|
|
PREPARING ROW
|
STA
|
497.000
|
$1,000.000
|
$694.680
|
$2,300.000
|
$1,187.850
|
$700.000
|
$1,800.000
|
$750.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
110,447.000
|
$5.000
|
$5.520
|
$3.000
|
$4.350
|
$6.500
|
$6.000
|
$7.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
331.000
|
$15.000
|
$11.220
|
$10.000
|
$17.400
|
$15.400
|
$13.000
|
$33.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
4,260.000
|
$25.000
|
$11.220
|
$4.500
|
$4.450
|
$16.600
|
$22.000
|
$13.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
110,447.000
|
$2.500
|
$1.650
|
$1.000
|
$1.100
|
$1.650
|
$2.000
|
$2.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
112,075.000
|
$5.000
|
$4.790
|
$4.500
|
$5.700
|
$7.400
|
$6.900
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
38,628.000
|
$7.500
|
$9.960
|
$15.000
|
$7.550
|
$7.850
|
$13.500
|
$8.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
25,463.000
|
$20.000
|
$9.960
|
$12.000
|
$8.900
|
$16.750
|
$29.000
|
$23.000
|
|
|
BLADING
|
HR
|
192.000
|
$120.000
|
$96.900
|
$145.000
|
$200.900
|
$107.000
|
$125.000
|
$130.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
114,826.000
|
$1.000
|
$1.000
|
$1.500
|
$0.600
|
$0.500
|
$2.900
|
$0.260
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
114,826.000
|
$0.250
|
$0.190
|
$0.180
|
$0.250
|
$0.160
|
$0.150
|
$0.110
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
57,413.000
|
$0.250
|
$0.120
|
$0.120
|
$0.250
|
$0.110
|
$0.150
|
$0.110
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
57,413.000
|
$0.250
|
$0.120
|
$0.120
|
$0.250
|
$0.110
|
$0.150
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
3,586.000
|
$15.000
|
$19.980
|
$20.000
|
$26.100
|
$16.000
|
$20.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
114,826.000
|
$0.750
|
$0.720
|
$0.700
|
$1.600
|
$0.850
|
$0.800
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
192.000
|
$100.000
|
$79.800
|
$90.000
|
$104.900
|
$65.000
|
$75.000
|
$95.000
|
|
|
FL BS (CMP IN PLACE)(TY D GR 1-2)(11")
|
SY
|
307,118.000
|
$12.000
|
$12.560
|
$13.000
|
$14.450
|
$14.550
|
$10.000
|
$16.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
61,424.000
|
$3.500
|
$3.940
|
$3.500
|
$4.300
|
$3.850
|
$3.600
|
$4.500
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
130,652.000
|
$2.500
|
$3.690
|
$3.500
|
$4.400
|
$3.600
|
$3.200
|
$4.250
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
3,629.000
|
$50.000
|
$66.210
|
$70.000
|
$97.700
|
$70.000
|
$70.500
|
$115.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
6,731.000
|
$68.000
|
$74.900
|
$72.000
|
$78.500
|
$88.500
|
$90.000
|
$85.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
119,143.800
|
$60.000
|
$65.530
|
$63.000
|
$65.750
|
$67.000
|
$67.500
|
$68.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
34,630.000
|
$70.000
|
$72.730
|
$72.000
|
$75.900
|
$79.500
|
$86.000
|
$82.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
424.000
|
$1.000
|
$2.100
|
$2.000
|
$6.850
|
$3.600
|
$22.000
|
$1.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
9,705.000
|
$1.000
|
$1.580
|
$1.000
|
$2.300
|
$2.500
|
$4.000
|
$1.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$218.000
|
$170.000
|
$250.000
|
$370.300
|
$385.000
|
$105.000
|
$800.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,857.000
|
$20.000
|
$20.000
|
$35.000
|
$35.050
|
$17.000
|
$25.000
|
$30.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
19.600
|
$400.000
|
$424.770
|
$500.000
|
$478.900
|
$455.000
|
$500.000
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
40.000
|
$495.000
|
$545.870
|
$500.000
|
$461.350
|
$438.000
|
$500.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
69.000
|
$191.000
|
$100.000
|
$100.000
|
$206.100
|
$165.000
|
$200.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
308.000
|
$198.000
|
$100.000
|
$130.000
|
$159.200
|
$165.000
|
$200.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
432.200
|
$450.000
|
$480.030
|
$500.000
|
$467.200
|
$445.000
|
$450.000
|
$550.000
|
|
|
RAIL (TY SSTR)
|
LF
|
88.000
|
$60.000
|
$68.000
|
$125.000
|
$157.700
|
$150.000
|
$145.000
|
$200.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
38.000
|
$175.000
|
$210.000
|
$225.000
|
$462.400
|
$385.000
|
$300.000
|
$440.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
58.000
|
$200.000
|
$220.000
|
$285.000
|
$558.050
|
$422.000
|
$310.000
|
$470.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
185.000
|
$400.000
|
$280.000
|
$320.000
|
$577.350
|
$433.000
|
$350.000
|
$570.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
87.000
|
$371.000
|
$370.000
|
$385.000
|
$572.350
|
$545.000
|
$850.000
|
$775.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$538.000
|
$400.000
|
$435.000
|
$584.000
|
$555.000
|
$1,000.000
|
$870.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
57.000
|
$509.000
|
$470.000
|
$460.000
|
$630.750
|
$600.000
|
$900.000
|
$785.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
23.000
|
$745.000
|
$520.000
|
$510.000
|
$642.400
|
$610.000
|
$800.000
|
$740.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
18.000
|
$736.000
|
$590.000
|
$555.000
|
$664.600
|
$630.000
|
$900.000
|
$900.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
223.000
|
$723.000
|
$460.000
|
$465.000
|
$793.100
|
$750.000
|
$1,000.000
|
$600.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
43.000
|
$586.000
|
$570.000
|
$585.000
|
$747.550
|
$700.000
|
$900.000
|
$810.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
28.000
|
$788.000
|
$570.000
|
$565.000
|
$814.100
|
$770.000
|
$1,000.000
|
$915.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
108.000
|
$651.000
|
$710.000
|
$600.000
|
$899.400
|
$855.000
|
$1,490.000
|
$1,485.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
18.000
|
$1,054.000
|
$770.000
|
$730.000
|
$911.050
|
$860.000
|
$1,200.000
|
$1,200.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
7.000
|
$573.000
|
$590.000
|
$550.000
|
$922.750
|
$875.000
|
$1,200.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
35.000
|
$70.000
|
$60.000
|
$125.000
|
$155.550
|
$100.000
|
$250.000
|
$160.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
68.000
|
$50.000
|
$52.000
|
$80.000
|
$76.200
|
$66.000
|
$260.000
|
$140.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
523.000
|
$125.000
|
$102.000
|
$135.000
|
$174.600
|
$175.000
|
$225.000
|
$225.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
138.000
|
$175.000
|
$140.000
|
$180.000
|
$277.200
|
$215.000
|
$250.000
|
$265.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$45,686.000
|
$44,000.000
|
$47,600.000
|
$65,059.550
|
$61,000.000
|
$43,000.000
|
$35,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$10,496.000
|
$7,000.000
|
$6,000.000
|
$5,840.150
|
$5,500.000
|
$12,000.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
7.000
|
$13,708.000
|
$10,000.000
|
$8,700.000
|
$14,004.750
|
$13,000.000
|
$15,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$14,321.000
|
$12,000.000
|
$12,600.000
|
$8,760.250
|
$8,000.000
|
$19,000.000
|
$13,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
7.000
|
$19,682.000
|
$18,000.000
|
$18,300.000
|
$9,928.300
|
$9,000.000
|
$22,000.000
|
$17,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$26,275.000
|
$23,000.000
|
$22,500.000
|
$11,096.350
|
$10,000.000
|
$25,000.000
|
$21,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(P)
|
EA
|
2.000
|
$5,000.000
|
$5,200.000
|
$4,000.000
|
$2,920.100
|
$2,700.000
|
$6,000.000
|
$5,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
4.000
|
$6,018.000
|
$5,000.000
|
$5,400.000
|
$3,620.900
|
$3,400.000
|
$6,000.000
|
$5,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$8,208.000
|
$5,100.000
|
$7,800.000
|
$4,029.700
|
$3,800.000
|
$7,000.000
|
$4,600.000
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
1.000
|
$9,838.000
|
$8,800.000
|
$8,200.000
|
$9,250.850
|
$8,500.000
|
$7,500.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$6,784.000
|
$4,600.000
|
$4,600.000
|
$4,882.400
|
$4,500.000
|
$7,000.000
|
$6,700.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$4,000.000
|
$5,200.000
|
$6,500.000
|
$4,321.750
|
$4,000.000
|
$8,000.000
|
$7,400.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,658.000
|
$5,400.000
|
$5,200.000
|
$5,700.000
|
$5,200.000
|
$9,000.000
|
$7,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$9,746.000
|
$7,600.000
|
$7,200.000
|
$3,784.450
|
$3,500.000
|
$10,000.000
|
$8,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
12.000
|
$5,250.000
|
$5,500.000
|
$7,400.000
|
$4,713.000
|
$4,400.000
|
$9,000.000
|
$7,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$7,745.000
|
$7,400.000
|
$8,000.000
|
$8,094.500
|
$7,500.000
|
$11,000.000
|
$8,400.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$6,987.000
|
$3,600.000
|
$4,300.000
|
$3,983.000
|
$3,500.000
|
$11,000.000
|
$7,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$5,767.000
|
$7,400.000
|
$7,200.000
|
$6,038.750
|
$5,600.000
|
$15,000.000
|
$9,200.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$6,502.000
|
$4,200.000
|
$8,000.000
|
$5,884.550
|
$5,500.000
|
$16,000.000
|
$8,400.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$13,369.000
|
$14,000.000
|
$14,200.000
|
$16,060.500
|
$15,000.000
|
$18,000.000
|
$11,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$12,263.000
|
$7,900.000
|
$7,600.000
|
$8,036.100
|
$7,500.000
|
$15,000.000
|
$11,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$700.000
|
$1,400.000
|
$1,500.000
|
$743.800
|
$1,100.000
|
$1,900.000
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,100.000
|
$1,800.000
|
$1,600.000
|
$873.950
|
$1,600.000
|
$2,100.000
|
$2,200.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$1,350.000
|
$2,400.000
|
$1,600.000
|
$3,308.150
|
$2,000.000
|
$1,900.000
|
$4,300.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,600.000
|
$3,200.000
|
$1,800.000
|
$6,476.300
|
$2,200.000
|
$2,300.000
|
$5,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
22.000
|
$1,865.000
|
$175.000
|
$1,400.000
|
$1,587.100
|
$1,600.000
|
$850.000
|
$8,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
41.000
|
$2,966.000
|
$675.000
|
$800.000
|
$952.250
|
$1,000.000
|
$1,000.000
|
$900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,794,400.000
|
$2,030,779.640
|
$2,500,000.000
|
$1,700,000.000
|
$1,819,000.000
|
$1,801,000.000
|
$2,076,346.030
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$5,000.000
|
$4,190.460
|
$6,700.000
|
$5,317.800
|
$5,500.000
|
$3,000.000
|
$9,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,390.000
|
$35.000
|
$19.600
|
$19.000
|
$32.800
|
$26.000
|
$31.000
|
$21.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,017.000
|
$40.000
|
$22.690
|
$22.000
|
$34.900
|
$31.000
|
$33.000
|
$23.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
163.000
|
$50.000
|
$46.420
|
$45.000
|
$50.800
|
$75.000
|
$48.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,570.000
|
$10.000
|
$8.250
|
$8.000
|
$15.850
|
$9.750
|
$15.000
|
$7.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
560.000
|
$20.000
|
$11.860
|
$11.500
|
$15.500
|
$24.000
|
$30.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
560.000
|
$8.000
|
$2.060
|
$2.000
|
$5.750
|
$8.000
|
$15.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
16,551.000
|
$2.500
|
$1.770
|
$2.480
|
$4.250
|
$3.100
|
$4.000
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
16,551.000
|
$1.000
|
$0.620
|
$0.600
|
$1.050
|
$0.460
|
$1.000
|
$0.400
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
256.000
|
$75.000
|
$96.900
|
$95.000
|
$134.400
|
$100.000
|
$45.000
|
$35.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
10,560.000
|
$40.000
|
$8.000
|
$20.000
|
$24.450
|
$24.000
|
$16.000
|
$18.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
72,020.000
|
$4.000
|
$8.000
|
$4.000
|
$7.650
|
$8.450
|
$5.500
|
$3.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
10,560.000
|
$5.000
|
$8.000
|
$7.000
|
$9.250
|
$10.000
|
$12.000
|
$5.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,709.000
|
$30.000
|
$56.940
|
$64.000
|
$79.400
|
$79.500
|
$55.230
|
$58.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
280.000
|
$60.000
|
$76.330
|
$65.000
|
$87.600
|
$84.000
|
$95.000
|
$70.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,643.000
|
$30.000
|
$42.390
|
$50.000
|
$38.200
|
$63.000
|
$93.000
|
$52.000
|
|
|
TURNOUTS (ACP)
|
SY
|
297.000
|
$40.000
|
$69.900
|
$50.000
|
$62.100
|
$92.500
|
$92.060
|
$38.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
102,688.000
|
$0.150
|
$0.140
|
$0.080
|
$0.150
|
$0.210
|
$0.200
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
15,247.000
|
$0.150
|
$0.320
|
$0.200
|
$0.600
|
$0.260
|
$0.250
|
$0.170
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,521.000
|
$20.000
|
$18.280
|
$18.000
|
$22.050
|
$21.000
|
$20.000
|
$19.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,750.000
|
$1,776.760
|
$1,750.000
|
$1,565.900
|
$1,500.000
|
$1,450.000
|
$3,000.000
|
|
|
SHORT RADIUS
|
LF
|
60.000
|
$35.000
|
$39.600
|
$39.000
|
$25.750
|
$33.000
|
$31.000
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,000.000
|
$934.070
|
$920.000
|
$1,100.400
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
550.000
|
$25.000
|
$14.210
|
$14.000
|
$22.050
|
$21.000
|
$20.000
|
$19.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
177.000
|
$75.000
|
$60.920
|
$60.000
|
$56.650
|
$66.000
|
$60.000
|
$49.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
2.000
|
$550.000
|
$101.530
|
$100.000
|
$631.650
|
$700.000
|
$650.000
|
$650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,455.000
|
$3.000
|
$1.020
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$220.000
|
$101.530
|
$100.000
|
$132.250
|
$160.000
|
$150.000
|
$150.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$375.000
|
$203.060
|
$200.000
|
$105.800
|
$220.000
|
$200.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
56.000
|
$2,300.000
|
$2,030.580
|
$2,000.000
|
$2,994.300
|
$2,650.000
|
$2,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
34.000
|
$200.000
|
$101.530
|
$100.000
|
$105.800
|
$150.000
|
$150.000
|
$150.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
22.000
|
$11,000.000
|
$9,036.090
|
$8,900.000
|
$3,796.500
|
$7,500.000
|
$7,000.000
|
$6,750.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
117.000
|
$1,500.000
|
$507.650
|
$500.000
|
$859.150
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
22.000
|
$600.000
|
$101.530
|
$100.000
|
$622.100
|
$550.000
|
$500.000
|
$500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
84.000
|
$250.000
|
$175.000
|
$200.000
|
$227.500
|
$185.000
|
$185.000
|
$225.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$275.000
|
$210.000
|
$235.000
|
$290.950
|
$220.000
|
$217.000
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
5.000
|
$450.000
|
$450.000
|
$475.000
|
$640.100
|
$475.000
|
$465.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
49.000
|
$475.000
|
$355.000
|
$355.000
|
$480.350
|
$370.000
|
$366.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
37.000
|
$650.000
|
$525.000
|
$525.000
|
$569.250
|
$550.000
|
$545.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$650.000
|
$560.000
|
$560.000
|
$617.900
|
$575.000
|
$580.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$750.000
|
$630.000
|
$630.000
|
$711.000
|
$650.000
|
$650.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$85.000
|
$45.000
|
$45.000
|
$79.350
|
$50.000
|
$47.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
33.000
|
$60.000
|
$52.000
|
$52.000
|
$46.400
|
$54.000
|
$54.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
78.000
|
$15.000
|
$26.000
|
$26.000
|
$15.100
|
$28.000
|
$27.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$30.000
|
$28.000
|
$28.000
|
$15.100
|
$30.000
|
$29.000
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
200.000
|
$0.250
|
$0.240
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
222,670.000
|
$0.250
|
$0.220
|
$0.200
|
$0.250
|
$0.240
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
|
EA
|
4.000
|
$6.000
|
$10.000
|
$55.000
|
$21.900
|
$11.000
|
$10.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
247,675.000
|
$0.250
|
$0.220
|
$0.200
|
$0.250
|
$0.240
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
17,142.000
|
$0.600
|
$0.530
|
$0.500
|
$0.950
|
$0.550
|
$0.550
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,306.000
|
$0.600
|
$0.600
|
$0.450
|
$0.950
|
$0.630
|
$0.600
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,971.000
|
$0.800
|
$1.760
|
$0.450
|
$2.550
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
345.000
|
$1.000
|
$1.000
|
$0.700
|
$2.750
|
$1.050
|
$1.000
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,100.000
|
$0.750
|
$0.640
|
$0.700
|
$1.050
|
$0.680
|
$0.650
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
192.000
|
$6.500
|
$6.000
|
$5.000
|
$5.500
|
$6.500
|
$6.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
22.000
|
$100.000
|
$121.000
|
$140.000
|
$107.300
|
$125.000
|
$125.000
|
$140.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$200.000
|
$277.000
|
$200.000
|
$191.650
|
$285.000
|
$280.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
22.000
|
$175.000
|
$134.000
|
$150.000
|
$136.900
|
$140.000
|
$135.000
|
$150.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
14.000
|
$200.000
|
$388.000
|
$400.000
|
$438.050
|
$395.000
|
$390.000
|
$400.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
140,223.000
|
$0.250
|
$0.120
|
$0.200
|
$0.150
|
$0.130
|
$0.150
|
$0.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
105,960.000
|
$0.250
|
$0.190
|
$0.220
|
$0.200
|
$0.210
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
5,100.000
|
$0.500
|
$0.400
|
$0.220
|
$0.350
|
$0.430
|
$0.400
|
$0.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
192.000
|
$2.000
|
$2.440
|
$3.000
|
$2.750
|
$2.500
|
$0.450
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
22.000
|
$30.000
|
$63.000
|
$55.000
|
$71.200
|
$65.000
|
$64.000
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
22.000
|
$30.000
|
$63.000
|
$65.000
|
$82.150
|
$65.000
|
$64.000
|
$65.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
14.000
|
$50.000
|
$188.000
|
$125.000
|
$136.900
|
$200.000
|
$190.000
|
$125.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$100.000
|
$109.000
|
$100.000
|
$104.050
|
$115.000
|
$110.000
|
$100.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,840.000
|
$0.250
|
$0.400
|
$0.350
|
$0.350
|
$0.420
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
105,960.000
|
$0.500
|
$0.490
|
$0.450
|
$0.350
|
$0.520
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
13,262.000
|
$0.250
|
$0.360
|
$0.350
|
$0.350
|
$0.400
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
123,776.000
|
$0.250
|
$0.350
|
$0.350
|
$0.350
|
$0.380
|
$0.350
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
424.000
|
$3.000
|
$3.000
|
$4.000
|
$5.500
|
$3.100
|
$3.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,062.000
|
$3.000
|
$3.000
|
$4.000
|
$5.500
|
$3.100
|
$3.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
96,568.000
|
$0.500
|
$0.470
|
$0.400
|
$0.550
|
$0.500
|
$0.500
|
$0.400
|
|
|
FULL - WIDTH MOWING
|
AC
|
84.000
|
$175.000
|
$50.000
|
$110.000
|
$495.000
|
$75.000
|
$220.000
|
$250.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
30.000
|
$1,000.000
|
$150.000
|
$450.000
|
$1,111.750
|
$400.000
|
$750.000
|
$575.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$7,948.670
|
$10,500.000
|
$2,919.850
|
$10,000.000
|
$16,000.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
819.000
|
$165.000
|
$164.270
|
$100.000
|
$362.400
|
$350.000
|
$90.000
|
$75.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
64.000
|
$130.000
|
$370.940
|
$250.000
|
$729.700
|
$375.000
|
$350.000
|
$585.000
|
|
Totals: |
$24,136,510.850
|
$24,608,308.912
|
$25,602,252.870
|
$26,497,990.980
|
$26,918,337.680
|
$27,303,526.740
|
$28,235,425.000
|