PREPARING ROW
|
STA
|
84.000
|
$3,000.000
|
$2,400.000
|
$700.000
|
$205.070
|
$4,500.000
|
$2,200.000
|
$5,000.000
|
$1,206.360
|
$1,500.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
7.000
|
$525.000
|
$640.000
|
$1,250.000
|
$1,500.790
|
$850.000
|
$1,000.000
|
$2,320.000
|
$1,080.000
|
$1,060.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
69.000
|
$14.000
|
$30.800
|
$20.000
|
$46.850
|
$10.000
|
$20.000
|
$28.300
|
$30.780
|
$25.600
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
131.000
|
$11.500
|
$16.700
|
$10.000
|
$46.790
|
$10.000
|
$15.000
|
$16.510
|
$30.780
|
$22.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
883.850
|
$13.500
|
$11.300
|
$15.000
|
$21.510
|
$10.000
|
$10.000
|
$14.210
|
$30.780
|
$16.400
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,504.000
|
$11.500
|
$16.000
|
$25.000
|
$10.830
|
$17.480
|
$13.500
|
$24.500
|
$23.940
|
$16.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,737.000
|
$13.500
|
$8.100
|
$10.000
|
$7.710
|
$9.000
|
$16.500
|
$14.500
|
$23.940
|
$16.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
25,504.000
|
$2.500
|
$2.000
|
$3.500
|
$2.220
|
$3.000
|
$3.000
|
$2.430
|
$1.140
|
$3.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
25,504.000
|
$0.200
|
$0.300
|
$0.260
|
$0.290
|
$0.290
|
$0.290
|
$0.260
|
$0.300
|
$0.170
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
25,504.000
|
$0.150
|
$0.200
|
$0.180
|
$0.200
|
$0.220
|
$0.220
|
$0.180
|
$0.210
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
397.000
|
$25.000
|
$34.000
|
$34.840
|
$41.130
|
$30.000
|
$12.000
|
$20.000
|
$23.940
|
$50.800
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
25,504.000
|
$1.500
|
$1.000
|
$0.900
|
$1.000
|
$1.650
|
$1.650
|
$0.900
|
$1.040
|
$0.900
|
|
|
PROOF ROLLING
|
HR
|
26.000
|
$100.000
|
$127.000
|
$75.000
|
$85.010
|
$75.000
|
$65.000
|
$215.490
|
$117.000
|
$91.200
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
8,976.000
|
$30.000
|
$58.000
|
$80.000
|
$70.180
|
$65.000
|
$58.000
|
$60.000
|
$70.490
|
$84.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
40,391.000
|
$3.000
|
$4.200
|
$8.000
|
$3.620
|
$9.000
|
$2.250
|
$9.000
|
$3.510
|
$2.900
|
|
|
LIME (HYD(SLY OR DRY) COM OR QK(DRY)
|
TON
|
970.000
|
$220.000
|
$260.000
|
$275.000
|
$290.140
|
$285.000
|
$300.000
|
$250.000
|
$263.520
|
$300.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
8,078.000
|
$3.500
|
$4.050
|
$5.000
|
$5.020
|
$3.750
|
$3.750
|
$4.030
|
$5.260
|
$3.950
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,708.000
|
$5.000
|
$3.250
|
$6.000
|
$3.670
|
$3.000
|
$3.500
|
$5.920
|
$4.010
|
$3.150
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
80.000
|
$120.000
|
$63.800
|
$75.000
|
$91.100
|
$185.000
|
$100.000
|
$166.300
|
$500.000
|
$148.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
72.000
|
$15.000
|
$23.050
|
$85.000
|
$239.150
|
$150.000
|
$110.000
|
$50.230
|
$150.000
|
$33.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
28.000
|
$360.000
|
$640.000
|
$600.000
|
$889.820
|
$1,500.000
|
$600.000
|
$476.840
|
$800.000
|
$707.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$375.000
|
$640.000
|
$750.000
|
$1,120.120
|
$1,500.000
|
$600.000
|
$479.520
|
$750.000
|
$723.000
|
|
|
RIPRAP (CONC)(DISSIPATER)
|
CY
|
3.000
|
$2,000.000
|
$3,190.000
|
$1,000.000
|
$1,703.520
|
$1,500.000
|
$900.000
|
$1,824.100
|
$2,000.000
|
$1,140.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.200
|
$500.000
|
$810.000
|
$750.000
|
$668.220
|
$550.000
|
$625.000
|
$499.000
|
$800.000
|
$715.000
|
|
|
RAIL (TY T402)
|
LF
|
175.000
|
$350.000
|
$270.000
|
$275.000
|
$323.420
|
$250.000
|
$275.000
|
$374.870
|
$350.000
|
$373.000
|
|
|
RAIL (TY T631)
|
LF
|
125.000
|
$115.000
|
$101.000
|
$220.000
|
$136.950
|
$123.000
|
$130.000
|
$150.000
|
$91.950
|
$130.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
72.000
|
$250.000
|
$151.000
|
$160.000
|
$133.650
|
$200.000
|
$100.000
|
$179.490
|
$147.000
|
$118.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
220.000
|
$705.000
|
$850.000
|
$1,100.000
|
$950.540
|
$1,070.000
|
$1,150.000
|
$1,187.430
|
$1,417.490
|
$1,320.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
239.000
|
$90.000
|
$81.700
|
$125.000
|
$68.800
|
$120.000
|
$80.000
|
$94.560
|
$103.950
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
255.000
|
$108.000
|
$97.600
|
$130.000
|
$88.980
|
$125.000
|
$80.000
|
$103.910
|
$120.750
|
$129.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
8.000
|
$115.000
|
$270.000
|
$215.000
|
$169.890
|
$190.000
|
$250.000
|
$338.990
|
$262.500
|
$185.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
19.000
|
$130.000
|
$201.000
|
$250.000
|
$272.300
|
$350.000
|
$245.000
|
$258.540
|
$278.250
|
$255.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$9,000.000
|
$9,700.000
|
$12,500.000
|
$10,289.860
|
$15,000.000
|
$11,000.000
|
$10,708.570
|
$14,699.910
|
$14,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$8,700.000
|
$3,340.000
|
$10,000.000
|
$34,706.900
|
$20,000.000
|
$8,250.000
|
$15,916.670
|
$20,000.000
|
$6,130.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$9,000.000
|
$6,700.000
|
$10,000.000
|
$17,868.120
|
$16,000.000
|
$9,500.000
|
$16,870.630
|
$12,000.000
|
$7,380.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$30,500.000
|
$54,000.000
|
$65,000.000
|
$70,820.420
|
$42,000.000
|
$90,000.000
|
$25,627.770
|
$70,000.000
|
$47,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,300.000
|
$2,350.000
|
$2,000.000
|
$1,478.990
|
$2,500.000
|
$1,600.000
|
$1,812.590
|
$2,992.480
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,800.000
|
$2,970.000
|
$2,600.000
|
$2,783.150
|
$3,800.000
|
$2,500.000
|
$2,306.460
|
$3,044.980
|
$2,050.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$1,700.000
|
$920.000
|
$1,200.000
|
$2,407.330
|
$1,500.000
|
$1,450.000
|
$426.430
|
$2,624.980
|
$3,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$743,193.980
|
$650,000.000
|
$380,000.000
|
$625,815.580
|
$785,000.000
|
$822,000.000
|
$800,000.000
|
$906,311.530
|
$823,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$7,000.000
|
$4,120.000
|
$10,000.000
|
$2,027.620
|
$5,000.000
|
$20,000.000
|
$4,010.260
|
$7,500.000
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
160.000
|
$25.000
|
$30.700
|
$28.000
|
$31.450
|
$33.500
|
$34.000
|
$28.000
|
$32.470
|
$29.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
130.000
|
$30.000
|
$35.050
|
$32.000
|
$35.990
|
$42.000
|
$42.000
|
$32.000
|
$37.110
|
$33.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
290.000
|
$8.000
|
$10.950
|
$10.000
|
$11.360
|
$6.500
|
$6.000
|
$10.000
|
$11.600
|
$10.600
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
702.000
|
$20.000
|
$21.900
|
$20.000
|
$22.150
|
$18.000
|
$18.000
|
$20.000
|
$23.190
|
$21.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
702.000
|
$6.000
|
$5.500
|
$5.000
|
$5.650
|
$6.000
|
$5.500
|
$5.000
|
$5.800
|
$5.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
665.000
|
$3.000
|
$3.550
|
$3.250
|
$3.730
|
$4.000
|
$4.000
|
$3.250
|
$3.770
|
$3.450
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
665.000
|
$1.000
|
$1.350
|
$1.250
|
$1.530
|
$0.500
|
$0.500
|
$1.250
|
$1.450
|
$1.300
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,164.200
|
$50.000
|
$55.000
|
$48.000
|
$67.900
|
$75.000
|
$34.500
|
$70.000
|
$72.900
|
$93.400
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
512.000
|
$66.000
|
$140.000
|
$40.000
|
$123.280
|
$68.000
|
$30.000
|
$30.890
|
$128.700
|
$140.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,870.000
|
$30.000
|
$19.850
|
$28.000
|
$40.680
|
$9.000
|
$45.000
|
$50.000
|
$40.000
|
$92.400
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
10,320.000
|
$4.000
|
$6.650
|
$4.000
|
$9.120
|
$2.000
|
$6.000
|
$5.130
|
$10.000
|
$5.900
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
6,870.000
|
$6.000
|
$18.000
|
$12.000
|
$10.230
|
$13.000
|
$12.000
|
$9.020
|
$10.000
|
$14.500
|
|
|
CONC CURB (TY II)
|
LF
|
682.000
|
$18.000
|
$25.500
|
$20.000
|
$15.340
|
$35.000
|
$24.000
|
$16.000
|
$32.000
|
$27.700
|
|
|
CONC CURB (SLOTTED)
|
LF
|
214.000
|
$32.000
|
$76.900
|
$25.000
|
$30.540
|
$50.000
|
$26.000
|
$75.000
|
$40.000
|
$49.100
|
|
|
DRIVEWAYS (CONC)
|
SY
|
90.000
|
$62.000
|
$151.000
|
$120.000
|
$153.070
|
$105.000
|
$95.000
|
$84.090
|
$125.000
|
$167.000
|
|
|
DRIVEWAYS AND TURNOUTS (ACP)
|
SY
|
1,871.000
|
$35.000
|
$36.450
|
$70.000
|
$61.580
|
$40.000
|
$30.000
|
$77.640
|
$49.500
|
$35.700
|
|
|
CONC SIDEWALKS (4")
|
SY
|
456.000
|
$45.000
|
$63.900
|
$55.000
|
$30.580
|
$65.000
|
$54.000
|
$71.090
|
$70.000
|
$87.400
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,950.000
|
$2,040.000
|
$1,500.000
|
$2,950.880
|
$2,700.000
|
$1,300.000
|
$2,166.530
|
$2,500.000
|
$1,810.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$2,000.000
|
$7,300.000
|
$1,500.000
|
$3,429.340
|
$2,500.000
|
$1,300.000
|
$2,166.530
|
$3,400.000
|
$1,940.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$2,000.000
|
$3,740.000
|
$1,500.000
|
$2,923.380
|
$2,800.000
|
$1,300.000
|
$2,166.530
|
$3,400.000
|
$2,210.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$2,500.000
|
$2,020.000
|
$2,000.000
|
$4,345.390
|
$4,500.000
|
$4,000.000
|
$2,666.530
|
$4,600.000
|
$2,550.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
194.000
|
$85.000
|
$102.000
|
$70.000
|
$139.970
|
$85.000
|
$85.000
|
$34.090
|
$125.000
|
$78.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
462.500
|
$20.000
|
$32.450
|
$35.000
|
$32.670
|
$30.000
|
$35.000
|
$29.600
|
$24.440
|
$31.300
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
2.000
|
$40.000
|
$2,340.000
|
$2,135.000
|
$4,042.450
|
$3,650.000
|
$2,500.000
|
$2,135.000
|
$2,385.820
|
$2,610.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
325.000
|
$3.000
|
$2.200
|
$2.000
|
$3.620
|
$3.000
|
$5.500
|
$2.000
|
$2.000
|
$2.100
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$275.000
|
$380.000
|
$350.000
|
$354.150
|
$275.000
|
$195.000
|
$350.000
|
$455.470
|
$370.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,400.000
|
$3,105.000
|
$3,852.150
|
$3,455.000
|
$4,000.000
|
$3,105.000
|
$3,204.540
|
$3,280.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$400.000
|
$490.000
|
$450.000
|
$1,619.150
|
$1,425.000
|
$400.000
|
$450.000
|
$355.470
|
$475.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
30.000
|
$3,500.000
|
$550.000
|
$1,000.000
|
$2,808.440
|
$2,550.000
|
$10,000.000
|
$500.000
|
$2,689.130
|
$528.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$625.000
|
$550.000
|
$500.000
|
$1,057.910
|
$950.000
|
$650.000
|
$500.000
|
$1,150.190
|
$528.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
30.000
|
$1,000.000
|
$550.000
|
$500.000
|
$1,055.330
|
$950.000
|
$1,000.000
|
$500.000
|
$1,100.000
|
$528.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$550.000
|
$630.000
|
$568.000
|
$636.280
|
$568.000
|
$546.000
|
$568.000
|
$568.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$600.000
|
$750.000
|
$685.000
|
$762.890
|
$685.000
|
$660.000
|
$685.000
|
$685.000
|
$723.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$750.000
|
$980.000
|
$892.000
|
$991.530
|
$892.000
|
$910.000
|
$892.000
|
$892.000
|
$942.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$900.000
|
$1,430.000
|
$1,295.000
|
$1,434.830
|
$1,295.000
|
$1,205.000
|
$1,295.000
|
$1,295.000
|
$1,370.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,240.000
|
$1,122.000
|
$1,244.530
|
$1,122.000
|
$1,050.000
|
$1,122.000
|
$1,122.000
|
$1,180.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,000.000
|
$1,650.000
|
$1,497.000
|
$1,657.030
|
$1,497.000
|
$1,095.000
|
$1,497.000
|
$1,497.000
|
$1,580.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$90.000
|
$148.000
|
$134.000
|
$156.380
|
$134.000
|
$50.000
|
$134.000
|
$134.000
|
$142.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$25.000
|
$35.250
|
$32.000
|
$45.530
|
$32.000
|
$40.000
|
$32.000
|
$32.000
|
$33.800
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
2.000
|
$70.000
|
$162.000
|
$147.000
|
$172.030
|
$147.000
|
$94.000
|
$147.000
|
$147.000
|
$155.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
33,661.000
|
$0.250
|
$0.400
|
$0.350
|
$0.390
|
$0.350
|
$0.250
|
$0.350
|
$0.350
|
$0.370
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
33,878.000
|
$0.250
|
$0.400
|
$0.350
|
$0.390
|
$0.350
|
$0.250
|
$0.350
|
$0.350
|
$0.370
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
1,454.000
|
$3.400
|
$3.850
|
$3.500
|
$3.990
|
$3.500
|
$5.250
|
$3.500
|
$3.500
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,897.000
|
$5.000
|
$3.850
|
$3.500
|
$3.920
|
$3.500
|
$5.250
|
$3.500
|
$3.500
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
29,071.000
|
$0.500
|
$0.650
|
$0.600
|
$0.670
|
$0.600
|
$0.850
|
$0.600
|
$0.600
|
$0.630
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
28,970.000
|
$0.500
|
$0.650
|
$0.600
|
$0.670
|
$0.600
|
$0.850
|
$0.600
|
$0.600
|
$0.630
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,013.000
|
$1.750
|
$1.600
|
$2.500
|
$1.490
|
$1.000
|
$2.000
|
$2.000
|
$1.550
|
$1.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,013.000
|
$1.750
|
$1.600
|
$2.500
|
$1.490
|
$1.000
|
$2.000
|
$2.000
|
$1.550
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,795.000
|
$1.000
|
$1.100
|
$1.000
|
$1.120
|
$1.000
|
$1.700
|
$1.000
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
298.000
|
$5.000
|
$7.700
|
$7.000
|
$8.050
|
$7.000
|
$10.000
|
$7.000
|
$7.000
|
$7.400
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$150.000
|
$193.000
|
$175.000
|
$202.830
|
$175.000
|
$150.000
|
$175.000
|
$175.000
|
$185.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
10.000
|
$150.000
|
$209.000
|
$190.000
|
$219.330
|
$190.000
|
$200.000
|
$190.000
|
$190.000
|
$201.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$50.000
|
$44.050
|
$40.000
|
$61.220
|
$40.000
|
$50.000
|
$40.000
|
$40.000
|
$42.200
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$300.000
|
$500.000
|
$450.000
|
$598.310
|
$450.000
|
$800.000
|
$450.000
|
$450.000
|
$475.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
30.000
|
$0.350
|
$0.550
|
$0.490
|
$3.980
|
$0.490
|
$3.000
|
$0.490
|
$0.490
|
$0.200
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,469.000
|
$1.000
|
$0.650
|
$0.600
|
$0.700
|
$0.600
|
$1.000
|
$0.600
|
$0.600
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,234.000
|
$0.350
|
$0.450
|
$0.400
|
$0.450
|
$0.400
|
$0.700
|
$0.400
|
$0.400
|
$0.420
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
13,821.000
|
$1.000
|
$0.850
|
$0.750
|
$2.130
|
$0.750
|
$1.250
|
$0.750
|
$0.750
|
$0.790
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
220.000
|
$0.500
|
$0.650
|
$0.600
|
$1.130
|
$0.600
|
$3.000
|
$0.600
|
$0.600
|
$0.630
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
5,413.000
|
$0.500
|
$0.650
|
$0.600
|
$0.680
|
$0.600
|
$1.200
|
$0.600
|
$0.600
|
$0.630
|
|
REFL PAV MRKR TY I-C
|
EA
|
427.000
|
$3.500
|
$5.500
|
$5.000
|
$5.740
|
$5.000
|
$4.500
|
$5.000
|
$5.000
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
805.000
|
$3.000
|
$6.050
|
$5.500
|
$6.310
|
$5.000
|
$4.000
|
$5.500
|
$5.500
|
$5.800
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1.000
|
$3.000
|
$6.050
|
$5.500
|
$16.380
|
$6.000
|
$10.000
|
$5.500
|
$5.500
|
$5.800
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
27,676.000
|
$0.500
|
$0.450
|
$0.410
|
$0.460
|
$0.450
|
$0.850
|
$0.410
|
$0.410
|
$0.430
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
2.000
|
$3,000.000
|
$6,700.000
|
$5,000.000
|
$2,993.310
|
$6,620.000
|
$2,750.000
|
$4,043.950
|
$16,000.000
|
$8,300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,487.000
|
$5.000
|
$4.800
|
$6.500
|
$3.210
|
$3.000
|
$1.000
|
$5.750
|
$5.000
|
$23.700
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
216.000
|
$180.000
|
$184.000
|
$230.000
|
$229.660
|
$215.000
|
$200.000
|
$214.430
|
$175.000
|
$214.000
|
|
|
TEMPORARY BLOW-OFF(COMPLETE)(2")
|
EA
|
1.000
|
$2,350.000
|
$2,550.000
|
$6,000.000
|
$4,520.810
|
$2,800.000
|
$2,700.000
|
$4,854.170
|
$3,300.000
|
$8,900.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
3.100
|
$12,500.000
|
$18,500.000
|
$24,000.000
|
$15,350.630
|
$8,500.000
|
$30,000.000
|
$22,036.210
|
$13,000.000
|
$12,900.000
|
|
|
CONCRETE SADDLE
|
CY
|
4.000
|
$400.000
|
$940.000
|
$650.000
|
$489.130
|
$400.000
|
$300.000
|
$627.260
|
$800.000
|
$237.000
|
|
|
DUCTILE IRON PIPE (16")
|
LF
|
5,113.000
|
$300.000
|
$164.000
|
$155.000
|
$181.530
|
$155.000
|
$140.000
|
$146.050
|
$165.000
|
$225.000
|
|
|
ADJUST VALVE BOX
|
EA
|
3.000
|
$600.000
|
$1,790.000
|
$2,100.000
|
$345.350
|
$750.000
|
$1,500.000
|
$1,986.340
|
$1,800.000
|
$2,610.000
|
|
|
RECONNECT SHORT SERVICE (1")
|
EA
|
1.000
|
$2,500.000
|
$2,910.000
|
$5,000.000
|
$3,598.920
|
$1,500.000
|
$3,000.000
|
$3,666.170
|
$5,500.000
|
$4,510.000
|
|
|
GATE VALVE & BOX (COMPLETE)(16")
|
EA
|
7.000
|
$9,500.000
|
$11,000.000
|
$14,000.000
|
$14,587.160
|
$13,000.000
|
$13,500.000
|
$13,170.170
|
$11,250.000
|
$17,300.000
|
|
|
TIE-IN (COMPLETE)(16")
|
EA
|
1.000
|
$8,500.000
|
$7,800.000
|
$9,000.000
|
$8,760.890
|
$9,000.000
|
$10,500.000
|
$7,391.740
|
$10,000.000
|
$9,490.000
|
|
|
NEW METER BOX
|
EA
|
1.000
|
$925.000
|
$670.000
|
$500.000
|
$712.030
|
$750.000
|
$1,450.000
|
$371.840
|
$1,500.000
|
$1,900.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
9.000
|
$6,500.000
|
$7,500.000
|
$9,500.000
|
$7,274.640
|
$8,500.000
|
$9,000.000
|
$8,299.370
|
$9,500.000
|
$12,600.000
|
|
|
WATER MAIN BREAKS LEAK REPAIR
|
EA
|
1.000
|
$1,000.000
|
$15,900.000
|
$7,000.000
|
$6,957.840
|
$3,000.000
|
$5,500.000
|
$5,053.750
|
$6,500.000
|
$9,610.000
|
|
|
WATER SERVICE LINE BREAKS LEAK REPAIR
|
EA
|
1.000
|
$1,000.000
|
$3,110.000
|
$5,000.000
|
$4,978.920
|
$1,500.000
|
$4,500.000
|
$2,885.650
|
$5,500.000
|
$3,920.000
|
|
|
STEEL CASING (30")(OPEN CUT)
|
LF
|
276.000
|
$300.000
|
$290.000
|
$220.000
|
$346.760
|
$275.000
|
$325.000
|
$196.260
|
$465.000
|
$480.000
|
|
|
WATER MAIN REMOVAL (16" & SMALLER)
|
LF
|
5,296.000
|
$35.000
|
$24.700
|
$16.000
|
$29.330
|
$16.100
|
$8.000
|
$14.560
|
$47.500
|
$42.100
|
|
|
AIR RELEASE VALVE (COMPLETE)(2")
|
EA
|
1.000
|
$14,000.000
|
$6,800.000
|
$42,000.000
|
$23,150.340
|
$24,000.000
|
$20,000.000
|
$39,289.540
|
$22,000.000
|
$26,900.000
|
|
|
CARRIER PIPE (IN CASING) (DI) (24")
|
LF
|
79.000
|
$305.000
|
$320.000
|
$220.000
|
$542.220
|
$275.000
|
$375.000
|
$206.950
|
$245.000
|
$1,140.000
|
|
|
CARRIER PIPE (OPEN CUT) (DI) (16")
|
LF
|
276.000
|
$200.000
|
$198.000
|
$180.000
|
$242.020
|
$215.000
|
$200.000
|
$171.310
|
$215.000
|
$344.000
|
|
|
GROUT ABANDONMENT WATER MAIN (16")
|
LF
|
40.000
|
$24.000
|
$85.100
|
$160.000
|
$147.460
|
$120.000
|
$230.000
|
$152.540
|
$165.000
|
$59.300
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(4 IN)
|
EA
|
1.000
|
$6,185.000
|
$13,500.000
|
$24,000.000
|
$16,550.020
|
$14,000.000
|
$13,000.000
|
$22,657.540
|
$15,000.000
|
$20,300.000
|
|
|
BUTTERFLY VALVE AND BOX (COMPL) (24")
|
EA
|
1.000
|
$24,000.000
|
$32,000.000
|
$38,000.000
|
$39,005.560
|
$33,000.000
|
$40,000.000
|
$35,619.800
|
$35,000.000
|
$43,900.000
|
|
|
TIE-IN (COMPLETE) (24")
|
EA
|
1.000
|
$15,000.000
|
$15,700.000
|
$10,000.000
|
$10,764.640
|
$10,500.000
|
$6,300.000
|
$8,679.530
|
$12,500.000
|
$16,800.000
|
|
|
24" DUCTILE IRON PIPE
|
LF
|
19.000
|
$450.000
|
$310.000
|
$300.000
|
$498.450
|
$225.000
|
$350.000
|
$272.290
|
$250.000
|
$439.000
|
|
|
STEEL CASING (42") (OPEN CUT)
|
LF
|
79.000
|
$430.000
|
$570.000
|
$245.000
|
$591.270
|
$550.000
|
$600.000
|
$231.900
|
$840.000
|
$819.000
|
|
|
WATER MAIN REMOVAL (24")
|
LF
|
118.000
|
$59.000
|
$52.600
|
$28.000
|
$63.090
|
$26.000
|
$30.000
|
$24.720
|
$70.000
|
$89.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.240
|
$25,000.000
|
$3,860.000
|
$20,000.000
|
$20,481.830
|
$36,869.000
|
$90,000.000
|
$2,000.000
|
$16,200.000
|
$8,447.920
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
13,707.060
|
$105.000
|
$95.000
|
$90.000
|
$89.600
|
$90.000
|
$92.000
|
$85.000
|
$102.420
|
$92.900
|
|
|
TACK COAT
|
GAL
|
10,713.000
|
$2.750
|
$1.100
|
$5.000
|
$5.660
|
$1.000
|
$1.000
|
$4.300
|
$4.240
|
$1.050
|
|
|
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
|
TON
|
203.900
|
$155.000
|
$173.000
|
$165.000
|
$165.780
|
$160.000
|
$175.000
|
$213.350
|
$140.040
|
$169.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
5,645.350
|
$110.000
|
$125.000
|
$115.000
|
$107.990
|
$117.000
|
$125.000
|
$97.000
|
$114.300
|
$123.000
|
|
|
TACK COAT
|
GAL
|
9,042.000
|
$3.000
|
$1.100
|
$5.000
|
$4.720
|
$1.000
|
$1.000
|
$4.350
|
$4.280
|
$1.050
|
|
|
BONDING COURSE
|
GAL
|
12,570.000
|
$3.000
|
$1.100
|
$5.000
|
$5.030
|
$1.000
|
$1.000
|
$4.030
|
$4.280
|
$1.050
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
40,391.000
|
$1.500
|
$1.500
|
$1.750
|
$1.730
|
$2.000
|
$2.000
|
$1.320
|
$1.390
|
$2.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$20,900.000
|
$9,000.000
|
$16,172.890
|
$9,500.000
|
$15,000.000
|
$15,000.000
|
$10,161.750
|
$13,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
27.000
|
$170.000
|
$14.350
|
$350.000
|
$190.640
|
$350.000
|
$250.000
|
$350.000
|
$355.660
|
$185.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
234.000
|
$150.000
|
$38.700
|
$90.000
|
$198.000
|
$67.000
|
$55.000
|
$50.000
|
$101.620
|
$90.200
|
|
Totals: |
$8,152,268.655
|
$7,692,727.430
|
$7,997,716.250
|
$8,097,089.339
|
$8,221,159.770
|
$8,305,622.660
|
$8,354,676.144
|
$9,124,178.449
|
$9,637,297.495
|