Show Job Controls
Bid Cobra

WEBB SH 359 (0086-01-073)

Items: 142

County: WEBB
Length: N/A
Highway: SH 359
District: LAREDO
Control Number: 0086-01-073
DBE Goal: N/A
Project: F 2B23(273)
Guaranty: N/A
Time: 443 WORKING DAYS
Engineer's Estimate: $49,327,702.36
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
DENNICE GARZA
ANGEL MARTINEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$49,327,702.36
$47,686,785.70
Over/Under Est: -3.33% -$1,640,916.66
$62,900,182.12
Over/Under Est: 27.51% $13,572,479.76
Amt Left: 31.9% $15,213,396.42
Subcontractor Percentage Amount
ACEE CONSTRUCTION LLC. 15.33% $7,575,381.28
TEXAS ICON CONSTRUCTION, LLC 6.49% $3,207,059.65
DEPENDABLE FENCE 1.42% $701,698.72
K. L. DURHAM CONSTRUCTION, L.L.C. 1.11% $548,510.97
TRAF-TEX, INC. 1.10% $543,569.43
HIGHWAY BARRICADES AND SERVICES, LLC 0.67% $331,083.20
EGGEMEYER LAND CLEARING, LLC 0.28% $138,363.13
RAMIRO RAMIREZ CONSTRUCTION, INC. 0.07% $34,590.78
PROFESSIONAL TRAFFIC CONTROL LLC 0.03% $14,824.62
4E TREE WORX LLC 0.01% $4,941.54
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.00% $0.00
Total: 26.51% $13,100,023.32

Bid Items & Bid Tabulations

142 Total 0 of 142
WEBB  |  SH 359  |  LAREDO  |  0086-01-073  |  08/02/2023  |  $49,327,702.36  |  F 2B23(273)  |  WIDEN ROAD - ADD LANES  |  443 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
WEBBER, LLC
PREPARING ROW
STA 313.400 $6,000.000 $700.000 $19,000.000
REMOVING CONC (PAV)
SY 13,047.000 $20.000 $8.000 $28.000
REMOVING CONC (RIPRAP)
SY 200.000 $25.000 $14.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 879.000 $24.000 $14.000 $28.000
REMOV STAB BASE AND ASPH PAV (22")
SY 153,386.000 $6.000 $6.000 $13.500
EXCAVATION (ROADWAY)
CY 177,266.000 $9.000 $7.000 $11.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 151,136.000 $20.000 $7.000 $22.000
BACKFILL (TY A OR B)
STA 313.400 $250.000 $70.000 $1,200.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 73.800 $600.000 $1,400.000 $1,325.000
DRILL SEEDING (TEMP) (WARM)
AC 73.800 $400.000 $1,000.000 $995.000
VEGETATIVE WATERING
MG 3,690.000 $25.000 $34.000 $73.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 96,167.000 $1.750 $1.600 $1.550
SPRINKLING (DUST CONTROL)
MG 738.000 $20.000 $36.000 $30.160
PROOF ROLLING
HR 329.000 $120.000 $90.000 $75.130
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 134,889.000 $70.000 $98.000 $115.000
SALV, HAUL & STKPL RCL ASPH PAV (3"-5")
SY 36,000.000 $3.000 $3.200 $2.160
PRIME COAT (MC-30)
GAL 59,383.000 $5.500 $5.600 $4.000
STRUCT EXCAV
CY 6,512.000 $20.000 $32.000 $13.510
CEM STABIL BKFL
CY 1,463.000 $220.000 $150.000 $210.650
CUT & RESTORE ASPH PAVING
SY 250.000 $210.000 $100.000 $87.570
TRENCH EXCAVATION PROTECTION
LF 959.000 $26.000 $10.000 $29.510
DRILL SHAFT (42 IN)
LF 76.000 $720.000 $470.000 $401.840
DRILL SHAFT (48 IN)
LF 42.000 $800.000 $510.000 $509.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 80.000 $350.000 $450.000 $241.110
RETAINING WALL (TEMP WALL)
SF 24,102.000 $40.000 $9.000 $16.700
RETAINING WALL (CONC BLOCK)
SF 6,068.000 $80.000 $62.000 $35.270
RIPRAP (CONC)(4 IN)
CY 2,855.500 $675.000 $500.000 $516.140
RIPRAP (CONC)(6 IN)
CY 514.000 $700.000 $520.000 $532.680
RIPRAP (MOW STRIP)(4 IN)
CY 1,036.200 $710.000 $500.000 $520.390
CONC BOX CULV (3 FT X 3 FT)
LF 300.000 $365.000 $455.000 $339.160
CONC BOX CULV (4 FT X 2 FT)
LF 105.000 $425.000 $465.000 $400.220
CONC BOX CULV (4 FT X 3 FT)
LF 104.000 $475.000 $500.000 $388.230
CONC BOX CULV (5 FT X 3 FT)
LF 716.000 $460.000 $600.000 $451.950
CONC BOX CULV (6 FT X 3 FT)
LF 1,134.000 $520.000 $800.000 $530.100
CONC BOX CULV (10 FT X 7 FT)
LF 358.000 $1,150.000 $2,000.000 $1,282.950
CONC BOX CULV (8 FT X 3 FT)
LF 514.000 $750.000 $1,100.000 $766.870
CONC BOX CULV (9FT X 4FT)
LF 714.000 $800.000 $1,400.000 $947.050
CONC BOX CULV (11 FT X 7 FT)
LF 472.000 $1,700.000 $2,400.000 $1,433.400
RC PIPE (CL III)(18 IN)
LF 3,356.000 $82.000 $72.000 $90.380
RC PIPE (CL III)(24 IN)
LF 518.000 $115.000 $96.000 $105.040
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 14.000 $8,500.000 $9,000.000 $4,823.420
INLT(COMPL)(PAZD)(FG)(4'X4'-3'X3')(MOD)
EA 1.000 $10,000.000 $14,000.000 $9,106.830
WINGWALL (PW - 1) (HW=10 FT)
EA 4.000 $50,250.000 $50,400.000 $61,359.710
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $11,000.000 $7,000.000 $14,019.450
WINGWALL (PW - 1) (HW=4 FT)
EA 13.000 $14,500.000 $11,830.000 $19,321.880
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $20,200.000 $13,200.000 $16,631.630
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $28,000.000 $16,500.000 $22,276.630
WINGWALL (PW - 1) (HW=8 FT)
EA 5.000 $31,600.000 $30,800.000 $39,292.800
WINGWALL (PW - 1) (HW=9 FT)
EA 3.000 $35,000.000 $39,200.000 $45,273.360
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 4.000 $1,400.000 $1,520.000 $1,702.270
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 84.000 $1,350.000 $1,850.000 $1,983.240
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $2,300.000 $2,200.000 $2,378.850
REMOV STR (SET)
EA 17.000 $570.000 $560.000 $866.470
REMOV STR (WINGWALL)
EA 36.000 $3,000.000 $950.000 $4,196.840
REMOV STR (HEADWALL)
EA 2.000 $2,000.000 $1,200.000 $1,071.390
REMOV STR (PIPE)
LF 1,066.000 $22.000 $25.000 $30.990
REMOV STR (BOX CULVERT)
LF 1,725.000 $85.000 $60.000 $82.390
MOBILIZATION
LS 1.000 $3,242,439.410 $3,220,000.000 $6,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $10,000.000 $14,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,298.000 $40.000 $46.000 $42.250
ROCK FILTER DAMS (REMOVE)
LF 2,298.000 $14.000 $30.000 $26.750
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 468.000 $82.000 $50.000 $80.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $9.000 $23.000 $22.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 59,305.000 $4.000 $4.000 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 59,305.000 $1.250 $1.600 $1.450
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 280.000 $10.000 $8.000 $7.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 280.000 $3.000 $2.800 $2.500
CONSTRUCTING DETOURS
SY 8,957.000 $90.000 $47.000 $48.930
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,730.000 $75.000 $23.000 $73.160
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,730.000 $26.000 $10.000 $8.990
DRIVEWAYS (ACP)
SY 6,634.000 $55.000 $31.000 $50.000
TURNOUTS (ACP)
SY 1,982.000 $55.000 $105.000 $95.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 729.000 $150.000 $240.000 $222.650
INTERSECTIONS (CONC) (FAST TRACK)
SY 463.000 $150.000 $240.000 $222.050
RUMBLE STRIPS (SHOULDER)
LF 84,808.000 $0.300 $0.150 $0.060
MTL W-BEAM GD FEN (TIM POST)
LF 9,650.000 $30.000 $26.000 $23.490
SHORT RADIUS
LF 75.000 $70.000 $37.000 $32.490
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $800.000 $1,080.000 $921.490
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 41.000 $1,600.000 $1,660.000 $1,795.490
REMOVE METAL BEAM GUARD FENCE
LF 8,165.000 $3.500 $2.800 $1.490
CABLE BARRIER SYSTEM (TL-4)
LF 11,150.000 $23.500 $18.000 $15.490
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 8.000 $8,100.000 $3,370.000 $3,821.490
GUARDRAIL END TREATMENT (INSTALL)
EA 39.000 $3,400.000 $3,630.000 $3,221.490
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $315.000 $250.000 $195.490
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $1,050.000 $1,020.000 $1,549.210
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 10.000 $23,600.000 $22,300.000 $26,231.490
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 20.000 $320.000 $360.000 $302.490
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 34.000 $620.000 $615.000 $495.490
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 8.000 $4,800.000 $5,000.000 $5,036.460
CONDT (PVC) (SCH 40) (2")
LF 782.000 $25.000 $17.000 $16.070
CONDT (PVC) (SCH 40) (3")
LF 170.000 $30.000 $22.000 $25.180
CONDT (PVC) (SCH 80) (2") (BORE)
LF 382.000 $39.000 $36.000 $37.510
CONDT (PVC) (SCH 80) (3") (BORE)
LF 800.000 $55.000 $43.000 $48.220
ELEC CONDR (NO.10) BARE
LF 970.000 $1.750 $1.500 $1.020
ELEC CONDR (NO.10) INSULATED
LF 1,940.000 $1.750 $1.600 $1.070
ELEC CONDR (NO.6) BARE
LF 936.000 $2.150 $2.000 $1.880
ELEC CONDR (NO.6) INSULATED
LF 1,872.000 $2.700 $2.250 $2.090
ELEC CONDR (NO.4) BARE
LF 228.000 $3.000 $2.500 $2.570
ELEC CONDR (NO.4) INSULATED
LF 684.000 $5.000 $3.000 $2.790
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,750.000 $1,125.000 $1,184.100
GROUND BOX TY C (162911)W/APRON
EA 8.000 $1,500.000 $1,200.000 $1,500.220
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 4.000 $7,000.000 $7,450.000 $6,536.680
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 6.000 $2,900.000 $6,430.000 $3,857.710
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 60.000 $795.000 $590.000 $528.490
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $950.000 $925.000 $785.490
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $980.000 $1,100.000 $949.490
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $1,065.000 $1,200.000 $1,221.490
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $35,000.000 $58,680.000 $55,722.490
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 179.000 $43.000 $54.000 $49.490
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,840.000 $5.500 $1.350 $1.200
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,240.000 $5.500 $1.350 $1.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 98,468.000 $0.700 $0.250 $0.220
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 98,468.000 $0.700 $0.250 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,737.000 $2.000 $1.800 $2.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,262.000 $2.000 $1.800 $2.720
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,346.000 $1.100 $1.000 $0.880
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 626.000 $8.000 $13.500 $12.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 138.000 $3.900 $10.000 $9.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 14,220.000 $1.000 $0.650 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 62,034.000 $0.850 $0.650 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,220.000 $1.000 $0.650 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 60,534.000 $0.850 $0.650 $0.600
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 75.000 $6.500 $10.000 $9.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 15.000 $360.000 $560.000 $500.000
PREFAB PAV MRK TY B (W)(UTURN ARROW)
EA 2.000 $360.000 $785.000 $700.000
PREFAB PAV MRK TY B (W)(WORD)
EA 13.000 $475.000 $1,000.000 $900.000
REFL PAV MRKR TY I-C
EA 1,026.000 $5.200 $4.300 $3.850
REFL PAV MRKR TY II-A-A
EA 929.000 $5.100 $4.300 $3.850
ELIM EXT PAV MRK & MRKS (4")
LF 24,504.000 $0.900 $0.400 $0.350
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 655.000 $30.000 $41.000 $51.070
D-GR HMA TY-B SAC-B PG70-22
TON 70,089.000 $115.000 $109.000 $114.000
SP MIXES SP-C SAC-A PG76-22
TON 33,074.000 $140.000 $138.000 $160.000
BONDING COURSE
GAL 59,399.000 $5.750 $5.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $25,000.000 $23,700.000 $26,327.560
CCTV FIELD EQUIPMENT (DIGITAL)
EA 4.000 $6,500.000 $7,200.000 $9,387.100
ITS POLE (50 FT)(90 MPH)
EA 4.000 $15,000.000 $16,130.000 $16,823.910
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 4.000 $10,000.000 $7,840.000 $5,893.730
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,000.000 $14,200.000 $11,633.110
TMA (STATIONARY)
DAY 1,144.000 $265.000 $310.000 $254.520
INSTALL OF DMS SYSTEM (POLE MOUNT)
EA 2.000 $12,000.000 $27,580.000 $10,715.870
ETHERNET SURGE PROTECTOR (INSTALL ONLY)
EA 6.000 $200.000 $570.000 $342.910
CELLULAR MODEM (INSTALL ONLY)
EA 6.000 $4,500.000 $460.000 $342.910
Totals: $49,327,702.360 $47,686,785.700 $62,900,182.128