Show Job Controls
Bid Cobra

WHARTON CR (0913-09-059)

Items: 40

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-059
DBE Goal: N/A
Project: BR 2012(412)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $775,371.00
Date: 04/04/2017 (9 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$775,371.00
$746,501.30
Over/Under Est: -3.72% -$28,869.70
$774,426.26
Over/Under Est: -0.12% -$944.74
Amt Left: 3.74% $27,924.96
Over/Under Est: 4.98% $38,624.33
Amt Left: 9.04% $67,494.03
Delta: -5.11% -$39,569.07
$826,148.49
Over/Under Est: 6.55% $50,777.49
Amt Left: 10.67% $79,647.19
Delta: -1.49% -$12,153.16
Over/Under Est: 8.19% $63,526.00
Amt Left: 12.38% $92,395.70
Delta: -1.54% -$12,748.51
Over/Under Est: 15.15% $117,448.55
Amt Left: 19.6% $146,318.25
Delta: -6.43% -$53,922.55
Over/Under Est: 38.57% $299,066.76
Amt Left: 43.93% $327,936.46
Delta: -20.34% -$181,618.21

Bid Items & Bid Tabulations

40 Total 0 of 40
WHARTON  |  CR  |  YOAKUM  |  0913-09-059  |  04/04/2017  |  $775,371.00  |  BR 2012(412)  |  REPLACE BRIDGE AND APPROACHES  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHN REED AND COMPANY, LLC
SB CONTRACTORS LLC
FUQUA CONSTRUCTION CO., INC.
TREVWAY, INC.
ISI CONTRACTING, INC.
A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
EXCAVATION (ROADWAY)
CY 552.000 $25.000 $30.000 $20.000 $14.820 $7.000 $20.000 $28.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 676.000 $25.000 $35.000 $20.000 $45.920 $9.000 $34.000 $33.500 $32.000
BLADING
HR 20.000 $100.000 $15.000 $65.000 $58.850 $50.000 $80.000 $130.000 $105.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,419.000 $2.000 $0.300 $0.900 $1.010 $1.000 $1.000 $1.100 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 856.000 $3.000 $0.300 $1.500 $0.190 $1.000 $1.000 $1.100 $0.350
CELL FBR MLCH SEED(TEMP)(COOL)
SY 856.000 $3.000 $0.300 $1.500 $0.190 $1.000 $1.000 $1.100 $0.360
VEGETATIVE WATERING
MG 28.800 $125.000 $10.000 $45.000 $22.630 $50.000 $20.000 $84.000 $50.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 567.000 $100.000 $105.000 $100.000 $91.420 $130.000 $102.000 $130.000 $100.000
PRIME COAT (MC-30)
GAL 351.000 $5.000 $6.000 $12.000 $6.000 $13.890 $6.000 $11.000 $7.500
AGGR(TY-PE GR-4 SAC-B)
CY 28.000 $70.000 $90.000 $521.500 $150.000 $252.630 $225.000 $390.000 $490.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 1,194.000 $3.000 $4.000 $12.750 $7.000 $13.890 $4.000 $9.500 $7.500
CEM STABIL BKFL
CY 34.000 $150.000 $50.000 $165.000 $161.000 $130.000 $50.000 $200.000 $250.000
SHEET PILING (PZ - 27)
SF 3,045.000 $38.000 $36.000 $36.000 $43.120 $41.000 $36.000 $36.500 $45.000
PRESTR CONC PIL (18 IN SQ)
LF 456.000 $110.000 $120.000 $102.000 $96.030 $97.000 $95.000 $83.000 $115.000
DRILL SHAFT (24 IN)
LF 330.000 $150.000 $240.000 $200.000 $184.650 $254.000 $215.000 $180.000 $275.000
CL C CONC (ABUT)
CY 44.400 $1,000.000 $1,000.000 $950.000 $912.950 $600.000 $800.000 $1,500.000 $1,550.000
REINF CONC SLAB (SLAB BEAM)
SF 2,906.000 $20.000 $9.000 $16.000 $20.150 $27.000 $21.000 $24.000 $32.000
PRESTR CONC SLAB BEAM (4SB15)
LF 396.000 $150.000 $140.000 $150.000 $155.450 $159.000 $150.000 $140.000 $275.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $190.000 $150.000 $150.000 $174.300 $184.000 $150.000 $140.000 $340.000
RIPRAP (CONC)(5 IN)
CY 5.000 $500.000 $260.000 $375.000 $1,013.060 $200.000 $575.000 $730.000 $700.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 90.000 $200.000 $100.000 $160.000 $165.660 $150.000 $150.000 $170.000 $190.000
RAIL (TY T223)
LF 248.000 $135.000 $70.000 $105.000 $120.530 $67.000 $85.000 $160.000 $115.000
ARMOR JOINT (SEALED)
LF 100.000 $60.000 $60.000 $85.000 $81.810 $69.460 $70.000 $150.000 $70.000
RC PIPE (CL III)(30 IN)
LF 20.000 $100.000 $120.000 $110.000 $165.280 $148.880 $300.000 $220.000 $300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $1,000.000 $2,100.000 $2,838.130 $3,522.000 $1,700.000 $4,300.000 $3,600.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $10,000.000 $25,000.000 $8,016.200 $9,235.630 $15,000.000 $30,000.000 $11,200.000 $24,000.000
MOBILIZATION
LS 1.000 $44,000.000 $70,000.000 $76,000.000 $78,527.000 $80,000.000 $82,000.000 $89,281.950 $102,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,500.000 $1,000.000 $3,000.000 $1,226.800 $750.000 $5,000.000 $3,500.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $50.000 $40.000 $45.000 $37.830 $12.000 $75.000 $50.000 $31.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $20.000 $10.000 $18.000 $12.610 $12.000 $35.000 $33.500 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 820.000 $3.000 $3.000 $4.500 $5.670 $2.000 $5.000 $5.600 $2.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 820.000 $2.000 $1.000 $1.500 $1.890 $1.000 $2.000 $3.400 $0.750
DRIVEWAYS (SURF TREAT)
SY 44.700 $150.000 $40.000 $45.000 $181.150 $56.000 $30.000 $84.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $20.000 $20.000 $30.000 $24.590 $24.000 $45.000 $22.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,500.000 $1,500.000 $1,500.000 $1,891.270 $1,600.000 $1,800.000 $1,600.000 $1,900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,000.000 $2,200.000 $2,200.000 $2,773.860 $2,100.000 $2,000.000 $2,500.000 $2,200.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $17,500.000 $13,000.000 $13,325.000 $16,390.970 $19,000.000 $15,000.000 $15,900.000 $15,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $200.000 $450.000 $209.760 $567.380 $400.000 $185.000 $130.000 $350.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $25.000 $50.000 $28.000 $35.300 $22.000 $6.000 $21.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $25.000 $30.000 $45.000 $37.830 $22.000 $6.000 $24.500 $45.000
Totals: $775,371.000 $746,501.300 $774,426.260 $813,995.339 $826,148.490 $838,897.000 $892,819.550 $1,074,437.760