Show Job Controls
Bid Cobra

JACKSON FM 530 (1090-01-027)

Items: 71

County: JACKSON
Length: N/A
Highway: FM 530
District: YOAKUM
Control Number: 1090-01-027
DBE Goal: N/A
Project: BR 2021(389)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $2,222,766.75
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$2,222,766.75
1
$2,346,537.14
Over/Under Est: 5.57% $123,770.39
Over/Under Est: 27.7% $615,670.70
Amt Left: 20.96% $491,900.31
$2,996,709.65
Over/Under Est: 34.82% $773,942.90
Amt Left: 27.71% $650,172.51
Delta: -5.58% -$158,272.20
Over/Under Est: 46.65% $1,036,820.27
Amt Left: 38.91% $913,049.88
Delta: -8.77% -$262,877.37
Subcontractor Percentage Amount
SPECIALTY DRILLING, LLC 8.95% $211,846.85
SYLVA CONSTRUCTION, LLC 3.53% $83,555.24
DARKHORSE INDUSTRIES, L.L.C. 3.07% $72,667.02
HIGHWAY 1 LLC 2.36% $55,861.29
S & S BRIDGE PAINTING, INC. 1.55% $36,688.56
A K FUQUAY CONSTRUCTION 0.89% $21,066.34
A1 EROSION CONTROL 0.14% $3,313.81
Total: 20.49% $484,999.11

Bid Items & Bid Tabulations

71 Total 0 of 71
JACKSON  |  FM 530  |  YOAKUM  |  1090-01-027  |  03/04/2021  |  $2,222,766.75  |  BR 2021(389)  |  REPLACE BRIDGE AND APPROACHES  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
TIERRA LEASE SERVICE, LLC
EARTH BUILDERS, L.P.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 4.050 $3,000.000 $5,000.000 $5,000.000 $7,000.000 $16,487.340
EXCAVATION (ROADWAY)
CY 3,594.000 $14.000 $6.000 $10.000 $15.000 $16.530
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,848.000 $7.500 $10.000 $25.000 $20.000 $16.270
BLADING
HR 50.000 $100.000 $15.000 $115.000 $125.000 $146.630
FURNISHING AND PLACING TOPSOIL (4")
SY 10,745.000 $1.000 $3.000 $3.500 $1.000 $4.210
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 29,576.000 $0.350 $0.420 $0.500 $0.500 $0.460
CELL FBR MLCH SEED(TEMP)(WARM)
SY 7,394.000 $0.350 $0.520 $0.400 $0.500 $0.460
CELL FBR MLCH SEED(TEMP)(COOL)
SY 7,394.000 $0.350 $0.520 $0.400 $0.500 $0.460
VEGETATIVE WATERING
MG 249.310 $40.000 $10.000 $10.000 $40.000 $48.220
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 3,090.000 $1.000 $2.000 $1.100 $2.500 $1.500
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 3,813.000 $65.000 $92.000 $90.000 $82.000 $79.420
CEMENT
TON 217.000 $150.000 $186.000 $155.000 $200.000 $170.400
CEMENT TREAT (SUBGRADE) (8")
SY 10,714.000 $3.000 $2.000 $1.750 $5.000 $6.750
PRIME COAT (MC-30)
GAL 1,779.000 $5.000 $7.000 $5.000 $7.000 $5.560
AGGR(TY-PE GR-3 SAC-B)
CY 105.000 $120.000 $290.000 $220.000 $330.000 $222.300
AGGR(TY-PE GR-4 SAC-B)
CY 69.000 $125.000 $300.000 $190.000 $300.000 $284.580
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 6,582.000 $3.500 $3.000 $3.750 $4.600 $4.100
CEM STABIL BKFL
CY 194.000 $80.000 $85.000 $150.000 $220.000 $262.820
TEMPORARY SPL SHORING
SF 485.000 $20.000 $35.000 $32.000 $25.000 $44.760
DRILL SHAFT (36 IN)
LF 1,070.000 $220.000 $336.000 $250.000 $250.000 $358.560
CL C CONC (ABUT)
CY 67.700 $1,000.000 $500.000 $1,250.000 $1,500.000 $1,598.400
CL C CONC (CAP)
CY 41.400 $1,150.000 $650.000 $1,500.000 $1,500.000 $1,598.400
CL C CONC (COLUMN)
CY 25.000 $1,150.000 $866.000 $1,550.000 $1,500.000 $1,958.400
REINF CONC SLAB
SF 15,640.000 $18.000 $15.000 $24.250 $25.000 $27.560
PRESTR CONC GIRDER (TX54)
LF 2,031.040 $130.000 $152.000 $150.000 $195.000 $181.920
RIPRAP (STONE PROTECTION)(18 IN)
CY 412.000 $150.000 $135.000 $240.000 $230.000 $215.270
RAIL (TY T223)
LF 728.000 $120.000 $81.000 $130.000 $110.000 $115.820
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 86.000 $110.000 $100.000 $135.000 $120.000 $123.200
RC PIPE (CL III)(36 IN)
LF 32.000 $125.000 $92.000 $175.000 $180.000 $232.800
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,000.000 $3,216.000 $3,000.000 $2,200.000 $3,718.800
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $100,000.000 $85,000.000 $100,000.000 $93,600.000
MOBILIZATION
LS 1.000 $200,000.000 $200,000.000 $325,000.000 $300,000.000 $297,171.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,800.000 $700.000 $2,000.000 $1,000.000 $3,850.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 170.000 $35.000 $10.000 $20.000 $45.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 170.000 $10.000 $2.000 $10.000 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,050.000 $3.000 $2.000 $3.000 $4.000 $3.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,050.000 $1.000 $0.500 $1.250 $1.000 $0.900
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 11.000 $5,000.000 $3,500.000 $4,000.000 $5,600.000 $3,630.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 990.000 $15.000 $3.000 $13.000 $20.000 $46.200
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 840.000 $10.000 $10.000 $20.000 $20.000 $38.500
DRIVEWAYS (SURF TREAT)
SY 324.000 $35.000 $4.290 $35.000 $28.000 $4.080
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $25.000 $20.000 $22.500 $28.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,850.000 $1,817.000 $2,000.000 $2,000.000 $1,920.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $2.500 $6.310 $1.500 $4.000 $1.500
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $250.000 $315.000 $200.000 $250.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $2,765.000 $2,700.000 $2,800.000 $3,240.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $97.000 $200.000 $350.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,894.000 $1,400.000 $3,500.000 $1,872.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,000.000 $631.000 $1,400.000 $2,000.000 $840.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $9,612.000 $9,000.000 $8,500.000 $10,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $500.000 $1,022.000 $1,000.000 $600.000 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $400.000 $453.860 $550.000 $450.000 $402.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $400.000 $515.000 $750.000 $450.000 $480.000
REMOVE SM RD SN SUP&AM
EA 9.000 $85.000 $86.000 $150.000 $200.000 $72.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $20.000 $6.000 $30.000 $7.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $24.000 $171.000 $25.000 $137.000 $42.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,100.000 $1.000 $0.910 $0.550 $0.850 $0.860
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $7.000 $6.320 $21.000 $6.000 $6.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 711.000 $1.000 $1.330 $0.600 $1.200 $1.260
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,910.000 $1.000 $0.910 $0.550 $0.850 $0.860
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 360.000 $2.000 $2.530 $1.050 $2.500 $2.640
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,200.000 $0.750 $0.630 $0.550 $0.550 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 711.000 $0.750 $0.630 $0.550 $0.550 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,710.000 $0.750 $0.630 $0.550 $0.550 $0.600
REFL PAV MRKR TY II-A-A
EA 157.000 $5.000 $5.000 $5.500 $5.000 $4.800
ELIM EXT PAV MRK & MRKS (4")
LF 19,900.000 $0.500 $0.510 $1.000 $0.450 $0.480
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $4.000 $2.530 $5.000 $2.000 $2.400
FULL - WIDTH MOWING
CYC 1.000 $2,600.000 $200.000 $2,500.000 $1,800.000 $3,960.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $16,000.000 $10,000.000 $16,000.000 $24,420.000
TMA (STATIONARY)
DAY 20.000 $300.000 $300.000 $200.000 $320.000 $366.000
TMA (MOBILE OPERATION)
DAY 6.000 $400.000 $300.000 $250.000 $400.000 $780.000
Totals: $2,222,766.750 $2,346,537.140 $2,838,437.450 $2,996,709.650 $3,259,587.042