Show Job Controls
Bid Cobra

COOKE FM 2896 (1357-01-026)

Items: 79

County: COOKE
Length: N/A
Highway: FM 2896
District: WICHITA FALLS
Control Number: 1357-01-026
DBE Goal: N/A
Project: SSW 1357-1-26
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $2,682,061.52
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,682,061.52
$2,595,534.07
Over/Under Est: -3.23% -$86,527.45
$2,727,846.30
Over/Under Est: 1.71% $45,784.78
Amt Left: 5.1% $132,312.23
Over/Under Est: 5.6% $150,132.20
Amt Left: 9.12% $236,659.65
Delta: -3.83% -$104,347.42
Over/Under Est: 10.42% $279,460.38
Amt Left: 14.1% $365,987.83
Delta: -4.57% -$129,328.18
Over/Under Est: 22.04% $591,189.48
Amt Left: 26.11% $677,716.93
Delta: -10.53% -$311,729.10

Bid Items & Bid Tabulations

79 Total 0 of 79
COOKE  |  FM 2896  |  WICHITA FALLS  |  1357-01-026  |  02/06/2019  |  $2,682,061.52  |  SSW 1357-1-26  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
OVERLAND CORPORATION
BLYTHE CONSTRUCTION, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
ACCELERATED CRITICAL PATH, INC.
PREPARING ROW
STA 8.000 $2,500.000 $4,500.000 $2,860.000 $4,000.000 $10,800.000 $2,400.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 294.000 $16.000 $15.790 $20.600 $9.500 $20.000 $8.200
EXCAVATION (ROADWAY)
CY 1,930.000 $15.000 $10.850 $29.200 $28.000 $22.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 4,008.000 $20.000 $12.750 $12.550 $22.750 $30.000 $19.000
BROADCAST SEED (TEMP) (WARM)
SY 28,231.000 $0.090 $0.060 $0.120 $0.060 $0.120 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 28,231.000 $0.090 $0.070 $0.120 $0.060 $0.120 $0.130
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 56,462.000 $0.150 $0.120 $0.230 $0.120 $0.130 $0.170
VEGETATIVE WATERING
MG 507.000 $28.000 $28.000 $27.250 $25.000 $36.000 $30.000
CEMENT
TON 286.000 $148.000 $146.000 $209.250 $145.000 $185.000 $190.000
CEMENT TREAT (SUBGRADE) (8")
SY 26,650.000 $3.000 $3.050 $2.950 $4.000 $3.000 $6.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 5,590.000 $2.750 $3.110 $3.000 $3.750 $2.750 $5.000
D-GR HMA(SQ) TY-B PG64-22
TON 5,341.000 $82.000 $72.500 $74.450 $68.000 $78.000 $95.000
SUPERPAVE MIXTURES SP-D PG70-22
TON 7,488.000 $90.000 $83.500 $89.850 $87.000 $87.000 $110.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,250.000 $60.000 $55.000 $64.950 $47.000 $55.000 $75.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,505.000 $3.500 $5.000 $6.650 $3.000 $5.000 $7.000
CEM STABIL BKFL
CY 157.000 $164.000 $210.520 $218.000 $190.000 $180.000 $170.000
CUT & RESTORING PAV
SY 132.000 $115.000 $57.890 $59.950 $150.000 $90.000 $110.000
TRENCH EXCAVATION PROTECTION
LF 45.000 $21.000 $12.630 $13.000 $22.000 $20.000 $2.000
TEMPORARY SPL SHORING
SF 88.000 $30.000 $68.420 $70.850 $155.000 $140.000 $95.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 181.000 $200.000 $159.910 $110.000 $215.000 $225.000 $220.000
CMP (GAL STL 18 IN)
LF 170.000 $55.000 $118.100 $49.050 $66.000 $60.000 $65.000
CMP (GAL STL 24 IN)
LF 30.000 $70.000 $68.420 $70.850 $82.500 $75.000 $110.000
CMP (GAL STL 36 IN)
LF 32.000 $110.000 $100.000 $103.550 $120.000 $110.000 $90.000
CMP (GAL STL 48 IN)
LF 28.000 $125.000 $157.890 $163.500 $145.000 $130.000 $175.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 59.000 $460.000 $499.990 $517.750 $500.000 $450.000 $600.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 23.000 $540.000 $589.460 $610.400 $550.000 $500.000 $850.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 29.000 $620.000 $684.200 $708.500 $700.000 $625.000 $850.000
RC PIPE (CL III)(24 IN)
LF 236.000 $80.000 $105.260 $109.000 $110.000 $100.000 $130.000
RC PIPE (CL III)(30 IN)
LF 172.000 $102.000 $249.580 $130.800 $145.000 $130.000 $140.000
RC PIPE (CL III)(48 IN)
LF 61.000 $180.000 $299.990 $310.650 $340.000 $310.000 $290.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $8,250.000 $9,473.500 $9,810.000 $9,350.000 $8,500.000 $8,500.000
WINGWALL (PW - 2) (HW=4 FT)
EA 6.000 $9,200.000 $9,999.800 $10,355.000 $6,925.000 $6,300.000 $11,500.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 84.000 $900.000 $947.350 $981.000 $965.000 $875.000 $950.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $890.000 $947.350 $981.000 $910.000 $825.000 $1,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 21.000 $800.000 $1,105.240 $1,145.000 $1,150.000 $1,050.000 $1,400.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,350.000 $999.980 $1,035.000 $900.000 $825.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $999.980 $1,035.000 $1,100.000 $975.000 $1,400.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 6.000 $2,000.000 $2,894.680 $2,995.000 $1,750.000 $1,600.000 $2,900.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $1,640.000 $2,105.220 $2,180.000 $1,100.000 $1,000.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $1,900.000 $2,631.530 $2,725.000 $2,200.000 $2,000.000 $2,900.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 4.000 $3,880.000 $3,684.140 $3,815.000 $3,850.000 $3,500.000 $4,500.000
SET (TY II) (48 IN) (CMP) (6: 1) (P)
EA 2.000 $4,250.000 $4,736.750 $4,905.000 $6,900.000 $6,300.000 $5,500.000
REMOV & RE - LAY PIPE (18 IN)
LF 496.000 $52.000 $26.320 $27.250 $60.000 $55.000 $45.000
REMOV & RE - LAY PIPE (24 IN)
LF 186.000 $90.000 $31.580 $32.700 $68.000 $62.000 $50.000
REMOV & RE - LAY PIPE (30 IN)
LF 60.000 $125.000 $36.840 $38.150 $93.500 $85.000 $55.000
CLEAN EXIST CULVERTS
EA 1.000 $1,600.000 $8,420.890 $8,720.000 $5,486.560 $2,500.000 $4,500.000
REMOV STR (PIPE)
LF 542.500 $22.000 $12.630 $13.100 $20.000 $18.000 $7.000
MOBILIZATION
LS 1.000 $238,369.000 $250,000.000 $355,000.000 $210,000.000 $295,000.000 $320,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,000.000 $7,400.000 $1,500.000 $20,000.000 $20,000.000 $13,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 400.000 $27.000 $35.790 $27.800 $34.000 $29.200 $40.000
ROCK FILTER DAMS (REMOVE)
LF 400.000 $10.000 $7.370 $8.700 $10.000 $11.140 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,675.000 $3.900 $2.000 $1.850 $1.900 $3.300 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,675.000 $1.100 $0.630 $0.550 $0.600 $0.460 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,940.000 $3.300 $3.050 $3.100 $2.900 $2.500 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,940.000 $0.750 $0.470 $0.700 $0.450 $0.350 $0.500
DRIVEWAYS (CONC)
SY 261.000 $80.000 $80.000 $105.000 $87.000 $100.000 $130.000
DRIVEWAYS (ACP)
SY 2,126.000 $24.000 $25.000 $32.400 $30.000 $26.500 $35.000
TURNOUTS (ACP)
SY 1,214.000 $40.000 $34.000 $39.100 $40.000 $37.000 $55.000
DRIVEWAYS (BASE)
SY 4,498.000 $17.000 $13.500 $10.800 $18.000 $17.000 $13.000
RUMBLE STRIPS (SHOULDER)
LF 40,740.000 $0.380 $0.110 $0.130 $0.210 $0.220 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 20,370.000 $0.210 $0.210 $0.130 $0.220 $0.250 $0.220
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 55.000 $240.000 $205.000 $210.000 $195.000 $195.000 $250.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $265.000 $263.000 $270.000 $250.000 $250.000 $250.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $540.000 $615.000 $635.000 $585.000 $585.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $620.000 $678.000 $700.000 $645.000 $645.000 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 43.000 $500.000 $342.000 $350.000 $325.000 $325.000 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $580.000 $489.000 $500.000 $465.000 $465.000 $350.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $275.000 $184.000 $190.000 $175.000 $175.000 $270.000
REMOVE SM RD SN SUP&AM
EA 27.000 $110.000 $89.000 $92.000 $85.000 $85.000 $80.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $150.000 $52.500 $55.000 $50.000 $50.000 $65.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 16.000 $170.000 $163.000 $169.000 $155.000 $155.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,184.000 $0.600 $0.920 $1.600 $2.000 $1.100 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 14.000 $11.500 $37.750 $21.800 $24.000 $24.000 $22.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 43,208.000 $0.480 $0.440 $0.500 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,008.000 $0.470 $0.440 $0.600 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 25,542.000 $0.470 $0.440 $0.500 $0.400 $0.400 $0.400
REFL PAV MRKR TY II-A-A
EA 472.000 $3.500 $3.680 $4.350 $4.000 $4.000 $6.000
TMA (STATIONARY)
DAY 135.000 $200.000 $211.000 $160.000 $400.000 $250.000 $150.000
TMA (MOBILE OPERATION)
HR 208.000 $50.000 $117.000 $10.000 $85.000 $95.000 $60.000
Totals: $2,682,061.520 $2,595,534.075 $2,727,846.300 $2,832,193.720 $2,961,521.900 $3,273,251.000