CAMERON SH 107 (0342-04-032)

Items: 156

County: CAMERON
Length: N/A
Highway: SH 107
District: PHARR
Control Number: 0342-04-032
DBE Goal: N/A
Project: NH 2017(971)
Guaranty: N/A
Time: 285 WORKING DAYS
Engineer's Estimate: $4,345,456.62
Date: 04/05/2017 (9 years ago)
Contract Number: N/A
Type: WIDEN TO 4 LANE UNDIVIDED C&G
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$4,345,456.62
$4,313,269.70
Over/Under Est: -0.74% -$32,186.92
Over/Under Est: 5.06% $220,073.88
Amt Left: 5.85% $252,260.80
$4,652,790.24
Over/Under Est: 7.07% $307,333.62
Amt Left: 7.87% $339,520.54
Delta: -1.91% -$87,259.74
$4,783,867.95
Over/Under Est: 10.09% $438,411.33
Amt Left: 10.91% $470,598.25
Delta: -2.82% -$131,077.71
$4,826,129.73
Over/Under Est: 11.06% $480,673.11
Amt Left: 11.89% $512,860.03
Delta: -0.88% -$42,261.78
Over/Under Est: 14.34% $622,939.18
Amt Left: 15.19% $655,126.10
Delta: -2.95% -$142,266.07
Over/Under Est: 31.03% $1,348,580.15
Amt Left: 32.01% $1,380,767.07
Delta: -14.61% -$725,640.97

Bid Items & Bid Tabulations

156 Total 0 of 156
CAMERON  |  SH 107  |  PHARR  |  0342-04-032  |  04/05/2017  |  $4,345,456.62  |  NH 2017(971)  |  WIDEN TO 4 LANE UNDIVIDED C&G  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
REIM CONSTRUCTION, INC.
TEXAS SAI, INC.
IOC COMPANY, LLC
CRG
ANDERSON COLUMBIA CO., INC.
J. CARROLL WEAVER, INC.
PREPARING ROW
STA 29.500 $1,032.460 $5,000.000 $500.000 $3,929.210 $1,000.000 $11,435.980 $450.000 $669.390
REMOVING CONC (PAV)
SY 5,250.000 $4.000 $5.000 $6.250 $8.100 $8.500 $9.360 $10.000 $4.480
REMOVING CONC (RIPRAP)
SY 931.000 $14.800 $10.000 $10.250 $7.670 $15.000 $5.830 $6.500 $5.460
REMOVING CONC (DRIVEWAYS)
SY 1,002.000 $13.720 $15.000 $9.100 $11.870 $20.000 $6.230 $10.000 $7.050
REMOVING CONC (CURB AND GUTTER)
LF 3,878.000 $3.050 $5.000 $2.300 $1.340 $4.250 $3.420 $3.500 $2.430
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 17,401.000 $3.660 $1.500 $4.500 $0.700 $2.750 $1.040 $2.000 $3.410
EXCAVATION (ROADWAY)
CY 23,845.000 $4.180 $7.000 $4.050 $10.590 $7.500 $6.900 $6.500 $14.640
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 795.000 $5.840 $25.000 $7.650 $7.110 $3.500 $8.750 $5.000 $6.060
FURNISHING AND PLACING TOPSOIL
CY 55.000 $36.040 $30.000 $33.250 $45.000 $65.000 $36.210 $30.000 $29.970
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 7,039.000 $0.230 $0.450 $0.400 $0.440 $0.450 $0.400 $0.500 $0.390
CELL FBR MLCH SEED(TEMP)(WARM)
SY 7,039.000 $0.170 $0.400 $0.350 $0.400 $0.450 $0.380 $0.400 $0.370
VEGETATIVE WATERING
MG 223.000 $17.900 $30.000 $33.750 $24.110 $30.000 $34.230 $35.000 $33.300
IRRIGATION SYSTEM
LS 1.000 $35,000.000 $16,500.000 $20,000.000 $16,125.000 $16,500.000 $20,235.040 $16,500.000 $19,730.250
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $400.000 $300.000 $1,010.000 $254.000 $255.000 $318.740 $260.000 $999.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,623.000 $55.000 $40.000 $51.500 $54.000 $58.000 $57.260 $52.000 $52.530
CEMENT
TON 459.000 $171.720 $165.000 $193.000 $201.650 $165.000 $188.530 $180.000 $183.990
CEMENT TREAT (NEW BASE) (6")
SY 802.000 $1.980 $3.000 $1.200 $6.550 $4.000 $14.540 $9.000 $11.040
CEMENT TREAT (NEW BASE) (10")
SY 22,525.000 $3.120 $1.250 $1.750 $1.170 $1.750 $2.330 $9.000 $2.230
CEMENT TREAT (SUBGRADE)(12")
SY 23,702.000 $1.750 $2.500 $1.850 $1.990 $3.000 $2.930 $3.500 $3.600
ASPHALT STAB BASE (GR 1)(PG 64)
TON 605.000 $78.000 $72.000 $79.000 $75.270 $85.500 $87.860 $72.000 $111.130
SALV,HAUL & STKPL RCL ASPH PV(3"TO 6")
SY 17,401.000 $2.250 $1.600 $3.850 $2.890 $2.500 $3.260 $3.000 $3.750
PRIME COAT (MC-30)
GAL 4,666.000 $3.710 $3.500 $3.600 $4.430 $3.800 $6.850 $4.000 $3.630
D-GR HMA TY-D SAC-B PG64-22
TON 92.000 $75.000 $125.000 $87.500 $125.000 $125.000 $77.440 $180.000 $94.220
D-GR HMA TY-D SAC-A PG76-22
TON 2,240.000 $75.100 $75.000 $98.500 $80.000 $90.000 $91.420 $102.000 $97.230
D-GR HMA TY B SAC-B PG (64-22)
TON 4,555.000 $65.390 $65.000 $86.500 $65.000 $79.000 $78.510 $72.000 $84.490
PLANE ASPH CONC PAV(0" TO 2")
SY 2,861.000 $2.100 $4.000 $2.300 $3.410 $1.500 $2.360 $7.000 $8.810
CONC PVMT (JOINTED - CPCD) (10")
SY 742.000 $94.600 $104.000 $82.000 $113.450 $140.000 $54.270 $103.000 $138.750
CEM STABIL BKFL
CY 3,883.000 $69.070 $55.000 $53.000 $55.550 $60.000 $65.950 $56.000 $94.350
TRENCH EXCAVATION PROTECTION
LF 6,349.000 $2.810 $2.000 $2.000 $1.010 $1.000 $3.310 $1.000 $4.440
SOIL NAIL ANCHORS
LF 11,110.000 $15.630 $17.000 $17.500 $24.300 $25.000 $12.970 $18.000 $29.770
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 24.000 $129.000 $125.000 $152.000 $125.000 $140.000 $142.630 $125.000 $138.750
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 78.000 $228.450 $290.000 $265.000 $290.000 $325.000 $330.910 $300.000 $321.900
RETAINING WALL (SOIL NAIL)(FACIA)
SF 8,949.000 $37.060 $46.000 $37.000 $31.720 $33.000 $36.970 $50.000 $32.480
RIPRAP (CONC)(4 IN)
CY 100.000 $330.950 $600.000 $298.000 $340.000 $425.000 $259.940 $350.000 $377.400
RIPRAP (STONE PROTECTION)(18 IN)
CY 39.000 $120.980 $250.000 $155.000 $306.970 $250.000 $272.850 $220.000 $299.700
RC PIPE (CL III)(24 IN)(SPL)
LF 2,348.000 $57.640 $55.000 $54.500 $43.430 $63.000 $52.510 $43.000 $83.680
RC PIPE (CL III)(30 IN)(SPL)
LF 1,911.000 $67.130 $74.000 $85.000 $60.600 $78.000 $69.440 $61.000 $106.430
RC PIPE (CL III)(36 IN)(SPL)
LF 412.000 $90.310 $93.000 $110.000 $81.810 $105.000 $93.500 $82.000 $111.400
RC PIPE (CL III)(42 IN)(SPL)
LF 1,678.000 $114.480 $118.000 $145.000 $108.070 $132.000 $117.920 $110.000 $148.540
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 4.000 $4,500.000 $4,900.000 $6,150.000 $4,444.000 $5,500.000 $4,898.520 $4,500.000 $3,885.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 3.000 $5,700.000 $5,200.000 $6,440.000 $4,545.000 $6,000.000 $5,474.940 $4,600.000 $3,885.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 7.000 $4,250.820 $4,200.000 $4,610.000 $3,838.000 $4,500.000 $3,869.600 $3,900.000 $4,662.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 5.000 $4,309.830 $4,400.000 $4,820.000 $3,989.500 $3,500.000 $4,057.870 $4,050.000 $3,552.000
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $5,310.000 $3,800.000 $3,810.000 $3,484.500 $3,120.000 $4,084.960 $3,500.000 $4,662.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 1.000 $4,755.000 $4,400.000 $4,810.000 $4,040.000 $4,250.000 $4,769.590 $4,100.000 $3,552.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $9,500.000 $5,500.000 $5,720.000 $4,949.000 $5,500.000 $5,454.220 $5,000.000 $4,329.000
REMOV STR (PIPE)
LF 565.000 $11.350 $11.000 $9.900 $10.100 $10.750 $8.070 $10.000 $5.550
MOBILIZATION
LS 1.000 $388,000.000 $292,000.000 $375,000.000 $462,952.620 $450,000.000 $350,000.000 $470,000.000 $428,540.080
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $3,000.000 $3,000.000 $4,257.400 $3,000.000 $2,943.880 $5,300.000 $1,165.500
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 156.000 $24.370 $35.000 $14.750 $25.000 $18.000 $17.120 $25.000 $27.750
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.610 $13.000 $5.800 $7.000 $2.500 $9.130 $8.000 $15.540
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 330.000 $3.730 $6.000 $6.250 $4.890 $4.500 $4.060 $3.300 $6.110
BIODEG EROSN CONT LOGS (REMOVE)
LF 330.000 $0.690 $1.000 $0.900 $2.590 $1.000 $0.310 $0.250 $0.830
CONSTRUCTING DETOURS
SY 1,040.000 $24.070 $40.000 $24.000 $42.320 $34.000 $41.190 $36.000 $75.930
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,410.000 $26.890 $40.000 $39.500 $26.300 $12.000 $40.450 $37.000 $43.890
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 920.000 $11.000 $8.000 $11.250 $35.670 $13.000 $24.010 $39.000 $45.670
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 720.000 $11.000 $8.000 $65.000 $30.280 $66.000 $31.260 $39.000 $74.350
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,150.000 $3.230 $5.000 $9.000 $7.410 $8.000 $12.880 $9.000 $21.560
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,020.000 $5.840 $5.000 $7.800 $8.020 $8.000 $5.260 $6.000 $14.300
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,600.000 $6.700 $5.000 $7.800 $10.100 $10.000 $10.910 $7.000 $14.850
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,410.000 $6.000 $6.000 $12.500 $11.890 $10.000 $12.970 $16.000 $20.610
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 920.000 $9.990 $6.000 $11.250 $17.560 $12.000 $16.160 $13.000 $21.150
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 720.000 $13.410 $6.000 $11.250 $11.220 $12.000 $19.470 $16.000 $21.150
LANDSCAPE PAVERS
SY 57.000 $50.690 $72.000 $89.500 $74.970 $110.000 $94.170 $140.000 $133.200
REMOVE AND RELAY PAVERS
SY 1,277.000 $35.000 $52.000 $50.500 $54.400 $50.000 $68.190 $65.000 $53.280
CONC CURB (MONO) (TY II)
LF 625.000 $13.000 $15.000 $10.750 $13.500 $16.000 $13.200 $14.000 $14.990
CONC CURB & GUTTER (VALLEY GUTTER)
LF 980.000 $21.260 $24.000 $33.000 $25.000 $25.000 $16.440 $25.000 $27.750
CONC CURB & GUTTER(VALLEY GUTTER)(48")
LF 531.000 $44.280 $30.000 $36.000 $37.750 $30.000 $19.320 $38.000 $41.900
CONC. CURB TY A (BARRIER)
LF 5,156.000 $12.000 $9.000 $11.000 $13.500 $9.250 $9.530 $14.000 $14.990
DRIVEWAYS (CONC)
SY 527.000 $51.450 $35.000 $42.500 $38.500 $65.000 $64.040 $40.000 $42.740
DRIVEWAYS (ACP)
SY 255.000 $22.440 $45.000 $24.500 $73.380 $30.000 $67.970 $60.000 $27.750
CONC SIDEWALKS (4")
SY 1,762.000 $35.170 $34.000 $35.250 $34.500 $30.000 $20.780 $36.000 $38.300
CURB RAMPS (TY 1)
EA 19.000 $1,254.500 $1,500.000 $1,050.000 $1,100.000 $1,100.000 $1,056.520 $1,125.000 $1,221.000
CURB RAMPS (TY 2)
EA 1.000 $1,325.000 $1,900.000 $1,020.000 $1,000.000 $1,550.000 $1,171.410 $1,020.000 $1,110.000
CURB RAMPS (TY 7)
EA 4.000 $1,275.000 $2,400.000 $1,070.000 $1,000.000 $1,500.000 $1,087.520 $1,020.000 $12,210.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 15.000 $2,924.730 $2,500.000 $720.000 $1,331.040 $1,500.000 $445.790 $2,950.000 $1,492.950
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,175.180 $1,200.000 $454.000 $1,120.960 $1,000.000 $167.170 $910.000 $987.900
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $6,200.000 $8,900.000 $7,950.000 $4,721.860 $9,500.000 $10,000.000 $10,850.000 $9,768.000
PIPE UNDERDRAINS (TY 4) (6")
LF 1,077.000 $8.000 $20.000 $23.000 $33.770 $25.000 $15.910 $24.000 $7.770
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 6.000 $175.000 $525.000 $254.000 $125.000 $150.000 $142.630 $128.000 $249.750
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,000.000 $1,100.000 $1,960.000 $1,100.000 $1,250.000 $1,255.160 $1,122.000 $1,221.000
CONDT (PVC) (SCH 40) (1")
LF 85.000 $8.920 $20.000 $6.050 $20.000 $23.000 $22.820 $21.000 $22.200
CONDT (PVC) (SCH 40) (2")
LF 395.000 $5.460 $9.000 $7.600 $9.000 $10.000 $10.270 $10.000 $9.990
CONDT (PVC) (SCH 80) (2")
LF 155.000 $8.010 $10.000 $10.250 $10.000 $12.000 $11.410 $11.000 $11.100
CONDT (PVC) (SCH 80) (2") (BORE)
LF 70.000 $15.850 $20.000 $26.000 $20.000 $23.000 $22.820 $21.000 $22.200
CONDT (RM) (1 1/4")
LF 210.000 $20.000 $17.500 $20.500 $17.500 $19.500 $19.970 $18.000 $19.430
ELEC CONDR (NO.12) INSULATED
LF 460.000 $0.750 $1.500 $1.000 $1.500 $1.700 $1.710 $1.500 $1.670
ELEC CONDR (NO.8) BARE
LF 455.000 $1.240 $1.400 $0.950 $1.400 $1.550 $1.600 $1.400 $1.550
ELEC CONDR (NO.8) INSULATED
LF 800.000 $2.200 $1.500 $1.200 $1.500 $1.700 $1.710 $1.500 $1.670
ELEC CONDR (NO.6) BARE
LF 20.000 $1.300 $1.800 $1.300 $1.800 $2.000 $2.050 $1.900 $2.000
ELEC CONDR (NO.6) INSULATED
LF 40.000 $1.470 $1.900 $1.300 $1.900 $2.100 $2.170 $2.000 $2.110
TRAY CABLE (4 CONDR) (12 AWG)
LF 370.000 $1.890 $2.000 $1.700 $2.000 $2.250 $2.280 $2.000 $2.220
GROUND BOX TY A (122311)W/APRON
EA 9.000 $772.020 $765.000 $817.000 $765.000 $850.000 $872.910 $780.000 $849.150
ZINC-COAT STL WIRE STRAND (3/8")
LF 1,115.000 $2.490 $2.100 $3.950 $2.100 $2.500 $2.400 $2.100 $2.330
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
EA 1.000 $3,800.000 $4,250.000 $5,580.000 $4,250.000 $4,800.000 $4,849.490 $4,340.000 $4,717.500
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 2.000 $1,242.120 $1,670.000 $1,630.000 $1,670.000 $1,850.000 $1,905.570 $1,700.000 $1,853.700
ELC SRV TY T 120/240 000(NS)GS(N)TP(O)
EA 2.000 $1,912.680 $2,100.000 $3,760.000 $2,100.000 $2,400.000 $2,396.220 $2,150.000 $1,853.700
ALUMINUM SIGNS (TY A)
SF 22.000 $24.130 $32.000 $27.000 $16.250 $30.000 $18.540 $17.000 $30.530
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 38.000 $477.990 $365.000 $603.000 $530.000 $450.000 $604.760 $540.000 $593.850
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $587.650 $500.000 $648.000 $645.000 $525.000 $735.980 $660.000 $638.250
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $789.030 $800.000 $845.000 $750.000 $600.000 $855.790 $770.000 $832.500
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,018.180 $850.000 $1,100.000 $860.000 $700.000 $981.310 $880.000 $1,082.250
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,065.990 $920.000 $1,350.000 $956.000 $800.000 $1,101.120 $990.000 $1,332.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $1,873.110 $1,200.000 $3,940.000 $1,515.000 $1,500.000 $1,728.700 $1,550.000 $3,885.000
REMOVE SM RD SN SUP&AM
EA 42.000 $60.520 $50.000 $84.500 $50.000 $250.000 $57.050 $51.000 $83.250
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $585.000 $350.000 $845.000 $490.000 $250.000 $559.120 $500.000 $832.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 17,106.000 $0.660 $0.500 $0.550 $0.500 $0.600 $1.140 $1.000 $1.110
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,010.000 $0.610 $0.550 $0.600 $0.550 $0.600 $1.140 $1.000 $1.110
WK ZN PAV MRK REMOV (Y)(4")SLD W/MRKR
LF 16,312.000 $0.800 $0.550 $0.600 $0.550 $0.600 $1.140 $1.000 $1.110
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,140.000 $0.920 $1.400 $1.600 $1.400 $1.500 $1.140 $1.000 $1.110
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,480.000 $2.320 $1.900 $2.150 $1.900 $2.050 $3.190 $3.000 $3.110
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 363.000 $4.840 $8.400 $9.450 $8.400 $9.000 $6.850 $6.000 $6.660
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 10.000 $80.730 $95.000 $107.000 $95.000 $101.000 $142.630 $130.000 $138.750
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 16.000 $139.810 $180.000 $203.000 $180.000 $200.000 $171.160 $150.000 $166.500
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 4.000 $127.500 $200.000 $225.000 $200.000 $215.000 $188.530 $170.000 $183.400
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $104.960 $200.000 $225.000 $200.000 $215.000 $200.240 $180.000 $194.790
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $412.300 $480.000 $541.000 $480.000 $550.000 $519.780 $470.000 $505.050
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 30.000 $1.000 $2.400 $2.700 $2.400 $2.550 $1.140 $1.000 $1.110
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,280.000 $0.370 $0.450 $0.500 $0.450 $0.500 $0.510 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 175.000 $0.360 $1.200 $1.400 $1.200 $1.300 $0.510 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,824.000 $0.380 $0.450 $0.500 $0.450 $0.500 $0.510 $0.500 $0.500
REFL PAV MRKR TY I-C
EA 78.000 $3.430 $4.400 $4.950 $4.400 $5.000 $4.560 $4.000 $4.440
REFL PAV MRKR TY II-A-A
EA 94.000 $3.190 $4.400 $4.950 $4.400 $5.000 $4.560 $4.000 $4.440
REFL PAV MRKR TY II-C-R
EA 46.000 $3.330 $4.400 $4.950 $4.400 $5.000 $4.560 $4.000 $4.440
ELIM EXT PAV MRK & MRKS (4")
LF 8,600.000 $0.530 $0.600 $0.700 $0.600 $0.650 $0.510 $0.500 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 400.000 $1.370 $2.400 $2.700 $2.400 $2.550 $2.280 $2.000 $2.220
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $25.540 $60.000 $67.500 $60.000 $65.000 $28.530 $25.000 $27.750
ELIM EXT PAV MRK & MRKS (WORD)
EA 6.000 $25.170 $60.000 $67.500 $60.000 $65.000 $28.530 $25.000 $27.750
ELIM EXT PAV MRK & MRKS (RR XING)
EA 1.000 $175.220 $120.000 $135.000 $120.000 $130.000 $171.160 $150.000 $166.500
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $1,096.910 $1,200.000 $1,370.000 $1,155.000 $1,300.000 $1,317.920 $1,200.000 $1,282.050
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $12,645.720 $17,500.000 $18,800.000 $17,500.000 $19,500.000 $19,968.490 $17,900.000 $19,425.000
REMOVING TRAFFIC SIGNALS
EA 3.000 $2,193.420 $2,100.000 $2,590.000 $2,100.000 $2,500.000 $2,396.220 $2,200.000 $2,331.000
TEMP TRAF SIGNALS
EA 1.000 $19,000.000 $13,000.000 $18,800.000 $12,900.000 $14,500.000 $14,719.630 $13,200.000 $14,319.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $166.030 $165.000 $254.000 $165.000 $200.000 $188.270 $170.000 $183.150
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $169.100 $165.000 $254.000 $165.000 $185.000 $188.270 $170.000 $183.150
VEH SIG SEC (12")LED(YEL)
EA 12.000 $166.940 $165.000 $254.000 $165.000 $200.000 $188.270 $170.000 $183.150
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $169.440 $165.000 $254.000 $165.000 $185.000 $188.270 $170.000 $183.150
VEH SIG SEC (12")LED(RED)
EA 20.000 $166.820 $165.000 $254.000 $165.000 $200.000 $188.270 $170.000 $183.150
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $174.000 $165.000 $254.000 $165.000 $185.000 $188.270 $170.000 $183.150
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $488.650 $475.000 $507.000 $475.000 $550.000 $542.000 $490.000 $527.250
BACK PLATE (12")(3 SEC)
EA 9.000 $73.560 $70.000 $50.500 $70.000 $80.000 $79.870 $72.000 $77.700
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 450.000 $1.540 $1.700 $1.400 $1.700 $2.250 $1.940 $1.700 $1.890
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,505.000 $1.860 $2.000 $1.900 $2.000 $2.250 $2.280 $2.000 $2.220
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 2,130.000 $1.720 $1.400 $1.200 $1.400 $1.600 $1.600 $1.500 $1.550
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,404.370 $3,300.000 $2,540.000 $3,250.000 $3,600.000 $3,708.430 $3,300.000 $3,607.500
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $780.950 $650.000 $282.000 $650.000 $750.000 $741.690 $660.000 $721.500
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $3,100.000 $2,900.000 $3,830.000 $2,880.000 $3,200.000 $3,286.240 $2,850.000 $3,196.800
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 4.000 $4,197.250 $4,300.000 $5,180.000 $4,200.000 $4,700.000 $4,792.440 $4,300.000 $4,662.000
PED POLE ASSEMBLY
EA 2.000 $933.860 $1,000.000 $761.000 $1,000.000 $1,110.000 $1,141.060 $1,020.000 $1,110.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $830.310 $760.000 $845.000 $760.000 $850.000 $867.200 $780.000 $843.600
PED DETECTOR CONTROLLER UNIT
EA 1.000 $2,659.070 $3,800.000 $3,300.000 $3,800.000 $4,210.000 $4,336.010 $3,900.000 $4,218.000
VEH LP DETECT (SAWCUT)
LF 600.000 $6.480 $10.000 $9.700 $10.000 $11.100 $11.410 $10.000 $11.100
TRANSPLANT PLANT MATERIAL
EA 19.000 $450.000 $500.000 $1,130.000 $495.000 $500.000 $621.170 $500.000 $1,110.000
GEOGRID BASE REINFORCEMENT (TY I)
SY 24,724.000 $1.250 $1.350 $0.950 $2.150 $1.000 $0.830 $1.300 $3.330
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $38,000.000 $200.000 $8,450.000 $29,328.670 $11,000.000 $14,822.320 $20,000.000 $16,650.000
VIVDS TEMPORARY
EA 1.000 $15,000.000 $12,500.000 $14,700.000 $12,500.000 $14,000.000 $14,263.200 $12,800.000 $13,875.000
Totals: $4,345,456.620 $4,313,269.700 $4,565,530.500 $4,652,790.245 $4,783,867.950 $4,826,129.730 $4,968,395.800 $5,694,036.775