|
|
PREPARING ROW
|
STA
|
475.600
|
$2,500.000
|
$260.000
|
$1,000.000
|
$250.000
|
$615.000
|
$654.900
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
126,858.000
|
$1.450
|
$0.800
|
$2.000
|
$2.500
|
$1.900
|
$1.650
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
8,646.000
|
$4.500
|
$1.000
|
$10.000
|
$6.500
|
$12.000
|
$5.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
21,090.000
|
$12.500
|
$7.250
|
$23.000
|
$14.000
|
$16.000
|
$11.800
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
81.000
|
$25.000
|
$55.000
|
$100.000
|
$64.000
|
$190.000
|
$77.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
35.000
|
$40.000
|
$80.000
|
$200.000
|
$51.000
|
$120.000
|
$115.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
13,947.000
|
$17.500
|
$6.000
|
$23.000
|
$11.000
|
$16.000
|
$10.500
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
172.000
|
$100.000
|
$100.000
|
$250.000
|
$350.000
|
$300.000
|
$77.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
96,090.000
|
$2.130
|
$0.400
|
$1.000
|
$1.250
|
$0.900
|
$0.940
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
96,090.000
|
$0.400
|
$0.250
|
$0.200
|
$0.250
|
$0.250
|
$0.170
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
48,045.000
|
$0.250
|
$0.250
|
$0.200
|
$0.250
|
$0.240
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
48,045.000
|
$0.250
|
$0.250
|
$0.200
|
$0.250
|
$0.240
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
962.000
|
$28.000
|
$100.000
|
$20.000
|
$52.000
|
$35.000
|
$31.500
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
173,537.000
|
$22.500
|
$24.000
|
$20.000
|
$25.000
|
$21.000
|
$19.380
|
|
|
REWORK BS MTL (TY C) (0"-8")(DENS CONT)
|
SY
|
35,610.000
|
$5.500
|
$0.750
|
$3.000
|
$2.500
|
$3.700
|
$3.120
|
|
|
REWORK BS MTL(TY B)(5"-14")(DENS CONT)
|
SY
|
85,679.000
|
$7.500
|
$0.500
|
$6.000
|
$2.750
|
$3.900
|
$12.900
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
87,210.000
|
$8.500
|
$2.100
|
$3.000
|
$1.500
|
$4.500
|
$3.600
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
1,454.000
|
$210.000
|
$310.000
|
$350.000
|
$175.000
|
$310.000
|
$352.000
|
|
|
CEMENT
|
TON
|
5,529.000
|
$242.000
|
$245.000
|
$100.000
|
$290.000
|
$210.000
|
$242.000
|
|
|
CEMENT TREAT (EXIST MATL) (10")
|
SY
|
173,537.000
|
$5.760
|
$2.500
|
$5.000
|
$4.250
|
$3.150
|
$3.120
|
|
|
CEM TRT(PLNT MX) (CL L)(TY D)(GR 4)(6")
|
SY
|
883.000
|
$47.500
|
$35.000
|
$45.000
|
$38.000
|
$71.000
|
$125.000
|
|
|
ASPH (RC-250)
|
GAL
|
38,370.000
|
$6.250
|
$9.000
|
$4.000
|
$6.000
|
$5.000
|
$5.360
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
1,129.000
|
$145.000
|
$130.000
|
$100.000
|
$130.000
|
$188.000
|
$116.850
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
254.000
|
$42.000
|
$100.000
|
$50.000
|
$33.000
|
$18.000
|
$47.960
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
245.000
|
$42.000
|
$100.000
|
$52.000
|
$33.000
|
$18.000
|
$49.050
|
|
|
CEM STABIL BKFL
|
CY
|
1,120.000
|
$135.000
|
$155.000
|
$200.000
|
$130.000
|
$200.000
|
$211.460
|
|
|
CUT & RESTORING PAV
|
SY
|
3,452.000
|
$120.000
|
$49.990
|
$60.000
|
$50.000
|
$1.000
|
$126.440
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
764.000
|
$15.000
|
$45.000
|
$10.000
|
$1.000
|
$15.000
|
$3.270
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,106.000
|
$35.000
|
$55.000
|
$25.000
|
$20.000
|
$1.000
|
$52.500
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
24.000
|
$358.270
|
$205.000
|
$300.000
|
$270.000
|
$210.000
|
$918.040
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
157.000
|
$220.000
|
$25.000
|
$100.000
|
$270.000
|
$190.000
|
$209.640
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
181.000
|
$650.000
|
$850.000
|
$710.000
|
$680.000
|
$750.000
|
$931.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
23.000
|
$725.000
|
$900.000
|
$720.000
|
$740.000
|
$870.000
|
$884.560
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
1.050
|
$650.000
|
$1,500.000
|
$1,000.000
|
$3,000.000
|
$2,500.000
|
$2,680.670
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
581.000
|
$200.000
|
$200.000
|
$140.000
|
$210.000
|
$195.000
|
$234.370
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
293.000
|
$650.000
|
$825.000
|
$710.000
|
$710.000
|
$830.000
|
$931.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
66.000
|
$500.000
|
$600.000
|
$325.000
|
$650.000
|
$750.000
|
$772.800
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
168.000
|
$545.000
|
$550.000
|
$375.000
|
$640.000
|
$800.000
|
$713.940
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
96.000
|
$750.000
|
$1,600.000
|
$625.000
|
$780.000
|
$1,050.000
|
$1,524.900
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
86.000
|
$900.000
|
$1,900.000
|
$1,725.000
|
$970.000
|
$1,400.000
|
$2,217.040
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
172.000
|
$840.000
|
$800.000
|
$750.000
|
$820.000
|
$970.000
|
$1,034.400
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
84.000
|
$1,400.000
|
$1,800.000
|
$1,850.000
|
$1,500.000
|
$1,500.000
|
$1,993.590
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,092.000
|
$80.000
|
$62.000
|
$75.000
|
$74.000
|
$135.000
|
$117.720
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
130.000
|
$130.000
|
$125.000
|
$165.000
|
$100.000
|
$176.000
|
$141.700
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
158.000
|
$180.000
|
$150.000
|
$200.000
|
$130.000
|
$200.000
|
$178.760
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
178.000
|
$220.000
|
$175.000
|
$250.000
|
$170.000
|
$280.000
|
$228.900
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
84.000
|
$265.000
|
$210.000
|
$290.000
|
$220.000
|
$335.000
|
$311.740
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
52.000
|
$320.000
|
$245.000
|
$325.000
|
$290.000
|
$380.000
|
$408.750
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
214.000
|
$150.000
|
$135.000
|
$170.000
|
$110.000
|
$180.000
|
$158.050
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
1,236.000
|
$125.000
|
$72.000
|
$90.000
|
$88.000
|
$165.000
|
$144.970
|
|
|
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
|
EA
|
1.000
|
$13,500.000
|
$7,000.000
|
$9,300.000
|
$5,000.000
|
$7,000.000
|
$4,585.590
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$5,750.000
|
$20,000.000
|
$6,025.000
|
$8,900.000
|
$8,000.000
|
$10,957.680
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$6,600.000
|
$20,000.000
|
$6,850.000
|
$14,000.000
|
$11,000.000
|
$19,933.750
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
3.000
|
$8,500.000
|
$21,000.000
|
$7,425.000
|
$15,000.000
|
$11,000.000
|
$19,285.200
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$15,500.000
|
$23,500.000
|
$8,575.000
|
$13,000.000
|
$12,000.000
|
$19,650.350
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$12,000.000
|
$24,500.000
|
$10,200.000
|
$22,000.000
|
$14,000.000
|
$23,890.410
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
2.000
|
$17,438.000
|
$31,000.000
|
$24,700.000
|
$42,000.000
|
$50,000.000
|
$49,663.240
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$18,500.000
|
$23,000.000
|
$20,700.000
|
$23,000.000
|
$24,000.000
|
$32,707.350
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$25,500.000
|
$23,000.000
|
$21,700.000
|
$25,000.000
|
$20,000.000
|
$31,768.870
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$30,000.000
|
$26,000.000
|
$24,400.000
|
$28,000.000
|
$24,000.000
|
$32,095.860
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$35,000.000
|
$30,000.000
|
$22,200.000
|
$30,000.000
|
$21,000.000
|
$33,316.650
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
3.000
|
$38,000.000
|
$34,500.000
|
$43,200.000
|
$35,000.000
|
$39,000.000
|
$62,752.940
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$47,000.000
|
$43,000.000
|
$63,100.000
|
$38,000.000
|
$57,000.000
|
$92,878.100
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$750.000
|
$1,150.000
|
$1,100.000
|
$1,200.000
|
$3,604.600
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,400.000
|
$1,200.000
|
$1,775.000
|
$1,400.000
|
$1,500.000
|
$3,764.830
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
110.000
|
$1,450.000
|
$800.000
|
$1,775.000
|
$1,400.000
|
$1,500.000
|
$3,747.390
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,850.000
|
$1,200.000
|
$1,575.000
|
$1,300.000
|
$1,800.000
|
$3,711.420
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,750.000
|
$1,400.000
|
$2,050.000
|
$1,400.000
|
$1,800.000
|
$3,853.120
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,100.000
|
$2,100.000
|
$2,400.000
|
$2,500.000
|
$3,000.000
|
$4,417.730
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$5,000.000
|
$3,000.000
|
$3,200.000
|
$3,700.000
|
$4,000.000
|
$5,567.670
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$650.000
|
$600.000
|
$400.000
|
$410.000
|
$600.000
|
$422.920
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$2,000.000
|
$2,650.000
|
$2,900.000
|
$4,900.000
|
$2,200.000
|
$6,933.430
|
|
|
REMOV STR (HEADWALL)
|
EA
|
13.000
|
$1,555.000
|
$2,100.000
|
$2,200.000
|
$3,000.000
|
$1,900.000
|
$567.890
|
|
|
REMOV STR (PIPE)
|
LF
|
2,993.000
|
$40.000
|
$14.000
|
$41.000
|
$34.000
|
$19.000
|
$20.710
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
24.000
|
$130.000
|
$500.000
|
$400.000
|
$66.000
|
$190.000
|
$118.810
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,197,500.000
|
$869,000.000
|
$1,800,000.000
|
$1,043,200.000
|
$1,450,000.000
|
$1,883,515.720
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$8,500.000
|
$15,500.000
|
$5,000.000
|
$18,000.000
|
$6,000.000
|
$12,357.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,360.000
|
$40.000
|
$36.000
|
$40.000
|
$36.000
|
$36.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,360.000
|
$13.250
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$11.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
70.000
|
$7.500
|
$4.000
|
$10.000
|
$4.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,320.000
|
$4.380
|
$3.500
|
$4.000
|
$3.500
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,320.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
748.000
|
$60.000
|
$55.000
|
$80.000
|
$68.000
|
$115.000
|
$55.200
|
|
|
DRIVEWAYS (CONC)
|
SY
|
164.000
|
$110.000
|
$115.000
|
$165.000
|
$440.000
|
$158.000
|
$127.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,065.000
|
$60.000
|
$100.000
|
$50.000
|
$55.000
|
$95.000
|
$55.200
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
7,636.000
|
$45.000
|
$33.000
|
$25.000
|
$36.000
|
$42.000
|
$50.600
|
|
|
TURNOUTS (ACP)
|
SY
|
524.000
|
$90.000
|
$110.000
|
$50.000
|
$53.000
|
$145.000
|
$55.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,825.000
|
$30.000
|
$26.500
|
$39.000
|
$21.000
|
$27.000
|
$20.640
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$2,500.000
|
$1,560.000
|
$2,000.000
|
$1,300.000
|
$1,600.000
|
$1,311.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$3,500.000
|
$2,900.000
|
$3,400.000
|
$3,000.000
|
$3,000.000
|
$3,012.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
17.000
|
$340.000
|
$195.000
|
$250.000
|
$230.000
|
$360.000
|
$225.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
3.000
|
$400.000
|
$210.000
|
$300.000
|
$250.000
|
$430.000
|
$245.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$575.000
|
$450.000
|
$500.000
|
$550.000
|
$720.000
|
$545.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$7,335.000
|
$5,965.000
|
$7,000.000
|
$6,700.000
|
$6,100.000
|
$7,950.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
340.000
|
$22.730
|
$7.500
|
$10.000
|
$15.000
|
$7.200
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
220.000
|
$52.580
|
$19.000
|
$20.000
|
$20.000
|
$19.000
|
$55.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,680.000
|
$3.310
|
$2.250
|
$3.000
|
$1.750
|
$2.200
|
$2.400
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$2,138.000
|
$1,500.000
|
$1,750.000
|
$1,000.000
|
$1,500.000
|
$2,550.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$8,500.000
|
$6,900.000
|
$7,500.000
|
$7,700.000
|
$7,000.000
|
$7,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
80.000
|
$720.000
|
$550.000
|
$600.000
|
$450.000
|
$420.000
|
$446.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
70.000
|
$751.000
|
$675.000
|
$700.000
|
$580.000
|
$570.000
|
$584.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
170.000
|
$111.220
|
$75.000
|
$125.000
|
$60.000
|
$75.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
54.000
|
$120.000
|
$100.000
|
$125.000
|
$120.000
|
$130.000
|
$120.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,500.000
|
$2.000
|
$1.000
|
$1.500
|
$0.500
|
$1.100
|
$1.840
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
93,782.000
|
$0.750
|
$0.750
|
$0.800
|
$0.750
|
$0.730
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
3,941.000
|
$2.330
|
$0.750
|
$0.800
|
$0.750
|
$0.740
|
$0.730
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
70,563.000
|
$0.750
|
$0.750
|
$0.800
|
$0.750
|
$0.730
|
$0.720
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
325.000
|
$20.000
|
$15.000
|
$18.000
|
$15.000
|
$15.000
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,081.000
|
$4.500
|
$6.000
|
$7.000
|
$6.000
|
$6.000
|
$6.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
10.000
|
$650.000
|
$400.000
|
$750.000
|
$480.000
|
$450.000
|
$385.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
5.000
|
$1,100.000
|
$800.000
|
$1,500.000
|
$750.000
|
$880.000
|
$825.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
7.000
|
$750.000
|
$1,200.000
|
$2,000.000
|
$1,000.000
|
$1,350.000
|
$1,650.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
1.000
|
$800.000
|
$1,900.000
|
$3,000.000
|
$1,400.000
|
$2,100.000
|
$2,750.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
500.000
|
$75.000
|
$15.000
|
$25.000
|
$20.000
|
$50.000
|
$55.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
98.000
|
$1,500.000
|
$170.000
|
$100.000
|
$120.000
|
$275.000
|
$315.010
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
26,160.000
|
$135.000
|
$125.000
|
$115.000
|
$130.000
|
$142.000
|
$130.800
|
|
|
TACK COAT
|
GAL
|
15,855.000
|
$7.500
|
$5.000
|
$4.000
|
$4.250
|
$4.000
|
$3.320
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$22,000.000
|
$12,000.000
|
$12,000.000
|
$10,000.000
|
$7,554.190
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
9,460.000
|
$4.950
|
$4.700
|
$6.000
|
$4.750
|
$4.800
|
$4.700
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
9,640.000
|
$4.210
|
$3.000
|
$5.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
TMA (STATIONARY)
|
DAY
|
423.000
|
$350.000
|
$600.000
|
$400.000
|
$260.000
|
$250.000
|
$302.170
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
22.000
|
$515.000
|
$900.000
|
$800.000
|
$790.000
|
$400.000
|
$503.610
|
|
Totals: |
$20,997,386.580
|
$17,441,398.880
|
$18,087,890.800
|
$18,366,049.250
|
$18,698,909.140
|
$20,867,066.244
|