Show Job Controls
Bid Cobra

WASHINGTON FM 2780 (1564-01-036)

Items: 122

County: WASHINGTON
Length: 0.0000 MILES
Highway: FM 2780
District: BRYAN
Control Number: 1564-01-036
DBE Goal: 0.0%
Project: C 1564-1-36
Guaranty: $100,000.00
Time: 293 WORKING DAYS
Engineer's Estimate: $20,997,386.58
Date: 10/01/2024 (1 year ago) Changed
Contract Number: 10243007
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00187297
Project Description: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JAMES KREAMER
RENE PEQUENO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$20,997,386.58
$17,441,398.88
Over/Under Est: -16.94% -$3,555,987.70
Over/Under Est: -13.86% -$2,909,495.78
Amt Left: 3.71% $646,491.92
Over/Under Est: -12.53% -$2,631,337.33
Amt Left: 5.3% $924,650.37
Delta: -1.54% -$278,158.45
Over/Under Est: -10.95% -$2,298,477.44
Amt Left: 7.21% $1,257,510.26
Delta: -1.81% -$332,859.89
$20,867,066.24
Over/Under Est: -0.62% -$130,320.34
Amt Left: 19.64% $3,425,667.36
Delta: -11.60% -$2,168,157.10
Subcontractor Percentage Amount
KINGZ INDUSTRIAL LLC 1.77% $308,712.76
TRAFFIC SIGNS & LINES, LLC 1.46% $254,644.42
CEN TEX HYDROSEED, INC. 1.26% $219,761.63
D. I. J. CONSTRUCTION, INC. 1.18% $205,808.51
BATTEN DRILLING, INC. 0.90% $156,972.59
CEN-TREE SOLUTIONS LLC 0.79% $137,787.05
THIRD COAST SERVICES LLC 0.25% $43,603.50
TRP CONSTRUCTION GROUP, LLC 0.21% $36,626.94
HIGHWAY 1 LLC 0.21% $36,626.94
J. H. ODEN CONTRACTING COMPANY 0.18% $31,394.52
BROCK CONSTRUCTION, LLC 0.14% $24,417.96
SCR CIVIL CONSTRUCTION, LLC 0.13% $22,673.82
Total: 8.48% $1,479,030.64

Bid Items & Bid Tabulations

122 Total 0 of 122
WASHINGTON  |  FM 2780  |  BRYAN  |  1564-01-036  |  10/01/2024  |  $20,997,386.58  |  C 1564-1-36  |  REHAB EXIST ROADWAY  |  293 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
LARRY YOUNG PAVING, INC.
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 475.600 $2,500.000 $260.000 $1,000.000 $250.000 $615.000 $654.900
REMOVING STAB BASE AND ASPH PAV (2")
SY 126,858.000 $1.450 $0.800 $2.000 $2.500 $1.900 $1.650
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 8,646.000 $4.500 $1.000 $10.000 $6.500 $12.000 $5.900
EXCAVATION (ROADWAY)
CY 21,090.000 $12.500 $7.250 $23.000 $14.000 $16.000 $11.800
EXCAVATION (CHANNEL)
CY 81.000 $25.000 $55.000 $100.000 $64.000 $190.000 $77.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 35.000 $40.000 $80.000 $200.000 $51.000 $120.000 $115.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 13,947.000 $17.500 $6.000 $23.000 $11.000 $16.000 $10.500
BACKFILLING PAVEMENT EDGES
CY 172.000 $100.000 $100.000 $250.000 $350.000 $300.000 $77.000
FURNISHING AND PLACING TOPSOIL (4")
SY 96,090.000 $2.130 $0.400 $1.000 $1.250 $0.900 $0.940
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 96,090.000 $0.400 $0.250 $0.200 $0.250 $0.250 $0.170
BROADCAST SEED (TEMP) (WARM)
SY 48,045.000 $0.250 $0.250 $0.200 $0.250 $0.240 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 48,045.000 $0.250 $0.250 $0.200 $0.250 $0.240 $0.150
VEGETATIVE WATERING
MG 962.000 $28.000 $100.000 $20.000 $52.000 $35.000 $31.500
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 173,537.000 $22.500 $24.000 $20.000 $25.000 $21.000 $19.380
REWORK BS MTL (TY C) (0"-8")(DENS CONT)
SY 35,610.000 $5.500 $0.750 $3.000 $2.500 $3.700 $3.120
REWORK BS MTL(TY B)(5"-14")(DENS CONT)
SY 85,679.000 $7.500 $0.500 $6.000 $2.750 $3.900 $12.900
LIME TRT (EXST MATL)(10")
SY 87,210.000 $8.500 $2.100 $3.000 $1.500 $4.500 $3.600
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 1,454.000 $210.000 $310.000 $350.000 $175.000 $310.000 $352.000
CEMENT
TON 5,529.000 $242.000 $245.000 $100.000 $290.000 $210.000 $242.000
CEMENT TREAT (EXIST MATL) (10")
SY 173,537.000 $5.760 $2.500 $5.000 $4.250 $3.150 $3.120
CEM TRT(PLNT MX) (CL L)(TY D)(GR 4)(6")
SY 883.000 $47.500 $35.000 $45.000 $38.000 $71.000 $125.000
ASPH (RC-250)
GAL 38,370.000 $6.250 $9.000 $4.000 $6.000 $5.000 $5.360
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 1,129.000 $145.000 $130.000 $100.000 $130.000 $188.000 $116.850
STRUCT EXCAV (BOX)
CY 254.000 $42.000 $100.000 $50.000 $33.000 $18.000 $47.960
STRUCT EXCAV (PIPE)
CY 245.000 $42.000 $100.000 $52.000 $33.000 $18.000 $49.050
CEM STABIL BKFL
CY 1,120.000 $135.000 $155.000 $200.000 $130.000 $200.000 $211.460
CUT & RESTORING PAV
SY 3,452.000 $120.000 $49.990 $60.000 $50.000 $1.000 $126.440
TRENCH EXCAVATION PROTECTION
LF 764.000 $15.000 $45.000 $10.000 $1.000 $15.000 $3.270
TEMPORARY SPL SHORING
SF 5,106.000 $35.000 $55.000 $25.000 $20.000 $1.000 $52.500
DRILL SHAFT (30 IN)
LF 24.000 $358.270 $205.000 $300.000 $270.000 $210.000 $918.040
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 157.000 $220.000 $25.000 $100.000 $270.000 $190.000 $209.640
RIPRAP (CONC)(4 IN)
CY 181.000 $650.000 $850.000 $710.000 $680.000 $750.000 $931.000
RIPRAP (CONC)(5 IN)
CY 23.000 $725.000 $900.000 $720.000 $740.000 $870.000 $884.560
RIPRAP (CONC) (CL B) (4")
CY 1.050 $650.000 $1,500.000 $1,000.000 $3,000.000 $2,500.000 $2,680.670
RIPRAP (STONE PROTECTION)(18 IN)
CY 581.000 $200.000 $200.000 $140.000 $210.000 $195.000 $234.370
RIPRAP (MOW STRIP)(4 IN)
CY 293.000 $650.000 $825.000 $710.000 $710.000 $830.000 $931.000
CONC BOX CULV (5 FT X 3 FT)
LF 66.000 $500.000 $600.000 $325.000 $650.000 $750.000 $772.800
CONC BOX CULV (5 FT X 4 FT)
LF 168.000 $545.000 $550.000 $375.000 $640.000 $800.000 $713.940
CONC BOX CULV (6 FT X 5 FT)
LF 96.000 $750.000 $1,600.000 $625.000 $780.000 $1,050.000 $1,524.900
CONC BOX CULV (6 FT X 6 FT)
LF 86.000 $900.000 $1,900.000 $1,725.000 $970.000 $1,400.000 $2,217.040
CONC BOX CULV (7 FT X 3 FT)
LF 172.000 $840.000 $800.000 $750.000 $820.000 $970.000 $1,034.400
CONC BOX CULV (10 FT X 6 FT)
LF 84.000 $1,400.000 $1,800.000 $1,850.000 $1,500.000 $1,500.000 $1,993.590
RC PIPE (CL III)(18 IN)
LF 1,092.000 $80.000 $62.000 $75.000 $74.000 $135.000 $117.720
RC PIPE (CL III)(24 IN)
LF 130.000 $130.000 $125.000 $165.000 $100.000 $176.000 $141.700
RC PIPE (CL III)(30 IN)
LF 158.000 $180.000 $150.000 $200.000 $130.000 $200.000 $178.760
RC PIPE (CL III)(36 IN)
LF 178.000 $220.000 $175.000 $250.000 $170.000 $280.000 $228.900
RC PIPE (CL III)(42 IN)
LF 84.000 $265.000 $210.000 $290.000 $220.000 $335.000 $311.740
RC PIPE (CL III)(48 IN)
LF 52.000 $320.000 $245.000 $325.000 $290.000 $380.000 $408.750
RC PIPE (CL IV)(24 IN)
LF 214.000 $150.000 $135.000 $170.000 $110.000 $180.000 $158.050
RC PIPE (CL V)(18 IN)
LF 1,236.000 $125.000 $72.000 $90.000 $88.000 $165.000 $144.970
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 1.000 $13,500.000 $7,000.000 $9,300.000 $5,000.000 $7,000.000 $4,585.590
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $5,750.000 $20,000.000 $6,025.000 $8,900.000 $8,000.000 $10,957.680
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,600.000 $20,000.000 $6,850.000 $14,000.000 $11,000.000 $19,933.750
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000 $8,500.000 $21,000.000 $7,425.000 $15,000.000 $11,000.000 $19,285.200
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $15,500.000 $23,500.000 $8,575.000 $13,000.000 $12,000.000 $19,650.350
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $12,000.000 $24,500.000 $10,200.000 $22,000.000 $14,000.000 $23,890.410
WINGWALL (FW - 0) (HW=9 FT)
EA 2.000 $17,438.000 $31,000.000 $24,700.000 $42,000.000 $50,000.000 $49,663.240
WINGWALL (PW - 1) (HW=4 FT)
EA 3.000 $18,500.000 $23,000.000 $20,700.000 $23,000.000 $24,000.000 $32,707.350
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $25,500.000 $23,000.000 $21,700.000 $25,000.000 $20,000.000 $31,768.870
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $30,000.000 $26,000.000 $24,400.000 $28,000.000 $24,000.000 $32,095.860
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $35,000.000 $30,000.000 $22,200.000 $30,000.000 $21,000.000 $33,316.650
WINGWALL (PW - 1) (HW=8 FT)
EA 3.000 $38,000.000 $34,500.000 $43,200.000 $35,000.000 $39,000.000 $62,752.940
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $47,000.000 $43,000.000 $63,100.000 $38,000.000 $57,000.000 $92,878.100
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $2,000.000 $750.000 $1,150.000 $1,100.000 $1,200.000 $3,604.600
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $2,400.000 $1,200.000 $1,775.000 $1,400.000 $1,500.000 $3,764.830
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 110.000 $1,450.000 $800.000 $1,775.000 $1,400.000 $1,500.000 $3,747.390
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 3.000 $1,850.000 $1,200.000 $1,575.000 $1,300.000 $1,800.000 $3,711.420
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $1,750.000 $1,400.000 $2,050.000 $1,400.000 $1,800.000 $3,853.120
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $3,100.000 $2,100.000 $2,400.000 $2,500.000 $3,000.000 $4,417.730
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $5,000.000 $3,000.000 $3,200.000 $3,700.000 $4,000.000 $5,567.670
REMOV STR (SET)
EA 18.000 $650.000 $600.000 $400.000 $410.000 $600.000 $422.920
REMOV STR (WINGWALL)
EA 8.000 $2,000.000 $2,650.000 $2,900.000 $4,900.000 $2,200.000 $6,933.430
REMOV STR (HEADWALL)
EA 13.000 $1,555.000 $2,100.000 $2,200.000 $3,000.000 $1,900.000 $567.890
REMOV STR (PIPE)
LF 2,993.000 $40.000 $14.000 $41.000 $34.000 $19.000 $20.710
REMOV STR (BOX CULVERT)
LF 24.000 $130.000 $500.000 $400.000 $66.000 $190.000 $118.810
MOBILIZATION
LS 1.000 $1,197,500.000 $869,000.000 $1,800,000.000 $1,043,200.000 $1,450,000.000 $1,883,515.720
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $8,500.000 $15,500.000 $5,000.000 $18,000.000 $6,000.000 $12,357.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,360.000 $40.000 $36.000 $40.000 $36.000 $36.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 3,360.000 $13.250 $10.000 $10.000 $10.000 $10.000 $11.000
CONSTRUCTION PERIMETER FENCE
LF 70.000 $7.500 $4.000 $10.000 $4.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 14,320.000 $4.380 $3.500 $4.000 $3.500 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 14,320.000 $1.020 $1.000 $1.000 $1.000 $1.000 $1.000
INTERSECTIONS (ACP)
SY 748.000 $60.000 $55.000 $80.000 $68.000 $115.000 $55.200
DRIVEWAYS (CONC)
SY 164.000 $110.000 $115.000 $165.000 $440.000 $158.000 $127.000
DRIVEWAYS (ACP)
SY 2,065.000 $60.000 $100.000 $50.000 $55.000 $95.000 $55.200
DRIVEWAYS (SURF TREAT)
SY 7,636.000 $45.000 $33.000 $25.000 $36.000 $42.000 $50.600
TURNOUTS (ACP)
SY 524.000 $90.000 $110.000 $50.000 $53.000 $145.000 $55.200
MTL W-BEAM GD FEN (TIM POST)
LF 2,825.000 $30.000 $26.500 $39.000 $21.000 $27.000 $20.640
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,500.000 $1,560.000 $2,000.000 $1,300.000 $1,600.000 $1,311.000
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $3,500.000 $2,900.000 $3,400.000 $3,000.000 $3,000.000 $3,012.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 17.000 $340.000 $195.000 $250.000 $230.000 $360.000 $225.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 3.000 $400.000 $210.000 $300.000 $250.000 $430.000 $245.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $575.000 $450.000 $500.000 $550.000 $720.000 $545.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 3.000 $7,335.000 $5,965.000 $7,000.000 $6,700.000 $6,100.000 $7,950.000
CONDT (PVC) (SCH 40) (2")
LF 340.000 $22.730 $7.500 $10.000 $15.000 $7.200 $25.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 220.000 $52.580 $19.000 $20.000 $20.000 $19.000 $55.000
ELEC CONDR (NO.8) INSULATED
LF 1,680.000 $3.310 $2.250 $3.000 $1.750 $2.200 $2.400
GROUND BOX TY D (162922)W/APRON
EA 3.000 $2,138.000 $1,500.000 $1,750.000 $1,000.000 $1,500.000 $2,550.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,500.000 $6,900.000 $7,500.000 $7,700.000 $7,000.000 $7,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 80.000 $720.000 $550.000 $600.000 $450.000 $420.000 $446.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 70.000 $751.000 $675.000 $700.000 $580.000 $570.000 $584.000
REMOVE SM RD SN SUP&AM
EA 170.000 $111.220 $75.000 $125.000 $60.000 $75.000 $60.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 54.000 $120.000 $100.000 $125.000 $120.000 $130.000 $120.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,500.000 $2.000 $1.000 $1.500 $0.500 $1.100 $1.840
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 93,782.000 $0.750 $0.750 $0.800 $0.750 $0.730 $0.720
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 3,941.000 $2.330 $0.750 $0.800 $0.750 $0.740 $0.730
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 70,563.000 $0.750 $0.750 $0.800 $0.750 $0.730 $0.720
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 325.000 $20.000 $15.000 $18.000 $15.000 $15.000 $15.000
REFL PAV MRKR TY II-A-A
EA 1,081.000 $4.500 $6.000 $7.000 $6.000 $6.000 $6.000
TREE REMOVAL (4" - 12" DIA)
EA 10.000 $650.000 $400.000 $750.000 $480.000 $450.000 $385.000
TREE REMOVAL (12" - 18" DIA)
EA 5.000 $1,100.000 $800.000 $1,500.000 $750.000 $880.000 $825.000
TREE REMOVAL (18" - 24" DIA)
EA 7.000 $750.000 $1,200.000 $2,000.000 $1,000.000 $1,350.000 $1,650.000
TREE REMOVAL (24" - 30" DIA)
EA 1.000 $800.000 $1,900.000 $3,000.000 $1,400.000 $2,100.000 $2,750.000
TREE TRIMMING AND BRUSH REMOVAL
LF 500.000 $75.000 $15.000 $25.000 $20.000 $50.000 $55.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 98.000 $1,500.000 $170.000 $100.000 $120.000 $275.000 $315.010
SP MIXES SP-C SAC-A PG64-22
TON 26,160.000 $135.000 $125.000 $115.000 $130.000 $142.000 $130.800
TACK COAT
GAL 15,855.000 $7.500 $5.000 $4.000 $4.250 $4.000 $3.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $22,000.000 $12,000.000 $12,000.000 $10,000.000 $7,554.190
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 9,460.000 $4.950 $4.700 $6.000 $4.750 $4.800 $4.700
PREFORMED CENTERLINE RUMBLE STRIP
LF 9,640.000 $4.210 $3.000 $5.000 $3.000 $3.000 $3.000
TMA (STATIONARY)
DAY 423.000 $350.000 $600.000 $400.000 $260.000 $250.000 $302.170
TMA (MOBILE OPERATION)
DAY 22.000 $515.000 $900.000 $800.000 $790.000 $400.000 $503.610
Totals: $20,997,386.580 $17,441,398.880 $18,087,890.800 $18,366,049.250 $18,698,909.140 $20,867,066.244