EXCAVATION (ROADWAY)
|
CY
|
4,318.000
|
$12.000
|
$10.650
|
$16.740
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
297.450
|
$450.000
|
$341.900
|
$865.800
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
8,163.700
|
$12.000
|
$16.250
|
$16.290
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$90.000
|
$102.600
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
26.200
|
$0.400
|
$3,090.000
|
$600.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
6.600
|
$0.250
|
$2,575.000
|
$400.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
6.600
|
$0.250
|
$2,575.000
|
$400.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,067.390
|
$20.000
|
$10.000
|
$23.310
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
31,890.000
|
$75.000
|
$89.620
|
$88.410
|
|
|
CEMENT
|
TON
|
1,373.000
|
$150.000
|
$147.480
|
$157.500
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
145,148.000
|
$2.000
|
$1.000
|
$2.170
|
|
|
ASPH (RC-250)
|
GAL
|
26,305.000
|
$3.500
|
$3.290
|
$5.110
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
939.000
|
$100.000
|
$109.460
|
$84.430
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
1,547.000
|
$100.000
|
$109.900
|
$98.250
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
1,012.000
|
$100.000
|
$118.710
|
$98.290
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
97,327.000
|
$3.000
|
$3.030
|
$4.010
|
|
|
CEM STABIL BKFL
|
CY
|
17.800
|
$150.000
|
$128.100
|
$115.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
23.400
|
$470.000
|
$404.240
|
$475.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
40.000
|
$75.000
|
$30.750
|
$95.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
12.000
|
$100.000
|
$75.150
|
$105.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
8.000
|
$400.000
|
$454.850
|
$600.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
4.000
|
$425.000
|
$844.510
|
$900.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
14.000
|
$500.000
|
$552.860
|
$750.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
24.000
|
$625.000
|
$429.760
|
$750.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
6.000
|
$600.000
|
$909.250
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
56.000
|
$75.000
|
$43.150
|
$90.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
44.000
|
$80.000
|
$55.250
|
$100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$4,000.000
|
$4,614.000
|
$4,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$5,677.700
|
$7,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$5,500.000
|
$6,284.400
|
$6,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$6,500.000
|
$6,318.600
|
$4,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$8,821.500
|
$9,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$9,030.000
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$1,000.000
|
$1,054.900
|
$1,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,100.000
|
$1,116.650
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,139.400
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,100.000
|
$1,261.500
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,200.000
|
$1,340.180
|
$2,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,400.000
|
$2,080.280
|
$2,800.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$2,348.450
|
$3,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$1,200.000
|
$525.000
|
$1,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$354,000.000
|
$227,072.500
|
$556,864.860
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,500.000
|
$1,236.000
|
$2,035.840
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$50.000
|
$72.100
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$36.050
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,420.000
|
$3.000
|
$5.670
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,420.000
|
$1.000
|
$2.580
|
$1.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,227.200
|
$25.000
|
$49.000
|
$26.280
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$22.000
|
$29.660
|
$22.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$80.000
|
$52.320
|
$65.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$3,290.850
|
$2,400.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$190.000
|
$309.000
|
$225.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$20.000
|
$38.060
|
$10.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
18.000
|
$55.000
|
$46.350
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,050.000
|
$0.250
|
$0.270
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
19,800.000
|
$0.250
|
$0.270
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,855.000
|
$0.250
|
$0.270
|
$0.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,179.000
|
$1.500
|
$3.050
|
$1.760
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
365.000
|
$2.300
|
$1.290
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
9,285.000
|
$0.700
|
$1.030
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
6,600.000
|
$0.750
|
$1.030
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
58,105.000
|
$0.350
|
$0.420
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(060MIL)
|
LF
|
6,600.000
|
$0.350
|
$0.360
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL)
|
LF
|
9,285.000
|
$0.350
|
$0.360
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
12.000
|
$15.000
|
$15.450
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
5.000
|
$28.000
|
$103.000
|
$100.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$3.500
|
$5.150
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
493.000
|
$3.500
|
$5.150
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$12,463.000
|
$8,118.750
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$8,000.000
|
$10,500.000
|
$7,036.250
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$500.000
|
$500.000
|
$270.620
|
|
Totals: |
$4,813,355.730
|
$5,207,582.106
|
$5,839,585.150
|