PREPARING ROW
|
STA
|
164.000
|
$2,000.000
|
$900.000
|
$650.000
|
$1,500.000
|
$1,409.700
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,205.000
|
$13.000
|
$22.000
|
$13.000
|
$20.000
|
$18.800
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
33,073.000
|
$4.000
|
$2.000
|
$4.050
|
$6.500
|
$11.800
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
28,466.000
|
$20.000
|
$17.000
|
$41.750
|
$30.000
|
$22.100
|
|
|
BACKFILL (TY B)
|
STA
|
240.000
|
$115.000
|
$500.000
|
$137.000
|
$225.000
|
$170.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
39.800
|
$1,000.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$999.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
39.800
|
$1,000.000
|
$900.000
|
$800.000
|
$800.000
|
$799.000
|
|
|
PROOF ROLLING
|
HR
|
14.000
|
$200.000
|
$120.000
|
$143.000
|
$100.000
|
$132.000
|
|
|
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
|
CY
|
7,946.000
|
$55.000
|
$55.000
|
$65.200
|
$100.000
|
$108.450
|
|
|
ASPH (RC-250)
|
GAL
|
54,268.000
|
$5.250
|
$5.500
|
$4.500
|
$5.500
|
$5.360
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
1,939.000
|
$110.000
|
$150.000
|
$203.000
|
$200.000
|
$173.200
|
|
|
FLEXIBLE PAVE STRUCTURE REPAIR(12.5")
|
SY
|
2,646.000
|
$104.810
|
$110.000
|
$93.500
|
$175.000
|
$124.010
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
215,306.000
|
$4.000
|
$2.100
|
$2.500
|
$3.000
|
$4.270
|
|
|
PLANE ASPH CONC PAV (10")
|
SY
|
21,287.000
|
$12.000
|
$7.000
|
$6.250
|
$4.000
|
$10.670
|
|
|
PLAN ASPH CONC PAV (4"-7.5")
|
SY
|
7,290.000
|
$5.000
|
$7.000
|
$5.100
|
$4.000
|
$8.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,052.000
|
$20.000
|
$22.000
|
$20.000
|
$30.000
|
$23.070
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
77.000
|
$300.000
|
$275.000
|
$265.000
|
$300.000
|
$265.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$175.000
|
$140.000
|
$125.000
|
$150.000
|
$125.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$725.000
|
$650.000
|
$538.000
|
$550.000
|
$620.450
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$11,000.000
|
$10,900.000
|
$10,500.000
|
$12,516.300
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
19.000
|
$15,195.000
|
$14,000.000
|
$11,600.000
|
$11,500.000
|
$13,347.800
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
5.000
|
$16,500.000
|
$16,000.000
|
$13,920.000
|
$14,000.000
|
$16,051.030
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
4.000
|
$13,000.000
|
$19,000.000
|
$21,420.000
|
$22,000.000
|
$24,701.620
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$6,500.000
|
$4,500.000
|
$7,005.000
|
$8,000.000
|
$8,077.410
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$5,000.000
|
$7,800.000
|
$13,105.000
|
$14,000.000
|
$15,109.980
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
17.000
|
$1,500.000
|
$3,000.000
|
$2,320.000
|
$3,000.000
|
$2,667.480
|
|
|
REMOV STR (WINGWALL)
|
EA
|
14.000
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
$2,500.000
|
$1,977.840
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,200.000
|
$1,000.000
|
$1,800.000
|
$2,500.000
|
$1,729.890
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,349,067.470
|
$1,160,000.000
|
$1,670,000.000
|
$3,000,000.000
|
$2,844,213.980
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$7,500.000
|
$2,000.000
|
$4,360.000
|
$25,000.000
|
$3,270.520
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
756.000
|
$50.000
|
$90.000
|
$85.000
|
$100.000
|
$85.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
756.000
|
$25.000
|
$27.000
|
$25.000
|
$30.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$20.000
|
$54.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$20.000
|
$22.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
64.600
|
$100.000
|
$140.000
|
$117.000
|
$100.000
|
$120.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,582.000
|
$3.000
|
$5.000
|
$4.250
|
$5.000
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,582.000
|
$3.000
|
$1.000
|
$0.500
|
$1.000
|
$0.500
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
2,480.000
|
$100.000
|
$165.000
|
$145.000
|
$135.000
|
$120.000
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
310.000
|
$140.000
|
$250.000
|
$180.000
|
$1,400.000
|
$468.840
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
540.000
|
$65.000
|
$25.000
|
$45.000
|
$65.000
|
$36.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,880.000
|
$8.000
|
$12.000
|
$50.000
|
$60.000
|
$32.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
540.000
|
$15.000
|
$10.000
|
$37.000
|
$60.000
|
$36.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,055.000
|
$65.210
|
$135.000
|
$110.000
|
$95.000
|
$87.400
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
110,437.000
|
$0.250
|
$0.100
|
$0.120
|
$0.150
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
82,523.000
|
$0.250
|
$0.100
|
$0.120
|
$0.150
|
$0.120
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
825.000
|
$25.000
|
$30.000
|
$27.500
|
$30.000
|
$24.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$3,660.000
|
$3,250.000
|
$2,700.000
|
$2,825.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$3.250
|
$2.000
|
$2.000
|
$2.250
|
$5.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$300.000
|
$215.000
|
$200.000
|
$225.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,600.000
|
$4,050.000
|
$3,750.000
|
$4,250.000
|
$3,365.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$220.000
|
$200.000
|
$225.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
46.000
|
$1,350.000
|
$990.000
|
$900.000
|
$2,000.000
|
$925.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$950.000
|
$810.000
|
$600.000
|
$2,000.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL) (S) (TL3)
|
EA
|
2.000
|
$13,000.000
|
$7,830.000
|
$8,700.000
|
$10,000.000
|
$8,350.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
54.000
|
$40.000
|
$30.000
|
$26.000
|
$30.000
|
$26.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,890.000
|
$35.000
|
$35.000
|
$32.000
|
$35.000
|
$32.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$600.000
|
$780.000
|
$725.000
|
$825.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
31.000
|
$925.000
|
$920.000
|
$850.000
|
$950.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$1,000.000
|
$1,060.000
|
$985.000
|
$1,125.000
|
$985.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
76.000
|
$100.000
|
$86.000
|
$80.000
|
$100.000
|
$80.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,795.800
|
$10.000
|
$6.000
|
$5.750
|
$6.500
|
$5.750
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$1,500.000
|
$1,620.000
|
$1,500.000
|
$1,700.000
|
$1,500.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
52.000
|
$30.000
|
$27.000
|
$25.000
|
$30.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
15.000
|
$35.000
|
$27.000
|
$42.000
|
$50.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
10.000
|
$35.000
|
$22.000
|
$25.000
|
$30.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
50.000
|
$80.000
|
$125.000
|
$115.000
|
$130.000
|
$115.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
177,786.000
|
$0.500
|
$0.400
|
$0.360
|
$0.500
|
$0.360
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
931.000
|
$1.100
|
$0.700
|
$0.660
|
$0.750
|
$0.660
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
581.000
|
$2.000
|
$1.000
|
$0.880
|
$1.000
|
$0.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,094.000
|
$1.000
|
$1.000
|
$0.880
|
$1.000
|
$0.880
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
102.000
|
$6.000
|
$17.000
|
$16.000
|
$18.000
|
$16.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
23.000
|
$175.000
|
$220.000
|
$200.000
|
$225.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
5.000
|
$500.000
|
$480.000
|
$450.000
|
$500.000
|
$450.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
23.000
|
$250.000
|
$270.000
|
$250.000
|
$280.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,431.000
|
$0.480
|
$0.900
|
$0.780
|
$0.800
|
$0.780
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
93,219.000
|
$0.480
|
$0.700
|
$0.660
|
$0.700
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,288.000
|
$2.250
|
$0.900
|
$0.780
|
$0.800
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
90,015.000
|
$0.450
|
$0.700
|
$0.660
|
$0.700
|
$0.660
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
1,538.000
|
$0.900
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
2,296.000
|
$0.800
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
236.000
|
$2.850
|
$8.000
|
$7.500
|
$8.000
|
$7.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,718.000
|
$2.850
|
$8.000
|
$7.500
|
$8.000
|
$7.500
|
|
|
STRIP MOWING
|
AC
|
208.000
|
$54.000
|
$86.000
|
$90.000
|
$250.000
|
$100.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
208.000
|
$54.000
|
$65.000
|
$90.000
|
$250.000
|
$100.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
74,207.000
|
$115.000
|
$100.000
|
$108.500
|
$122.000
|
$130.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
39,767.000
|
$135.000
|
$155.000
|
$164.000
|
$160.000
|
$207.000
|
|
|
BONDING COURSE
|
GAL
|
54,708.000
|
$4.000
|
$5.000
|
$4.000
|
$6.000
|
$3.540
|
|
|
CEMENT
|
TON
|
1,277.000
|
$250.000
|
$300.000
|
$223.000
|
$250.000
|
$275.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
3,190.000
|
$600.000
|
$680.000
|
$720.000
|
$735.000
|
$770.000
|
|
|
FOAMED ASPHALT TREAT (12")(DC)
|
SY
|
249,666.000
|
$6.000
|
$6.000
|
$7.000
|
$6.000
|
$6.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$32,800.000
|
$9,600.000
|
$40,000.000
|
$11,437.720
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
200.000
|
$25.000
|
$22.000
|
$20.000
|
$25.000
|
$20.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$13,000.000
|
$11,880.000
|
$12,500.000
|
$15,000.000
|
$8,639.850
|
|
|
TMA (STATIONARY)
|
DAY
|
489.000
|
$265.000
|
$165.000
|
$250.000
|
$600.000
|
$265.360
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$200.000
|
$60.000
|
$85.000
|
$100.000
|
$92.120
|
|
Totals: |
$26,044,109.530
|
$24,522,672.400
|
$26,989,209.530
|
$31,056,427.450
|
$32,422,450.730
|