Show Job Controls
Bid Cobra

WISE US0380 (6489-67-001)

Items: 48

County: WISE
Length: 0.0100 MILES
Highway: US0380
District: FORT WORTH
Control Number: 6489-67-001
DBE Goal: 0.0%
Project: RMC - A00217511
Guaranty: $36,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,804,575.00
Date: 11/05/2025 (7 months ago)
Contract Number: 11254007
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00217511
Project Description: FY26 METAL BEAM GUARDRAIL AND CABLE FENCE REPAIR IN JACK AND WISE COUNTIES
Mail/Deliver Bids To: N/A
MICHAEL REYNOLDS
TEMI ABAYOMI
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,804,575.00
$977,150.00
Over/Under Est: -45.85% -$827,425.00
Over/Under Est: -35.69% -$644,058.60
Amt Left: 18.77% $183,366.40
$1,194,997.00
Over/Under Est: -33.78% -$609,578.00
Amt Left: 22.29% $217,847.00
Delta: -2.97% -$34,480.60
Subcontractor Percentage Amount
JUNIOR CONSTRUCTION COMPANY, INC. 42.79% $488,603.07
Total: 42.79% $488,603.07

Bid Items & Bid Tabulations

48 Total 0 of 48
WISE  |  US0380  |  FORT WORTH  |  6489-67-001  |  11/05/2025  |  $1,804,575.00  |  RMC - A00217511  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
MARCOM'S MOWING SERVICE, LLC
ROSS SA ENTERPRISE LLC
MOBILIZATION (CALLOUT)
EA 13.000 $2,500.000 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 5.000 $3,000.000 $1.000 $4,000.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $125.000 $1.000 $200.000 $25.000
TMA (STATIONARY)
DAY 150.000 $200.000 $1.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 10,000.000 $22.000 $25.000 $28.500 $18.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,300.000 $1.000 $1,300.000 $880.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,300.000 $500.000 $100.000 $100.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $500.000 $500.000 $100.000 $100.000
MTL BEAM GD FEN TRANS (T6)
EA 2.000 $500.000 $500.000 $100.000 $100.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 250.000 $25.000 $1.000 $6.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,400.000 $1,000.000 $1,300.000 $1,250.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $1,600.000 $500.000 $820.000 $350.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 6.000 $900.000 $200.000 $900.000 $200.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 10.000 $600.000 $500.000 $2,500.000 $550.000
REMOVE METAL BEAM GUARD FENCE
LF 10,000.000 $2.000 $0.100 $0.100 $0.010
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $230.000 $1,000.000 $0.100 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,600.000 $5,000.000 $4,500.000 $5,875.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,000.000 $34.000 $50.000 $54.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 75.000 $50.000 $50.000 $1.000 $55.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 30.000 $120.000 $100.000 $300.000 $55.000
REPLACE TIMBER POST W/O CONC FND
EA 350.000 $25.000 $25.000 $1.000 $50.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $60.000 $25.000 $50.000 $60.000
REALIGN POSTS
EA 300.000 $15.000 $100.000 $1.000 $20.000
REM OBSOLETE GET & REPL W/ SGT
EA 75.000 $3,500.000 $3,000.000 $3,500.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $750.000 $1,000.000 $3,500.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 700.000 $25.000 $50.000 $1.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 60.000 $140.000 $100.000 $1.000 $745.000
REPLACE BLOCKOUT
EA 375.000 $20.000 $1.000 $1.000 $10.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $100.000 $100.000 $350.000 $100.000
RESET SGT IMPACT HEAD
EA 7.000 $100.000 $100.000 $10.000 $500.000
REPLACE SGT CABLE ANCHOR
EA 17.000 $60.000 $1.000 $10.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $80.000 $1.000 $10.000 $1.000
REPLACE SGT STRUT
EA 12.000 $50.000 $1.000 $300.000 $1.000
RAISE RAIL
LF 150.000 $10.000 $1.000 $8.000 $8.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $1,500.000 $1,000.000 $1,300.000 $850.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 2,500.000 $160.000 $1.000 $1.000 $100.000
REPLACE POSTS (TL-4)(TRINITY)
EA 2,500.000 $160.000 $1.000 $1.000 $0.100
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $140.000 $1.000 $250.000 $100.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 3.000 $500.000 $1.000 $1.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 7.000 $2,500.000 $10,000.000 $15,000.000 $18,400.000
REPLACE CABLE (TL-4)
LF 150.000 $10.000 $10.000 $5.000 $30.000
CHECK / RE-TENSION CABLE (TL-4)
EA 25.000 $100.000 $1.000 $200.000 $100.000
POST AND CABLE FENCE (REMOVAL)
LF 600.000 $10.000 $1.000 $0.100 $5.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 150.000 $65.000 $10.000 $8.000 $20.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 4.000 $150.000 $100.000 $200.000 $20.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 7.000 $55.000 $100.000 $80.000 $20.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 2.000 $100.000 $100.000 $200.000 $20.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 350.000 $6.000 $10.000 $8.000 $20.000
Totals: $1,804,575.000 $977,150.000 $1,160,516.400 $1,194,997.000