Show Job Controls
Bid Cobra

JIM WELLS US 281 (0255-15-005)

Items: 204

County: JIM WELLS
Length: N/A
Highway: US 281
District: CORPUS CHRISTI
Control Number: 0255-15-005
DBE Goal: N/A
Project: NH 1902(299)
Guaranty: N/A
Time: 834 WORKING DAYS
Engineer's Estimate: $78,379,833.75
Date: 10/02/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROADWAY LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$78,379,833.75
$78,425,429.45
Over/Under Est: 0.06% $45,595.70
Over/Under Est: 5.26% $4,124,602.65
Amt Left: 5.2% $4,079,006.95
Over/Under Est: 23.59% $18,491,842.88
Amt Left: 23.52% $18,446,247.18
Delta: -17.41% -$14,367,240.23
Subcontractor Percentage Amount
BAY LTD. 14.25% $11,709,681.06
BEAVER CONTRACTORS, LLC 3.53% $2,900,713.98
MATERIAL PRODUCERS CONSTRUCTION SERVICES, LLC 3.21% $2,637,759.73
ROVAN TEXAS, LLC 2.14% $1,758,506.49
GUERRA UNDERGROUND LLC 2.12% $1,742,071.85
IZAGUIRRE CONSTRUCTION LLC 1.64% $1,347,640.49
M & D FOUNDATION DRILLING INDUSTRIES, INC. 1.51% $1,240,815.33
THE LEVY COMPANY, INC. 1.25% $1,027,165.01
DEPENDABLE FENCE 1.07% $879,253.24
PANTHER CREEK TRANSPORTATION, INC. 0.37% $304,040.84
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.36% $295,823.52
AGUAWORKS PIPE & SUPPLY, LLC 0.36% $295,823.52
HIGHWAY BARRICADES AND SERVICES, LLC 0.35% $287,606.20
LONE STAR EROSION CONTROL 0.32% $262,954.24
A BROTHERS MILLING, LLC 0.19% $156,129.08
STRUCTURAL TECHNOLOGIES, LLC 0.19% $156,129.08
SIBONEY CONTRACTING CO. 0.17% $139,694.44
SOUTH TEXAS PAINTING 0.14% $115,042.48
J.L.V. CONSTRUCTION COMPANY, INC. 0.14% $115,042.48
CAPITAL PUMPING, LP 0.13% $106,825.16
PRODUCTION EQUIPMENT COMPANY OF SOUTH TEXAS, INC. 0.05% $41,086.60
LIMON MASONRY, LLC 0.04% $32,869.28
PRIMATE CONSTRUCTION, LP 0.04% $32,869.28
SWZ SERVICES, INC. 0.04% $32,869.28
BK FIELD OPERATIONS LLC 0.02% $16,434.64
TCI ROOFING & CONSTRUCTION, INC. 0.02% $16,434.64
BONDED LIGHTNING PROTECTION 0.01% $8,217.32
TNT CRANE & RIGGING, INC. 0.00% $0.00
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.00% $0.00
STRATA FOUNDATION DRILLING, LLC 0.00% $0.00
SWEEP ACROSS TEXAS 0.00% $0.00
Total: 33.66% $27,659,499.26

Bid Items & Bid Tabulations

204 Total 0 of 204
JIM WELLS  |  US 281  |  CORPUS CHRISTI  |  0255-15-005  |  10/02/2019  |  $78,379,833.75  |  NH 1902(299)  |  CONSTRUCT NEW ROADWAY LANES  |  834 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
ANDERSON COLUMBIA CO., INC.
SUNDT CONSTRUCTION, INC.
PREPARING ROW
STA 497.920 $3,000.000 $15,665.170 $1,500.000 $1,530.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 1,019.900 $2.800 $5.070 $1.000 $6.000
REMOVING STAB BASE & ASPH PAV (9")
SY 5,197.100 $6.700 $4.230 $2.500 $8.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 7,645.200 $9.200 $2.630 $1.000 $4.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 1,499.300 $19.000 $11.700 $3.500 $18.000
REMOVING STAB BASE AND ASPH PAV(4.5")
SY 1,318.400 $3.000 $10.920 $1.500 $12.000
OBLITERATING ABANDONED ROAD
SY 12,869.800 $9.000 $5.180 $5.000 $8.000
EXCAVATION (ROADWAY)
CY 112,040.000 $5.800 $2.130 $5.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 44,063.000 $5.000 $1.220 $6.000 $12.250
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 1,149,395.000 $12.000 $6.680 $8.700 $12.250
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 159,006.000 $14.000 $35.850 $10.200 $12.250
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 312,057.000 $0.130 $0.120 $0.120 $0.150
VEGETATIVE WATERING
MG 50,000.000 $20.000 $18.890 $22.000 $13.500
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 160,491.000 $1.100 $0.850 $0.850 $0.900
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 27,991.000 $10.500 $0.900 $0.900 $1.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 99,499.000 $63.000 $60.000 $88.000 $90.000
LIME (HYD, COM OR QK)(SLURRY)
TON 5,080.000 $200.000 $180.000 $170.000 $182.000
LIME TRT (SUBGRADE)(8")
SY 258,537.000 $3.750 $1.960 $3.750 $2.650
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 10,380.600 $1.600 $1.160 $1.200 $2.000
SALV, HAUL & STKPL RCL APH PV (3")
SY 1,997.700 $1.200 $4.310 $4.400 $5.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 19,944.500 $1.100 $1.370 $1.400 $3.000
SALV, HAUL & STKPL RCL ASH PV (12")
SY 4,065.300 $3.000 $5.130 $7.200 $9.000
SLV, HAUL & STKPL RCL APH PV (13")
SY 12,109.500 $1.300 $5.690 $6.800 $9.500
PRIME COAT (MC-30)
GAL 54,268.200 $3.800 $4.290 $4.800 $3.780
ASPH (MULTI OPTION)
GAL 105,549.700 $2.800 $2.950 $4.500 $2.730
AGGR (MULTI OPTION)
CY 2,795.300 $65.000 $61.840 $115.000 $121.500
SUPERPAVE MIXTURES SP-B PG70-22
TON 65,261.900 $80.000 $76.920 $88.000 $94.120
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 33,959.800 $110.000 $111.070 $128.000 $126.750
CEM STABIL BKFL
CY 3,415.000 $75.000 $44.570 $78.000 $200.000
TEMPORARY SPL SHORING
SF 6,050.000 $11.000 $13.310 $45.000 $40.000
PRESTR CONC PIL (18 IN SQ)
LF 4,760.000 $80.000 $90.010 $86.000 $125.000
DRILL SHAFT (18 IN)
LF 1,086.000 $65.000 $76.540 $134.000 $70.000
DRILL SHAFT (36 IN)
LF 3,821.000 $175.000 $171.130 $190.000 $225.000
DRILL SHAFT (42 IN)
LF 4,300.000 $225.000 $208.820 $230.000 $300.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 240.000 $200.000 $285.000 $285.000 $320.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 240.000 $550.000 $650.000 $650.000 $725.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $200.000 $260.000 $260.000 $290.000
CL C CONC (ABUT)
CY 528.000 $800.000 $837.360 $940.000 $950.000
CL C CONC (CAP)
CY 461.600 $950.000 $1,098.790 $940.000 $1,100.000
CL C CONC (COLUMN)
CY 384.800 $750.000 $981.490 $880.000 $1,150.000
CL C CONC (COLUMN)(MASS)
CY 301.500 $700.000 $775.040 $1,100.000 $850.000
CL C CONC (FOOTING)(MASS)
CY 569.000 $600.000 $581.470 $700.000 $650.000
CL C CONC (RAIL FOUNDATION)
CY 4,408.500 $475.000 $300.000 $340.000 $350.000
CL C CONC (MISC)
CY 2.700 $850.000 $1,813.660 $1,500.000 $1,000.000
CL H CONC (PT CAP)(MASS)
CY 759.200 $1,000.000 $1,471.710 $1,350.000 $1,800.000
CL K CONC (MISC)
CY 19.000 $725.000 $2,688.270 $1,700.000 $1,000.000
CL A CONC (CHANNEL LINING)
CY 1,158.000 $400.000 $465.450 $425.000 $450.000
REINF CONC SLAB
SF 130,517.000 $15.000 $17.210 $21.400 $18.000
REINF CONC SLAB (SLAB BEAM)
SF 12,042.000 $15.000 $15.690 $15.400 $17.000
APPROACH SLAB
CY 269.300 $500.000 $470.520 $550.000 $525.000
RETAINING WALL (MSE)
SF 143,190.000 $50.000 $26.600 $74.000 $90.000
RETAINING WALL (MSE) (ASHLAR STONE FIN)
SF 4,405.000 $60.000 $29.310 $78.000 $90.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,242.000 $95.000 $125.560 $150.000 $160.000
PRESTR CONC SLAB BEAM (5SB12)
LF 1,345.500 $100.000 $127.280 $172.000 $160.000
PRESTR CONC GIRDER (TX34)
LF 1,790.080 $150.000 $122.200 $148.000 $140.000
PRESTR CONC GIRDER (TX40)
LF 5,370.030 $150.000 $97.840 $145.000 $145.000
PRESTR CONC GIRDER (TX54)
LF 8,425.320 $150.000 $120.560 $140.000 $150.000
RIPRAP (CONC)(4 IN)
CY 22.230 $450.000 $626.330 $350.000 $800.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 412.000 $475.000 $367.370 $325.000 $450.000
RIPRAP (CONC) (CL B) (4")
CY 15.850 $450.000 $764.900 $400.000 $650.000
RIPRAP (SPECIAL)
CY 1,293.000 $600.000 $535.600 $475.000 $500.000
RIPRAP (CONC)(FLUME)
CY 14.610 $550.000 $612.590 $400.000 $600.000
RIPRAP (MOW STRIP)(5 IN)
CY 209.370 $475.000 $509.830 $315.000 $500.000
RAIL (TY SSTR)
LF 35,069.430 $50.000 $30.000 $48.000 $55.000
RAIL (TY C223)
LF 600.000 $125.000 $101.410 $160.000 $108.500
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 1,093.000 $80.000 $85.190 $86.000 $100.000
CONC BOX CULV (3 FT X 2 FT)
LF 623.000 $225.000 $160.920 $175.000 $250.000
CONC BOX CULV (4 FT X 2 FT)
LF 272.000 $175.000 $231.130 $215.000 $275.000
CONC BOX CULV (4 FT X 4 FT)
LF 120.000 $300.000 $471.110 $263.000 $276.000
CONC BOX CULV (6 FT X 4 FT)
LF 4,637.000 $300.000 $371.410 $455.000 $500.000
CONC BOX CULV (6 FT X 5 FT)
LF 108.000 $350.000 $604.960 $475.000 $525.000
CONC BOX CULV (8 FT X 4 FT)
LF 130.000 $450.000 $965.810 $615.000 $555.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 90.000 $650.000 $451.410 $300.000 $800.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 57.000 $1,000.000 $1,313.150 $680.000 $1,100.000
RC PIPE (CL III)(18 IN)
LF 149.000 $55.000 $249.630 $52.000 $300.000
RC PIPE (CL III)(24 IN)
LF 939.000 $69.000 $60.260 $67.000 $100.000
INLET (COMPL)(TY MSE2)
EA 12.000 $5,300.000 $2,966.570 $2,450.000 $5,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 3.000 $8,200.000 $7,629.100 $6,870.000 $5,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $5,600.000 $2,891.330 $4,650.000 $3,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $6,000.000 $5,286.540 $5,740.000 $6,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 4.000 $6,000.000 $4,388.470 $5,780.000 $4,800.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 14.000 $6,900.000 $4,472.450 $9,740.000 $5,200.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 6.000 $9,000.000 $4,107.240 $9,590.000 $5,500.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 36.000 $10,300.000 $3,959.900 $9,090.000 $6,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 14.000 $10,000.000 $6,900.290 $12,200.000 $8,000.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 1.000 $10,000.000 $20,490.750 $12,200.000 $9,500.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (C)
EA 1.000 $10,000.000 $29,796.010 $14,000.000 $12,500.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (C)
EA 4.000 $26,000.000 $10,015.700 $14,000.000 $9,500.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
EA 4.000 $7,700.000 $9,948.170 $13,100.000 $9,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $593.290 $1,120.000 $1,300.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,500.000 $905.010 $1,120.000 $1,300.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 8.000 $1,500.000 $823.690 $1,120.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 10.000 $1,400.000 $869.470 $1,540.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $823.690 $1,540.000 $1,500.000
REMOV STR (PIPE)
LF 180.000 $20.000 $16.060 $14.250 $20.000
MOBILIZATION
LS 1.000 $6,600,000.000 $7,686,704.260 $7,760,000.000 $10,444,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 48.000 $5,600.000 $7,000.000 $8,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 200.000 $28.000 $35.000 $37.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $8.400 $10.000 $10.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,111.000 $20.000 $16.000 $17.000 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 1,111.000 $6.600 $7.000 $7.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,115.000 $2.400 $2.750 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,115.000 $0.700 $1.250 $1.300 $1.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,980.000 $3.800 $4.750 $5.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,980.000 $1.000 $2.000 $2.000 $2.100
CONSTRUCTING DETOURS (TY 1)
SY 5,350.000 $55.000 $115.510 $70.000 $160.000
CONSTRUCTING DETOURS (TY 2)
SY 3,817.000 $55.000 $68.670 $15.000 $80.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 14,693.000 $24.000 $31.980 $41.000 $71.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 15,030.000 $4.000 $5.250 $10.000 $4.750
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 10,710.000 $6.000 $18.590 $18.000 $7.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 400.000 $50.000 $80.810 $65.000 $95.000
INTERSECTIONS (ACP)
SY 11,461.000 $16.750 $22.720 $20.000 $40.000
RUMBLE STRIPS (SHOULDER)
LF 81,245.090 $0.140 $0.100 $0.250 $0.150
CRASH CUSH ATTEN (MOVE & RESET)
EA 13.000 $1,300.000 $1,555.000 $2,950.000 $1,550.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,400.000 $800.000 $1,040.000 $900.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 19.000 $20,000.000 $21,809.000 $24,300.000 $21,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 35.000 $12,500.000 $14,508.000 $16,900.000 $14,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $20,000.000 $20,855.000 $23,600.000 $22,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,300.000 $1,500.000 $1,560.000 $1,650.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 5.000 $3,100.000 $2,850.000 $2,970.000 $3,100.000
CONDT (PVC) (SCH 40) (2")
LF 6,225.000 $9.900 $8.000 $8.000 $9.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 355.000 $29.000 $35.500 $37.000 $36.000
CONDT (RM) (3/4")
LF 370.000 $15.000 $29.500 $31.000 $30.000
ELEC CONDR (NO.10) BARE
LF 2,980.000 $1.900 $1.050 $1.100 $1.100
ELEC CONDR (NO.10) INSULATED
LF 6,210.000 $1.200 $1.050 $1.100 $1.100
ELEC CONDR (NO.8) BARE
LF 3,970.000 $1.300 $1.250 $1.300 $1.300
ELEC CONDR (NO.8) INSULATED
LF 7,940.000 $1.700 $1.250 $1.300 $1.300
GROUND BOX TY A (122311)W/APRON
EA 18.000 $1,100.000 $880.000 $920.000 $900.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 6.000 $6,800.000 $6,400.000 $6,660.000 $6,600.000
ALUMINUM SIGNS (TY G)
SF 340.000 $25.000 $21.000 $18.000 $31.000
ALUMINUM SIGNS (TY O)
SF 2,651.000 $25.000 $22.000 $20.000 $21.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $535.000 $510.000 $500.000 $455.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $25.000 $650.000 $470.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 51.000 $550.000 $600.000 $615.000 $575.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 2.000 $550.000 $1,245.000 $1,390.000 $1,500.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 8.000 $650.000 $2,100.000 $2,250.000 $1,650.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $1,000.000 $260.000 $115.000 $200.000
REMOVE SM RD SN SUP&AM
EA 49.000 $3,200.000 $40.000 $78.000 $75.000
INSTALL LRSS (STRUCT STEEL)
LB 1,894.800 $5.000 $6.500 $4.500 $5.000
INS OH SN SUP(55 FT BRDG)
EA 1.000 $30,000.000 $27,000.000 $28,540.000 $26,000.000
INS OH SN SUP(60 FT BRDG)
EA 3.000 $30,000.000 $28,500.000 $30,620.000 $28,000.000
INS OH SN SUP(65 FT BRDG)
EA 1.000 $35,000.000 $30,000.000 $31,350.000 $29,000.000
INS OH SN SUP(70 FT BRDG)
EA 1.000 $46,800.000 $31,500.000 $33,800.000 $31,000.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 66.000 $60.000 $55.000 $48.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 11.000 $70.000 $60.000 $48.000 $65.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 235.000 $65.000 $15.000 $18.000 $18.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 6.000 $125.000 $60.000 $48.000 $65.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 152.000 $20.000 $12.000 $18.000 $15.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 65.000 $55.000 $55.000 $48.000 $60.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 28.000 $18.000 $60.000 $48.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $80.000 $18.000 $32.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 24.000 $90.000 $18.000 $32.000 $20.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 672.000 $0.600 $0.650 $0.700 $0.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 12,414.000 $0.600 $0.650 $0.700 $0.700
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 771.000 $1.250 $2.000 $2.000 $2.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 15,605.000 $0.600 $0.650 $0.700 $0.700
REFL PAV MRK TY I (W)4"(LNDP)(090MIL)
LF 1,254.000 $1.500 $0.450 $0.500 $0.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,379.000 $0.750 $0.700 $0.700 $0.750
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 900.000 $2.300 $2.500 $2.600 $2.550
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 143.000 $5.000 $5.000 $5.000 $5.100
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 16.000 $90.000 $120.000 $125.000 $125.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 4.000 $175.000 $150.000 $160.000 $155.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 5.000 $125.000 $175.000 $180.000 $180.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 13,847.000 $0.350 $0.400 $0.400 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 88,399.000 $0.260 $0.350 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 90,209.000 $0.280 $0.350 $0.400 $0.400
TRAFFIC BUTTON TY II-A-A
EA 383.000 $3.400 $4.000 $4.000 $4.100
TRAFFIC BUTTON TY II-C-R
EA 1,799.000 $4.300 $3.500 $4.000 $3.600
INSTL TIED CONCRETE EROSN CONTROL MATS
SF 2,711.000 $4.300 $25.000 $20.000 $12.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 305,481.080 $1.500 $5.000 $1.150 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $17,320.000 $71,300.000 $16,500.000
TMA (STATIONARY)
EA 2.000 $6,000.000 $32,500.000 $23,200.000 $60,000.000
TMA (MOBILE OPERATION)
HR 200.000 $50.000 $45.240 $29.000 $50.000
LED HI MST(150 FT)(110MPH)(6FIXT)(TY A)
EA 8.000 $50,000.000 $46,600.000 $48,470.000 $48,000.000
TRENCH EXCAVATION PROTECTION
LF 6,646.000 $2.500 $6.500 $4.700 $11.250
FIRE HYDRANT
EA 1.000 $6,000.000 $6,790.000 $5,600.000 $12,000.000
WATER METER ASSEMBLY
EA 1.000 $3,000.000 $3,725.000 $8,900.000 $14,000.000
8"X6" TAPPING SLEEVE
EA 1.000 $6,000.000 $8,184.000 $3,680.000 $4,800.000
WATER MAIN (PVC) (C-900) (6")
LF 436.000 $100.000 $33.000 $26.000 $56.000
PIPE WATER MAIN (STEEL CASING) (12")
LF 1,215.000 $120.000 $80.000 $90.000 $215.000
WATER MAIN PIPE (PVC) (4IN) (C-900)
LF 65.000 $75.000 $81.500 $76.000 $32.000
AIR RELEASE/VACUUM RELEASE VALVE
EA 1.000 $3,500.000 $5,653.000 $10,030.000 $11,500.000
GATE VALVE & BOX (COMPLETE) (8IN)
EA 1.000 $2,000.000 $1,616.000 $2,100.000 $5,200.000
SWR (8") FORCE MAIN (C-900)
LF 539.000 $125.000 $53.300 $33.000 $79.000
4' MANHOLE
EA 15.000 $6,000.000 $9,692.000 $6,870.000 $12,000.000
4' EXTRA DEPTH MANHOLE
LF 151.000 $300.000 $1,042.000 $220.000 $350.000
7' DROP MANHOLE
EA 1.000 $15,000.000 $27,147.000 $18,820.000 $23,000.000
7' EXTRA DEPTH MANHOLE
LF 9.000 $600.000 $1,980.000 $1,020.000 $11,500.000
SANITARY SEWER (15IN) (PVC) (SDR35)
LF 3,402.000 $300.000 $137.000 $78.000 $79.000
PIPE ENCASEMENT (24" STEEL)
LF 921.000 $200.000 $206.000 $158.000 $220.000
SANITARY SEWER (24" IN) (PVC) (PS46)
LF 17.000 $330.000 $196.000 $200.000 $111.000
ABAND AND GROUT/FILL 15"WASTWATER MAIN
LF 3,720.000 $20.000 $38.500 $19.000 $26.000
ABAND AND GROUT/FILL LAT MULT SIZES
LF 1,261.000 $20.000 $25.000 $36.000 $26.000
MANHOLE REMOVAL (4' DIA)
EA 8.000 $500.000 $2,669.000 $910.000 $2,000.000
REMOVAL (8" FORCE MAIN)
LF 6,024.000 $125.000 $2.000 $16.000 $26.000
REMOVAL OF WATER PIPE (VARIOUS SIZES)
LF 1,090.000 $150.000 $15.000 $17.000 $21.000
4" GATE VALVE & (6") BOX (COMPLETE)
EA 2.000 $1,000.000 $930.000 $1,240.000 $5,500.000
6" GATE VALVE & (6") BOX (COMPLETE)
EA 2.000 $1,500.000 $1,090.000 $1,510.000 $6,600.000
PIPE ENCASEMENT (16" STL)
LF 51.000 $150.000 $103.000 $100.000 $215.000
CARRIER PIPE (4 IN) (PVC) (C900)
LF 720.000 $75.000 $28.750 $29.000 $36.000
CARRIER PIPE (6 IN) (PVC) (C900)
LF 495.000 $100.000 $31.650 $34.000 $72.000
CARRIER PIPE (8 IN) (PVC) (SDR35)
LF 51.000 $125.000 $33.000 $39.000 $90.000
CARRIER PIPE (15 IN) (PVC) (SDR35)
LF 921.000 $300.000 $45.400 $102.000 $140.000
SANITARY SEWER LIFT STATION
EA 1.000 $650,000.000 $2,259,878.290 $1,200,000.000 $2,000,000.000
Totals: $78,379,833.753 $78,425,429.615 $82,504,436.404 $96,871,676.648