PREPARING ROW
|
STA
|
1.000
|
$2,500.000
|
$5,550.000
|
$9,555.000
|
$50,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
20.000
|
$10.000
|
$350.000
|
$61.710
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
8.000
|
$350.000
|
$600.000
|
$5,610.000
|
$450.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
885.000
|
$20.000
|
$14.200
|
$20.850
|
$40.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
70.720
|
$125.000
|
$290.000
|
$149.850
|
$250.000
|
|
|
BLADING
|
HR
|
20.000
|
$100.000
|
$100.000
|
$102.600
|
$150.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
4,107.000
|
$0.350
|
$0.840
|
$0.500
|
$2.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
1,027.000
|
$0.350
|
$0.840
|
$1.200
|
$2.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,027.000
|
$0.350
|
$0.840
|
$1.200
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
34.630
|
$35.000
|
$40.000
|
$36.630
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
478.000
|
$90.000
|
$91.840
|
$94.240
|
$125.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
12.000
|
$200.000
|
$220.500
|
$236.250
|
$171.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
1,661.000
|
$5.000
|
$8.000
|
$7.980
|
$5.500
|
|
|
ASPH (RC-250)
|
GAL
|
288.000
|
$5.000
|
$10.200
|
$9.810
|
$10.000
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
10.000
|
$250.000
|
$294.610
|
$200.030
|
$300.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
17.000
|
$150.000
|
$282.370
|
$257.160
|
$300.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
300.000
|
$100.000
|
$116.250
|
$183.000
|
$150.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
13,818.000
|
$3.500
|
$4.160
|
$5.430
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
189.000
|
$80.000
|
$103.800
|
$137.250
|
$110.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
3,806.000
|
$80.000
|
$88.400
|
$92.640
|
$120.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$75.000
|
$110.570
|
$74.400
|
$85.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,034.000
|
$2.000
|
$4.730
|
$3.240
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
57.000
|
$200.000
|
$107.750
|
$165.000
|
$350.000
|
|
|
CUT & RESTORING PAV
|
SY
|
50.000
|
$120.000
|
$105.000
|
$340.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
16.000
|
$20.000
|
$210.000
|
$120.000
|
$4.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,747.000
|
$25.000
|
$21.000
|
$45.000
|
$42.000
|
|
|
CL C CONC (CURB)
|
CY
|
4.100
|
$1,300.000
|
$2,627.550
|
$1,100.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
17.700
|
$470.000
|
$550.750
|
$575.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
266.000
|
$200.000
|
$141.050
|
$175.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
7.200
|
$500.000
|
$383.750
|
$575.000
|
$550.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
32.000
|
$900.000
|
$2,609.250
|
$1,600.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
160.000
|
$80.000
|
$73.300
|
$62.000
|
$95.000
|
|
|
WINGWALL (PW - 1) (HW=16 FT)
|
EA
|
2.000
|
$45,000.000
|
$63,351.250
|
$80,000.000
|
$40,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$1,500.000
|
$1,843.800
|
$2,000.000
|
$2,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$85,000.000
|
$123,228.850
|
$130,188.830
|
$160,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$2,500.000
|
$1,155.000
|
$1,128.020
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
110.000
|
$40.000
|
$31.500
|
$35.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
110.000
|
$10.000
|
$12.600
|
$20.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
635.000
|
$3.000
|
$5.250
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
635.000
|
$1.000
|
$1.580
|
$2.000
|
$2.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
7,072.000
|
$0.250
|
$1.990
|
$0.600
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$25.000
|
$24.200
|
$24.150
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
625.000
|
$2.000
|
$4.780
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$3,116.500
|
$2,845.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$628.000
|
$275.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$400.000
|
$535.000
|
$500.000
|
$850.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$30.000
|
$25.200
|
$20.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,505.000
|
$0.200
|
$0.230
|
$0.200
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
14,144.000
|
$0.200
|
$0.210
|
$0.180
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
198.000
|
$0.400
|
$0.440
|
$0.400
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,930.000
|
$0.300
|
$0.290
|
$0.360
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
17,454.000
|
$0.200
|
$0.210
|
$0.180
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,590.000
|
$1.500
|
$2.580
|
$1.760
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,746.000
|
$1.500
|
$2.580
|
$1.760
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
198.000
|
$0.900
|
$0.910
|
$0.850
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,930.000
|
$0.750
|
$0.860
|
$0.800
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,505.000
|
$0.350
|
$0.420
|
$0.380
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
14,144.000
|
$0.350
|
$0.400
|
$0.360
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
17,454.000
|
$0.350
|
$0.400
|
$0.360
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
24.000
|
$15.000
|
$18.900
|
$14.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$300.000
|
$199.500
|
$185.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$275.000
|
$304.500
|
$285.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$700.000
|
$609.000
|
$575.000
|
$500.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
549.000
|
$6.000
|
$10.500
|
$7.000
|
$20.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
154.000
|
$3.500
|
$3.680
|
$3.250
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
549.000
|
$4.000
|
$3.680
|
$3.250
|
$5.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$2,500.000
|
$1,575.000
|
$6,500.000
|
$6,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$10,500.000
|
$6,500.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$8,000.000
|
$9,500.000
|
$7,500.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$500.000
|
$500.000
|
$250.000
|
$650.000
|
|
Totals: |
$1,009,684.950
|
$1,252,351.560
|
$1,364,442.039
|
$1,640,756.500
|