Show Job Controls
Bid Cobra

JACKSON FM 1862 (1744-02-013)

Items: 71

County: JACKSON
Length: N/A
Highway: FM 1862
District: YOAKUM
Control Number: 1744-02-013
DBE Goal: N/A
Project: STP 1902(027)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $4,813,355.73
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,813,355.73
$5,207,582.09
Over/Under Est: 8.19% $394,226.36
Over/Under Est: 21.32% $1,026,229.41
Amt Left: 12.14% $632,003.05

Bid Items & Bid Tabulations

71 Total 0 of 71
JACKSON  |  FM 1862  |  YOAKUM  |  1744-02-013  |  06/04/2019  |  $4,813,355.73  |  STP 1902(027)  |  REHAB EXIST ROADWAY  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REXCO CONSTRUCTION SERVICES, INC.
HUNTER INDUSTRIES, LTD.
EXCAVATION (ROADWAY)
CY 4,318.000 $12.000 $10.650 $16.740
SUBGRADE WIDENING (ORD COMP)
STA 297.450 $450.000 $341.900 $865.800
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 8,163.700 $12.000 $16.250 $16.290
BLADING
HR 50.000 $100.000 $90.000 $102.600
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 26.200 $0.400 $3,090.000 $600.000
DRILL SEEDING (TEMP) (WARM)
AC 6.600 $0.250 $2,575.000 $400.000
DRILL SEEDING (TEMP) (COOL)
AC 6.600 $0.250 $2,575.000 $400.000
VEGETATIVE WATERING
MG 1,067.390 $20.000 $10.000 $23.310
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 31,890.000 $75.000 $89.620 $88.410
CEMENT
TON 1,373.000 $150.000 $147.480 $157.500
CEMENT TREAT (EXIST MATL) (6")
SY 145,148.000 $2.000 $1.000 $2.170
ASPH (RC-250)
GAL 26,305.000 $3.500 $3.290 $5.110
AGGR(TY-E GR-5 SAC-B)
CY 939.000 $100.000 $109.460 $84.430
AGGR(TY-PE GR-3 SAC-B)
CY 1,547.000 $100.000 $109.900 $98.250
AGGR(TY-PE GR-4 SAC-B)
CY 1,012.000 $100.000 $118.710 $98.290
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 97,327.000 $3.000 $3.030 $4.010
CEM STABIL BKFL
CY 17.800 $150.000 $128.100 $115.000
RIPRAP (CONC)(5 IN)
CY 23.400 $470.000 $404.240 $475.000
CMP (GAL STL 18 IN)
LF 40.000 $75.000 $30.750 $95.000
CMP (GAL STL 30 IN)
LF 12.000 $100.000 $75.150 $105.000
CONC BOX CULV (4 FT X 2 FT)
LF 8.000 $400.000 $454.850 $600.000
CONC BOX CULV (4 FT X 4 FT)
LF 4.000 $425.000 $844.510 $900.000
CONC BOX CULV (5 FT X 3 FT)
LF 14.000 $500.000 $552.860 $750.000
CONC BOX CULV (7 FT X 3 FT)
LF 24.000 $625.000 $429.760 $750.000
CONC BOX CULV (7 FT X 4 FT)
LF 6.000 $600.000 $909.250 $1,100.000
RC PIPE (CL III)(18 IN)
LF 56.000 $75.000 $43.150 $90.000
RC PIPE (CL III)(24 IN)
LF 44.000 $80.000 $55.250 $100.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $4,000.000 $4,614.000 $4,200.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $7,000.000 $5,677.700 $7,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $5,500.000 $6,284.400 $6,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $6,500.000 $6,318.600 $4,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $6,000.000 $8,821.500 $9,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $6,500.000 $9,030.000 $12,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 10.000 $1,000.000 $1,054.900 $1,300.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 32.000 $1,100.000 $1,116.650 $1,400.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $2,000.000 $1,139.400 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $2,100.000 $1,261.500 $2,000.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 2.000 $2,200.000 $1,340.180 $2,800.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 8.000 $2,400.000 $2,080.280 $2,800.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $3,000.000 $2,348.450 $3,500.000
CLEAN EXIST CULVERTS
EA 13.000 $1,200.000 $525.000 $1,800.000
MOBILIZATION
LS 1.000 $354,000.000 $227,072.500 $556,864.860
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $1,236.000 $2,035.840
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $50.000 $72.100 $40.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $36.050 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,420.000 $3.000 $5.670 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,420.000 $1.000 $2.580 $1.000
DRIVEWAYS (SURF TREAT)
SY 2,227.200 $25.000 $49.000 $26.280
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $22.000 $29.660 $22.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $80.000 $52.320 $65.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $3,290.850 $2,400.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $190.000 $309.000 $225.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $20.000 $38.060 $10.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 18.000 $55.000 $46.350 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 4,050.000 $0.250 $0.270 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 19,800.000 $0.250 $0.270 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,855.000 $0.250 $0.270 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,179.000 $1.500 $3.050 $1.760
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 365.000 $2.300 $1.290 $1.250
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 9,285.000 $0.700 $1.030 $1.000
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 6,600.000 $0.750 $1.030 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 58,105.000 $0.350 $0.420 $0.410
RE PM W/RET REQ TY I (Y)4"(BRK)(060MIL)
LF 6,600.000 $0.350 $0.360 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL)
LF 9,285.000 $0.350 $0.360 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 12.000 $15.000 $15.450 $15.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 5.000 $28.000 $103.000 $100.000
REFL PAV MRKR TY I-C
EA 18.000 $3.500 $5.150 $5.000
REFL PAV MRKR TY II-A-A
EA 493.000 $3.500 $5.150 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $12,463.000 $8,118.750
TMA (STATIONARY)
EA 2.000 $8,000.000 $10,500.000 $7,036.250
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $500.000 $270.620
Totals: $4,813,355.730 $5,207,582.106 $5,839,585.150