.000
|
$473.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
109.000
|
$95.000
|
$100.000
|
$52.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
28.000
|
$30.000
|
$25.000
|
$15.800
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
18.000
|
$65.000
|
$70.000
|
$57.750
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
12.000
|
$90.000
|
$130.000
|
$68.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,135.000
|
$1.000
|
$1.500
|
$0.440
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,330.000
|
$0.600
|
$1.500
|
$0.440
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,703.000
|
$0.850
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
140.000
|
$6.550
|
$9.000
|
$7.900
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
79,665.000
|
$0.300
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,883.000
|
$0.350
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
19,614.000
|
$0.300
|
$0.500
|
$0.470
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$205.000
|
$300.000
|
$284.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$230.000
|
$350.000
|
$368.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
85.000
|
$3.250
|
$6.000
|
$7.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,156.000
|
$3.100
|
$6.000
|
$5.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
320.000
|
$1.480
|
$2.000
|
$10.500
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
30,298.000
|
$87.000
|
$103.000
|
$125.000
|
|
|
BONDING COURSE
|
GAL
|
18,362.000
|
$2.750
|
$4.000
|
$5.800
|
|
|
CEMENT
|
TON
|
787.000
|
$200.000
|
$227.000
|
$260.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
1,888.000
|
$600.000
|
$825.000
|
$910.000
|
|
|
FOAMED ASPHALT TREAT (8") (DC)
|
SY
|
194,214.000
|
$4.300
|
$3.000
|
$3.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$8,000.000
|
$7,500.000
|
$13,400.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
320.000
|
$16.400
|
$16.000
|
$26.300
|
|
|
TMA (STATIONARY)
|
DAY
|
254.000
|
$170.000
|
$150.000
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
28.000
|
$240.000
|
$250.000
|
$300.000
|
|
Totals: |
$11,983,466.890
|
$14,087,277.980
|
$16,829,519.680
|