Show Job Controls
Bid Cobra

WINKLER SH 115 (0354-04-041)

Items: 115

County: WINKLER
Length: 0.0000 MILES
Highway: SH 115
District: ODESSA
Control Number: 0354-04-041
DBE Goal: 0.0%
Project: F 2024(538)
Guaranty: $100,000.00
Time: 442 WORKING DAYS
Engineer's Estimate: $35,916,484.00
Date: 11/06/2025 (7 months ago)
Contract Number: 11253203
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Project ID: A00187840
Contract Type: Federal
Project Description: ROADWAY WIDENING TO A SUPER 2
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$35,916,484.00
Over/Under Est: -21.47% -$7,712,002.92
Over/Under Est: -15.17% -$5,450,101.40
Amt Left: 8.02% $2,261,901.52
$30,793,274.09
Over/Under Est: -14.26% -$5,123,209.91
Amt Left: 9.18% $2,588,793.01
Delta: -1.07% -$326,891.49
$32,289,294.70
Over/Under Est: -10.1% -$3,627,189.30
Amt Left: 14.48% $4,084,813.62
Delta: -4.86% -$1,496,020.61
$34,622,567.78
Over/Under Est: -3.6% -$1,293,916.22
Amt Left: 22.76% $6,418,086.70
Delta: -7.23% -$2,333,273.08
Over/Under Est: 13.88% $4,986,994.52
Amt Left: 45.02% $12,698,997.44
Delta: -18.14% -$6,280,910.74
Subcontractor Percentage Amount
DESERT PAVING, INC. 13.69% $3,881,468.41
DOUBLE A CONTRACTING, L.P. 3.46% $980,999.32
TEXOP CONSTRUCTION 1.29% $365,748.30
HJC FARMS, INC. 1.20% $340,230.98
CONTRACTORS SERVICE, LTD. 0.63% $178,621.26
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.43% $121,916.10
WILLIS ELECTRIC CO., LP 0.37% $104,904.55
DK CONTRACTING, LLC 0.32% $90,728.26
R.E.B.D. TRUCKING LLC 0.00% $0.00
Total: 21.39% $6,064,617.18

Bid Items & Bid Tabulations

115 Total 0 of 115
WINKLER  |  SH 115  |  ODESSA  |  0354-04-041  |  11/06/2025  |  $35,916,484.00  |  F 2024(538)  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  442 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RAGLE CONSTRUCTION, INC.
FNF CONSTRUCTION, INC.
CK NEWBERRY, LLC
A. L. HELMCAMP, INC.
JAMES HAMILTON CONSTRUCTION CO.
REMOV CONC (MEDIANS)
SY 10.000 $25.000 $260.000 $150.000 $215.000 $200.000 $220.000 $115.000
REMOV CONC (DRIVEWAYS)
SY 949.000 $20.000 $49.950 $17.000 $50.000 $20.000 $15.000 $43.000
REMOV CONC (CURB)
LF 97.000 $16.000 $27.000 $6.000 $23.000 $20.000 $25.000 $19.000
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 7,070.000 $35.000 $10.250 $5.600 $8.000 $6.000 $7.500 $7.500
RMV (7") TRT/UNTRT BASE & ASPH PAV
SY 167,570.000 $6.000 $5.550 $3.300 $5.500 $5.500 $6.250 $5.000
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
SY 3,699.000 $10.000 $19.250 $8.600 $11.000 $10.000 $13.500 $13.500
EXCAV (ROADWAY)
CY 145,380.000 $15.000 $9.500 $18.000 $17.500 $13.000 $13.000 $19.000
EMBANK (FNL)(DC)(TY B)
CY 22,185.000 $15.000 $17.130 $11.000 $6.750 $10.000 $12.000 $19.000
BLADING
HR 107.000 $375.000 $375.000 $147.000 $140.000 $175.000 $215.000 $270.000
DRILL SEED (PERM_RURAL_SAND)
SY 392,418.000 $0.200 $0.130 $0.120 $0.130 $0.150 $0.130 $0.130
PROOF ROLLING
HR 213.000 $160.000 $150.000 $91.000 $90.000 $70.000 $200.000 $130.000
FL BS (CMP IN PLC)(TY A GR 4) (4")
SY 133,054.000 $10.000 $7.770 $6.600 $6.500 $9.000 $9.150 $11.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 174,493.000 $1.000 $0.790 $1.100 $1.250 $1.000 $0.250 $2.000
PRIME COAT (AE-P)
GAL 61,520.000 $5.000 $4.580 $3.900 $4.500 $5.000 $4.150 $5.000
ASPH (AC-20-5TR)
GAL 55,761.000 $4.000 $3.570 $5.000 $4.000 $3.750 $3.500 $5.250
ASPH (CRS-2P)
GAL 55,761.000 $5.000 $4.190 $5.000 $4.000 $3.750 $3.750 $5.500
AGGR (TY-B, GR-4)(SAC-A)
CY 1,345.000 $150.000 $97.000 $175.000 $140.000 $125.000 $190.000 $190.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 1,345.000 $150.000 $143.400 $175.000 $165.000 $135.000 $250.000 $233.000
SP MIXES SP-B SAC-B PG70-22
TON 116,326.000 $95.000 $90.000 $100.000 $87.000 $108.250 $121.000 $120.000
TACK COAT
GAL 29,354.000 $5.000 $4.080 $3.600 $4.250 $4.000 $4.000 $4.500
CUT & RESTORING PAV
SY 431.000 $300.000 $347.260 $120.000 $150.000 $100.000 $65.000 $250.000
CEM STABIL BKFL
CY 343.100 $330.000 $183.750 $143.000 $200.000 $275.000 $250.000 $275.000
TEMPORARY SPL SHORING
SF 6,938.000 $30.000 $31.500 $32.000 $10.000 $15.000 $25.000 $35.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $525.000 $630.000 $600.000 $700.000 $600.000 $605.000 $660.000
CLASS S CONC UTILITY PROTECTION PAD
CY 130.200 $1,000.000 $840.000 $730.000 $1,200.000 $600.000 $780.000 $1,100.000
RIPRAP (CONC)(5 IN)
CY 2,523.500 $850.000 $714.000 $500.000 $650.000 $575.000 $755.000 $940.000
CONC BOX CULV (3 FT X 2 FT)
LF 88.000 $420.000 $434.700 $316.000 $500.000 $325.000 $405.000 $635.000
CONC BOX CULV (6 FT X 2 FT)
LF 837.000 $700.000 $673.200 $480.000 $525.000 $525.000 $700.000 $935.000
CONC BOX CULV (8 FT X 3 FT)
LF 164.000 $850.000 $985.950 $680.000 $925.000 $775.000 $1,010.000 $1,375.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(P)
EA 4.000 $5,000.000 $6,468.000 $16,500.000 $9,400.000 $6,000.000 $9,750.000 $10,450.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 3.000 $9,000.000 $6,888.000 $17,000.000 $10,000.000 $10,000.000 $19,500.000 $15,950.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(C)
EA 15.000 $15,000.000 $10,269.000 $18,510.000 $12,000.000 $13,000.000 $22,500.000 $19,250.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1)(C)
EA 2.000 $30,000.000 $24,307.500 $27,150.000 $20,000.000 $24,000.000 $25,500.000 $28,050.000
CLEAN EXIST CULVERTS
EA 10.000 $3,000.000 $1,050.000 $2,300.000 $3,000.000 $1,500.000 $2,600.000 $5,000.000
REMOV STR (SET)
EA 4.000 $1,000.000 $787.500 $600.000 $500.000 $2,000.000 $1,025.000 $1,800.000
REMOV STR (PIPE)
LF 103.000 $120.000 $26.250 $20.000 $75.000 $30.000 $30.000 $70.000
MOBILIZATION
LS 1.000 $3,683,000.000 $1,500,000.000 $3,000,000.000 $3,080,000.000 $3,000,000.000 $2,800,000.000 $3,830,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $30,000.000 $15,000.000 $37,200.000 $24,000.000 $12,000.000 $15,000.000 $45,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000 $25,000.000 $17,000.000 $25,000.000 $13,000.000 $38,000.000
TMA (STATIONARY)
DAY 650.000 $250.000 $27.500 $346.000 $200.000 $250.000 $125.000 $400.000
TMA (MOBILE OPERATION)
DAY 80.000 $800.000 $903.000 $675.000 $500.000 $500.000 $250.000 $1,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,920.000 $10.000 $10.500 $42.520 $50.000 $15.000 $15.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 1,920.000 $5.000 $2.730 $12.800 $15.000 $5.000 $5.000 $6.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,900.000 $11.000 $8.540 $8.130 $10.000 $10.000 $8.500 $9.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,900.000 $2.000 $1.240 $1.180 $1.400 $2.000 $1.200 $4.500
CONSTRUCTING DETOURS
SY 4,930.000 $55.000 $53.000 $48.000 $50.000 $60.000 $53.000 $90.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 20.000 $8,000.000 $8,000.000 $3,800.000 $3,500.000 $5,000.000 $250.000 $8,500.000
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 1,260.000 $30.000 $21.000 $22.000 $15.000 $40.000 $42.000 $45.000
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 7,560.000 $12.000 $10.500 $10.000 $4.500 $8.000 $12.000 $12.500
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,260.000 $25.000 $21.000 $12.000 $13.000 $3.000 $28.000 $25.250
DRIVEWAYS (CONC)
SY 932.000 $130.000 $131.100 $100.000 $120.000 $120.000 $162.000 $240.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 3,595.000 $60.000 $67.000 $57.000 $60.000 $65.000 $53.000 $110.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 75,635.000 $0.200 $0.190 $0.070 $0.120 $0.100 $0.220 $0.250
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 82,470.000 $0.200 $0.230 $0.080 $0.150 $0.100 $0.220 $0.400
CONC DIRECTIONAL ISLAND
SY 10.000 $140.000 $157.500 $250.000 $400.000 $500.000 $210.000 $245.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 36.000 $1,800.000 $3,675.000 $1,100.000 $500.000 $500.000 $2,650.000 $1,950.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,500.000 $1,575.000 $1,100.000 $1,000.000 $500.000 $5,000.000 $1,900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,000.000 $9,975.000 $15,000.000 $6,500.000 $10,000.000 $11,500.000 $11,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 5.000 $700.000 $525.000 $500.000 $7,000.000 $500.000 $515.000 $550.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 5.000 $5,900.000 $8,137.500 $7,750.000 $7,000.000 $8,000.000 $8,000.000 $8,525.000
CONDT (PVC) (SCH 40) (2")
LF 1,390.000 $20.000 $12.600 $12.000 $14.000 $12.000 $12.500 $13.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 95.000 $45.000 $15.750 $15.000 $18.000 $15.000 $15.500 $16.500
ELEC CONDR (NO.12) BARE
LF 1,530.000 $2.000 $1.050 $1.000 $1.100 $1.000 $1.050 $1.100
ELEC CONDR (NO.12) INSULATED
LF 3,060.000 $3.000 $1.050 $1.000 $1.100 $1.000 $1.050 $1.100
GROUND BOX TY A (122311)W/APRON
EA 3.000 $3,000.000 $1,837.500 $1,750.000 $2,000.000 $1,800.000 $1,800.000 $1,925.000
REMOVE GROUND BOX
EA 2.000 $400.000 $367.500 $350.000 $400.000 $350.000 $360.000 $385.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 54.000 $1,000.000 $700.350 $600.000 $1,000.000 $600.000 $615.000 $660.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 35.000 $1,100.000 $846.300 $695.000 $1,000.000 $700.000 $715.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,500.000 $1,183.350 $950.000 $1,200.000 $950.000 $970.000 $1,045.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,400.000 $1,199.100 $975.000 $1,200.000 $975.000 $990.000 $1,070.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,500.000 $1,023.750 $1,025.000 $1,200.000 $1,025.000 $1,050.000 $1,130.000
REMOVE SM RD SN SUP&AM
EA 41.000 $115.000 $100.000 $100.000 $110.000 $100.000 $125.000 $110.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GNDHH
EA 45.000 $90.000 $151.200 $150.000 $175.000 $150.000 $155.000 $165.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH(BI)
EA 16.000 $115.000 $163.800 $150.000 $175.000 $150.000 $155.000 $165.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 226,657.000 $0.700 $0.180 $0.520 $0.200 $0.200 $0.180 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 291.000 $1.000 $0.470 $5.000 $0.400 $0.350 $0.480 $0.440
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 262,700.000 $0.700 $0.180 $0.500 $0.200 $0.200 $0.180 $0.240
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 8,920.000 $7.000 $4.200 $4.000 $4.250 $3.500 $4.240 $5.500
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 92,940.000 $1.000 $0.580 $0.710 $1.100 $1.100 $0.580 $0.490
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 265.000 $25.000 $5.250 $2.690 $6.500 $6.000 $5.290 $19.250
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 92,940.000 $1.000 $0.580 $0.530 $1.100 $1.100 $0.580 $0.490
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,486.000 $2.000 $1.620 $0.890 $1.250 $1.000 $1.090 $5.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,294.000 $2.000 $1.620 $0.860 $1.250 $1.000 $1.090 $5.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,259.000 $1.000 $1.000 $0.600 $0.650 $0.600 $1.010 $0.930
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 1,016.000 $1.000 $1.260 $0.600 $0.650 $0.600 $1.270 $0.930
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,649.000 $1.000 $0.950 $0.610 $1.100 $1.000 $0.950 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 605.000 $8.000 $3.150 $1.350 $3.100 $3.000 $3.180 $7.700
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 231,656.000 $1.500 $0.920 $0.550 $0.800 $0.800 $0.890 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 322,584.000 $1.500 $0.920 $0.550 $0.800 $0.800 $0.890 $1.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 8,079.000 $1.000 $0.680 $0.500 $0.650 $0.600 $0.690 $0.820
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 89,212.000 $1.000 $0.580 $0.500 $0.650 $0.600 $0.580 $0.730
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 126,064.000 $1.000 $0.580 $0.500 $0.650 $0.600 $0.580 $0.730
PREFAB PM TY C (W)(24")(SLD)
LF 12.000 $20.000 $26.250 $20.000 $14.000 $12.000 $26.000 $20.000
PREFAB PM TY C (W)(ARROW)
EA 35.000 $300.000 $215.250 $380.190 $175.000 $160.000 $210.000 $260.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 12.000 $450.000 $577.500 $570.280 $500.000 $450.000 $575.000 $590.000
PREFAB PM TY C (W)(WORD)
EA 35.000 $350.000 $262.500 $380.190 $250.000 $225.000 $260.000 $368.000
PREFAB PM TY C (Y)(12")(SLD)
LF 13,667.000 $10.000 $3.150 $8.500 $5.500 $5.000 $3.150 $10.450
REFL PAV MRKR TY I-C
EA 1,124.000 $6.000 $4.730 $4.000 $4.000 $4.000 $4.650 $5.500
REFL PAV MRKR TY II-A-A
EA 5,523.000 $5.000 $3.680 $4.000 $4.000 $4.000 $3.650 $5.500
ELIM EXT PM & MRKS (4")
LF 57,925.000 $1.500 $0.800 $0.010 $0.650 $0.500 $0.680 $0.100
ELIM EXT PM & MRKS (6")
LF 972,650.000 $1.200 $0.010 $0.010 $0.400 $0.500 $0.120 $0.100
ELIM EXT PM & MRKS (8")
LF 3,937.000 $3.000 $1.510 $0.010 $0.800 $0.500 $1.200 $0.100
BONDING COURSE
GAL 23,495.000 $5.000 $2.760 $3.700 $5.000 $4.000 $4.500 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 8,555.000 $5.000 $3.750 $3.570 $4.500 $3.750 $3.600 $3.950
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 8,555.000 $1.000 $1.040 $0.990 $1.100 $1.000 $1.000 $1.100
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 32,488.000 $140.000 $0.000 $0.000 $142.000 $0.000 $0.000 $175.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 32,488.000 $140.000 $132.000 $105.000 $0.000 $140.000 $148.000 $0.000
2
RC PIPE (CL III)(24 IN)
LF 956.000 $145.000 $0.000 $90.000 $125.000 $125.000 $135.000 $175.000
2A
THERMOPLASTIC PIPE (PP) (24")
LF 956.000 $145.000 $78.750 $0.000 $0.000 $0.000 $0.000 $0.000
3
RC PIPE (CL III)(30 IN)
LF 136.000 $185.000 $0.000 $117.000 $150.000 $175.000 $185.000 $230.000
3A
THERMOPLASTIC PIPE (PP) (30")
LF 136.000 $185.000 $115.500 $0.000 $0.000 $0.000 $0.000 $0.000
4
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $3,500.000 $0.000 $1,900.000 $1,100.000 $2,500.000 $2,550.000 $2,900.000
4A
SET (TY II) (24 IN) (TP) (6: 1) (P)
EA 24.000 $3,500.000 $2,800.350 $0.000 $0.000 $0.000 $0.000 $0.000
5
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,600.000 $0.000 $4,200.000 $1,900.000 $3,000.000 $5,000.000 $5,550.000
5A
SET (TY II) (30 IN) (TP) (6: 1) (P)
EA 4.000 $3,600.000 $5,884.200 $0.000 $0.000 $0.000 $0.000 $0.000
Totals: $40,726,984.000 $28,204,481.075 $30,466,382.600 $30,793,274.090 $32,289,294.700 $34,622,567.780 $40,903,478.520