KARNES FM 81 (0691-01-044)

Items: 114

County: KARNES
Length: N/A
Highway: FM 81
District: CORPUS CHRISTI
Control Number: 0691-01-044
DBE Goal: N/A
Project: F 2023(101)
Guaranty: N/A
Time: 186 WORKING DAYS
Engineer's Estimate: $5,066,217.01
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
NICK NOVOSAD
ROBERTO A JIMENEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$5,066,217.01
1
$4,887,025.52
Over/Under Est: -3.54% -$179,191.49
Over/Under Est: 0.46% $23,312.17
Amt Left: 4.14% $202,503.66
Over/Under Est: 3.67% $185,843.22
Amt Left: 7.47% $365,034.71
Delta: -3.19% -$162,531.05
$5,255,313.80
Over/Under Est: 3.73% $189,096.79
Amt Left: 7.54% $368,288.28
Delta: -0.06% -$3,253.57
Over/Under Est: 6.75% $341,783.79
Amt Left: 10.66% $520,975.28
Delta: -2.91% -$152,687.00
$5,608,077.85
Over/Under Est: 10.7% $541,860.84
Amt Left: 14.75% $721,052.33
Delta: -3.70% -$200,077.05
Over/Under Est: 16.86% $854,083.99
Amt Left: 21.14% $1,033,275.48
Delta: -5.57% -$312,223.15
Subcontractor Percentage Amount
CK NEWBERRY, LLC 26.97% $1,352,671.07
ACEE CONSTRUCTION LLC. 13.55% $679,595.59
TEXAS MATERIALS GROUP, INC. 12.35% $619,410.00
GREGORY PILE DRIVING, INC. 3.44% $172,532.02
DIIBS SPECIALISTS, LLC 1.77% $88,773.74
LONE STAR EROSION CONTROL 1.34% $67,207.24
HIGHWAY BARRICADES AND SERVICES, LLC 1.25% $62,693.32
TORO BRAVO CONSTRUCTION, LLC 0.61% $30,594.34
Total: 61.28% $3,073,477.32

Bid Items & Bid Tabulations

114 Total 0 of 114
KARNES  |  FM 81  |  CORPUS CHRISTI  |  0691-01-044  |  09/07/2022  |  $5,066,217.01  |  F 2023(101)  |  REHAB EXIST ROADWAY  |  186 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
HUNTER INDUSTRIES, LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
CK NEWBERRY, LLC
ACME BRIDGE COMPANY, INC.
MILLING SERVICES
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 102.000 $5,000.000 $1,500.000 $1,050.000 $125.290 $500.000 $1,000.000 $800.000 $1,400.000
REMOVING CONC (RIPRAP)
SY 774.000 $20.000 $20.000 $13.680 $22.250 $10.000 $17.300 $28.000 $19.000
EXCAVATION (ROADWAY)
CY 5,325.000 $11.000 $11.000 $17.190 $11.850 $15.000 $18.700 $12.000 $17.750
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,039.000 $12.000 $14.000 $17.190 $8.140 $16.000 $21.500 $15.000 $11.300
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 44,062.000 $0.300 $0.240 $0.230 $0.270 $0.350 $0.240 $0.550 $0.370
DRILL SEED (TEMP)(WARM OR COOL)
SY 11,017.000 $0.300 $0.190 $0.180 $0.230 $0.300 $0.190 $0.550 $0.310
VEGETATIVE WATERING
MG 1,003.000 $55.000 $25.000 $20.520 $39.530 $15.000 $44.100 $47.000 $18.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 11,646.000 $1.000 $1.000 $0.950 $1.080 $1.500 $1.000 $2.200 $1.460
FL BS (RDWY DEL)(TYA GR 1, 2 OR 5)F POS
CY 4,176.000 $44.000 $78.000 $74.340 $93.320 $90.000 $58.400 $65.000 $93.250
CEMENT
TON 586.000 $240.000 $260.000 $248.400 $231.390 $250.000 $350.000 $230.000 $265.000
CEMENT TREAT (NEW BASE) (8")
SY 615.000 $3.000 $2.000 $4.680 $3.780 $3.000 $3.050 $17.000 $13.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 42,068.000 $2.000 $2.000 $2.340 $2.170 $2.000 $3.050 $2.800 $4.100
CEMENT TREAT (NEW BASE) (10")
SY 3,394.000 $3.000 $2.000 $3.510 $3.160 $2.500 $3.050 $5.000 $5.100
ASPH (MULTI OPTION)
GAL 18,328.000 $5.000 $6.000 $4.180 $4.850 $4.750 $4.300 $4.400 $5.000
ASPH (RC-250)
GAL 9,188.000 $6.000 $6.000 $5.800 $6.500 $5.250 $4.500 $4.600 $5.990
AGGR(TY-B GR-5 SAC-B)
CY 344.000 $125.000 $195.000 $88.300 $197.090 $200.000 $220.000 $230.000 $254.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 419.000 $130.000 $195.000 $104.960 $179.420 $175.000 $187.000 $195.000 $213.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 386.000 $4.000 $15.750 $12.960 $15.690 $5.000 $38.400 $21.000 $5.000
CEM STABIL BKFL
CY 275.000 $180.000 $165.000 $200.000 $139.620 $200.000 $177.000 $178.000 $232.000
CUT & RESTORE ASPH PAVING
SY 204.000 $80.000 $150.000 $180.000 $107.460 $125.000 $95.100 $62.000 $121.000
TRENCH EXCAVATION PROTECTION
LF 119.000 $5.000 $15.000 $50.000 $39.190 $50.000 $9.100 $7.000 $21.000
TEMPORARY SPL SHORING
SF 1,253.000 $30.000 $40.000 $75.000 $55.970 $15.000 $42.000 $30.000 $52.250
DRILL SHAFT (36 IN)
LF 835.000 $400.000 $300.000 $344.970 $292.510 $300.000 $308.000 $350.000 $439.000
CL C CONC (ABUT)
CY 50.800 $1,400.000 $1,596.000 $1,500.000 $1,452.470 $2,500.000 $1,520.000 $1,500.000 $2,300.000
CL C CONC (CAP)
CY 42.600 $1,400.000 $1,635.200 $1,500.000 $1,583.290 $2,750.000 $1,820.000 $2,000.000 $2,120.000
CL C CONC (COLUMN)
CY 32.700 $1,400.000 $1,449.000 $1,500.000 $1,614.130 $2,250.000 $1,700.000 $1,400.000 $1,750.000
REINF CONC SLAB
SF 8,280.000 $23.000 $26.150 $40.000 $29.400 $28.000 $33.400 $41.000 $44.500
PRESTR CONC BOX BEAM (5XB20)
LF 1,249.500 $305.000 $299.980 $250.000 $516.380 $375.000 $355.000 $360.000 $303.000
RIPRAP (CONC)(4 IN)
CY 120.000 $500.000 $450.000 $625.000 $553.980 $575.000 $545.000 $1,000.000 $690.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 146.000 $560.000 $450.000 $600.000 $554.330 $600.000 $577.000 $508.000 $675.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 476.000 $190.000 $179.200 $175.000 $389.430 $200.000 $179.000 $200.000 $228.000
RIPRAP (MOW STRIP)(4 IN)
CY 83.000 $625.000 $465.000 $725.000 $690.020 $600.000 $559.000 $700.000 $750.000
RAIL (TY T223)
LF 400.000 $130.000 $134.400 $160.000 $190.540 $175.000 $109.000 $220.000 $188.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 92.000 $160.000 $303.800 $250.000 $264.440 $200.000 $274.000 $155.000 $265.000
CONC BOX CULV (4 FT X 3 FT)
LF 49.000 $240.000 $508.620 $750.000 $674.060 $600.000 $588.000 $575.000 $628.000
CONC BOX CULV (5 FT X 2 FT)
LF 150.000 $500.000 $587.020 $700.000 $670.330 $650.000 $750.000 $540.000 $678.000
CONC BOX CULV (12 FT X 4 FT)
LF 100.000 $1,600.000 $1,946.840 $2,000.000 $2,500.050 $2,000.000 $2,530.000 $1,800.000 $1,970.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 13.000 $1,000.000 $826.000 $1,000.000 $1,107.540 $800.000 $848.000 $1,200.000 $1,153.000
RC PIPE (CL III)(18 IN)
LF 32.000 $85.000 $103.880 $80.000 $152.630 $125.000 $76.300 $172.000 $156.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $11,600.000 $8,204.000 $7,500.000 $12,313.670 $20,000.000 $9,400.000 $16,800.000 $14,415.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $16,000.000 $9,961.000 $12,000.000 $16,499.460 $28,000.000 $16,700.000 $16,500.000 $22,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $19,000.000 $13,412.000 $18,000.000 $19,203.270 $30,000.000 $25,900.000 $18,300.000 $29,700.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,300.000 $6,990.900 $6,400.000 $10,809.400 $12,000.000 $5,480.000 $7,200.000 $7,500.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $12,500.000 $7,456.400 $9,200.000 $12,684.400 $13,000.000 $6,380.000 $8,000.000 $11,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,876.000 $3,200.000 $1,624.100 $3,500.000 $1,420.000 $1,700.000 $1,755.000
CLEAN EXIST CULVERTS
EA 1.000 $2,200.000 $2,000.000 $1,000.000 $3,766.980 $2,500.000 $3,470.000 $2,700.000 $2,800.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $65,000.000 $165,000.000 $77,932.140 $175,000.000 $78,000.000 $100,000.000 $75,000.000
REMOV STR (PIPE)
EA 2.000 $390.000 $2,500.000 $2,000.000 $998.810 $2,000.000 $2,690.000 $1,600.000 $2,770.000
REMOV STR (SMALL FENCE)
LF 384.000 $15.000 $12.000 $5.000 $5.990 $4.000 $2.250 $4.000 $4.800
MOBILIZATION
LS 1.000 $451,837.910 $450,000.000 $505,910.660 $448,794.160 $350,000.000 $428,000.000 $560,000.000 $590,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $4,500.000 $5,000.000 $1,781.520 $10,000.000 $13,900.000 $12,000.000 $16,665.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 180.000 $50.000 $34.400 $32.000 $35.760 $30.000 $33.800 $40.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $70.000 $92.450 $86.000 $95.620 $40.000 $90.900 $130.000 $82.000
ROCK FILTER DAMS (REMOVE)
LF 280.000 $13.000 $16.120 $15.000 $17.230 $20.000 $15.900 $18.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 311.000 $30.000 $24.720 $23.000 $25.950 $15.000 $24.300 $20.000 $36.000
CONSTRUCTION EXITS (REMOVE)
SY 311.000 $15.000 $2.150 $2.000 $2.850 $10.000 $2.100 $8.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,220.000 $4.000 $2.250 $2.100 $2.460 $5.000 $2.200 $4.000 $4.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,220.000 $1.000 $0.800 $0.750 $0.860 $2.000 $0.790 $0.600 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $4,100.000 $3,500.000 $12,354.010 $5,645.020 $5,000.000 $3,910.000 $8,600.000 $5,400.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,230.000 $50.000 $22.000 $120.000 $29.130 $40.000 $53.600 $116.000 $60.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 900.000 $12.000 $10.000 $12.000 $11.940 $15.000 $9.600 $30.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,230.000 $15.000 $22.000 $18.000 $16.630 $20.000 $16.600 $3.500 $20.000
CONCRETE CURB (SPECIAL)
LF 77.000 $40.000 $80.000 $30.000 $75.220 $135.000 $51.500 $44.000 $72.000
DRIVEWAYS (ACP)
SY 235.000 $50.000 $60.000 $62.370 $113.260 $70.000 $85.000 $48.000 $66.000
DRIVEWAYS (SURF TREAT)
SY 42.000 $40.000 $60.000 $62.370 $91.260 $100.000 $180.000 $48.000 $50.000
TURNOUTS (ACP)
SY 18.000 $60.000 $60.000 $62.370 $174.690 $150.000 $5,140.000 $48.000 $70.000
RUMBLE STRIPS (SHOULDER)
LF 20,281.000 $0.200 $0.600 $0.350 $0.330 $0.250 $0.250 $0.500 $0.280
RUMBLE STRIPS (CENTERLINE)
LF 10,075.000 $0.200 $0.600 $0.400 $0.590 $0.300 $0.290 $0.500 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 525.000 $30.000 $27.950 $24.770 $29.560 $32.000 $30.100 $32.000 $28.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,700.000 $1,935.000 $2,385.830 $3,601.560 $2,400.000 $2,310.000 $2,100.000 $3,250.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $115.000 $76.860 $80.690 $117.970 $115.000 $116.000 $125.000 $73.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,700.000 $1,343.750 $1,316.430 $1,647.960 $1,700.000 $1,430.000 $1,500.000 $1,775.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $2.300 $2.150 $2.000 $2.350 $2.250 $2.400 $2.500 $2.050
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $225.000 $215.000 $170.450 $272.880 $200.000 $502.000 $530.000 $260.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,200.000 $3,063.750 $3,204.810 $3,737.880 $3,500.000 $2,910.000 $3,000.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $241.870 $255.470 $298.260 $500.000 $634.000 $670.000 $260.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $800.000 $1,277.340 $1,040.760 $1,500.000 $1,590.000 $1,700.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,100.000 $600.000 $750.750 $710.760 $50.000 $423.000 $445.000 $825.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $8,000.000 $9,364.000 $18,780.890 $10,000.000 $8,300.000 $8,800.000 $9,750.000
WIRE FENCE (TY C)
LF 214.000 $18.000 $20.690 $18.330 $21.650 $20.000 $17.400 $17.000 $23.000
GATE (TY 1)
EA 2.000 $1,500.000 $3,655.000 $1,527.740 $3,790.760 $4,000.000 $2,110.000 $1,100.000 $1,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $320.000 $403.120 $300.000 $246.650 $350.000 $227.000 $306.000 $287.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 20.000 $900.000 $779.370 $800.000 $972.650 $850.000 $925.000 $825.000 $775.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,100.000 $913.750 $825.000 $1,055.150 $875.000 $1,000.000 $885.000 $830.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,000.000 $983.620 $965.000 $1,104.650 $1,000.000 $1,050.000 $1,150.000 $1,075.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,400.000 $1,343.750 $1,160.000 $1,385.150 $1,200.000 $1,320.000 $1,600.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 22.000 $130.000 $21.500 $75.000 $91.730 $85.000 $79.300 $67.000 $62.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 14.000 $120.000 $99.980 $70.000 $62.250 $80.000 $116.000 $75.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $40.000 $40.310 $35.000 $111.400 $40.000 $39.600 $37.000 $34.400
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 4.000 $40.000 $39.230 $45.000 $308.780 $50.000 $31.700 $25.000 $23.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,995.000 $0.400 $0.480 $0.400 $0.490 $0.500 $0.420 $0.400 $0.420
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,920.000 $0.400 $48.380 $0.400 $0.490 $0.500 $0.420 $0.400 $0.420
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 144.000 $4.000 $8.600 $3.500 $4.550 $4.000 $3.700 $3.900 $3.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,525.000 $0.900 $0.860 $0.850 $0.980 $1.000 $0.900 $1.000 $0.890
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 36.000 $18.000 $13.970 $6.000 $9.420 $7.000 $6.300 $7.000 $6.270
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,840.000 $0.900 $0.860 $0.850 $0.960 $1.000 $0.900 $1.000 $0.890
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,021.000 $1.900 $3.000 $1.520 $1.500 $2.750 $1.750 $1.200 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,021.000 $1.700 $3.000 $1.520 $1.500 $2.750 $1.750 $1.200 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 20,389.000 $0.500 $0.650 $0.550 $0.620 $0.750 $0.580 $0.600 $0.570
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,411.000 $0.600 $0.700 $0.550 $0.650 $0.750 $0.580 $0.600 $0.570
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 6,993.000 $0.500 $0.640 $0.550 $0.630 $0.750 $0.580 $0.600 $0.570
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 52.000 $16.000 $21.500 $16.000 $19.550 $18.000 $16.900 $18.000 $16.700
REFL PAV MRKR TY II-A-A
EA 205.000 $5.000 $10.750 $3.500 $4.350 $4.000 $3.700 $4.000 $3.650
ELIM EXT PAV MRK & MRKS (4")
LF 2,560.000 $0.800 $0.540 $0.500 $0.630 $1.000 $0.530 $0.600 $0.520
TREE AND BRUSH REMOVAL
AC 0.400 $7,000.000 $35,000.000 $10,800.000 $28,787.580 $35,000.000 $42,000.000 $25,000.000 $9,000.000
D-GR HMA TY-B PG64-22
TON 697.000 $100.000 $115.500 $109.950 $106.770 $120.000 $143.000 $138.000 $136.000
D-GR HMA TY-D SAC-B PG70-22
TON 3,792.000 $150.000 $142.800 $105.510 $114.500 $145.000 $159.000 $167.000 $134.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 102.000 $160.000 $142.800 $137.000 $228.340 $150.000 $275.000 $167.000 $275.000
TACK COAT
GAL 350.000 $4.000 $3.410 $4.250 $10.210 $3.500 $5.400 $4.500 $5.000
INSTALL FTB
LF 183.000 $60.000 $70.000 $2.500 $85.760 $60.000 $43.800 $75.000 $96.000
REMOVE FTB
LF 183.000 $30.000 $20.000 $1.000 $17.460 $25.000 $8.800 $8.000 $13.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $13,500.000 $10,089.590 $24,369.070 $15,000.000 $13,100.000 $20,000.000 $14,000.000
TMA (STATIONARY)
DAY 160.000 $200.000 $300.000 $327.910 $245.450 $300.000 $191.000 $300.000 $150.000
TMA (MOBILE OPERATION)
HR 232.000 $100.000 $50.000 $100.900 $124.980 $20.000 $89.000 $50.000 $85.000
Totals: $5,066,217.010 $4,887,025.520 $5,089,529.180 $5,252,060.243 $5,255,313.800 $5,408,000.800 $5,608,077.850 $5,920,301.000