Show Job Controls
Bid Cobra

WINKLER SH 115 (0354-04-044)

Items: 120

County: WINKLER
Length: 0.0000 MILES
Highway: SH 115
District: ODESSA
Control Number: 0354-04-044
DBE Goal: 0.0%
Project: F 2025(060)
Guaranty: $200,000.00
Time: 429 WORKING DAYS
Engineer's Estimate: $26,580,487.00
Date: 12/02/2025 (6 months ago)
Contract Number: 12253002
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Project ID: A00207377
Contract Type: Federal
Project Description: ROADWAY WIDENING TO A SUPER 2
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$26,580,487.00
Over/Under Est: -8.21% -$2,182,602.32
$28,594,084.76
Over/Under Est: 7.58% $2,013,597.76
Amt Left: 17.2% $4,196,200.08
Over/Under Est: 12.44% $3,305,989.40
Amt Left: 22.5% $5,488,591.72
Delta: -4.52% -$1,292,391.64
$29,921,611.55
Over/Under Est: 12.57% $3,341,124.55
Amt Left: 22.64% $5,523,726.87
Delta: -0.12% -$35,135.15
Over/Under Est: 22.2% $5,900,859.09
Amt Left: 33.13% $8,083,461.41
Delta: -8.55% -$2,559,734.54

Bid Items & Bid Tabulations

120 Total 0 of 120
WINKLER  |  SH 115  |  ODESSA  |  0354-04-044  |  12/02/2025  |  $26,580,487.00  |  F 2025(060)  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  429 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
RAGLE CONSTRUCTION, INC.
A. L. HELMCAMP, INC.
JAMES HAMILTON CONSTRUCTION CO.
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 2,454.000 $10.000 $11.000 $6.500 $6.200 $5.000 $7.300
RMV (7") TRT/UNTRT BASE & ASPH PAV
SY 157,362.000 $6.000 $5.510 $6.500 $6.000 $5.000 $5.750
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
SY 3,496.000 $10.000 $17.000 $9.000 $11.500 $7.000 $12.500
EXCAV (ROADWAY)
CY 112,795.000 $10.000 $9.470 $25.000 $22.000 $12.000 $17.000
EMBANK (FNL)(DC)(TY B)
CY 18,903.000 $17.000 $16.700 $8.000 $15.000 $12.000 $20.000
BLADING
HR 101.000 $375.000 $350.000 $270.000 $147.000 $225.000 $230.000
DRILL SEED (PERM_RURAL_SAND)
SY 311,740.000 $0.200 $0.120 $0.120 $0.170 $0.180 $0.120
PROOF ROLLING
HR 200.000 $160.000 $150.000 $98.000 $119.000 $200.000 $100.000
FL BS (CMP IN PLC)(TY A GR 4) (4")
SY 111,003.000 $8.500 $8.040 $7.250 $8.100 $8.500 $11.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 159,816.000 $1.000 $0.790 $0.750 $1.000 $0.600 $2.000
PRIME COAT (AE-P)
GAL 54,171.000 $5.000 $4.550 $5.500 $4.700 $4.500 $5.000
ASPH (AC-20-5TR)
GAL 48,980.000 $4.000 $3.820 $4.250 $5.500 $3.750 $5.300
ASPH (CRS-2P)
GAL 48,980.000 $5.000 $4.190 $4.000 $4.500 $4.000 $5.300
AGGR (TY-B, GR-4)(SAC-A)
CY 1,427.000 $100.000 $89.500 $131.000 $200.000 $175.000 $185.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 1,427.000 $145.000 $135.000 $161.000 $225.000 $225.000 $230.000
SP MIXES SP-B SAC-B PG70-22
TON 102,327.000 $91.000 $87.500 $89.000 $97.000 $121.000 $120.000
TACK COAT
GAL 25,783.000 $5.000 $4.000 $4.500 $4.810 $4.000 $4.500
CUT & RESTORING PAV
SY 568.000 $300.000 $91.000 $160.000 $137.000 $68.000 $275.000
CEM STABIL BKFL
CY 239.500 $200.000 $230.340 $250.000 $145.000 $235.000 $193.000
TEMPORARY SPL SHORING
SF 5,324.000 $30.000 $35.830 $15.000 $41.000 $36.000 $27.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 128.000 $630.000 $393.750 $400.000 $375.000 $390.000 $412.500
RIPRAP (CONC)(5 IN)
CY 2,218.600 $750.000 $793.410 $747.000 $600.000 $700.000 $715.000
CONC BOX CULV (4 FT X 2 FT)
LF 200.000 $500.000 $358.310 $525.000 $451.000 $367.000 $370.000
CONC BOX CULV (4 FT X 3 FT)
LF 369.000 $500.000 $378.790 $565.000 $521.000 $388.000 $396.000
CONC BOX CULV (4 FT X 4 FT)
LF 56.000 $550.000 $409.500 $755.000 $556.000 $420.000 $429.000
CONC BOX CULV (5 FT X 3 FT)
LF 40.000 $600.000 $522.110 $960.000 $635.000 $535.000 $517.000
CONC BOX CULV (6 FT X 2 FT)
LF 868.000 $710.000 $506.760 $710.000 $655.000 $520.000 $589.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P)
EA 4.000 $10,000.000 $9,213.750 $9,000.000 $19,500.000 $9,450.000 $9,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
EA 3.000 $16,500.000 $9,213.750 $9,500.000 $15,800.000 $9,450.000 $9,350.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1)(C)
EA 3.000 $20,000.000 $11,261.250 $10,500.000 $16,500.000 $11,550.000 $11,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1)(P)
EA 2.000 $20,000.000 $11,773.130 $10,250.000 $16,600.000 $12,075.000 $13,200.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1)(P)
EA 2.000 $27,000.000 $17,403.750 $13,000.000 $17,000.000 $17,850.000 $14,300.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 9.000 $9,000.000 $12,285.000 $7,500.000 $15,500.000 $12,600.000 $16,500.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(C)
EA 11.000 $15,000.000 $11,773.130 $11,000.000 $16,100.000 $12,075.000 $18,150.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $13,000.000 $14,076.570 $11,750.000 $16,500.000 $14,438.000 $14,300.000
CLEAN EXIST CULVERTS
EA 7.000 $3,000.000 $3,583.130 $5,000.000 $2,200.000 $3,675.000 $5,300.000
REMOV STR (SET)
EA 6.000 $1,000.000 $511.880 $4,500.000 $585.000 $525.000 $1,100.000
REMOV STR (PIPE)
LF 154.000 $120.000 $15.360 $50.000 $23.000 $15.000 $33.000
MOBILIZATION
LS 1.000 $1,500,000.000 $1,375,000.000 $2,859,000.000 $2,900,000.000 $2,550,000.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $17,500.000 $15,000.000 $38,325.000 $83,200.000 $12,000.000 $36,100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $22,000.000 $16,450.000 $30,000.000 $15,000.000 $34,800.000
TMA (STATIONARY)
DAY 640.000 $250.000 $27.500 $220.000 $346.000 $125.000 $400.000
TMA (MOBILE OPERATION)
DAY 70.000 $800.000 $946.000 $600.000 $675.000 $450.000 $1,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,920.000 $10.000 $10.500 $25.000 $21.000 $15.000 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 1,920.000 $5.000 $2.750 $8.500 $8.000 $5.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,670.000 $11.000 $10.670 $10.000 $8.000 $9.500 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,670.000 $2.000 $1.850 $1.750 $1.500 $1.550 $2.000
CONSTRUCTING DETOURS
SY 2,900.000 $55.000 $57.000 $76.000 $48.000 $60.000 $68.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 10.000 $8,000.000 $9,350.000 $3,750.000 $3,500.000 $3,000.000 $8,400.000
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 1,920.000 $40.000 $13.130 $15.000 $23.000 $35.000 $38.500
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 4,320.000 $10.000 $10.500 $5.000 $10.000 $10.000 $11.000
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,920.000 $30.000 $12.600 $14.000 $12.000 $12.000 $13.250
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 2,763.000 $60.000 $58.300 $80.000 $49.000 $55.000 $80.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 74,523.000 $0.200 $0.190 $0.150 $0.130 $0.320 $0.270
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 77,378.000 $0.200 $0.240 $0.150 $0.130 $0.310 $0.310
CONC DIRECTIONAL ISLAND
SY 70.000 $140.000 $184.280 $400.000 $150.000 $375.000 $260.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $3,500.000 $1,050.000 $410.000 $1,400.000 $1,000.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,500.000 $1,050.000 $370.000 $1,200.000 $1,000.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $8,000.000 $9,450.000 $6,500.000 $8,100.000 $9,000.000 $9,900.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $600.000 $787.500 $760.000 $750.000 $785.000 $825.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 16.000 $5,900.000 $8,137.500 $7,800.000 $7,750.000 $8,140.000 $8,525.000
CONDT (PVC) (SCH 40) (2")
LF 3,965.000 $20.000 $10.500 $11.000 $10.000 $10.500 $11.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 390.000 $45.000 $21.000 $21.000 $20.000 $21.000 $22.000
ELEC CONDR (NO.8) BARE
LF 4,400.000 $2.000 $1.840 $2.000 $1.750 $1.850 $1.920
ELEC CONDR (NO.8) INSULATED
LF 8,800.000 $3.000 $2.100 $2.150 $2.000 $2.100 $2.200
GROUND BOX TY A (122311)W/APRON
EA 4.000 $3,000.000 $1,942.500 $1,860.000 $1,850.000 $1,943.000 $2,035.000
GROUND BOX TY BATTERY (162915)W/APRON
EA 2.000 $3,000.000 $4,725.000 $4,510.000 $4,500.000 $4,725.000 $4,950.000
REMOVE GROUND BOX
EA 4.000 $500.000 $105.000 $105.000 $100.000 $105.000 $110.000
ALUMINUM SIGNS (TY A)
SF 18.000 $40.000 $42.000 $42.000 $44.670 $49.000 $29.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $1,000.000 $741.300 $815.000 $706.000 $1,075.000 $880.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $1,100.000 $868.350 $915.000 $827.000 $1,187.000 $990.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,200.000 $1,003.800 $1,010.000 $956.000 $1,329.000 $1,090.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $1,400.000 $1,187.550 $1,007.000 $1,131.000 $1,555.000 $1,090.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,400.000 $1,660.050 $1,118.000 $1,581.000 $1,750.000 $1,210.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 3.000 $2,000.000 $1,715.700 $1,118.000 $1,634.000 $1,875.000 $1,210.000
REMOVE SM RD SN SUP&AM
EA 30.000 $115.000 $105.000 $105.000 $146.510 $113.000 $110.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GNDHH
EA 26.000 $90.000 $198.450 $225.000 $189.000 $265.000 $242.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH(BI)
EA 16.000 $115.000 $224.700 $225.000 $214.000 $288.000 $242.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 187,671.000 $0.200 $0.190 $0.200 $0.250 $0.180 $0.190
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 224,298.000 $0.200 $0.190 $0.200 $0.250 $0.180 $0.190
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 8,080.000 $5.000 $4.200 $4.500 $4.500 $4.200 $4.400
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 94,711.000 $1.000 $0.580 $0.500 $1.000 $0.470 $0.490
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 144.000 $25.000 $7.350 $5.500 $8.000 $5.250 $5.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 96,872.000 $1.000 $0.580 $0.500 $1.000 $0.470 $0.490
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,660.000 $2.000 $1.750 $0.550 $1.500 $1.100 $5.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,709.000 $1.000 $1.260 $1.000 $1.350 $0.900 $0.950
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 508.000 $1.000 $1.260 $1.000 $1.350 $0.900 $0.950
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 152.000 $1.000 $2.100 $1.150 $2.500 $1.050 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,808.000 $1.000 $1.000 $1.000 $1.500 $0.900 $0.950
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 610.000 $8.000 $3.150 $5.500 $7.000 $5.250 $5.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 178,912.000 $1.000 $1.000 $1.000 $0.750 $0.910 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 199,394.000 $1.000 $1.000 $1.000 $0.750 $0.910 $1.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 5,842.000 $1.000 $0.790 $0.750 $0.830 $0.660 $0.700
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 80,909.000 $1.000 $0.610 $0.650 $0.720 $0.600 $0.600
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 111,678.000 $1.000 $0.610 $0.650 $0.720 $0.600 $0.600
PREFAB PM TY C (W)(24")(SLD)
LF 16.000 $20.000 $21.000 $21.000 $15.000 $21.000 $22.000
PREFAB PM TY C (W)(ARROW)
EA 23.000 $300.000 $262.500 $215.000 $220.000 $221.000 $231.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 10.000 $450.000 $577.500 $560.000 $300.000 $577.000 $605.000
PREFAB PM TY C (W)(WORD)
EA 21.000 $350.000 $336.000 $255.000 $250.000 $263.000 $275.000
PREFAB PM TY C (Y)(12")(SLD)
LF 6,512.000 $10.000 $3.150 $5.500 $7.500 $5.250 $5.500
REFL PAV MRKR TY I-C
EA 519.000 $6.000 $4.460 $5.000 $6.000 $4.800 $5.100
REFL PAV MRKR TY II-A-A
EA 3,713.000 $5.000 $3.680 $4.500 $6.000 $4.200 $4.500
ELIM EXT PM & MRKS (4")
LF 78,143.000 $1.500 $0.580 $0.750 $0.300 $0.100 $0.010
ELIM EXT PM & MRKS (6")
LF 430,376.000 $0.500 $0.010 $0.010 $0.300 $0.100 $0.010
ELIM EXT PM & MRKS (8")
LF 278.000 $3.000 $3.150 $1.150 $0.300 $0.100 $0.010
VEH SIG SEC (12")LED(YEL)
EA 4.000 $1,100.000 $367.500 $355.000 $350.000 $368.000 $385.000
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 4.000 $220.000 $183.750 $180.000 $175.000 $185.000 $192.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 60.000 $5.000 $5.250 $5.500 $5.000 $5.250 $5.500
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $1,000.000 $787.500 $755.000 $750.000 $787.000 $825.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $15,000.000 $13,125.000 $12,600.000 $12,500.000 $13,125.000 $13,750.000
BONDING COURSE
GAL 20,632.000 $4.000 $2.600 $4.500 $4.540 $4.900 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 6,200.000 $5.000 $3.980 $5.000 $4.150 $4.000 $4.200
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 6,200.000 $1.000 $1.240 $1.000 $1.000 $1.000 $1.300
LED ROADSIDE SIGN
EA 1.000 $4,500.000 $2,555.700 $3,110.000 $2,434.000 $3,150.000 $3,300.000
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 28,531.000 $135.000 $0.000 $131.000 $0.000 $0.000 $0.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 28,531.000 $135.000 $132.000 $0.000 $109.000 $160.000 $140.000
2
RC PIPE (CL III)(24 IN)
LF 408.000 $145.000 $0.000 $150.000 $132.000 $0.000 $110.000
2A
THERMOPLASTIC PIPE (PP) (24")
LF 408.000 $145.000 $112.610 $0.000 $0.000 $115.000 $0.000
3
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $3,500.000 $0.000 $2,000.000 $2,000.000 $0.000 $2,750.000
3A
SET (TY II) (24 IN) (TP) (6: 1) (P)
EA 8.000 $3,500.000 $3,071.250 $0.000 $0.000 $3,150.000 $0.000
Totals: $30,519,332.000 $24,397,884.676 $28,594,084.760 $29,886,476.400 $29,921,611.550 $32,481,346.090