PREPARING ROW
|
STA
|
6.550
|
$18,000.000
|
$10,730.280
|
$60,000.000
|
$15,000.000
|
$50,000.000
|
$90,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,391.000
|
$24.000
|
$29.650
|
$9.000
|
$8.000
|
$20.000
|
$33.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
872.000
|
$23.000
|
$31.920
|
$11.000
|
$8.000
|
$20.000
|
$22.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
374.000
|
$21.000
|
$39.930
|
$10.000
|
$7.000
|
$15.000
|
$45.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
781.000
|
$4.300
|
$21.170
|
$0.100
|
$4.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
226.000
|
$15.000
|
$59.340
|
$15.000
|
$15.000
|
$35.000
|
$37.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,094.000
|
$27.000
|
$25.310
|
$9.000
|
$6.000
|
$25.000
|
$38.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
3.000
|
$7.300
|
$342.540
|
$50.000
|
$100.000
|
$150.000
|
$435.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
264.000
|
$21.000
|
$53.990
|
$50.000
|
$50.000
|
$40.000
|
$145.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
110.000
|
$26.000
|
$49.180
|
$105.000
|
$90.000
|
$45.000
|
$172.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
160.000
|
$16.000
|
$47.910
|
$90.000
|
$98.000
|
$55.000
|
$109.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
25.000
|
$75.000
|
$62.980
|
$75.000
|
$24.000
|
$50.000
|
$210.000
|
|
|
BLOCK SODDING
|
SY
|
2,446.000
|
$6.000
|
$9.730
|
$7.000
|
$5.000
|
$7.000
|
$9.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
2,446.000
|
$0.900
|
$0.460
|
$1.000
|
$1.000
|
$5.000
|
$1.400
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,224.000
|
$0.420
|
$0.860
|
$1.000
|
$1.000
|
$3.000
|
$1.400
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
1,224.000
|
$0.150
|
$0.290
|
$1.000
|
$1.000
|
$3.000
|
$1.400
|
|
|
FERTILIZER
|
AC
|
0.070
|
$1,600.000
|
$1,603.000
|
$5,000.000
|
$5,700.000
|
$5,500.000
|
$6,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
10.000
|
$23.000
|
$45.800
|
$30.000
|
$120.000
|
$50.000
|
$255.000
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
34.000
|
$600.000
|
$394.360
|
$400.000
|
$350.000
|
$450.000
|
$460.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
2,454.000
|
$4.200
|
$12.160
|
$9.500
|
$6.000
|
$20.000
|
$24.000
|
|
|
CEMENT
|
TON
|
21.000
|
$270.000
|
$143.130
|
$1.000
|
$300.000
|
$450.000
|
$275.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
1,522.000
|
$4.400
|
$8.040
|
$25.000
|
$6.000
|
$20.000
|
$20.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
79.000
|
$110.000
|
$254.360
|
$150.000
|
$250.000
|
$250.000
|
$510.000
|
|
|
CONC PAV (JOINT REINF) (8")
|
SY
|
1,433.000
|
$100.000
|
$80.710
|
$70.000
|
$80.000
|
$210.000
|
$160.000
|
|
|
STRUCT EXCAV
|
CY
|
8,330.000
|
$50.000
|
$23.670
|
$27.000
|
$60.000
|
$50.000
|
$46.000
|
|
|
CEM STABIL BKFL
|
CY
|
2,399.000
|
$320.000
|
$70.390
|
$80.000
|
$76.030
|
$165.000
|
$205.000
|
|
|
SAND BACKFILL
|
CY
|
23.000
|
$45.000
|
$29.870
|
$125.000
|
$60.000
|
$80.000
|
$580.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
233.000
|
$11.000
|
$14.890
|
$4.000
|
$4.000
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,320.000
|
$49.000
|
$33.950
|
$42.000
|
$32.410
|
$75.000
|
$82.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
44.000
|
$150.000
|
$286.600
|
$200.000
|
$120.000
|
$160.000
|
$160.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,400.000
|
$210.000
|
$250.450
|
$250.000
|
$200.000
|
$320.000
|
$310.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,576.000
|
$270.000
|
$491.720
|
$450.000
|
$320.000
|
$500.000
|
$600.000
|
|
|
CL C CONC (ABUT)
|
CY
|
273.700
|
$1,200.000
|
$1,830.950
|
$1,600.000
|
$1,800.000
|
$2,500.000
|
$1,600.000
|
|
|
CL C CONC (CAP)
|
CY
|
27.000
|
$1,600.000
|
$2,851.580
|
$2,300.000
|
$1,800.000
|
$2,000.000
|
$2,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
24.700
|
$1,700.000
|
$2,474.390
|
$2,900.000
|
$1,800.000
|
$2,000.000
|
$3,300.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
63.000
|
$880.000
|
$680.520
|
$1,100.000
|
$800.000
|
$1,200.000
|
$980.000
|
|
|
CL C CONC (MISC)
|
CY
|
2.800
|
$1,100.000
|
$4,225.390
|
$6,000.000
|
$1,600.000
|
$1,500.000
|
$1,000.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
6,686.000
|
$25.000
|
$20.590
|
$35.000
|
$25.000
|
$40.000
|
$26.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
1,971.000
|
$50.000
|
$24.950
|
$23.000
|
$25.000
|
$28.000
|
$38.000
|
|
|
APPROACH SLAB
|
CY
|
56.000
|
$630.000
|
$1,804.000
|
$900.000
|
$850.000
|
$1,200.000
|
$1,800.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
931.000
|
$260.000
|
$205.010
|
$190.000
|
$220.000
|
$280.000
|
$270.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
356.000
|
$300.000
|
$195.590
|
$215.000
|
$220.000
|
$280.000
|
$318.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
177.000
|
$700.000
|
$611.300
|
$1,500.000
|
$400.000
|
$700.000
|
$890.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
100.000
|
$210.000
|
$278.370
|
$220.000
|
$90.000
|
$230.000
|
$379.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
700.000
|
$15.000
|
$50.800
|
$18.000
|
$25.000
|
$18.000
|
$39.000
|
|
|
RAIL (TY T221)
|
LF
|
155.000
|
$120.000
|
$151.940
|
$250.000
|
$90.000
|
$170.000
|
$145.000
|
|
|
RAIL (TY T223)
|
LF
|
45.000
|
$150.000
|
$144.480
|
$340.000
|
$110.000
|
$200.000
|
$223.000
|
|
|
RAIL (TY C221)
|
LF
|
147.000
|
$230.000
|
$221.540
|
$270.000
|
$120.000
|
$200.000
|
$137.000
|
|
|
RAIL (TY C223)
|
LF
|
45.000
|
$200.000
|
$258.690
|
$380.000
|
$160.000
|
$230.000
|
$218.000
|
|
|
RAIL (TY T221) (MOD)
|
LF
|
20.000
|
$200.000
|
$168.360
|
$300.000
|
$150.000
|
$250.000
|
$100.000
|
|
|
RAIL (TY PR11)
|
LF
|
348.000
|
$200.000
|
$130.530
|
$180.000
|
$150.000
|
$210.000
|
$157.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$110.000
|
$292.000
|
$300.000
|
$250.000
|
$150.000
|
$500.000
|
|
|
WINGWALL (FW - 0) (HW=2 FT)
|
EA
|
1.000
|
$8,000.000
|
$4,951.140
|
$2,000.000
|
$2,000.000
|
$4,000.000
|
$8,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$14,000.000
|
$98,278.590
|
$40,000.000
|
$360,000.000
|
$600,000.000
|
$78,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$3,100.000
|
$2,456.980
|
$500.000
|
$1,000.000
|
$5,000.000
|
$78,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$17,000.000
|
$43,249.560
|
$50,000.000
|
$50,000.000
|
$75,000.000
|
$55,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$84,000.000
|
$77,385.150
|
$100,000.000
|
$180,000.000
|
$150,000.000
|
$100,000.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
34.000
|
$35.000
|
$578.110
|
$70.000
|
$1,500.000
|
$140.000
|
$480.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$624,000.000
|
$761,918.400
|
$700,000.000
|
$625,000.000
|
$1,000,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$8,400.000
|
$3,195.230
|
$8,000.000
|
$6,000.000
|
$4,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
30.000
|
$67.000
|
$84.160
|
$60.000
|
$100.000
|
$90.000
|
$130.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$13.000
|
$17.180
|
$30.000
|
$15.000
|
$15.000
|
$46.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,495.000
|
$3.700
|
$4.010
|
$3.500
|
$4.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,495.000
|
$1.200
|
$1.150
|
$1.000
|
$1.000
|
$1.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
140.000
|
$5.100
|
$4.580
|
$2.500
|
$20.000
|
$10.000
|
$5.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
140.000
|
$2.700
|
$1.150
|
$1.000
|
$5.000
|
$2.000
|
$4.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$20.000
|
$43.670
|
$25.000
|
$50.000
|
$80.000
|
$60.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$20.000
|
$25.510
|
$25.000
|
$50.000
|
$35.000
|
$58.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
7.000
|
$92.000
|
$286.260
|
$175.000
|
$50.000
|
$500.000
|
$100.000
|
|
|
CONC CURB (TY II)
|
LF
|
32.000
|
$26.000
|
$33.920
|
$10.000
|
$40.000
|
$35.000
|
$64.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
783.000
|
$8.000
|
$7.280
|
$14.000
|
$8.000
|
$10.000
|
$24.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
124.000
|
$51.000
|
$18.150
|
$55.000
|
$25.000
|
$55.000
|
$32.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
199.000
|
$150.000
|
$102.920
|
$80.000
|
$60.000
|
$150.000
|
$210.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
597.000
|
$130.000
|
$80.560
|
$50.000
|
$180.000
|
$90.000
|
$270.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$2,500.000
|
$2,373.170
|
$1,400.000
|
$2,500.000
|
$2,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,000.000
|
$2,373.170
|
$3,000.000
|
$3,200.000
|
$2,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$3,500.000
|
$2,373.150
|
$1,500.000
|
$3,000.000
|
$2,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$2,700.000
|
$2,373.170
|
$3,300.000
|
$3,500.000
|
$2,000.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$780.000
|
$1,145.030
|
$500.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$26,000.000
|
$34,923.250
|
$20,000.000
|
$30,000.000
|
$35,000.000
|
$35,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$720.000
|
$755.720
|
$700.000
|
$660.000
|
$800.000
|
$860.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$430.000
|
$549.610
|
$500.000
|
$480.000
|
$650.000
|
$630.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$60.000
|
$389.310
|
$350.000
|
$340.000
|
$500.000
|
$440.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$170.000
|
$114.500
|
$100.000
|
$100.000
|
$120.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$31.000
|
$24.050
|
$25.000
|
$21.000
|
$25.000
|
$28.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$31.000
|
$34.350
|
$33.000
|
$30.000
|
$35.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
1.000
|
$59.000
|
$177.480
|
$160.000
|
$155.000
|
$165.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
4.000
|
$60.000
|
$120.230
|
$110.000
|
$105.000
|
$130.000
|
$135.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
|
EA
|
2.000
|
$240.000
|
$177.480
|
$160.000
|
$155.000
|
$180.000
|
$200.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
1.000
|
$240.000
|
$177.480
|
$160.000
|
$155.000
|
$180.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
425.000
|
$5.000
|
$3.440
|
$3.500
|
$3.000
|
$3.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
6,120.000
|
$1.700
|
$3.440
|
$3.500
|
$3.000
|
$3.500
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
109.000
|
$1.600
|
$4.580
|
$4.500
|
$4.000
|
$4.500
|
$5.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
25.000
|
$5.600
|
$6.870
|
$7.000
|
$6.000
|
$6.500
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
44.000
|
$12.000
|
$13.740
|
$14.000
|
$12.000
|
$14.000
|
$16.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
1.000
|
$250.000
|
$229.000
|
$230.000
|
$200.000
|
$250.000
|
$260.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$410.000
|
$229.000
|
$230.000
|
$200.000
|
$250.000
|
$260.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
491.000
|
$0.210
|
$1.150
|
$1.000
|
$1.000
|
$1.200
|
$1.300
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
404.000
|
$0.230
|
$1.150
|
$1.000
|
$1.000
|
$1.200
|
$1.300
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,849.000
|
$0.120
|
$0.570
|
$0.600
|
$0.500
|
$0.600
|
$0.600
|
|
|
PAVEMENT SEALER 8"
|
LF
|
109.000
|
$0.500
|
$0.800
|
$0.750
|
$0.700
|
$0.800
|
$1.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
25.000
|
$1.500
|
$1.150
|
$1.000
|
$1.000
|
$1.200
|
$1.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
110.000
|
$7.000
|
$2.290
|
$2.000
|
$2.000
|
$2.400
|
$2.600
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
1.000
|
$30.000
|
$28.630
|
$28.000
|
$25.000
|
$30.000
|
$33.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
1.000
|
$110.000
|
$28.630
|
$28.000
|
$25.000
|
$30.000
|
$33.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
740.000
|
$0.650
|
$2.290
|
$2.500
|
$2.000
|
$2.400
|
$2.600
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
830.000
|
$2.500
|
$2.290
|
$2.500
|
$2.000
|
$2.400
|
$2.600
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
384.000
|
$2.400
|
$3.440
|
$3.500
|
$3.000
|
$3.500
|
$4.000
|
|
PREFAB PAV MRK TY C (GRN)(SLD)(BLOCK)
|
SF
|
164.000
|
$10.000
|
$20.610
|
$21.000
|
$18.000
|
$22.000
|
$24.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
43.000
|
$6.500
|
$10.310
|
$11.000
|
$9.000
|
$10.000
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
13.000
|
$8.000
|
$10.310
|
$11.000
|
$9.000
|
$10.000
|
$12.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6.000
|
$7.000
|
$10.310
|
$11.000
|
$9.000
|
$10.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
770.000
|
$0.650
|
$0.230
|
$0.250
|
$0.200
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,134.000
|
$0.030
|
$0.340
|
$0.350
|
$0.300
|
$0.350
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
109.000
|
$0.040
|
$68.700
|
$70.000
|
$60.000
|
$65.000
|
$78.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
25.000
|
$0.060
|
$1.030
|
$1.000
|
$0.900
|
$1.000
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
126.000
|
$4.000
|
$1.720
|
$1.750
|
$1.500
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$49.000
|
$10.310
|
$11.000
|
$9.000
|
$10.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$74.000
|
$10.310
|
$11.000
|
$9.000
|
$10.000
|
$11.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
434.000
|
$180.000
|
$200.020
|
$150.000
|
$230.000
|
$350.000
|
$190.000
|
|
|
TACK COAT
|
GAL
|
55.000
|
$16.000
|
$5.780
|
$25.000
|
$10.000
|
$20.000
|
$5.250
|
|
|
PRECST LONG SPAN CLV STR (40'X13'X204')
|
LF
|
204.000
|
$3,400.000
|
$4,748.950
|
$4,100.000
|
$5,000.000
|
$7,500.000
|
$6,800.000
|
|
|
RETROFIT DET WARN SURF(SURF APPLIED)
|
SF
|
16.000
|
$100.000
|
$257.630
|
$31.000
|
$50.000
|
$150.000
|
$370.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$8,800.000
|
$21,443.160
|
$2,900.000
|
$3,000.000
|
$18,000.000
|
$16,000.000
|
|
|
SANITARY SEWER (12IN) (PVC) (C900)
|
LF
|
378.000
|
$500.000
|
$112.630
|
$130.000
|
$375.000
|
$250.000
|
$177.000
|
|
|
CASING (STEEL)(SANITARY SEWER)(18 IN)
|
LF
|
210.000
|
$500.000
|
$164.410
|
$290.000
|
$390.000
|
$400.000
|
$308.000
|
|
|
MANHOLE (SAN SEWER) ( 4' DIA)
|
EA
|
3.000
|
$7,000.000
|
$3,538.210
|
$6,000.000
|
$13,500.000
|
$10,000.000
|
$13,000.000
|
|
|
CONNECTION TO EXIST MANHOLE (SAN SWR)
|
EA
|
1.000
|
$4,400.000
|
$1,611.890
|
$1,600.000
|
$6,000.000
|
$4,000.000
|
$6,000.000
|
|
|
CONNECT EXIST SAN SWR TO MANHOLE
|
EA
|
1.000
|
$4,400.000
|
$1,611.890
|
$1,600.000
|
$6,000.000
|
$4,000.000
|
$5,600.000
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (12IN)
|
LF
|
327.000
|
$28.000
|
$32.540
|
$10.000
|
$40.000
|
$120.000
|
$62.000
|
|
|
ABANDON MANHOLE
|
EA
|
1.000
|
$1,100.000
|
$2,634.850
|
$1,600.000
|
$3,500.000
|
$1,500.000
|
$62.000
|
|
|
BYPASS PUMPING
|
LS
|
1.000
|
$20,000.000
|
$13,025.980
|
$70,000.000
|
$125,000.000
|
$150,000.000
|
$116,000.000
|
|
|
CASING (STEEL)(18")(OPEN TRENCH)
|
LF
|
66.000
|
$700.000
|
$216.930
|
$800.000
|
$450.000
|
$350.000
|
$950.000
|
|
|
WATER MAIN PIPE (STL) (24IN)
|
LF
|
225.000
|
$350.000
|
$294.230
|
$430.000
|
$830.000
|
$850.000
|
$690.000
|
|
|
GATE VALVE (24IN)
|
EA
|
2.000
|
$14,000.000
|
$37,364.140
|
$40,000.000
|
$40,000.000
|
$75,000.000
|
$98,000.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
1.000
|
$7,600.000
|
$7,519.490
|
$8,000.000
|
$8,500.000
|
$14,000.000
|
$19,000.000
|
|
|
REMOVING AND SALVAGING FIRE HYDRANT
|
EA
|
1.000
|
$600.000
|
$1,041.100
|
$1,000.000
|
$2,000.000
|
$1,500.000
|
$2,800.000
|
|
|
WET CONNECTION (24IN)
|
EA
|
2.000
|
$15,000.000
|
$2,879.790
|
$7,500.000
|
$14,000.000
|
$10,000.000
|
$10,000.000
|
|
|
REMOVE EXIST WATER PIPE(VAR)(SIZE)(MTL)
|
LF
|
175.000
|
$30.000
|
$28.080
|
$30.000
|
$45.000
|
$30.000
|
$400.000
|
|
|
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
|
EA
|
6.000
|
$6,000.000
|
$2,597.660
|
$6,000.000
|
$3,500.000
|
$4,000.000
|
$8,800.000
|
|
Totals: |
$6,860,602.170
|
$6,980,350.314
|
$7,213,317.650
|
$7,312,958.670
|
$10,569,053.000
|
$11,065,158.350
|