WILBARGER US 283 (0124-02-035)

Items: 38

County: WILBARGER
Length: N/A
Highway: US 283
District: WICHITA FALLS
Control Number: 0124-02-035
DBE Goal: 0.0%
Project: F 2B24(221)
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $6,139,659.94
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
JOSH GILLIS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$6,139,659.94
$5,643,664.87
Over/Under Est: -8.08% -$495,995.07
$5,679,361.18
Over/Under Est: -7.5% -$460,298.76
Amt Left: 0.63% $35,696.31
$5,926,630.79
Over/Under Est: -3.47% -$213,029.15
Amt Left: 5.01% $282,965.92
Delta: -4.35% -$247,269.61
$6,578,464.52
Over/Under Est: 7.15% $438,804.58
Amt Left: 16.56% $934,799.65
Delta: -11.00% -$651,833.73
$8,317,606.05
Over/Under Est: 35.47% $2,177,946.11
Amt Left: 47.38% $2,673,941.18
Delta: -26.44% -$1,739,141.53
Subcontractor Percentage Amount
HJC FARMS, INC. 2.99% $148,745.72
LINEAR TRAFFIC MARKINGS LLC 2.77% $137,801.21
TEXOP CONSTRUCTION 1.26% $62,682.14
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.55% $27,361.25
PROFESSIONAL TRAFFIC CONTROL LLC 0.41% $20,396.57
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.20% $9,949.55
Total: 8.18% $406,936.44

Bid Items & Bid Tabulations

38 Total 0 of 38
WILBARGER  |  US 283  |  WICHITA FALLS  |  0124-02-035  |  07/10/2024  |  $6,139,659.94  |  F 2B24(221)  |  RESURF ROADWAY  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OVERLAND CORPORATION
ZACK BURKETT CO.
DUININCK, INC.
A. L. HELMCAMP, INC.
GILVIN-TERRILL, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 250.000 $15.000 $25.000 $23.400 $24.500 $30.000 $12.000
BACKFILL (TY B)
STA 417.000 $160.000 $256.280 $275.000 $190.000 $630.000 $200.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 18.000 $600.000 $498.000 $582.660 $570.000 $600.000 $525.000
VEGETATIVE WATERING
MG 685.000 $25.000 $65.000 $35.000 $32.500 $25.000 $109.360
EMULS ASPH (EROSN CONT)(SS-1)
GAL 11,562.000 $3.000 $4.250 $4.000 $3.700 $5.000 $9.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 17,000.000 $60.000 $55.000 $67.000 $60.000 $70.000 $85.000
PLAN & TEXT CONC PAV(0" TO 2")
SY 978.000 $4.000 $22.000 $5.000 $19.000 $18.000 $7.500
RIPRAP (MOW STRIP)(4 IN)
CY 90.350 $700.000 $725.000 $830.000 $740.000 $1,200.000 $800.000
MOBILIZATION
LS 1.000 $563,128.180 $530,000.000 $400,000.000 $575,000.000 $450,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $9,000.000 $3,500.000 $5,000.000 $23,000.000 $12,000.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $4.000 $9.000 $10.530 $9.950 $11.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $1.000 $1.170 $2.100 $2.300 $4.000
DRIVEWAYS (ACP)
SY 3,290.000 $50.000 $40.000 $50.000 $34.000 $85.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 83,244.000 $0.190 $0.080 $0.290 $0.110 $0.160 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 41,622.000 $0.220 $0.080 $0.290 $0.160 $0.190 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 850.000 $36.000 $26.500 $31.010 $27.500 $30.000 $26.500
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 125.000 $60.000 $85.500 $100.000 $89.500 $130.000 $85.500
MTL THRIE-BEAM GD FEN (TIM POST)
EA 2.000 $2,500.000 $2,415.000 $2,825.550 $2,500.000 $4,500.000 $2,415.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $4.000 $2.000 $2.340 $2.100 $12.000 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $400.000 $200.000 $234.000 $210.000 $450.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $4,000.000 $3,050.000 $3,568.500 $3,200.000 $4,000.000 $3,050.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $200.000 $234.000 $210.000 $500.000 $200.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,183.000 $2.720 $1.500 $1.200 $1.550 $0.750 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,168.000 $2.220 $2.000 $1.200 $1.550 $0.750 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,800.000 $1.820 $0.750 $2.280 $0.780 $1.300 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 168.000 $1.310 $1.000 $1.170 $1.050 $1.700 $2.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 867.000 $7.560 $6.250 $8.830 $6.550 $11.000 $7.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 36,139.000 $1.020 $0.600 $0.780 $0.630 $0.750 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 83,243.000 $1.420 $0.580 $0.780 $0.610 $0.700 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 83,243.000 $1.380 $0.580 $0.780 $0.610 $0.700 $0.750
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 181.000 $21.350 $12.000 $17.550 $12.500 $15.000 $13.750
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 6.000 $900.000 $475.000 $643.500 $495.000 $550.000 $350.000
REFL PAV MRKR TY I-C
EA 906.000 $5.780 $3.900 $5.270 $4.100 $5.500 $5.000
REFL PAV MRKR TY II-A-A
EA 1,046.000 $12.180 $3.900 $5.270 $4.100 $5.500 $5.000
SP MIXES SP-C SAC-B PG70-28
TON 26,219.000 $135.000 $129.500 $123.250 $132.500 $140.000 $188.000
BONDING COURSE
GAL 14,301.000 $5.750 $4.250 $5.850 $3.500 $7.000 $8.000
TMA (STATIONARY)
DAY 90.000 $500.000 $210.000 $275.000 $155.000 $200.000 $600.000
TMA (MOBILE OPERATION)
DAY 30.000 $500.000 $240.000 $1.000 $750.000 $200.000 $900.000
Totals: $6,139,659.940 $5,643,664.870 $5,679,361.180 $5,926,630.790 $6,578,464.520 $8,317,606.050