PREPARING ROW
|
STA
|
118.200
|
$1,500.000
|
$715.000
|
$425.608
|
$457.040
|
$1,000.000
|
$2,550.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,152.000
|
$25.000
|
$27.000
|
$14.240
|
$22.380
|
$15.000
|
$11.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,274.000
|
$15.000
|
$27.000
|
$12.040
|
$21.300
|
$12.000
|
$8.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
147.000
|
$12.000
|
$27.000
|
$19.720
|
$114.800
|
$15.000
|
$13.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,029.000
|
$11.000
|
$15.000
|
$13.635
|
$17.860
|
$26.000
|
$26.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
907.000
|
$13.000
|
$17.000
|
$19.065
|
$29.980
|
$40.000
|
$30.000
|
|
|
BLADING
|
HR
|
28.000
|
$155.000
|
$85.000
|
$118.712
|
$542.630
|
$150.000
|
$190.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
22,301.000
|
$1.200
|
$1.350
|
$0.990
|
$1.480
|
$1.000
|
$3.200
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
22,301.000
|
$0.200
|
$0.160
|
$0.166
|
$0.730
|
$0.150
|
$0.160
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
11,150.500
|
$0.150
|
$0.140
|
$0.119
|
$1.260
|
$0.100
|
$0.110
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
11,150.500
|
$0.150
|
$0.140
|
$0.119
|
$1.260
|
$0.100
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
698.000
|
$22.000
|
$20.000
|
$23.048
|
$30.660
|
$40.000
|
$29.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
22,301.000
|
$1.000
|
$1.000
|
$0.781
|
$1.330
|
$0.800
|
$0.810
|
|
|
PROOF ROLLING
|
HR
|
28.000
|
$75.000
|
$80.000
|
$81.194
|
$531.230
|
$80.000
|
$115.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
5,494.000
|
$55.000
|
$67.000
|
$58.886
|
$51.990
|
$58.000
|
$54.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
15,818.000
|
$3.000
|
$2.250
|
$2.926
|
$3.100
|
$4.000
|
$2.500
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
118.000
|
$150.000
|
$185.000
|
$198.082
|
$252.620
|
$230.000
|
$190.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
3,297.000
|
$4.000
|
$4.000
|
$3.867
|
$7.460
|
$4.200
|
$4.050
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
1,012.000
|
$80.000
|
$88.000
|
$89.926
|
$88.060
|
$96.000
|
$119.000
|
|
|
TACK COAT
|
GAL
|
920.000
|
$3.000
|
$3.250
|
$4.724
|
$17.040
|
$4.000
|
$6.050
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
84,688.000
|
$48.000
|
$43.500
|
$43.608
|
$38.960
|
$50.000
|
$51.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
9,201.000
|
$2.500
|
$2.950
|
$3.612
|
$3.480
|
$4.000
|
$5.800
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
316,744.000
|
$1.500
|
$1.200
|
$2.200
|
$1.420
|
$2.000
|
$1.650
|
|
|
FLOWABLE BACKFILL
|
CY
|
38.000
|
$120.000
|
$150.000
|
$130.000
|
$341.030
|
$155.000
|
$210.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,767.000
|
$20.000
|
$22.500
|
$15.600
|
$30.000
|
$46.000
|
$12.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
140.700
|
$450.000
|
$435.000
|
$506.920
|
$500.000
|
$440.000
|
$340.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
63.000
|
$500.000
|
$445.000
|
$506.920
|
$500.000
|
$467.000
|
$900.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
2,270.000
|
$130.000
|
$115.000
|
$162.000
|
$105.000
|
$100.000
|
$95.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
253.900
|
$475.000
|
$460.000
|
$496.800
|
$420.000
|
$445.000
|
$510.000
|
|
|
RAIL (TY T631)
|
LF
|
75.000
|
$75.000
|
$225.000
|
$71.947
|
$200.000
|
$75.000
|
$76.000
|
|
|
RAIL (TY SSTR)
|
LF
|
132.000
|
$45.000
|
$87.000
|
$156.000
|
$110.000
|
$160.000
|
$170.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
187.000
|
$80.000
|
$185.000
|
$150.801
|
$100.000
|
$60.000
|
$61.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
195.000
|
$650.000
|
$371.000
|
$520.000
|
$550.000
|
$500.000
|
$660.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
24.000
|
$800.000
|
$412.000
|
$754.000
|
$1,600.000
|
$675.000
|
$1,200.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$600.000
|
$453.000
|
$780.000
|
$2,500.000
|
$700.000
|
$2,250.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
22.000
|
$1,000.000
|
$770.000
|
$832.000
|
$1,500.000
|
$800.000
|
$1,150.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
7.000
|
$600.000
|
$417.000
|
$624.000
|
$2,000.000
|
$600.000
|
$1,700.000
|
|
|
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
|
LF
|
6.000
|
$400.000
|
$215.000
|
$572.000
|
$1,500.000
|
$350.000
|
$2,900.000
|
|
|
CONC BOX CULV (3 FT X 1.5 FT)(EXTEND)
|
LF
|
14.000
|
$500.000
|
$250.000
|
$624.000
|
$1,000.000
|
$400.000
|
$1,300.000
|
|
|
CONC BOX CULV (4 FT X 1.5 FT)(EXTEND)
|
LF
|
8.000
|
$600.000
|
$350.000
|
$650.000
|
$1,600.000
|
$525.000
|
$3,900.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
124.000
|
$115.000
|
$160.000
|
$192.400
|
$150.000
|
$185.000
|
$200.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$7,500.000
|
$7,300.000
|
$9,360.000
|
$16,000.000
|
$9,000.000
|
$14,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$20,000.000
|
$20,980.000
|
$18,720.000
|
$30,000.000
|
$21,000.000
|
$20,000.000
|
|
|
SET (TY I)(S=2 FT)(HW=3FT)(3:1)(C)
|
EA
|
3.000
|
$3,000.000
|
$4,820.000
|
$3,900.000
|
$11,000.000
|
$4,500.000
|
$10,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
1.000
|
$4,850.000
|
$4,200.000
|
$4,160.000
|
$12,000.000
|
$4,000.000
|
$7,500.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$7,200.000
|
$4,800.000
|
$4,420.000
|
$11,000.000
|
$4,800.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$4,500.000
|
$3,500.000
|
$4,420.000
|
$8,000.000
|
$4,250.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
15.000
|
$5,000.000
|
$4,200.000
|
$4,576.000
|
$3,000.000
|
$4,400.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
8.000
|
$5,000.000
|
$5,100.000
|
$4,680.000
|
$4,500.000
|
$4,500.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
11.000
|
$7,650.000
|
$5,900.000
|
$5,200.000
|
$6,500.000
|
$6,000.000
|
$9,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$8,250.000
|
$11,070.000
|
$6,760.000
|
$20,000.000
|
$12,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$3,600.000
|
$4,500.000
|
$6,760.000
|
$18,000.000
|
$4,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$8,350.000
|
$11,000.000
|
$7,280.000
|
$18,000.000
|
$12,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$10,250.000
|
$18,705.000
|
$8,320.000
|
$24,000.000
|
$18,000.000
|
$16,000.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,400.000
|
$2,300.000
|
$2,600.000
|
$3,000.000
|
$2,500.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
26.000
|
$1,400.000
|
$1,500.000
|
$1,872.000
|
$1,500.000
|
$1,800.000
|
$3,300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
31.000
|
$1,200.000
|
$500.000
|
$1,040.000
|
$2,000.000
|
$700.000
|
$3,600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,207,000.000
|
$1,115,000.000
|
$1,111,685.140
|
$1,150,000.000
|
$1,284,000.000
|
$1,463,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$9,000.000
|
$4,493.456
|
$5,900.000
|
$2,500.000
|
$10,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
542.000
|
$26.000
|
$27.000
|
$30.576
|
$46.910
|
$24.000
|
$25.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
247.000
|
$60.000
|
$48.000
|
$82.576
|
$101.470
|
$51.000
|
$52.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
789.000
|
$9.000
|
$10.000
|
$13.624
|
$23.420
|
$7.000
|
$7.450
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
160.000
|
$15.000
|
$35.000
|
$16.609
|
$94.000
|
$14.000
|
$14.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$5.000
|
$10.000
|
$6.032
|
$83.000
|
$2.100
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,913.000
|
$2.000
|
$2.400
|
$2.340
|
$6.240
|
$2.000
|
$1.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,913.000
|
$0.500
|
$0.500
|
$0.260
|
$5.050
|
$0.600
|
$0.640
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
80.000
|
$100.000
|
$85.000
|
$179.418
|
$241.790
|
$168.000
|
$136.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
7,840.000
|
$20.000
|
$33.000
|
$16.196
|
$10.760
|
$46.000
|
$40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
8,440.000
|
$8.000
|
$6.000
|
$12.040
|
$8.060
|
$13.000
|
$6.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
740.000
|
$35.000
|
$10.000
|
$12.040
|
$24.300
|
$18.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
7,840.000
|
$8.000
|
$10.000
|
$14.362
|
$9.380
|
$18.000
|
$9.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
381.000
|
$90.000
|
$78.000
|
$94.880
|
$112.690
|
$82.000
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
517.000
|
$40.000
|
$40.000
|
$48.449
|
$62.300
|
$98.000
|
$98.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
112,711.000
|
$0.150
|
$0.250
|
$0.148
|
$0.230
|
$0.300
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
54,315.000
|
$0.200
|
$0.400
|
$0.159
|
$0.370
|
$0.300
|
$0.110
|
|
|
CONC MEDIAN
|
SY
|
1,152.000
|
$65.000
|
$52.000
|
$90.680
|
$54.330
|
$54.000
|
$60.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,004.000
|
$20.000
|
$26.500
|
$20.582
|
$40.910
|
$20.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$1,460.000
|
$1,728.200
|
$3,959.870
|
$1,800.000
|
$1,830.000
|
|
|
SHORT RADIUS
|
LF
|
71.000
|
$36.000
|
$25.400
|
$36.400
|
$213.520
|
$35.000
|
$31.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,000.000
|
$1,040.000
|
$994.240
|
$3,059.870
|
$956.000
|
$910.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
250.000
|
$16.000
|
$21.000
|
$20.800
|
$79.840
|
$23.000
|
$28.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
264.000
|
$60.000
|
$57.000
|
$74.880
|
$104.090
|
$72.000
|
$56.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
3.000
|
$650.000
|
$898.000
|
$1,258.400
|
$4,944.740
|
$1,250.000
|
$630.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,851.000
|
$1.500
|
$2.000
|
$1.092
|
$8.000
|
$1.100
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$140.000
|
$164.000
|
$208.000
|
$3,364.810
|
$200.000
|
$127.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$2,500.000
|
$2,830.000
|
$2,633.280
|
$3,089.060
|
$2,700.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$180.000
|
$200.000
|
$62.400
|
$1,769.900
|
$60.000
|
$152.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
46.000
|
$900.000
|
$500.000
|
$780.000
|
$1,131.720
|
$750.000
|
$860.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,200.000
|
$350.000
|
$936.000
|
$7,775.600
|
$900.000
|
$3,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
24.000
|
$500.000
|
$350.000
|
$260.000
|
$989.970
|
$250.000
|
$460.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
24.000
|
$7,550.000
|
$5,000.000
|
$6,763.120
|
$8,339.970
|
$6,700.000
|
$7,900.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$190.000
|
$164.000
|
$171.600
|
$2,014.650
|
$170.000
|
$168.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$575.000
|
$575.000
|
$582.400
|
$13,534.230
|
$600.000
|
$590.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
54.000
|
$30.000
|
$35.000
|
$22.880
|
$239.990
|
$37.000
|
$35.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
1,390.000
|
$30.000
|
$25.000
|
$26.000
|
$34.790
|
$21.000
|
$20.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$420.000
|
$452.000
|
$470.080
|
$928.490
|
$520.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$500.000
|
$497.000
|
$516.880
|
$2,473.550
|
$650.000
|
$640.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$700.000
|
$640.000
|
$665.600
|
$3,418.750
|
$870.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$100.000
|
$80.000
|
$83.200
|
$484.830
|
$120.000
|
$118.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
45.000
|
$55.000
|
$47.000
|
$48.880
|
$335.930
|
$50.000
|
$49.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$22.000
|
$18.000
|
$18.720
|
$633.860
|
$18.000
|
$17.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
31.000
|
$16.000
|
$18.000
|
$18.720
|
$434.790
|
$18.000
|
$17.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,235.000
|
$0.450
|
$0.280
|
$0.291
|
$6.080
|
$0.260
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
348.000
|
$0.500
|
$0.280
|
$0.291
|
$37.520
|
$3.000
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
89,474.000
|
$0.300
|
$0.240
|
$0.250
|
$0.380
|
$0.260
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
702.000
|
$0.700
|
$0.670
|
$0.697
|
$19.130
|
$0.500
|
$0.680
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
70.000
|
$6.000
|
$7.000
|
$7.280
|
$192.130
|
$5.000
|
$7.050
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
5.000
|
$150.000
|
$150.000
|
$156.000
|
$2,741.850
|
$80.000
|
$152.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
5.000
|
$160.000
|
$150.000
|
$156.000
|
$2,741.850
|
$80.000
|
$152.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,470.000
|
$0.300
|
$0.280
|
$0.291
|
$4.010
|
$0.260
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
38,089.000
|
$0.300
|
$0.240
|
$0.250
|
$0.580
|
$0.260
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)(MED NOSE)
|
EA
|
2.000
|
$400.000
|
$342.000
|
$355.680
|
$6,821.620
|
$158.000
|
$350.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
67,207.000
|
$0.600
|
$0.470
|
$0.489
|
$0.660
|
$0.600
|
$0.470
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
88,038.000
|
$0.600
|
$0.470
|
$0.489
|
$0.620
|
$0.600
|
$0.470
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
12,282.000
|
$1.000
|
$0.800
|
$1.336
|
$2.840
|
$1.300
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
600.000
|
$1.500
|
$0.500
|
$0.520
|
$22.100
|
$2.600
|
$0.510
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,382.000
|
$1.000
|
$0.670
|
$0.697
|
$3.080
|
$0.900
|
$0.680
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
530.000
|
$6.500
|
$5.000
|
$5.200
|
$29.450
|
$6.000
|
$5.050
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
26.000
|
$125.000
|
$123.000
|
$127.920
|
$621.430
|
$100.000
|
$124.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$290.000
|
$377.000
|
$392.080
|
$3,616.810
|
$240.000
|
$380.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
26.000
|
$150.000
|
$143.000
|
$148.720
|
$641.430
|
$157.000
|
$144.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
26.000
|
$35.000
|
$33.000
|
$34.320
|
$531.430
|
$21.000
|
$33.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$315.000
|
$322.000
|
$334.880
|
$6,801.620
|
$420.000
|
$330.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
108,902.000
|
$0.150
|
$0.100
|
$0.104
|
$0.220
|
$0.160
|
$0.100
|
|
|
PAVEMENT SEALER 6"
|
LF
|
126,956.000
|
$0.200
|
$0.180
|
$0.187
|
$0.280
|
$0.200
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
5,382.000
|
$0.350
|
$0.400
|
$0.416
|
$2.810
|
$0.300
|
$0.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
530.000
|
$2.500
|
$2.440
|
$2.538
|
$26.890
|
$2.600
|
$2.450
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
21.000
|
$45.000
|
$63.000
|
$65.520
|
$680.110
|
$58.000
|
$64.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
21.000
|
$50.000
|
$63.000
|
$65.520
|
$680.110
|
$58.000
|
$64.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$120.000
|
$188.000
|
$195.520
|
$6,667.620
|
$210.000
|
$190.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
4.000
|
$110.000
|
$111.000
|
$115.440
|
$3,350.810
|
$80.000
|
$112.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
26.000
|
$23.000
|
$22.000
|
$22.880
|
$520.430
|
$16.000
|
$22.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
6,140.000
|
$0.500
|
$0.360
|
$0.374
|
$2.470
|
$0.300
|
$0.360
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
126,956.000
|
$0.550
|
$0.470
|
$0.489
|
$0.570
|
$0.400
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,500.000
|
$0.400
|
$0.360
|
$0.374
|
$3.240
|
$0.320
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
97,662.000
|
$0.400
|
$0.340
|
$0.354
|
$0.470
|
$0.300
|
$0.340
|
|
REFL PAV MRKR TY I-C
|
EA
|
525.000
|
$4.000
|
$4.000
|
$4.160
|
$28.680
|
$6.000
|
$4.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,246.000
|
$3.500
|
$3.330
|
$3.463
|
$9.100
|
$3.000
|
$3.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
72,283.000
|
$0.500
|
$0.320
|
$0.333
|
$0.500
|
$0.400
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
617.000
|
$1.000
|
$1.000
|
$1.040
|
$22.000
|
$0.750
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$60.000
|
$65.000
|
$67.600
|
$2,656.850
|
$54.000
|
$66.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$60.000
|
$65.000
|
$67.600
|
$2,656.850
|
$63.000
|
$66.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$6,700.000
|
$9,800.000
|
$9,412.000
|
$11,209.870
|
$9,500.000
|
$9,100.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$4,465.000
|
$2,500.000
|
$2,403.000
|
$6,955.300
|
$12,260.000
|
$2,900.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
36.000
|
$500.000
|
$2,000.000
|
$540.000
|
$509.980
|
$670.000
|
$1,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,212.000
|
$5.000
|
$7.500
|
$9.720
|
$12.970
|
$18.000
|
$13.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,677.000
|
$68.000
|
$72.500
|
$59.190
|
$63.650
|
$67.000
|
$84.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
39,722.000
|
$80.000
|
$78.000
|
$71.488
|
$69.720
|
$82.000
|
$86.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
70,921.000
|
$3.500
|
$3.000
|
$5.832
|
$3.140
|
$4.000
|
$4.050
|
|
|
STENCILING PERMANENT STRUCTURE NUMBERS
|
EA
|
3.000
|
$500.000
|
$270.000
|
$540.000
|
$4,319.740
|
$1,100.000
|
$940.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$12,000.000
|
$10,800.000
|
$10,843.240
|
$25,300.000
|
$29,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
530.000
|
$215.000
|
$125.000
|
$189.000
|
$176.520
|
$230.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
93.000
|
$260.000
|
$125.000
|
$378.000
|
$443.480
|
$290.000
|
$670.000
|
|
Totals: |
$13,266,755.050
|
$12,527,098.060
|
$12,765,399.114
|
$13,157,902.398
|
$14,280,682.800
|
$15,078,801.920
|