PREPARING ROW
|
STA
|
40.000
|
$4,500.000
|
$4,200.000
|
$725.000
|
$441.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
1.000
|
$825.000
|
$3,300.000
|
$750.000
|
$3,900.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
645.000
|
$22.000
|
$30.000
|
$26.900
|
$44.790
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
3,755.000
|
$15.000
|
$11.000
|
$15.800
|
$12.500
|
|
|
REMOVING CONC (MISC)
|
SY
|
140.000
|
$29.000
|
$30.000
|
$85.000
|
$63.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
327.000
|
$7.000
|
$25.000
|
$15.100
|
$24.170
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,372.000
|
$20.000
|
$36.000
|
$11.280
|
$16.490
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
1,135.000
|
$16.000
|
$40.000
|
$32.630
|
$18.060
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
13,412.000
|
$2.000
|
$4.000
|
$6.500
|
$4.830
|
|
|
BLOCK SODDING
|
SY
|
13,412.000
|
$7.000
|
$5.500
|
$9.850
|
$5.980
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
6,706.000
|
$0.750
|
$0.850
|
$2.390
|
$0.790
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
6,706.000
|
$0.750
|
$0.850
|
$2.750
|
$0.790
|
|
|
VEGETATIVE WATERING
|
MG
|
537.000
|
$26.000
|
$30.000
|
$70.000
|
$40.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
17,401.000
|
$45.000
|
$35.000
|
$38.460
|
$26.670
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
17,780.000
|
$3.000
|
$9.000
|
$4.900
|
$4.060
|
|
|
CEMENT
|
TON
|
192.000
|
$250.000
|
$340.000
|
$288.000
|
$364.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
17,780.000
|
$4.000
|
$4.700
|
$8.500
|
$4.060
|
|
|
ASPH (RC-250)
|
GAL
|
4,872.000
|
$8.000
|
$8.000
|
$11.000
|
$4.900
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
129.000
|
$180.000
|
$440.000
|
$88.550
|
$275.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,625.000
|
$6.000
|
$8.000
|
$8.710
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
12.000
|
$230.000
|
$250.000
|
$225.000
|
$260.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
329.000
|
$100.000
|
$110.000
|
$175.870
|
$16.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
50.000
|
$280.000
|
$700.000
|
$369.340
|
$290.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
70.000
|
$17.000
|
$20.000
|
$25.200
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
208.000
|
$40.000
|
$200.000
|
$41.000
|
$115.250
|
|
|
STEEL H - PILING (HP 12 X 53)
|
LF
|
88.000
|
$2,500.000
|
$450.000
|
$139.100
|
$238.000
|
|
|
CL C CONC (ABUT)
|
CY
|
9.100
|
$1,500.000
|
$3,400.000
|
$1,645.000
|
$7,424.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
2.000
|
$1,800.000
|
$5,000.000
|
$5,000.000
|
$1,177.000
|
|
|
CL A CONC (CHANNEL LINING)
|
CY
|
40.000
|
$600.000
|
$1,050.000
|
$1,000.000
|
$612.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.000
|
$690.000
|
$730.000
|
$742.360
|
$795.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
55.000
|
$630.000
|
$800.000
|
$704.310
|
$660.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
389.000
|
$270.000
|
$285.000
|
$410.000
|
$313.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
8.000
|
$83.000
|
$150.000
|
$122.600
|
$112.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
92.000
|
$350.000
|
$500.000
|
$405.000
|
$650.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
92.000
|
$500.000
|
$800.000
|
$700.000
|
$919.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
140.000
|
$850.000
|
$1,000.000
|
$1,100.000
|
$1,096.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
42.000
|
$500.000
|
$720.000
|
$625.000
|
$859.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 1)
|
LF
|
940.000
|
$80.000
|
$230.000
|
$275.000
|
$270.650
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$24,000.000
|
$12,750.000
|
$8,486.000
|
|
|
JCT BOX (STAGE I) (PJB) (4 FT X 4 FT)
|
EA
|
1.000
|
$7,000.000
|
$3,700.000
|
$14,200.000
|
$8,486.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
2.000
|
$6,500.000
|
$11,000.000
|
$19,250.000
|
$14,347.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
1.000
|
$14,000.000
|
$12,000.000
|
$13,605.000
|
$11,900.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
1.000
|
$12,000.000
|
$11,000.000
|
$4,750.000
|
$11,270.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
1.000
|
$12,000.000
|
$10,000.000
|
$7,064.250
|
$11,470.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
4.000
|
$14,000.000
|
$16,000.000
|
$1,405.300
|
$21,725.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
35.000
|
$2,000.000
|
$2,700.000
|
$225.600
|
$3,190.000
|
|
|
GRATE & FRAME
|
EA
|
4.000
|
$2,500.000
|
$4,000.000
|
$1,780.000
|
$2,174.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$2,575.000
|
$1,590.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$1,500.000
|
$1,700.000
|
$2,750.000
|
$1,282.000
|
|
|
REMOV STR (PIPE)
|
LF
|
546.000
|
$20.000
|
$17.000
|
$125.000
|
$23.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
261.000
|
$80.000
|
$36.000
|
$145.250
|
$143.900
|
|
|
REMOVE STR (CONC)
|
EA
|
2.000
|
$2,500.000
|
$1,100.000
|
$8,800.000
|
$1,765.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$600.000
|
$1,100.000
|
$1,925.000
|
$1,590.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$430,733.000
|
$400,000.000
|
$437,850.000
|
$1,140,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$10,000.000
|
$5,800.000
|
$17,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
89.000
|
$40.000
|
$37.000
|
$49.250
|
$53.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
89.000
|
$11.000
|
$10.000
|
$15.500
|
$18.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$25.000
|
$36.000
|
$25.250
|
$43.820
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$15.000
|
$14.000
|
$10.500
|
$15.420
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,594.000
|
$4.000
|
$5.500
|
$4.590
|
$6.720
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,594.000
|
$1.500
|
$1.500
|
$2.100
|
$1.490
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
180.000
|
$6.000
|
$5.000
|
$15.250
|
$8.110
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
180.000
|
$2.000
|
$1.500
|
$2.100
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
60.000
|
$75.000
|
$150.000
|
$1,250.000
|
$206.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$6,000.000
|
$5,000.000
|
$7,500.000
|
$5,895.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
720.000
|
$60.000
|
$31.000
|
$160.000
|
$14.900
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$60.000
|
$31.000
|
$155.000
|
$12.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
460.000
|
$10.000
|
$9.000
|
$10.250
|
$4.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$9.000
|
$10.240
|
$8.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
720.000
|
$20.000
|
$20.000
|
$18.000
|
$14.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$20.000
|
$20.000
|
$18.000
|
$14.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
4,215.000
|
$25.000
|
$35.000
|
$49.310
|
$43.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
10.000
|
$250.000
|
$400.000
|
$472.400
|
$530.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,070.000
|
$110.000
|
$130.000
|
$136.120
|
$208.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,433.000
|
$55.000
|
$119.000
|
$120.000
|
$110.400
|
|
|
TURNOUTS (ACP)
|
SY
|
274.000
|
$100.000
|
$122.000
|
$120.000
|
$118.600
|
|
|
CONC SIDEWALKS (4")
|
SY
|
57.000
|
$90.000
|
$110.000
|
$160.000
|
$242.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$30.000
|
$33.000
|
$45.000
|
$41.640
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$1,900.000
|
$2,500.000
|
$2,320.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$17,000.000
|
$24,000.000
|
$30,038.800
|
$30,731.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$4.000
|
$4.000
|
$7.750
|
$8.240
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$200.000
|
$235.760
|
$241.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,000.000
|
$3,400.000
|
$4,200.000
|
$4,047.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$400.000
|
$425.000
|
$489.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
62.000
|
$220.000
|
$170.000
|
$265.000
|
$176.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$270.000
|
$180.000
|
$325.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
29.000
|
$840.000
|
$700.000
|
$818.410
|
$794.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$810.000
|
$800.000
|
$985.600
|
$941.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$958.700
|
$1,120.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
30.000
|
$110.000
|
$140.000
|
$190.910
|
$88.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$26.000
|
$17.870
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
12.000
|
$30.000
|
$31.000
|
$30.020
|
$31.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$80.000
|
$65.000
|
$62.010
|
$71.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
8.000
|
$192.000
|
$85.000
|
$98.000
|
$95.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
422.000
|
$5.000
|
$11.000
|
$6.250
|
$6.920
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,180.000
|
$2.000
|
$1.400
|
$1.150
|
$2.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
58.000
|
$10.000
|
$22.000
|
$6.580
|
$11.770
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,118.000
|
$2.000
|
$1.400
|
$1.150
|
$2.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,605.000
|
$2.000
|
$1.300
|
$0.650
|
$2.350
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
27.000
|
$10.000
|
$15.000
|
$12.250
|
$22.350
|
|
|
PAVEMENT SEALER 6"
|
LF
|
620.000
|
$0.500
|
$0.800
|
$0.850
|
$0.390
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
7,930.000
|
$0.750
|
$1.300
|
$1.350
|
$1.310
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
8,114.000
|
$0.750
|
$1.300
|
$1.410
|
$1.310
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
103.000
|
$5.000
|
$6.000
|
$9.250
|
$7.470
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
620.000
|
$0.300
|
$0.400
|
$0.950
|
$0.090
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
2,000.000
|
$150.000
|
$74.500
|
$150.000
|
$84.710
|
|
|
TACK COAT
|
GAL
|
1,727.000
|
$10.000
|
$4.000
|
$15.250
|
$4.350
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
3,764.000
|
$160.000
|
$174.000
|
$175.090
|
$147.980
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,000.000
|
$15,000.000
|
$16,250.000
|
$26,350.000
|
|
Totals: |
$4,752,058.000
|
$5,263,760.100
|
$5,372,633.510
|
$5,616,795.930
|