WEBB CR (0922-33-159)

Items: 65

County: WEBB
Length: N/A
Highway: CR
District: LAREDO
Control Number: 0922-33-159
DBE Goal: N/A
Project: BR 2021(892)
Guaranty: N/A
Time: 437 WORKING DAYS
Engineer's Estimate: $3,374,329.75
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,374,329.75
1
$4,871,880.84
Over/Under Est: 44.38% $1,497,551.09
$4,917,131.20
Over/Under Est: 45.72% $1,542,801.45
Amt Left: 0.93% $45,250.36
Subcontractor Percentage Amount
ACEE CONSTRUCTION LLC. 44.52% $2,168,961.35
DEPENDABLE FENCE 4.02% $195,849.61
TEXAS ICON CONSTRUCTION, LLC 3.20% $155,900.19
Total: 51.74% $2,520,711.15

Bid Items & Bid Tabulations

65 Total 0 of 65
WEBB  |  CR  |  LAREDO  |  0922-33-159  |  12/01/2022  |  $3,374,329.75  |  BR 2021(892)  |  BRIDGE REPL  |  437 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
CK NEWBERRY, LLC
PREPARING ROW
STA 8.350 $2,000.000 $35,000.000 $10,000.000
EXCAVATION (ROADWAY)
CY 816.000 $9.500 $15.000 $35.000
EXCAVATION (CHANNEL)
CY 1,069.000 $15.000 $15.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 4,407.000 $13.000 $25.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 819.000 $14.000 $40.000 $45.000
BLADING
HR 40.000 $200.000 $105.000 $165.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 2,752.000 $1.000 $1.650 $0.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 2.200 $1,500.000 $1,650.000 $2,000.000
DRILL SEEDING (TEMP) (WARM)
AC 2.200 $500.000 $1,650.000 $2,000.000
DRILL SEEDING (TEMP) (COOL)
SY 2,752.000 $1.000 $1.650 $0.600
VEGETATIVE WATERING
MG 31.000 $300.000 $80.000 $25.000
PROOF ROLLING
HR 5.000 $125.000 $90.000 $100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 2,362.000 $100.000 $110.000 $175.000
PRIME COAT (MC-30)
GAL 2,043.000 $4.500 $6.000 $8.000
ASPH (AC-15P)
GAL 5,907.000 $3.000 $7.000 $6.500
AGGR(TY-PD GR-3S SAC-B)
CY 28.000 $102.000 $250.000 $525.000
AGGR(TY-PD GR-3 SAC-B)
CY 49.000 $130.000 $250.000 $525.000
AGGR(TY-PD GR-4S SAC-B)
CY 21.000 $72.000 $250.000 $525.000
AGGR(TY-PD GR-4 SAC-B)
CY 45.000 $115.000 $250.000 $525.000
FLOWABLE BACKFILL
CY 64.000 $275.000 $300.000 $450.000
TEMPORARY SPL SHORING
SF 1,140.000 $20.000 $35.000 $20.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 733.000 $200.000 $195.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 65.000 $750.000 $700.000 $650.000
RAIL (TY T223)
LF 152.000 $175.000 $100.000 $250.000
RAIL (TY T631)
LF 623.000 $105.000 $114.730 $100.000
CONC BOX CULV (8 FT X 4 FT)
LF 60.000 $750.000 $1,380.000 $1,400.000
CONC BOX CULV (10 FT X 5 FT)
LF 93.000 $1,200.000 $1,992.000 $1,600.000
CONC BOX CULV (10 FT X 6 FT)
LF 210.000 $1,200.000 $2,071.500 $1,700.000
CONC BOX CULV (8 FT X 3 FT)
LF 60.000 $560.000 $1,303.500 $1,400.000
CONC BOX CULV (12 FT X 5 FT)
LF 90.000 $1,000.000 $2,569.500 $2,000.000
CONCRETE BOX CULVERT (12 FT X 7 FT)
LF 180.000 $1,000.000 $2,790.000 $2,200.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $22,000.000 $42,525.000 $35,000.000
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $20,000.000 $27,600.000 $25,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $45,000.000 $54,075.000 $60,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $19,075.000 $20,850.000 $26,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $44,000.000 $34,275.000 $50,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $30,000.000 $62,475.000 $70,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $12,500.000 $19,456.500 $20,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 6.000 $20,000.000 $18,500.000 $40,000.000
MOBILIZATION
LS 1.000 $306,757.250 $425,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $3,500.000 $6,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 854.000 $50.000 $65.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 854.000 $13.000 $20.000 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 624.000 $30.000 $38.500 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $10.000 $16.500 $10.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 7.900 $70.000 $100.000 $200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,763.000 $3.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,763.000 $1.000 $3.000 $2.000
CONSTRUCTING DETOURS
SY 7,116.000 $85.000 $60.000 $50.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 896.000 $100.000 $85.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,060.000 $35.000 $50.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 120.000 $35.000 $50.000 $125.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,660.000 $7.000 $20.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 320.000 $10.000 $20.000 $40.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,980.000 $8.000 $20.000 $12.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $10.000 $20.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,960.000 $17.000 $20.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $17.000 $20.000 $16.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,437.500 $28.000 $26.180 $26.520
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,535.500 $2,500.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $21,000.000 $29,597.700 $30,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $3,400.000 $3,657.500 $4,000.000
REMOVE SM RD SN SUP&AM
EA 8.000 $120.000 $110.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $35.000 $65.000 $75.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 16.000 $70.000 $126.500 $100.000
Totals: $3,374,329.750 $4,871,880.840 $4,917,131.200