Show Job Controls
Bid Cobra

BEXAR SL 13 (0521-03-060)

Items: 83

County: BEXAR
Length: N/A
Highway: SL 13
District: SAN ANTONIO
Control Number: 0521-03-060
DBE Goal: N/A
Project: C 521-3-60
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $3,385,792.57
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: BSE RPR, MILL, SC, SURF & PAV'T MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$3,385,792.57
$3,075,678.77
Over/Under Est: -9.16% -$310,113.80
Over/Under Est: -6.31% -$213,706.82
Amt Left: 3.13% $96,406.98
Over/Under Est: 5.77% $195,346.29
Amt Left: 16.43% $505,460.09
Delta: -12.90% -$409,053.11
$3,588,475.67
Over/Under Est: 5.99% $202,683.10
Amt Left: 16.67% $512,796.90
Delta: -0.20% -$7,336.81
Over/Under Est: 22.21% $752,019.64
Amt Left: 34.53% $1,062,133.44
Delta: -15.31% -$549,336.54
Over/Under Est: 22.95% $776,965.22
Amt Left: 35.34% $1,087,079.02
Delta: -0.60% -$24,945.58

Bid Items & Bid Tabulations

83 Total 0 of 83
BEXAR  |  SL 13  |  SAN ANTONIO  |  0521-03-060  |  02/06/2019  |  $3,385,792.57  |  C 521-3-60  |  BSE RPR, MILL, SC, SURF & PAV'T MRK  |  50 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
LONE STAR PAVING COMPANY
CLARK CONSTRUCTION OF TEXAS, INC.
AUSTIN MATERIALS, LLC
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
REMOVING CONC (RIPRAP)
SY 23.000 $8.530 $16.000 $5.000 $26.250 $37.000 $21.200 $139.350
REMOVING CONC (MEDIANS)
SY 123.000 $13.000 $16.000 $20.000 $26.250 $20.500 $21.200 $139.350
REMOVING CONC (CURB)
LF 14.000 $1.800 $16.000 $20.000 $21.000 $20.500 $10.600 $16.650
REMOVING CONC (SIDEWALK OR RAMP)
SY 47.000 $11.330 $11.000 $20.000 $26.250 $20.500 $21.200 $149.850
REMOVING CONCRETE(MOW STRIP)
LF 269.000 $8.880 $11.000 $15.000 $12.600 $10.000 $9.646 $9.990
COMPOST MANUF TOPSOIL (4")
SY 8.000 $1.400 $30.000 $50.000 $52.500 $50.000 $146.280 $125.000
BLOCK SODDING
SY 8.000 $3.460 $30.000 $30.000 $36.750 $50.000 $108.120 $125.000
VEGETATIVE WATERING
MG 1.000 $19.960 $100.000 $500.000 $136.500 $500.000 $636.000 $1,848.150
AGGR (TY-B GR-4)
CY 1,748.000 $23.460 $0.000 $0.000 $51.670 $0.000 $70.564 $60.590
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 60,306.000 $1.320 $0.000 $0.000 $3.270 $0.000 $3.191 $2.490
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 2,000.000 $71.000 $81.000 $83.000 $93.950 $104.000 $88.209 $100.620
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 23,118.000 $90.000 $70.000 $74.500 $81.530 $72.000 $84.535 $88.080
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 2,352.000 $32.440 $42.000 $50.000 $47.750 $60.000 $50.815 $106.190
PLANE ASPH CONC PAV (2")
SY 201,020.000 $0.940 $1.300 $1.250 $2.000 $2.100 $2.846 $2.030
FLOWABLE BACKFILL
CY 7.000 $130.200 $270.000 $200.000 $136.500 $300.000 $530.000 $198.980
RIPRAP (CONC)(4 IN)
CY 4.000 $320.780 $750.000 $550.000 $840.000 $750.000 $742.000 $661.640
RIPRAP (MOW STRIP)(4 IN)
CY 39.000 $420.750 $450.000 $425.000 $451.500 $430.000 $530.000 $451.520
MOBILIZATION
LS 1.000 $260,000.000 $184,000.000 $165,000.000 $65,000.000 $259,150.000 $399,024.415 $395,019.150
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,500.000 $8,000.000 $2,500.000 $3,000.000 $37,600.000 $3,798.344 $1,488.630
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 150.000 $2.830 $8.000 $5.000 $5.250 $5.000 $12.360 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $0.800 $0.250 $2.500 $5.250 $5.000 $2.060 $5.000
CONC CURB (TY I)
LF 24.000 $8.070 $54.000 $110.000 $36.750 $105.000 $53.000 $40.780
CURB RAMPS (TY 1)
EA 2.000 $1,507.360 $2,750.000 $1,200.000 $1,680.000 $1,250.000 $2,120.000 $1,841.460
CURB RAMPS (TY 10)
EA 1.000 $1,411.560 $3,500.000 $1,200.000 $1,680.000 $1,250.000 $2,120.000 $1,928.190
MTL W-BEAM GD FEN (TIM POST)
LF 1,150.000 $18.950 $17.000 $18.500 $20.900 $19.900 $18.540 $19.900
MTL BEAM GD FEN TRANS (T6)
EA 2.000 $1,125.000 $460.000 $500.000 $766.500 $730.000 $566.500 $730.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,013.950 $900.000 $975.000 $939.750 $895.000 $978.500 $895.000
REMOVE METAL BEAM GUARD FENCE
LF 1,210.000 $1.390 $2.000 $2.000 $1.580 $1.500 $1.030 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $156.970 $100.000 $100.000 $131.250 $125.000 $154.500 $125.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,418.470 $1,900.000 $2,000.000 $2,761.500 $2,630.000 $2,317.500 $2,630.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $168.500 $200.000 $200.000 $236.250 $225.000 $206.000 $225.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 420.000 $3.450 $5.000 $5.000 $5.250 $5.000 $5.150 $5.000
ALUMINUM SIGNS (TY A)
SF 129.000 $20.220 $53.000 $50.000 $55.650 $53.000 $54.590 $53.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000 $403.520 $418.000 $450.000 $491.400 $468.000 $430.540 $468.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $469.640 $497.000 $500.000 $553.350 $527.000 $511.910 $527.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 11.000 $506.410 $426.000 $450.000 $488.250 $465.000 $438.780 $465.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $490.320 $512.000 $550.000 $572.250 $545.000 $527.360 $545.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $623.010 $638.000 $700.000 $705.600 $672.000 $657.140 $672.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $681.820 $691.000 $750.000 $750.750 $715.000 $711.730 $715.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 4.000 $625.000 $643.000 $700.000 $654.150 $623.000 $662.290 $623.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 2.000 $625.000 $692.000 $750.000 $752.850 $717.000 $712.760 $717.000
REMOVE SM RD SN SUP&AM
EA 8.000 $65.000 $87.000 $100.000 $99.750 $95.000 $89.610 $95.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $52.000 $22.000 $25.000 $47.250 $45.000 $66.950 $45.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 10.000 $55.000 $30.000 $30.000 $47.250 $45.000 $66.950 $45.000
INSTL OM ASSM (OM-3L)(FLX)SRF
EA 1.000 $325.000 $200.000 $24.000 $251.050 $250.000 $224.540 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 27.000 $18.000 $11.000 $12.000 $15.750 $15.000 $25.750 $15.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 2.000 $24.000 $11.000 $25.000 $15.750 $15.000 $25.750 $15.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 753.000 $0.620 $1.000 $1.000 $3.150 $1.000 $1.030 $1.240
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,633.000 $0.710 $0.630 $0.650 $0.890 $0.630 $0.649 $0.780
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,620.000 $4.940 $4.200 $4.250 $6.300 $4.200 $4.326 $5.220
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 36.000 $92.100 $93.000 $100.000 $120.750 $93.000 $95.790 $115.600
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 4.000 $138.720 $200.000 $200.000 $141.750 $200.000 $206.000 $248.610
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 36.000 $116.620 $111.000 $120.000 $141.750 $111.000 $114.330 $137.980
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 12.000 $236.920 $344.000 $350.000 $262.500 $344.000 $354.320 $427.610
PAVEMENT SEALER 4"
LF 68,584.000 $0.110 $0.120 $0.150 $0.320 $0.120 $0.124 $0.150
PAVEMENT SEALER 8"
LF 7,503.000 $0.270 $0.400 $0.400 $0.530 $0.400 $0.412 $0.500
PAVEMENT SEALER 24"
LF 2,620.000 $2.240 $2.400 $2.500 $2.100 $2.400 $2.472 $2.980
PAVEMENT SEALER (ARROW)
EA 36.000 $46.000 $53.000 $55.000 $68.250 $53.000 $54.590 $65.880
PAVEMENT SEALER (WORD)
EA 36.000 $46.350 $53.000 $55.000 $68.250 $53.000 $54.590 $65.880
PAVEMENT SEALER (MED NOSE)
EA 12.000 $177.770 $177.000 $185.000 $78.750 $177.000 $182.310 $220.020
PAVEMENT SEALER (DBL ARROW)
EA 4.000 $102.620 $87.000 $90.000 $78.750 $87.000 $89.610 $108.140
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 17,770.000 $0.350 $0.340 $0.350 $0.420 $0.340 $0.350 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,840.000 $0.280 $0.340 $0.350 $1.050 $0.340 $0.350 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,550.000 $0.280 $0.340 $0.350 $0.420 $0.340 $0.350 $0.420
REFL PAV MRKR TY I-C
EA 1,331.000 $3.210 $3.000 $3.000 $5.250 $3.000 $3.090 $3.730
REFL PAV MRKR TY II-A-A
EA 1,279.000 $3.030 $3.000 $3.000 $5.250 $3.000 $3.090 $3.730
INSTALL HWY TRF SIG (UPGRADE)
EA 4.000 $2,319.150 $13,500.000 $14,000.000 $14,200.000 $13,500.000 $13,905.000 $13,500.000
PED SIG SEC (LED)(COUNTDOWN)
EA 28.000 $546.650 $620.000 $650.000 $651.000 $620.000 $638.600 $620.000
PED DETECT PUSH BUTTON (APS)
EA 28.000 $783.600 $680.000 $700.000 $715.000 $680.000 $700.400 $680.000
PED DETECTOR CONTROLLER UNIT
EA 4.000 $2,459.850 $2,400.000 $2,500.000 $2,520.000 $2,400.000 $2,472.000 $2,400.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 28.000 $92.620 $25.000 $25.000 $26.250 $25.000 $25.750 $25.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 17.000 $123.630 $90.000 $100.000 $94.500 $90.000 $92.700 $90.000
REMOV PED SIG LED TRAF SIG LAMP UNIT
EA 28.000 $123.630 $40.000 $40.000 $42.000 $40.000 $41.200 $40.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $5,000.000 $2,500.000 $7,000.000 $9,750.000 $6,890.000 $7,836.850
RADAR PRESENCE DETECTOR
EA 17.000 $6,785.920 $7,050.000 $7,500.000 $7,402.500 $7,050.000 $7,261.500 $7,050.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 4,170.000 $2.950 $3.000 $3.000 $3.150 $3.000 $3.090 $3.000
CONDUIT (PREPARE)
LF 865.000 $2.450 $2.400 $2.500 $2.520 $2.400 $2.472 $2.400
GROUND BOX (PREPARE)
EA 10.000 $135.390 $80.000 $85.000 $84.000 $80.000 $82.400 $80.000
RADAR ADVANCED DETECTION DEVICE
EA 10.000 $7,455.710 $7,850.000 $8,500.000 $8,242.500 $7,850.000 $8,085.500 $7,850.000
TMA (STATIONARY)
DAY 50.000 $200.000 $175.000 $150.000 $400.000 $207.000 $212.000 $199.580
TMA (MOBILE OPERATION)
DAY 25.000 $150.000 $175.000 $250.000 $250.000 $830.000 $445.200 $199.580
CUT AND REPLACE CONCRETE CURB
LF 237.000 $18.500 $40.000 $125.000 $26.250 $21.000 $37.100 $40.020
1
MEMBRANE UNDERSEAL
GAL 60,306.000 $2.000 $2.800 $2.500 $0.000 $2.700 $0.000 $0.000
Totals: $3,506,404.570 $3,075,678.770 $3,172,085.750 $3,581,138.860 $3,588,475.670 $4,137,812.252 $4,162,757.790