HARRIS CS (0912-72-559)

Items: 140

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-559
DBE Goal: 550.0%
Project: BR 2022(705)
Guaranty: N/A
Time: 255 WORKING DAYS
Engineer's Estimate: $6,860,602.17
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$6,860,602.17
$6,980,350.30
Over/Under Est: 1.75% $119,748.13
$7,213,317.65
Over/Under Est: 5.14% $352,715.48
Amt Left: 3.34% $232,967.35
Over/Under Est: 6.59% $452,356.50
Amt Left: 4.76% $332,608.37
Delta: -1.38% -$99,641.02
$10,569,053.00
Over/Under Est: 54.05% $3,708,450.83
Amt Left: 51.41% $3,588,702.70
Delta: -44.52% -$3,256,094.33
Over/Under Est: 61.29% $4,204,556.18
Amt Left: 58.52% $4,084,808.05
Delta: -4.69% -$496,105.35
Subcontractor Percentage Amount
LARRY YOUNG PAVING, INC. 2.00% $139,518.94
HIGHWAY 1 LLC 1.47% $102,546.42
GMJ PAVING COMPANY LLC 1.41% $98,360.85
MORRIS COUNTY CONTRACTORS, L.L.C. 0.92% $64,178.71
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.83% $57,900.36
HERMANOS STEEL, LLC 0.65% $45,343.65
SEMARCK LANDSCAPE SERVICES, INC. 0.22% $15,347.08
HOUSTON SAWING & DRILLING 0.14% $9,766.33
BPR OPERATING, LLC 0.07% $4,883.16
CURB PLANET INC. 0.04% $2,790.38
Total: 7.75% $540,635.88

Bid Items & Bid Tabulations

140 Total 0 of 140
HARRIS  |  CS  |  HOUSTON  |  0912-72-559  |  06/05/2024  |  $6,860,602.17  |  BR 2022(705)  |  BRIDGE REPL  |  255 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
MC2 CIVIL, LLC
JOHN REED AND COMPANY, LLC
EARTH BUILDERS, L.P.
FORDE CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 6.550 $18,000.000 $10,730.280 $60,000.000 $15,000.000 $50,000.000 $90,000.000
REMOVING CONC (PAV)
SY 1,391.000 $24.000 $29.650 $9.000 $8.000 $20.000 $33.000
REMOVING CONC (RIPRAP)
SY 872.000 $23.000 $31.920 $11.000 $8.000 $20.000 $22.000
REMOVING CONC (SIDEWALKS)
SY 374.000 $21.000 $39.930 $10.000 $7.000 $15.000 $45.000
REMOVING CONC (CURB)
LF 781.000 $4.300 $21.170 $0.100 $4.000 $10.000 $20.000
REMOVING CONC (CTB)
LF 226.000 $15.000 $59.340 $15.000 $15.000 $35.000 $37.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,094.000 $27.000 $25.310 $9.000 $6.000 $25.000 $38.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 3.000 $7.300 $342.540 $50.000 $100.000 $150.000 $435.000
EXCAVATION (ROADWAY)
CY 264.000 $21.000 $53.990 $50.000 $50.000 $40.000 $145.000
EXCAVATION (CHANNEL)
CY 110.000 $26.000 $49.180 $105.000 $90.000 $45.000 $172.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 160.000 $16.000 $47.910 $90.000 $98.000 $55.000 $109.000
FURNISHING AND PLACING TOPSOIL
CY 25.000 $75.000 $62.980 $75.000 $24.000 $50.000 $210.000
BLOCK SODDING
SY 2,446.000 $6.000 $9.730 $7.000 $5.000 $7.000 $9.000
STRAW OR HAY MULCH
SY 2,446.000 $0.900 $0.460 $1.000 $1.000 $5.000 $1.400
BROADCAST SEED (TEMP) (WARM)
SY 1,224.000 $0.420 $0.860 $1.000 $1.000 $3.000 $1.400
DRILL SEED (TEMP)(WARM OR COOL)
SY 1,224.000 $0.150 $0.290 $1.000 $1.000 $3.000 $1.400
FERTILIZER
AC 0.070 $1,600.000 $1,603.000 $5,000.000 $5,700.000 $5,500.000 $6,500.000
VEGETATIVE WATERING
MG 10.000 $23.000 $45.800 $30.000 $120.000 $50.000 $255.000
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
TON 34.000 $600.000 $394.360 $400.000 $350.000 $450.000 $460.000
LIME TRT (SUBGRADE)(6")
SY 2,454.000 $4.200 $12.160 $9.500 $6.000 $20.000 $24.000
CEMENT
TON 21.000 $270.000 $143.130 $1.000 $300.000 $450.000 $275.000
CEMENT TREAT (NEW BASE) (6")
SY 1,522.000 $4.400 $8.040 $25.000 $6.000 $20.000 $20.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 79.000 $110.000 $254.360 $150.000 $250.000 $250.000 $510.000
CONC PAV (JOINT REINF) (8")
SY 1,433.000 $100.000 $80.710 $70.000 $80.000 $210.000 $160.000
STRUCT EXCAV
CY 8,330.000 $50.000 $23.670 $27.000 $60.000 $50.000 $46.000
CEM STABIL BKFL
CY 2,399.000 $320.000 $70.390 $80.000 $76.030 $165.000 $205.000
SAND BACKFILL
CY 23.000 $45.000 $29.870 $125.000 $60.000 $80.000 $580.000
TRENCH EXCAVATION PROTECTION
LF 233.000 $11.000 $14.890 $4.000 $4.000 $1.000 $1.000
TEMPORARY SPL SHORING
SF 4,320.000 $49.000 $33.950 $42.000 $32.410 $75.000 $82.000
DRILL SHAFT (18 IN)
LF 44.000 $150.000 $286.600 $200.000 $120.000 $160.000 $160.000
DRILL SHAFT (24 IN)
LF 1,400.000 $210.000 $250.450 $250.000 $200.000 $320.000 $310.000
DRILL SHAFT (36 IN)
LF 2,576.000 $270.000 $491.720 $450.000 $320.000 $500.000 $600.000
CL C CONC (ABUT)
CY 273.700 $1,200.000 $1,830.950 $1,600.000 $1,800.000 $2,500.000 $1,600.000
CL C CONC (CAP)
CY 27.000 $1,600.000 $2,851.580 $2,300.000 $1,800.000 $2,000.000 $2,700.000
CL C CONC (COLUMN)
CY 24.700 $1,700.000 $2,474.390 $2,900.000 $1,800.000 $2,000.000 $3,300.000
CL C CONC (RAIL FOUNDATION)
CY 63.000 $880.000 $680.520 $1,100.000 $800.000 $1,200.000 $980.000
CL C CONC (MISC)
CY 2.800 $1,100.000 $4,225.390 $6,000.000 $1,600.000 $1,500.000 $1,000.000
REINF CONC SLAB (SLAB BEAM)
SF 6,686.000 $25.000 $20.590 $35.000 $25.000 $40.000 $26.000
BRIDGE SIDEWALK
SF 1,971.000 $50.000 $24.950 $23.000 $25.000 $28.000 $38.000
APPROACH SLAB
CY 56.000 $630.000 $1,804.000 $900.000 $850.000 $1,200.000 $1,800.000
PRESTR CONC SLAB BEAM (5SB12)
LF 931.000 $260.000 $205.010 $190.000 $220.000 $280.000 $270.000
PRESTR CONC SLAB BEAM (5SB15)
LF 356.000 $300.000 $195.590 $215.000 $220.000 $280.000 $318.000
RIPRAP (CONC)(5 IN)
CY 177.000 $700.000 $611.300 $1,500.000 $400.000 $700.000 $890.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 100.000 $210.000 $278.370 $220.000 $90.000 $230.000 $379.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 700.000 $15.000 $50.800 $18.000 $25.000 $18.000 $39.000
RAIL (TY T221)
LF 155.000 $120.000 $151.940 $250.000 $90.000 $170.000 $145.000
RAIL (TY T223)
LF 45.000 $150.000 $144.480 $340.000 $110.000 $200.000 $223.000
RAIL (TY C221)
LF 147.000 $230.000 $221.540 $270.000 $120.000 $200.000 $137.000
RAIL (TY C223)
LF 45.000 $200.000 $258.690 $380.000 $160.000 $230.000 $218.000
RAIL (TY T221) (MOD)
LF 20.000 $200.000 $168.360 $300.000 $150.000 $250.000 $100.000
RAIL (TY PR11)
LF 348.000 $200.000 $130.530 $180.000 $150.000 $210.000 $157.000
RC PIPE (CL III)(24 IN)
LF 8.000 $110.000 $292.000 $300.000 $250.000 $150.000 $500.000
WINGWALL (FW - 0) (HW=2 FT)
EA 1.000 $8,000.000 $4,951.140 $2,000.000 $2,000.000 $4,000.000 $8,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $14,000.000 $98,278.590 $40,000.000 $360,000.000 $600,000.000 $78,000.000
REMOV STR (WINGWALL)
EA 1.000 $3,100.000 $2,456.980 $500.000 $1,000.000 $5,000.000 $78,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $17,000.000 $43,249.560 $50,000.000 $50,000.000 $75,000.000 $55,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $84,000.000 $77,385.150 $100,000.000 $180,000.000 $150,000.000 $100,000.000
REMOV STR (RET WALL)
LF 34.000 $35.000 $578.110 $70.000 $1,500.000 $140.000 $480.000
MOBILIZATION
LS 1.000 $624,000.000 $761,918.400 $700,000.000 $625,000.000 $1,000,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $8,400.000 $3,195.230 $8,000.000 $6,000.000 $4,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 30.000 $67.000 $84.160 $60.000 $100.000 $90.000 $130.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $13.000 $17.180 $30.000 $15.000 $15.000 $46.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,495.000 $3.700 $4.010 $3.500 $4.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,495.000 $1.200 $1.150 $1.000 $1.000 $1.000 $4.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 140.000 $5.100 $4.580 $2.500 $20.000 $10.000 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 140.000 $2.700 $1.150 $1.000 $5.000 $2.000 $4.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 210.000 $20.000 $43.670 $25.000 $50.000 $80.000 $60.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 210.000 $20.000 $25.510 $25.000 $50.000 $35.000 $58.000
PORT CTB CONNECT HARDWARE
EA 7.000 $92.000 $286.260 $175.000 $50.000 $500.000 $100.000
CONC CURB (TY II)
LF 32.000 $26.000 $33.920 $10.000 $40.000 $35.000 $64.000
CONC CURB (MONO) (TY II)
LF 783.000 $8.000 $7.280 $14.000 $8.000 $10.000 $24.000
CONC CURB & GUTTER (TY II)
LF 124.000 $51.000 $18.150 $55.000 $25.000 $55.000 $32.000
DRIVEWAYS (CONC)
SY 199.000 $150.000 $102.920 $80.000 $60.000 $150.000 $210.000
CONC SIDEWALKS (6")
SY 597.000 $130.000 $80.560 $50.000 $180.000 $90.000 $270.000
CURB RAMPS (TY 1)
EA 1.000 $2,500.000 $2,373.170 $1,400.000 $2,500.000 $2,000.000 $4,500.000
CURB RAMPS (TY 2)
EA 1.000 $2,000.000 $2,373.170 $3,000.000 $3,200.000 $2,000.000 $4,500.000
CURB RAMPS (TY 7)
EA 8.000 $3,500.000 $2,373.150 $1,500.000 $3,000.000 $2,000.000 $4,500.000
CURB RAMPS (TY 10)
EA 1.000 $2,700.000 $2,373.170 $3,300.000 $3,500.000 $2,000.000 $2,800.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $780.000 $1,145.030 $500.000 $1,000.000 $1,500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $26,000.000 $34,923.250 $20,000.000 $30,000.000 $35,000.000 $35,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $720.000 $755.720 $700.000 $660.000 $800.000 $860.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $430.000 $549.610 $500.000 $480.000 $650.000 $630.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $60.000 $389.310 $350.000 $340.000 $500.000 $440.000
REMOVE SM RD SN SUP&AM
EA 5.000 $170.000 $114.500 $100.000 $100.000 $120.000 $130.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $31.000 $24.050 $25.000 $21.000 $25.000 $28.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000 $31.000 $34.350 $33.000 $30.000 $35.000 $40.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 1.000 $59.000 $177.480 $160.000 $155.000 $165.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 4.000 $60.000 $120.230 $110.000 $105.000 $130.000 $135.000
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 2.000 $240.000 $177.480 $160.000 $155.000 $180.000 $200.000
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 1.000 $240.000 $177.480 $160.000 $155.000 $180.000 $200.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 425.000 $5.000 $3.440 $3.500 $3.000 $3.500 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 6,120.000 $1.700 $3.440 $3.500 $3.000 $3.500 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 109.000 $1.600 $4.580 $4.500 $4.000 $4.500 $5.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 25.000 $5.600 $6.870 $7.000 $6.000 $6.500 $8.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 44.000 $12.000 $13.740 $14.000 $12.000 $14.000 $16.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $250.000 $229.000 $230.000 $200.000 $250.000 $260.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $410.000 $229.000 $230.000 $200.000 $250.000 $260.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 491.000 $0.210 $1.150 $1.000 $1.000 $1.200 $1.300
REFL PAV MRK TY II (Y) 6" (SLD)
LF 404.000 $0.230 $1.150 $1.000 $1.000 $1.200 $1.300
PAVEMENT SEALER 6"
LF 2,849.000 $0.120 $0.570 $0.600 $0.500 $0.600 $0.600
PAVEMENT SEALER 8"
LF 109.000 $0.500 $0.800 $0.750 $0.700 $0.800 $1.000
PAVEMENT SEALER 12"
LF 25.000 $1.500 $1.150 $1.000 $1.000 $1.200 $1.300
PAVEMENT SEALER 24"
LF 110.000 $7.000 $2.290 $2.000 $2.000 $2.400 $2.600
PAVEMENT SEALER (ARROW)
EA 1.000 $30.000 $28.630 $28.000 $25.000 $30.000 $33.000
PAVEMENT SEALER (WORD)
EA 1.000 $110.000 $28.630 $28.000 $25.000 $30.000 $33.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 740.000 $0.650 $2.290 $2.500 $2.000 $2.400 $2.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 830.000 $2.500 $2.290 $2.500 $2.000 $2.400 $2.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 384.000 $2.400 $3.440 $3.500 $3.000 $3.500 $4.000
PREFAB PAV MRK TY C (GRN)(SLD)(BLOCK)
SF 164.000 $10.000 $20.610 $21.000 $18.000 $22.000 $24.000
REFL PAV MRKR TY I-C
EA 43.000 $6.500 $10.310 $11.000 $9.000 $10.000 $12.000
REFL PAV MRKR TY II-A-A
EA 13.000 $8.000 $10.310 $11.000 $9.000 $10.000 $12.000
REFL PAV MRKR TY II-C-R
EA 6.000 $7.000 $10.310 $11.000 $9.000 $10.000 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 770.000 $0.650 $0.230 $0.250 $0.200 $0.300 $0.300
PAV SURF PREP FOR MRK (6")
LF 2,134.000 $0.030 $0.340 $0.350 $0.300 $0.350 $0.400
PAV SURF PREP FOR MRK (8")
LF 109.000 $0.040 $68.700 $70.000 $60.000 $65.000 $78.000
PAV SURF PREP FOR MRK (12")
LF 25.000 $0.060 $1.030 $1.000 $0.900 $1.000 $1.200
PAV SURF PREP FOR MRK (24")
LF 126.000 $4.000 $1.720 $1.750 $1.500 $2.000 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $49.000 $10.310 $11.000 $9.000 $10.000 $11.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $74.000 $10.310 $11.000 $9.000 $10.000 $11.000
D-GR HMA TY-B SAC-B PG70-22
TON 434.000 $180.000 $200.020 $150.000 $230.000 $350.000 $190.000
TACK COAT
GAL 55.000 $16.000 $5.780 $25.000 $10.000 $20.000 $5.250
PRECST LONG SPAN CLV STR (40'X13'X204')
LF 204.000 $3,400.000 $4,748.950 $4,100.000 $5,000.000 $7,500.000 $6,800.000
RETROFIT DET WARN SURF(SURF APPLIED)
SF 16.000 $100.000 $257.630 $31.000 $50.000 $150.000 $370.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $8,800.000 $21,443.160 $2,900.000 $3,000.000 $18,000.000 $16,000.000
SANITARY SEWER (12IN) (PVC) (C900)
LF 378.000 $500.000 $112.630 $130.000 $375.000 $250.000 $177.000
CASING (STEEL)(SANITARY SEWER)(18 IN)
LF 210.000 $500.000 $164.410 $290.000 $390.000 $400.000 $308.000
MANHOLE (SAN SEWER) ( 4' DIA)
EA 3.000 $7,000.000 $3,538.210 $6,000.000 $13,500.000 $10,000.000 $13,000.000
CONNECTION TO EXIST MANHOLE (SAN SWR)
EA 1.000 $4,400.000 $1,611.890 $1,600.000 $6,000.000 $4,000.000 $6,000.000
CONNECT EXIST SAN SWR TO MANHOLE
EA 1.000 $4,400.000 $1,611.890 $1,600.000 $6,000.000 $4,000.000 $5,600.000
ABAND/FILL EXIST SAN SWR PIPE (12IN)
LF 327.000 $28.000 $32.540 $10.000 $40.000 $120.000 $62.000
ABANDON MANHOLE
EA 1.000 $1,100.000 $2,634.850 $1,600.000 $3,500.000 $1,500.000 $62.000
BYPASS PUMPING
LS 1.000 $20,000.000 $13,025.980 $70,000.000 $125,000.000 $150,000.000 $116,000.000
CASING (STEEL)(18")(OPEN TRENCH)
LF 66.000 $700.000 $216.930 $800.000 $450.000 $350.000 $950.000
WATER MAIN PIPE (STL) (24IN)
LF 225.000 $350.000 $294.230 $430.000 $830.000 $850.000 $690.000
GATE VALVE (24IN)
EA 2.000 $14,000.000 $37,364.140 $40,000.000 $40,000.000 $75,000.000 $98,000.000
FIRE HYDRANT ASSEMBLY
EA 1.000 $7,600.000 $7,519.490 $8,000.000 $8,500.000 $14,000.000 $19,000.000
REMOVING AND SALVAGING FIRE HYDRANT
EA 1.000 $600.000 $1,041.100 $1,000.000 $2,000.000 $1,500.000 $2,800.000
WET CONNECTION (24IN)
EA 2.000 $15,000.000 $2,879.790 $7,500.000 $14,000.000 $10,000.000 $10,000.000
REMOVE EXIST WATER PIPE(VAR)(SIZE)(MTL)
LF 175.000 $30.000 $28.080 $30.000 $45.000 $30.000 $400.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 6.000 $6,000.000 $2,597.660 $6,000.000 $3,500.000 $4,000.000 $8,800.000
Totals: $6,860,602.170 $6,980,350.314 $7,213,317.650 $7,312,958.670 $10,569,053.000 $11,065,158.350