PREPARING ROW
|
STA
|
150.000
|
$7,100.000
|
$3,124.500
|
$10,000.000
|
$2,500.000
|
$3,968.130
|
$3,000.000
|
$6,000.000
|
$1,188.180
|
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
27,664.000
|
$5.000
|
$7.300
|
$7.000
|
$8.000
|
$4.640
|
$4.000
|
$10.000
|
$9.150
|
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
17,912.000
|
$4.000
|
$5.600
|
$4.000
|
$6.500
|
$4.470
|
$4.000
|
$10.000
|
$6.320
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
64,335.000
|
$10.000
|
$6.800
|
$10.000
|
$11.500
|
$15.420
|
$10.000
|
$10.000
|
$10.730
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
23,873.000
|
$12.000
|
$5.200
|
$6.000
|
$15.000
|
$13.460
|
$10.000
|
$23.000
|
$26.710
|
|
|
|
COMPOST MANUF TOPSOIL (2")
|
SY
|
187,206.000
|
$1.700
|
$1.300
|
$0.500
|
$0.400
|
$0.660
|
$0.500
|
$0.700
|
$0.890
|
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
88,983.000
|
$0.500
|
$0.300
|
$0.250
|
$0.250
|
$0.280
|
$0.360
|
$0.280
|
$0.670
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
98,223.000
|
$0.100
|
$0.100
|
$0.110
|
$0.170
|
$0.110
|
$0.140
|
$0.110
|
$0.270
|
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
187,206.000
|
$0.150
|
$0.100
|
$0.060
|
$0.120
|
$0.070
|
$0.080
|
$0.070
|
$0.490
|
|
|
|
VEGETATIVE WATERING
|
MG
|
3,158.000
|
$25.000
|
$21.500
|
$18.000
|
$25.000
|
$19.980
|
$22.800
|
$22.000
|
$17.430
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
98,223.000
|
$1.250
|
$0.800
|
$0.900
|
$1.200
|
$0.860
|
$0.810
|
$0.860
|
$0.780
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
88,983.000
|
$2.000
|
$0.900
|
$1.100
|
$3.900
|
$0.890
|
$0.930
|
$0.890
|
$1.430
|
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
94,035.000
|
$10.000
|
$5.800
|
$4.000
|
$5.500
|
$5.380
|
$6.500
|
$6.000
|
$5.620
|
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
94,347.000
|
$4.000
|
$3.400
|
$1.500
|
$4.000
|
$5.130
|
$3.000
|
$3.600
|
$2.120
|
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
2,971.000
|
$170.000
|
$155.600
|
$130.000
|
$165.000
|
$157.500
|
$166.100
|
$150.000
|
$186.540
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
18,814.000
|
$3.000
|
$4.100
|
$3.700
|
$4.300
|
$3.540
|
$3.060
|
$4.250
|
$5.000
|
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
173,302.000
|
$1.250
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
5,025.000
|
$25.870
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
40,119.000
|
$62.000
|
$53.100
|
$56.000
|
$58.000
|
$54.310
|
$65.000
|
$56.000
|
$62.920
|
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
1,411.000
|
$70.000
|
$59.400
|
$72.000
|
$64.000
|
$64.120
|
$73.000
|
$62.000
|
$70.290
|
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
4,337.000
|
$85.000
|
$62.200
|
$67.000
|
$66.000
|
$61.270
|
$73.000
|
$65.000
|
$73.690
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
17,181.000
|
$80.000
|
$71.300
|
$75.000
|
$77.000
|
$70.850
|
$80.000
|
$75.000
|
$84.460
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
32,349.000
|
$100.000
|
$93.800
|
$96.000
|
$100.000
|
$99.610
|
$102.000
|
$98.000
|
$112.090
|
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
652.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
10,233.000
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
|
SY
|
26,157.000
|
$55.000
|
$33.000
|
$30.000
|
$36.000
|
$27.270
|
$38.000
|
$35.000
|
$39.610
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
112,769.000
|
$1.500
|
$1.600
|
$0.500
|
$1.750
|
$1.550
|
$1.050
|
$2.000
|
$1.910
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
193,284.000
|
$2.500
|
$1.200
|
$0.650
|
$1.300
|
$1.650
|
$1.300
|
$1.500
|
$1.440
|
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
6.000
|
$95.000
|
$164.700
|
$240.000
|
$200.000
|
$483.020
|
$200.000
|
$460.000
|
$112.310
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
13,976.000
|
$3.000
|
$2.000
|
$2.000
|
$2.000
|
$2.100
|
$1.000
|
$2.000
|
$2.100
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
48.000
|
$250.000
|
$178.800
|
$480.000
|
$155.000
|
$205.960
|
$330.000
|
$320.000
|
$537.790
|
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
42.000
|
$125.000
|
$76.300
|
$113.000
|
$110.000
|
$110.000
|
$111.110
|
$110.000
|
$112.310
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
54.000
|
$200.000
|
$266.300
|
$175.000
|
$170.000
|
$170.000
|
$171.720
|
$170.000
|
$168.460
|
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
118.000
|
$450.000
|
$545.100
|
$520.000
|
$500.000
|
$500.000
|
$505.050
|
$500.000
|
$561.530
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
250.000
|
$200.000
|
$221.400
|
$195.000
|
$190.000
|
$190.000
|
$191.920
|
$190.000
|
$219.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
2,694.000
|
$400.000
|
$461.000
|
$375.000
|
$450.000
|
$500.000
|
$440.000
|
$450.000
|
$488.350
|
|
|
|
CL C CONC (RAC-R)
|
CY
|
39.300
|
$1,060.000
|
$866.400
|
$850.000
|
$600.000
|
$1,065.520
|
$600.000
|
$1,200.000
|
$1,023.710
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
12,239.000
|
$47.000
|
$43.000
|
$51.000
|
$52.000
|
$38.000
|
$55.000
|
$54.000
|
$54.130
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
475.000
|
$350.000
|
$282.000
|
$500.000
|
$400.000
|
$375.910
|
$400.000
|
$310.000
|
$387.070
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
120.000
|
$450.000
|
$316.000
|
$430.000
|
$360.000
|
$448.450
|
$500.000
|
$325.000
|
$420.490
|
|
|
|
RAIL (TY SSTR)
|
LF
|
20,097.000
|
$45.000
|
$45.100
|
$51.000
|
$46.000
|
$51.350
|
$45.000
|
$46.000
|
$49.820
|
|
|
|
RAIL (TY C223)
|
LF
|
129.000
|
$130.000
|
$153.200
|
$155.000
|
$350.000
|
$158.210
|
$120.000
|
$240.000
|
$142.330
|
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
707.000
|
$100.000
|
$86.300
|
$130.000
|
$80.000
|
$105.000
|
$66.000
|
$74.000
|
$168.460
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
569.000
|
$60.000
|
$68.700
|
$50.000
|
$60.000
|
$87.150
|
$95.000
|
$83.000
|
$52.500
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,415.000
|
$70.000
|
$63.400
|
$58.000
|
$90.000
|
$106.050
|
$103.000
|
$101.000
|
$70.650
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
3,898.000
|
$85.000
|
$95.100
|
$77.000
|
$105.000
|
$134.400
|
$125.000
|
$128.000
|
$98.750
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,104.000
|
$115.000
|
$137.300
|
$75.000
|
$120.000
|
$174.310
|
$160.000
|
$166.000
|
$102.660
|
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
7.000
|
$125.000
|
$158.400
|
$180.000
|
$200.000
|
$218.410
|
$300.000
|
$208.000
|
$281.160
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$3,250.000
|
$7,921.900
|
$3,700.000
|
$4,000.000
|
$4,620.160
|
$4,684.690
|
$4,400.000
|
$3,992.870
|
|
|
|
INLET (COMPL)(PSL)(RH)(3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$4,753.100
|
$2,700.000
|
$4,700.000
|
$5,040.170
|
$6,072.690
|
$4,800.000
|
$5,671.490
|
|
|
|
INLET (COMPL)(PSL)(RH)(4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$5,281.200
|
$4,800.000
|
$5,800.000
|
$7,350.250
|
$5,926.540
|
$7,000.000
|
$5,671.490
|
|
|
|
INLET (COMPL)(PSL)(RH)(5FTX6FT)
|
EA
|
1.000
|
$5,000.000
|
$5,809.400
|
$6,100.000
|
$6,000.000
|
$7,927.770
|
$6,586.420
|
$7,600.000
|
$8,984.530
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
27.000
|
$4,250.000
|
$4,172.200
|
$3,500.000
|
$7,200.000
|
$5,166.180
|
$4,700.000
|
$5,000.000
|
$3,415.430
|
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
20.000
|
$5,000.000
|
$5,017.200
|
$4,000.000
|
$7,500.000
|
$6,300.220
|
$5,400.000
|
$6,000.000
|
$4,891.030
|
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$5,281.200
|
$4,800.000
|
$7,700.000
|
$7,192.750
|
$6,400.000
|
$7,000.000
|
$5,985.950
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$3,960.900
|
$3,500.000
|
$4,800.000
|
$5,145.180
|
$5,565.590
|
$5,000.000
|
$5,556.360
|
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
73.000
|
$4,250.000
|
$4,753.100
|
$4,500.000
|
$6,000.000
|
$6,930.240
|
$6,400.000
|
$7,000.000
|
$4,743.620
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$5,000.000
|
$5,650.900
|
$4,500.000
|
$5,500.000
|
$6,720.230
|
$7,026.440
|
$6,500.000
|
$4,182.190
|
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
4.000
|
$6,000.000
|
$5,518.200
|
$10,000.000
|
$7,000.000
|
$8,925.310
|
$14,822.840
|
$17,000.000
|
$5,899.990
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
3.000
|
$1,450.000
|
$1,003.400
|
$2,000.000
|
$2,200.000
|
$2,100.070
|
$1,734.680
|
$2,000.000
|
$1,593.330
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$2,700.000
|
$1,954.100
|
$4,700.000
|
$4,000.000
|
$3,570.120
|
$3,333.090
|
$3,500.000
|
$2,302.910
|
|
|
|
ADJUSTING INLETS
|
EA
|
2.000
|
$1,500.000
|
$2,112.500
|
$2,000.000
|
$600.000
|
$2,415.080
|
$1,897.770
|
$2,500.000
|
$2,937.050
|
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
7.000
|
$1,500.000
|
$2,640.600
|
$2,000.000
|
$2,200.000
|
$2,400.000
|
$1,472.710
|
$2,500.000
|
$481.840
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$3,168.700
|
$3,500.000
|
$15,000.000
|
$5,250.180
|
$15,698.330
|
$5,000.000
|
$1,342.860
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,502,611.250
|
$2,540,000.000
|
$2,150,000.000
|
$2,173,507.540
|
$2,031,745.780
|
$2,650,000.000
|
$2,200,000.000
|
$2,807,667.020
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$7,000.000
|
$4,366.000
|
$12,000.000
|
$10,000.000
|
$2,465.740
|
$10,000.000
|
$16,000.000
|
$16,497.020
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$30.000
|
$21.200
|
$22.000
|
$25.000
|
$24.260
|
$22.500
|
$25.000
|
$61.900
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$8.500
|
$8.500
|
$6.000
|
$7.000
|
$9.310
|
$9.000
|
$10.000
|
$18.220
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
480.000
|
$20.000
|
$10.800
|
$11.000
|
$17.000
|
$24.030
|
$11.500
|
$25.000
|
$46.560
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
480.000
|
$7.000
|
$8.500
|
$5.000
|
$7.000
|
$8.240
|
$9.000
|
$9.000
|
$17.680
|
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
1,900.000
|
$10.000
|
$5.700
|
$8.000
|
$7.500
|
$6.830
|
$6.000
|
$7.000
|
$13.590
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,373.000
|
$2.500
|
$2.000
|
$2.000
|
$2.500
|
$1.940
|
$2.100
|
$2.000
|
$4.040
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,373.000
|
$0.700
|
$0.500
|
$0.200
|
$0.350
|
$0.460
|
$0.500
|
$0.500
|
$0.960
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,197.000
|
$3.000
|
$3.300
|
$5.000
|
$4.500
|
$3.820
|
$3.500
|
$4.000
|
$9.030
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,197.000
|
$1.000
|
$0.700
|
$0.800
|
$1.500
|
$0.810
|
$0.700
|
$1.000
|
$2.260
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
13,410.000
|
$30.000
|
$41.800
|
$45.000
|
$14.000
|
$8.000
|
$30.000
|
$34.000
|
$43.630
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
11,180.000
|
$30.000
|
$41.800
|
$45.000
|
$14.000
|
$10.000
|
$8.000
|
$34.000
|
$30.090
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$50.000
|
$41.800
|
$45.000
|
$14.000
|
$12.000
|
$8.000
|
$34.000
|
$41.510
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
25,680.000
|
$5.000
|
$8.800
|
$5.000
|
$3.000
|
$7.000
|
$4.000
|
$8.000
|
$4.980
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
19,740.000
|
$6.000
|
$8.800
|
$5.000
|
$3.000
|
$10.000
|
$4.000
|
$8.000
|
$4.250
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$10.000
|
$8.800
|
$5.000
|
$3.000
|
$12.000
|
$4.000
|
$8.000
|
$8.290
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
13,410.000
|
$5.000
|
$8.800
|
$5.000
|
$5.000
|
$8.000
|
$8.000
|
$10.000
|
$6.730
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
11,180.000
|
$7.000
|
$8.800
|
$5.000
|
$5.000
|
$9.000
|
$8.000
|
$10.000
|
$6.420
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$9.000
|
$8.800
|
$5.000
|
$5.000
|
$10.000
|
$8.000
|
$10.000
|
$11.040
|
|
|
|
PERM CTB (SSCB)(TY 3)(MOD)
|
LF
|
136.000
|
$132.000
|
$199.300
|
$225.000
|
$150.000
|
$180.000
|
$109.490
|
$250.000
|
$449.230
|
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
7,574.000
|
$65.000
|
$52.500
|
$62.000
|
$65.000
|
$55.100
|
$60.000
|
$65.000
|
$59.650
|
|
|
|
CONC CURB (TY I)
|
LF
|
11,368.000
|
$10.000
|
$8.900
|
$10.000
|
$9.000
|
$8.930
|
$9.000
|
$9.000
|
$19.960
|
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
30.000
|
$260.000
|
$233.200
|
$275.000
|
$325.000
|
$315.010
|
$326.910
|
$225.000
|
$230.070
|
|
|
|
CONC CURB (MOUNTABLE)
|
LF
|
1,072.000
|
$8.000
|
$21.500
|
$19.000
|
$11.500
|
$10.500
|
$15.370
|
$21.000
|
$36.690
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
119.000
|
$75.000
|
$49.600
|
$75.000
|
$60.000
|
$74.670
|
$152.070
|
$53.000
|
$64.500
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
7,286.000
|
$50.000
|
$35.000
|
$42.000
|
$45.000
|
$44.150
|
$35.000
|
$48.000
|
$46.470
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$1,500.000
|
$1,166.700
|
$1,400.000
|
$1,500.000
|
$1,601.130
|
$1,308.400
|
$1,260.000
|
$1,442.160
|
|
|
|
CURB RAMPS (TY 10)
|
EA
|
10.000
|
$1,600.000
|
$1,166.700
|
$1,500.000
|
$1,500.000
|
$1,601.130
|
$3,275.090
|
$1,260.000
|
$1,559.450
|
|
|
|
CURB RAMPS (TY 20)
|
EA
|
2.000
|
$1,700.000
|
$1,166.700
|
$1,600.000
|
$1,500.000
|
$2,041.150
|
$3,683.110
|
$1,260.000
|
$2,446.040
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
56,141.000
|
$0.150
|
$0.100
|
$0.200
|
$0.100
|
$0.230
|
$0.200
|
$0.250
|
$0.140
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$25.000
|
$17.900
|
$24.000
|
$21.000
|
$23.350
|
$20.750
|
$22.000
|
$19.580
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
17.000
|
$1,700.000
|
$1,367.500
|
$1,800.000
|
$1,450.000
|
$1,396.000
|
$1,448.000
|
$2,045.000
|
$1,814.840
|
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
900.000
|
$10.000
|
$12.300
|
$15.000
|
$10.000
|
$14.750
|
$10.000
|
$11.000
|
$16.250
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,100.000
|
$895.900
|
$1,800.000
|
$1,100.000
|
$1,788.000
|
$1,075.000
|
$1,128.000
|
$1,071.420
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
|
EA
|
4.000
|
$350.000
|
$377.200
|
$230.000
|
$500.000
|
$225.000
|
$500.000
|
$525.000
|
$1,853.850
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,848.000
|
$3.000
|
$0.900
|
$1.000
|
$1.000
|
$1.060
|
$1.000
|
$1.000
|
$2.800
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
21.000
|
$200.000
|
$188.600
|
$95.000
|
$125.000
|
$95.000
|
$125.000
|
$130.000
|
$199.110
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
19.000
|
$2,400.000
|
$2,074.800
|
$2,600.000
|
$2,730.000
|
$2,505.000
|
$1,730.000
|
$2,860.000
|
$2,546.220
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
23.000
|
$200.000
|
$165.000
|
$120.000
|
$150.000
|
$117.000
|
$150.000
|
$157.000
|
$256.470
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
9.000
|
$10,000.000
|
$8,016.200
|
$20,000.000
|
$2,100.000
|
$21,931.360
|
$20,978.000
|
$10,840.000
|
$8,786.200
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$1,500.000
|
$1,414.600
|
$900.000
|
$1,700.000
|
$875.000
|
$1,500.000
|
$3,255.000
|
$1,322.260
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$471.500
|
$300.000
|
$500.000
|
$300.000
|
$500.000
|
$525.000
|
$2,624.760
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,000.000
|
$9,902.300
|
$6,800.000
|
$7,500.000
|
$7,454.310
|
$7,400.000
|
$12,400.000
|
$3,577.560
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
2.000
|
$175.000
|
$235.800
|
$180.000
|
$175.000
|
$175.000
|
$175.000
|
$180.000
|
$310.980
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$300.000
|
$587.700
|
$180.000
|
$180.000
|
$180.000
|
$181.820
|
$190.000
|
$449.230
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
21.000
|
$3,000.000
|
$3,008.700
|
$2,650.000
|
$2,600.000
|
$2,600.000
|
$2,626.260
|
$2,730.000
|
$3,930.730
|
|
|
|
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
|
EA
|
4.000
|
$4,000.000
|
$3,739.600
|
$3,250.000
|
$3,200.000
|
$3,200.000
|
$3,232.320
|
$3,360.000
|
$4,829.190
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,650.000
|
$8.000
|
$11.500
|
$6.300
|
$6.250
|
$6.250
|
$6.310
|
$7.000
|
$15.720
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,128.000
|
$35.000
|
$26.600
|
$35.000
|
$34.000
|
$34.000
|
$34.340
|
$35.000
|
$44.920
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
11,617.000
|
$1.500
|
$0.900
|
$1.000
|
$1.000
|
$1.000
|
$1.010
|
$1.000
|
$1.240
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
24,198.000
|
$1.250
|
$1.200
|
$1.000
|
$0.950
|
$0.950
|
$0.960
|
$1.000
|
$1.240
|
|
|
|
GROUND BOX TY A (122311)
|
EA
|
5.000
|
$650.000
|
$837.300
|
$540.000
|
$530.000
|
$530.000
|
$535.350
|
$555.000
|
$887.220
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
21.000
|
$1,000.000
|
$1,004.500
|
$730.000
|
$710.000
|
$710.000
|
$717.170
|
$745.000
|
$887.220
|
|
|
|
REMOVE GROUND BOX
|
EA
|
11.000
|
$250.000
|
$230.000
|
$65.000
|
$64.000
|
$64.000
|
$64.650
|
$67.000
|
$112.310
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
4.000
|
$5,500.000
|
$5,891.400
|
$5,200.000
|
$5,100.000
|
$5,100.000
|
$5,151.520
|
$5,353.000
|
$5,053.800
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
889.000
|
$25.000
|
$17.000
|
$22.000
|
$22.000
|
$22.000
|
$22.220
|
$23.000
|
$23.580
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
919.000
|
$20.000
|
$25.100
|
$20.000
|
$19.000
|
$19.000
|
$19.190
|
$20.000
|
$24.710
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
202.000
|
$25.000
|
$35.200
|
$20.000
|
$20.000
|
$20.000
|
$20.200
|
$21.000
|
$24.710
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
46.000
|
$450.000
|
$330.100
|
$400.000
|
$453.000
|
$380.000
|
$348.900
|
$400.000
|
$539.070
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
53.000
|
$500.000
|
$377.200
|
$500.000
|
$570.000
|
$480.000
|
$447.000
|
$500.000
|
$656.990
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$550.000
|
$495.100
|
$550.000
|
$523.000
|
$530.000
|
$478.000
|
$550.000
|
$741.220
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$518.700
|
$670.000
|
$726.000
|
$645.000
|
$545.000
|
$670.000
|
$853.530
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
86.000
|
$75.000
|
$66.000
|
$100.000
|
$65.000
|
$40.000
|
$40.000
|
$42.000
|
$56.150
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,281.000
|
$5.000
|
$6.000
|
$3.500
|
$3.500
|
$3.450
|
$3.480
|
$3.600
|
$5.560
|
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$2,500.000
|
$2,165.000
|
$2,800.000
|
$2,800.000
|
$2,800.000
|
$2,828.290
|
$2,940.000
|
$1,465.600
|
|
|
|
REMOVE LRSA
|
EA
|
8.000
|
$750.000
|
$1,581.800
|
$440.000
|
$430.000
|
$430.000
|
$434.340
|
$450.000
|
$449.230
|
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
6.000
|
$25,000.000
|
$20,119.400
|
$19,000.000
|
$18,700.000
|
$18,700.000
|
$18,888.890
|
$25,000.000
|
$30,322.800
|
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$5,000.000
|
$9,009.600
|
$3,700.000
|
$3,600.000
|
$3,600.000
|
$3,636.370
|
$3,780.000
|
$6,176.870
|
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
2.000
|
$500.000
|
$832.100
|
$500.000
|
$480.000
|
$480.000
|
$484.850
|
$500.000
|
$393.070
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
104.000
|
$20.000
|
$12.300
|
$40.000
|
$17.250
|
$18.000
|
$18.000
|
$19.000
|
$23.150
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
22,100.000
|
$0.500
|
$0.800
|
$0.670
|
$0.800
|
$0.780
|
$0.660
|
$0.700
|
$0.990
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
50,441.000
|
$0.500
|
$0.700
|
$0.620
|
$0.700
|
$0.720
|
$0.610
|
$0.600
|
$0.880
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
132.000
|
$1.000
|
$7.500
|
$4.800
|
$5.500
|
$5.620
|
$4.750
|
$5.000
|
$8.980
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
7,229.000
|
$1.000
|
$1.600
|
$1.600
|
$1.750
|
$1.790
|
$1.520
|
$1.600
|
$1.910
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
68,115.000
|
$0.500
|
$0.700
|
$0.620
|
$0.700
|
$0.720
|
$0.610
|
$0.600
|
$0.880
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
68.000
|
$0.750
|
$16.000
|
$1.000
|
$1.150
|
$1.200
|
$1.010
|
$1.000
|
$19.090
|
|
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
253.000
|
$0.750
|
$3.800
|
$1.000
|
$1.160
|
$1.200
|
$1.010
|
$1.000
|
$4.490
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
19,337.000
|
$0.750
|
$1.200
|
$0.790
|
$0.900
|
$0.920
|
$0.780
|
$0.800
|
$1.400
|
|
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
549.000
|
$3.000
|
$2.400
|
$2.750
|
$3.150
|
$3.230
|
$2.730
|
$3.000
|
$2.810
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,855.000
|
$3.000
|
$3.900
|
$2.350
|
$2.750
|
$2.790
|
$2.350
|
$2.450
|
$4.600
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
186.000
|
$5.000
|
$7.500
|
$7.100
|
$8.150
|
$8.370
|
$7.070
|
$7.350
|
$8.980
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$110.000
|
$141.500
|
$125.000
|
$144.000
|
$148.310
|
$125.250
|
$130.000
|
$168.460
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
29.000
|
$125.000
|
$160.300
|
$140.000
|
$160.000
|
$163.850
|
$138.380
|
$140.000
|
$190.920
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
9,983.000
|
$0.400
|
$0.600
|
$0.460
|
$0.550
|
$0.540
|
$0.450
|
$0.500
|
$0.730
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,878.000
|
$0.350
|
$0.500
|
$0.430
|
$0.500
|
$0.500
|
$0.420
|
$0.440
|
$0.620
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
17,189.000
|
$0.600
|
$0.800
|
$0.570
|
$0.650
|
$0.660
|
$0.560
|
$0.600
|
$0.950
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
35,552.000
|
$0.500
|
$0.700
|
$0.570
|
$0.650
|
$0.660
|
$0.560
|
$0.600
|
$0.840
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,322.000
|
$0.350
|
$0.600
|
$0.430
|
$0.500
|
$0.500
|
$0.420
|
$0.450
|
$0.670
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
41,194.000
|
$0.500
|
$0.700
|
$0.570
|
$0.650
|
$0.660
|
$0.560
|
$0.600
|
$0.840
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$3.500
|
$18.900
|
$10.000
|
$12.000
|
$11.960
|
$10.100
|
$10.500
|
$22.460
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,478.000
|
$3.500
|
$4.700
|
$3.800
|
$4.500
|
$4.510
|
$3.810
|
$4.000
|
$5.620
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
351,858.000
|
$0.500
|
$0.300
|
$0.250
|
$0.350
|
$0.140
|
$0.060
|
$0.530
|
$0.900
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
16,461.000
|
$1.000
|
$0.700
|
$0.750
|
$1.000
|
$0.310
|
$0.100
|
$0.740
|
$2.750
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
690.000
|
$4.000
|
$2.400
|
$4.000
|
$3.700
|
$1.200
|
$1.000
|
$4.200
|
$9.030
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$3,500.000
|
$2,919.700
|
$2,500.000
|
$5,225.000
|
$4,000.000
|
$2,000.000
|
$6,400.000
|
$4,232.090
|
|
|
|
LITTER REMOVAL
|
CYC
|
19.000
|
$860.000
|
$809.600
|
$1,700.000
|
$1,550.000
|
$1,000.000
|
$1,000.000
|
$3,750.000
|
$723.750
|
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
8,459.000
|
$0.500
|
$0.700
|
$1.600
|
$0.450
|
$0.370
|
$0.370
|
$0.400
|
$2.270
|
|
|
|
NO. OF WORKING DAYS
|
$/D
|
2,000.000
|
$479.000
|
$416.000
|
$479.000
|
$400.000
|
$479.000
|
$450.000
|
$450.000
|
$350.000
|
|
|
|
PEDESTRIAN SHELTER AND CANOPY
|
EA
|
2.000
|
$50,000.000
|
$40,461.800
|
$70,000.000
|
$110,000.000
|
$46,964.940
|
$134,343.440
|
$140,000.000
|
$42,115.010
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$7,406.900
|
$18,000.000
|
$3,500.000
|
$7,657.380
|
$7,500.000
|
$27,000.000
|
$9,806.570
|
|
|
|
RELOCATE EXISTING OVERHEAD SIGNS
|
EA
|
1.000
|
$1,000.000
|
$1,959.700
|
$60.000
|
$58.000
|
$58.000
|
$58.590
|
$60.000
|
$561.530
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$7,500.000
|
$8,386.000
|
$15,000.000
|
$9,500.000
|
$9,500.000
|
$8,900.000
|
$11,500.000
|
$16,059.850
|
|
|
|
TMA (STATIONARY)
|
DAY
|
33.000
|
$180.000
|
$185.800
|
$350.000
|
$125.000
|
$201.130
|
$166.670
|
$155.000
|
$454.010
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
161.000
|
$500.000
|
$337.900
|
$350.000
|
$175.000
|
$382.870
|
$803.030
|
$205.000
|
$329.340
|
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
4.000
|
$5,000.000
|
$5,113.700
|
$5,400.000
|
$5,300.000
|
$5,300.000
|
$5,353.540
|
$5,550.000
|
$7,861.470
|
|
|
|
WORK ZONE INTELLIGENT TRNSPRTN SYSTEM
|
LS
|
1.000
|
$425,000.000
|
$233,759.500
|
$290,000.000
|
$215,000.000
|
$307,170.000
|
$212,170.000
|
$310,000.000
|
$320,074.040
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
173,302.000
|
$2.000
|
$2.900
|
$2.400
|
$3.150
|
$3.030
|
$2.750
|
$3.200
|
$3.530
|
|
2
|
|
PFC (ASPHALT) PG76-22
|
TON
|
652.000
|
$100.000
|
$97.700
|
$100.000
|
$104.000
|
$108.440
|
$118.000
|
$102.000
|
$117.990
|
|
2
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
10,233.000
|
$95.000
|
$97.700
|
$100.000
|
$104.000
|
$108.450
|
$118.000
|
$102.000
|
$117.990
|
|
Totals: |
$29,758,794.000
|
$25,398,550.720
|
$25,839,300.470
|
$26,315,529.000
|
$26,410,551.436
|
$27,240,629.050
|
$28,420,801.140
|
$29,325,855.443
|