WHARTON VARIOUS (0913-09-132)

Items: 83

County: WHARTON
Length: 1.2660 MILES
Highway: VARIOUS
District: YOAKUM
Control Number: 0913-09-132
DBE Goal: 6.0%
Project: STP 2B24(465)TAPS
Guaranty: $51,000.00
Time: 158 WORKING DAYS
Engineer's Estimate: $2,558,830.58
Date: 06/05/2025 (1 year ago)
Contract Number: 6253225
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206896
Contract Type: Federal
Project Description: THE PROJECT WILL CONSTRUCT MORE THAN 1-MILE OF 6-FOOT-WIDE SIDEWALKS WITHIN THE EXISTING RIGHT-OF-WAY. IT WILL REMOVE EXISTING SUBSTANDARD SIDEWALKS, ADA RAMPS AND DRIVEWAYS TO CONSTRUCT THE IMPROVED PEDESTRIAN PATWAYS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,558,830.58
$2,130,273.30
Over/Under Est: -16.75% -$428,557.28
$2,142,703.83
Over/Under Est: -16.26% -$416,126.75
Amt Left: 0.58% $12,430.53
$2,205,475.00
Over/Under Est: -13.81% -$353,355.58
Amt Left: 3.53% $75,201.70
Delta: -2.93% -$62,771.17
$2,573,813.97
Over/Under Est: 0.59% $14,983.39
Amt Left: 20.82% $443,540.67
Delta: -16.70% -$368,338.97
Over/Under Est: 6.99% $178,790.92
Amt Left: 28.51% $607,348.20
Delta: -6.36% -$163,807.53
Over/Under Est: 24.39% $624,074.42
Amt Left: 49.41% $1,052,631.70
Delta: -16.27% -$445,283.50
Subcontractor Percentage Amount
RAM-ROD CONCRETE COMPANY, INC. 9.38% $199,819.64
THIRD COAST SERVICES LLC 5.71% $121,638.61
SANTA FE CONCRETE SERVICES LLC 3.11% $66,251.50
ROBIN STEEL LLC 1.69% $36,001.62
CONCRETE CUTTING & BREAKING COMPANY 0.92% $19,598.51
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.62% $13,207.69
HIGHWAY BARRICADES AND SERVICES, LLC 0.17% $3,621.46
Total: 21.60% $460,139.03

Bid Items & Bid Tabulations

83 Total 0 of 83
WHARTON  |  VARIOUS  |  YOAKUM  |  0913-09-132  |  06/05/2025  |  $2,558,830.58  |  STP 2B24(465)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  158 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
STX CIVIL
ENCINO LANDSCAPE, INC.
C. E. BARKER, LTD.
GREY SKY CONSTRUCTION LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
PREPARING ROW
STA 19.000 $1,000.000 $110.000 $4,976.000 $500.000 $13,000.000 $12,500.000 $6,500.000
REMOV CONC (DRIVEWAYS)
SY 1,489.000 $28.000 $24.990 $18.000 $20.000 $71.290 $30.000 $50.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 799.000 $68.000 $23.290 $16.000 $20.000 $49.380 $30.000 $50.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 2,734.000 $21.000 $9.070 $8.500 $15.000 $49.380 $30.000 $30.000
REMOV CONC (GUTTER)
LF 429.000 $5.000 $7.230 $8.500 $15.000 $49.380 $30.000 $30.000
REMOV CONC (MISC)
SY 54.000 $75.000 $34.450 $21.000 $30.000 $107.810 $30.000 $30.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,214.000 $100.000 $27.800 $24.000 $20.000 $35.510 $30.000 $20.000
BLOCK SODDING
SY 62.000 $10.000 $11.000 $7.000 $10.000 $13.910 $10.000 $20.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 23.000 $4.600 $3.300 $7.000 $10.000 $6.960 $10.000 $5.000
VEGETATIVE WATERING
TGL 0.730 $55.000 $1.100 $321.000 $200.000 $86.940 $50.000 $500.000
RDSIDE AMENITY (WHEEL STOP)
EA 12.000 $185.000 $385.000 $160.000 $500.000 $417.310 $250.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 400.000 $100.000 $110.000 $128.000 $300.000 $417.310 $150.000 $175.000
CUT & RESTORING PAV
SY 109.000 $186.000 $110.000 $188.000 $300.000 $205.360 $200.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 940.000 $30.000 $0.010 $36.000 $1.000 $6.960 $10.000 $25.000
TEMPORARY SPL SHORING
SF 384.000 $60.000 $25.000 $43.000 $1.000 $6.960 $85.000 $70.000
RIPRAP (CONC)(4 IN)
CY 60.000 $850.000 $828.820 $781.000 $800.000 $2,872.500 $550.000 $850.000
RIPRAP (CONC)(CL B)(5 IN)
CY 11.000 $600.000 $828.820 $834.000 $900.000 $2,872.500 $650.000 $850.000
RAIL (TY C221)
LF 53.000 $250.000 $500.000 $227.000 $200.000 $290.160 $185.000 $200.000
RAIL (HANDRAIL)(TY B)
LF 233.000 $210.000 $123.000 $225.000 $100.000 $226.390 $185.000 $200.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 9.000 $750.000 $1,602.210 $1,285.000 $3,000.000 $2,199.700 $2,000.000 $3,000.000
RC PIPE (CL III)(24 IN)
LF 20.000 $110.000 $318.280 $136.000 $150.000 $475.920 $150.000 $125.000
RC PIPE (CL III)(30 IN)
LF 17.000 $140.000 $371.740 $176.000 $200.000 $578.080 $250.000 $200.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $25,000.000 $57,297.580 $32,650.000 $5,000.000 $27,820.800 $55,000.000 $50,000.000
SET (TY II) (12 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,120.570 $1,025.000 $1,000.000 $5,251.180 $1,850.000 $3,000.000
ADJUSTING MANHOLES
EA 3.000 $3,000.000 $620.160 $1,340.000 $2,000.000 $4,214.210 $2,500.000 $1,500.000
ADJUSTING INLETS
EA 8.000 $3,000.000 $775.200 $1,180.000 $2,500.000 $2,921.180 $5,000.000 $3,500.000
CLEAN EXIST CULVERTS
EA 2.000 $3,500.000 $5,256.480 $5,890.000 $2,000.000 $4,707.070 $5,000.000 $3,000.000
REMOV STR (PIPE)
LF 32.000 $30.000 $37.040 $27.000 $20.000 $58.420 $50.000 $20.000
MOBILIZATION
LS 1.000 $269,446.130 $221,097.600 $160,000.000 $450,000.000 $225,000.000 $250,000.000 $318,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $4,000.000 $9,000.000 $2,260.000 $3,000.000 $8,381.020 $15,000.000 $4,500.000
TMA (STATIONARY)
DAY 20.000 $500.000 $1.100 $1.000 $300.000 $1,219.640 $250.000 $300.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $30.000 $1.100 $27.000 $1.000 $16.930 $20.000 $20.000
SANDBAGS FOR EROSION CONTROL
EA 76.000 $14.000 $1.100 $1.000 $10.000 $21.910 $10.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 335.000 $10.000 $0.110 $0.100 $10.000 $13.910 $18.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 335.000 $3.000 $0.110 $0.100 $1.000 $6.960 $9.000 $2.000
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 30.000 $70.000 $1.100 $58.000 $50.000 $83.460 $50.000 $70.000
CONC CURB (TY II)
LF 86.000 $35.000 $61.790 $54.000 $20.000 $41.040 $65.000 $50.000
CONC CURB & GUTTER (TY II)
LF 3,011.000 $90.000 $61.790 $54.000 $40.000 $26.430 $65.000 $50.000
CONC CURB (TY C1)
LF 46.000 $80.000 $226.550 $176.000 $175.000 $41.730 $95.000 $200.000
CONC CURB (TY F1)
LF 77.000 $95.000 $302.070 $176.000 $150.000 $41.730 $100.000 $200.000
DRIVEWAYS (CONC)
SY 2,290.000 $150.000 $134.120 $101.000 $100.000 $36.510 $85.000 $140.000
DRIVEWAYS (CONC) (HES)
SY 146.000 $175.000 $137.790 $107.000 $150.000 $36.510 $125.000 $140.000
CONC SIDEWALKS (5")
SY 3,025.000 $150.000 $127.790 $96.000 $100.000 $95.630 $70.000 $125.000
CURB RAMPS (TY 7)
SY 204.000 $450.000 $143.390 $204.000 $140.000 $77.380 $650.000 $350.000
CURB RAMPS (TY 10)
SY 54.000 $220.000 $143.390 $204.000 $140.000 $77.380 $650.000 $350.000
CONDT (PVC) (SCH 40) (2")
LF 5,720.000 $11.000 $14.410 $15.000 $16.000 $18.220 $20.000 $33.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 65.000 $26.000 $31.810 $31.000 $35.000 $40.230 $100.000 $55.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 590.000 $10.500 $25.960 $25.000 $30.000 $32.830 $25.000 $43.000
ELEC CONDR (NO.8) BARE
LF 105.000 $2.000 $2.510 $250.000 $4.000 $3.170 $3.000 $4.000
GROUND BOX TY A (122311)
EA 1.000 $1,200.000 $1,245.050 $1,215.000 $1,500.000 $1,574.460 $1,150.000 $2,000.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,500.000 $1,453.520 $1,420.000 $1,600.000 $1,838.090 $1,500.000 $1,500.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,460.000 $1,523.010 $1,482.000 $1,600.000 $1,925.960 $1,500.000 $1,500.000
ELC SRV TY D 120/240 060(NS)GS(N)EX(O)
EA 1.000 $10,000.000 $3,299.370 $3,210.000 $4,000.000 $4,172.330 $12,500.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $1,000.000 $495.000 $800.000 $1,750.000 $1,354.790 $1,150.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $1,000.000 $605.000 $642.000 $750.000 $822.190 $1,150.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $1,030.000 $495.000 $515.000 $500.000 $1,279.050 $1,150.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 7.000 $200.000 $55.000 $145.000 $100.000 $180.840 $500.000 $100.000
PREFAB PM TY C (W)(24")(SLD)
LF 48.000 $17.500 $44.000 $86.000 $30.000 $87.290 $20.000 $90.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $18,000.000 $10,418.170 $10,200.000 $11,000.000 $13,174.620 $35,000.000 $21,000.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $690.000 $943.620 $920.000 $1,000.000 $1,193.290 $6,500.000 $600.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 160.000 $2.000 $2.920 $3.500 $3.000 $3.690 $3.000 $3.500
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 150.000 $1.450 $2.630 $2.500 $3.000 $3.320 $3.000 $3.500
PED POLE ASSEMBLY
EA 2.000 $2,150.000 $2,204.360 $2,150.000 $2,500.000 $2,787.590 $4,500.000 $5,000.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $760.000 $895.640 $880.000 $1,000.000 $1,132.610 $1,850.000 $1,500.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,500.000 $3,911.090 $3,810.000 $5,000.000 $4,945.900 $6,500.000 $5,500.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 95.000 $200.000 $27.500 $110.000 $200.000 $76.870 $100.000 $45.000
WATER MAIN PIPE (PVC)(2 IN )
LF 21.000 $225.000 $102.270 $65.000 $100.000 $30.000 $60.000 $350.000
WATER MAIN PIPE (PVC)(C900)(6 IN)
LF 22.000 $80.000 $111.390 $145.000 $200.000 $50.000 $85.000 $350.000
WATER MAIN PIPE (PVC)(C900)(8 IN)
LF 897.000 $80.000 $99.810 $170.000 $250.000 $65.000 $100.000 $225.000
FIRE HYDRANT ASSEMBLY
EA 3.000 $7,000.000 $9,290.130 $30,500.000 $5,000.000 $8,500.000 $12,500.000 $8,500.000
WATERLINE REMOVAL (ALL SIZES/MATERIALS)
LF 902.000 $10.000 $34.080 $80.000 $10.000 $15.000 $50.000 $200.000
CASING (STEEL)(18 IN)(OPEN CUT)
LF 72.000 $300.000 $217.680 $250.000 $200.000 $80.000 $450.000 $600.000
TEMP BLOW OFF VALVE (2 IN)
EA 2.000 $1,500.000 $2,562.160 $3,425.000 $1,000.000 $1,800.000 $6,500.000 $4,000.000
CONNECT TO EXISTING WATER LINE (2 IN)
EA 3.000 $1,500.000 $2,350.990 $5,200.000 $2,000.000 $500.000 $1,500.000 $3,000.000
CONNECT TO EXISTING WATER LINE (6 IN)
EA 3.000 $5,000.000 $3,134.650 $7,000.000 $3,000.000 $1,200.000 $3,500.000 $3,000.000
GATE VALVE W BOX (2 IN)
EA 3.000 $1,500.000 $1,725.320 $2,140.000 $500.000 $650.000 $6,500.000 $9,500.000
GATE VALVE W BOX (6 IN)
EA 1.000 $2,000.000 $4,516.130 $3,585.000 $1,500.000 $1,500.000 $7,500.000 $9,500.000
GATE VALVE W BOX (8 IN)
EA 4.000 $2,500.000 $4,687.100 $4,495.000 $2,000.000 $2,200.000 $8,500.000 $9,500.000
REMOVE WATER VALVE AND BOX
EA 2.000 $350.000 $521.110 $642.000 $500.000 $350.000 $1,500.000 $7,500.000
SERVICE LINE(SHORT SIDE 3/4 IN TO 2 IN)
EA 7.000 $1,500.000 $2,412.000 $1,658.000 $1,000.000 $1,800.000 $4,500.000 $5,000.000
CUT AND PLUG WATER MAIN (2 IN)
EA 6.000 $500.000 $642.880 $1,284.000 $1,000.000 $250.000 $1,500.000 $2,000.000
CUT AND PLUG WATER MAIN (6 IN)
EA 4.000 $2,000.000 $1,201.310 $1,712.000 $1,500.000 $350.000 $2,500.000 $4,000.000
REMOV(ABATEMENT)OF ASBESTOS-CEMENT PIPE
LF 926.000 $60.000 $30.000 $38.500 $25.000 $212.130 $100.000 $125.000
Totals: $2,558,830.580 $2,130,273.303 $2,142,703.830 $2,205,475.000 $2,573,813.966 $2,737,621.500 $3,182,905.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $1,500.00