Show Job Controls
Bid Cobra

WILLIAMSON RM 1869 (1755-01-021)

Items: 79

County: WILLIAMSON
Length: N/A
Highway: RM 1869
District: AUSTIN
Control Number: 1755-01-021
DBE Goal: N/A
Project: STP 2023(737)VRU
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $3,432,985.10
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
JASON HUDSON
JOHN PETERS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,432,985.10
$3,853,599.28
Over/Under Est: 12.25% $420,614.18
Over/Under Est: 16.52% $567,211.08
Amt Left: 3.8% $146,596.90
$4,251,237.45
Over/Under Est: 23.84% $818,252.35
Amt Left: 10.32% $397,638.17
Delta: -6.28% -$251,041.27
Over/Under Est: 44.22% $1,518,150.40
Amt Left: 28.48% $1,097,536.22
Delta: -16.46% -$699,898.05
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 28.45% $1,117,331.46
ENVIRONMENTAL SAFETY SERVICES, INC. 4.10% $161,021.41
D. I. J. CONSTRUCTION, INC. 1.90% $74,619.68
AWP SAFETY 0.36% $14,138.46
TRP CONSTRUCTION GROUP, LLC 0.25% $9,818.38
STRIPE IT UP, LLC 0.15% $5,891.03
Total: 35.21% $1,382,820.42

Bid Items & Bid Tabulations

79 Total 0 of 79
WILLIAMSON  |  RM 1869  |  AUSTIN  |  1755-01-021  |  05/04/2023  |  $3,432,985.10  |  STP 2023(737)VRU  |  WIDEN ROAD - ADD SHOULDERS  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN UNDERGROUND INCORPORATED
HUNTER INDUSTRIES, LTD.
3LW CIVIL LLC
AARON CONCRETE CONTRACTORS, LLC
PREPARING ROW
STA 81.200 $2,000.000 $1,000.000 $910.200 $3,914.010 $3,000.000
REMOVING CONC (DRIVEWAYS)
SY 46.000 $22.000 $45.000 $31.500 $98.500 $60.000
REMOVING STAB BASE & ASPH PAV (9")
SY 4,212.000 $7.000 $4.000 $7.000 $6.170 $16.000
EXCAVATION (ROADWAY)
CY 4,251.000 $15.000 $25.000 $23.600 $37.600 $27.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 3,659.000 $20.000 $17.000 $23.600 $24.700 $21.000
FURNISHING AND PLACING TOPSOIL (4")
SY 23,699.000 $2.000 $1.300 $1.960 $6.250 $6.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 23,699.000 $0.300 $0.400 $0.320 $0.520 $0.400
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 23,699.000 $0.350 $0.280 $0.320 $0.200 $0.400
VEGETATIVE WATERING
MG 40.100 $25.000 $90.000 $27.600 $100.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 23,699.000 $1.150 $1.250 $1.190 $1.780 $1.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 3,679.000 $65.000 $91.000 $91.880 $67.000 $100.000
PRIME COAT (MULTI OPTION)
GAL 3,063.000 $5.000 $10.000 $7.900 $4.250 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,500.000 $75.000 $123.000 $71.500 $71.000 $98.000
CEM STABIL BKFL
CY 375.000 $150.000 $180.000 $259.220 $225.000 $320.000
CUT & RESTORING PAV
SY 190.000 $100.000 $60.000 $324.030 $225.000 $260.000
FLOWABLE BACKFILL
CY 21.600 $250.000 $380.000 $299.190 $415.000 $315.000
TRENCH EXCAVATION PROTECTION
LF 166.000 $6.000 $25.000 $58.320 $15.500 $42.000
TEMPORARY SPL SHORING
SF 616.000 $30.000 $30.000 $31.310 $45.000 $45.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $300.000 $380.000 $238.250 $200.000 $315.000
CONC BOX CULV (5 FT X 2 FT)
LF 100.000 $500.000 $885.000 $712.860 $668.000 $770.000
CONC BOX CULV (5 FT X 4 FT)
LF 50.000 $900.000 $1,000.000 $863.010 $726.200 $860.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 22.100 $1,500.000 $1,800.000 $3,332.140 $1,699.550 $3,600.000
CONC BOX CULV (6 FT X 2 FT)
LF 190.000 $550.000 $820.000 $807.170 $726.200 $760.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 110.000 $190.000 $245.000 $294.550 $288.000 $325.000
RC PIPE (ARCH)(CL IV)(DES 1)
LF 365.000 $190.000 $205.000 $248.410 $298.000 $270.000
WINGWALL (PW - 1) (HW=3 FT)
EA 5.000 $11,750.000 $16,000.000 $9,278.150 $8,430.000 $21,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $13,500.000 $27,000.000 $18,891.130 $19,537.500 $37,300.000
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $15,000.000 $30,000.000 $19,431.190 $23,542.500 $39,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $20,000.000 $40,000.000 $27,532.010 $27,690.000 $50,300.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 14.000 $1,900.000 $2,200.000 $2,545.820 $2,427.650 $2,900.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 4.000 $3,500.000 $3,200.000 $4,967.430 $5,702.750 $3,200.000
REMOV STR (SET)
EA 8.000 $650.000 $700.000 $403.960 $525.000 $805.000
REMOV STR (HEADWALL)
EA 10.000 $2,500.000 $750.000 $1,825.390 $1,250.000 $1,500.000
REMOV STR (PIPE)
LF 448.000 $28.000 $20.000 $21.590 $37.000 $33.000
REMOV STR (BOX CULVERT)
LF 42.000 $100.000 $130.000 $171.740 $125.000 $90.000
REMOV STR (SMALL FENCE)
LF 480.000 $4.500 $6.000 $32.590 $10.000 $10.000
MOBILIZATION
LS 1.000 $275,000.000 $290,000.000 $394,453.210 $330,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,000.000 $7,000.000 $9,500.000 $19,490.670 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 372.000 $40.000 $43.000 $46.810 $44.000 $60.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 495.000 $46.000 $48.000 $55.340 $57.940 $70.000
ROCK FILTER DAMS (REMOVE)
LF 975.000 $20.000 $6.000 $31.790 $18.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $25.000 $88.000 $52.060 $42.000 $67.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $10.000 $8.000 $21.600 $18.750 $28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,710.000 $4.000 $3.200 $4.320 $3.600 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,710.000 $0.500 $0.300 $1.080 $0.500 $1.400
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $7.000 $11.500 $4.320 $8.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $2.000 $1.150 $1.080 $2.000 $1.400
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 108.000 $50.000 $73.000 $76.150 $57.000 $97.000
INTERSECTIONS (ACP)
SY 622.000 $85.000 $100.000 $50.600 $238.550 $115.000
DRIVEWAYS (CONC)
SY 94.000 $115.000 $178.000 $126.370 $112.420 $175.000
DRIVEWAYS (ACP)
SY 954.000 $65.000 $90.000 $50.600 $187.100 $91.000
TURNOUTS (ACP)
SY 86.000 $150.000 $200.000 $101.200 $308.600 $120.000
WIRE FENCE (TY C)
LF 480.000 $23.000 $3.500 $54.010 $32.000 $19.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $350.000 $350.000 $372.640 $435.000 $430.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $950.000 $800.000 $664.270 $1,168.750 $770.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $650.000 $775.000 $775.520 $1,085.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $800.000 $850.000 $856.530 $1,200.000 $992.000
REMOVE SM RD SN SUP&AM
EA 8.000 $115.000 $35.000 $162.020 $125.000 $190.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $85.000 $90.000 $77.770 $115.000 $90.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 14.000 $25.000 $35.000 $16.200 $10.000 $19.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 36,100.000 $0.850 $0.500 $0.460 $0.430 $0.900
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 36,100.000 $0.850 $0.500 $0.460 $0.430 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 42.000 $18.000 $17.000 $16.200 $15.000 $8.500
PAVEMENT SEALER 6"
LF 28,556.000 $0.400 $0.310 $0.290 $0.270 $0.400
PAVEMENT SEALER 24"
LF 42.000 $11.000 $5.250 $4.860 $4.500 $4.600
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 17,561.000 $1.000 $1.400 $1.190 $1.100 $1.200
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 2,170.000 $1.200 $1.400 $1.240 $1.150 $1.400
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 8,825.000 $1.000 $1.400 $1.190 $1.100 $1.200
REFL PAV MRKR TY II-A-A
EA 175.000 $10.000 $7.000 $5.780 $5.350 $5.700
ELIM EXT PAV MRK & MRKS (4")
LF 1,785.000 $1.000 $2.850 $1.620 $1.500 $1.000
D-GR HMA TY-B PG64-22
TON 2,526.000 $115.000 $125.000 $126.100 $114.250 $146.000
D-GR HMA TY-D PG76-22
TON 3,612.000 $135.000 $136.000 $141.500 $119.000 $165.000
TOM-C PG76-22 SAC-B
TON 1,840.000 $165.000 $175.000 $165.700 $152.000 $210.000
BONDING COURSE
GAL 2,955.000 $5.000 $5.000 $4.090 $4.250 $6.000
UNDERSEAL COURSE
GAL 6,508.000 $5.000 $5.000 $5.740 $4.250 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $14,000.000 $8,100.830 $0.010 $12,500.000
TMA (STATIONARY)
DAY 220.000 $225.000 $125.000 $237.560 $0.010 $315.000
TMA (MOBILE OPERATION)
HR 256.000 $80.000 $30.000 $135.010 $0.010 $110.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,000.000 $2,000.000 $3,780.390 $1,500.000 $2,700.000
Totals: $3,432,985.100 $3,853,599.280 $4,000,196.188 $4,251,237.457 $4,951,135.500