WALLER SH 6 (0050-04-027)

Items: 76

County: WALLER
Length: N/A
Highway: SH 6
District: HOUSTON
Control Number: 0050-04-027
DBE Goal: N/A
Project: C 50-4-27
Guaranty: N/A
Time: 138 WORKING DAYS
Engineer's Estimate: $5,968,402.13
Date: 02/05/2021 (5 years ago)
Contract Number: N/A
Type: BASE REPAIR, PLANING, SEAL COAT, PFC OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$5,968,402.13
$5,294,013.75
Over/Under Est: -11.3% -$674,388.38
Over/Under Est: -10.79% -$643,805.91
Amt Left: 0.58% $30,582.47
Over/Under Est: -9.17% -$547,008.75
Amt Left: 2.41% $127,379.63
Delta: -1.82% -$96,797.16
Over/Under Est: 3.84% $228,941.66
Amt Left: 17.06% $903,330.04
Delta: -14.31% -$775,950.41
Over/Under Est: 12.27% $732,036.75
Amt Left: 26.57% $1,406,425.13
Delta: -8.12% -$503,095.09

Bid Items & Bid Tabulations

76 Total 0 of 76
WALLER  |  SH 6  |  HOUSTON  |  0050-04-027  |  02/05/2021  |  $5,968,402.13  |  C 50-4-27  |  BASE REPAIR, PLANING, SEAL COAT, PFC...  |  138 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN CONSTRUCTION
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
JAMES CONSTRUCTION GROUP, LLC
KNIFE RIVER CORPORATION - SOUTH
REMOVING CONC (CURB)
LF 176.000 $5.000 $21.000 $10.000 $10.000 $25.000 $42.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 50.000 $10.000 $92.130 $60.000 $75.000 $75.000 $76.000
BACKFILL (TY A OR B)
STA 788.000 $123.000 $182.140 $75.000 $70.000 $85.000 $72.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 1,310.000 $1.400 $3.170 $1.500 $3.000 $10.000 $3.420
SALV,HAUL & STKPL RCL APH PV (2")
SY 403,442.000 $1.400 $0.400 $1.000 $0.950 $1.650 $1.840
ASPH (MULTI OPTION)
GAL 161,901.000 $2.760 $2.840 $2.250 $1.750 $2.480 $3.390
AGGR(TY-PB GR-4 SAC-B)
CY 4,048.000 $85.000 $117.860 $70.000 $50.000 $122.000 $148.750
D-GR HMA(SQ) TY-D SAC-A PG76-22
TON 992.000 $135.000 $127.270 $125.000 $140.000 $120.000 $129.300
PFC (ASPHALT) PG76-22
TON 1,875.000 $80.000 $0.010 $105.000 $120.000 $108.750 $123.850
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 26,970.000 $110.000 $108.000 $105.000 $120.000 $108.750 $123.850
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $32.000 $61.510 $45.000 $60.000 $61.000 $54.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 28.000 $107.000 $96.430 $120.000 $120.000 $85.000 $90.000
RIPRAP (MOW STRIP)(4 IN)
CY 85.700 $396.000 $535.750 $600.000 $550.000 $440.000 $450.000
SET (TY I)(S= 9 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $15,000.000 $19,822.690 $19,000.000 $19,000.000 $15,000.000 $22,300.000
REMOV STR (SET)
EA 1.000 $425.000 $1,285.800 $2,000.000 $1,200.000 $3,400.000 $2,100.000
MOBILIZATION
LS 1.000 $401,836.000 $63,395.120 $280,000.000 $120,000.000 $432,000.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,500.000 $16,400.120 $5,750.000 $1,000.000 $13,800.000 $958.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 68,596.000 $0.160 $0.410 $0.190 $0.550 $0.390 $0.400
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $20.000 $20.250 $19.000 $20.000 $17.500 $18.610
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 21.000 $1,685.000 $1,285.800 $1,850.000 $2,000.000 $1,695.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,207.000 $1,017.920 $1,200.000 $1,250.000 $1,130.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 887.500 $2.460 $1.340 $1.000 $1.000 $2.000 $2.130
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $148.000 $107.150 $160.000 $200.000 $350.000 $372.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $195.000 $107.150 $310.000 $350.000 $150.000 $160.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,462.000 $2,250.140 $2,450.000 $2,600.000 $2,370.000 $2,520.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $239.000 $117.860 $310.000 $350.000 $150.000 $160.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 31.000 $257.000 $144.650 $225.000 $255.000 $250.000 $266.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $304.000 $171.440 $235.000 $350.000 $310.000 $330.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 9.000 $543.000 $583.970 $515.000 $600.000 $650.000 $691.000
ALUMINUM SIGNS (TY G)
SF 455.250 $30.000 $26.790 $18.000 $20.000 $25.000 $26.600
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 9.000 $17.420 $19.290 $14.000 $20.000 $23.250 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 157.000 $509.000 $471.460 $400.000 $430.000 $360.000 $382.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 76.000 $600.000 $589.320 $500.000 $550.000 $420.000 $447.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 47.000 $565.000 $482.170 $370.000 $400.000 $490.000 $521.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $787.000 $776.840 $575.000 $600.000 $530.000 $564.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 17.000 $659.000 $712.550 $670.000 $700.000 $625.000 $665.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $868.000 $841.130 $800.000 $900.000 $625.000 $665.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $922.000 $1,023.280 $900.000 $1,100.000 $1,010.000 $1,074.000
REMOVE SM RD SN SUP&AM
EA 309.000 $81.000 $75.000 $50.000 $70.000 $50.000 $53.000
INSTALL LRSS (STRUCT STEEL)
LB 1,336.500 $4.670 $4.620 $4.500 $5.000 $3.750 $4.000
REMOVE LRSA
EA 4.000 $1,011.000 $1,607.250 $1,600.000 $1,700.000 $1,250.000 $1,330.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 11.000 $65.070 $41.790 $92.000 $90.000 $48.000 $51.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 63.000 $55.130 $13.930 $113.000 $90.000 $95.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 38.000 $17.640 $13.930 $8.000 $20.000 $18.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 38.000 $17.100 $23.570 $8.000 $20.000 $18.000 $20.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 60.000 $96.600 $12.860 $95.000 $85.000 $48.000 $51.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 48.000 $32.300 $12.860 $24.000 $30.000 $28.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 21.000 $24.480 $12.860 $24.000 $30.000 $28.000 $30.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 42,112.000 $0.320 $0.190 $0.200 $0.180 $0.200 $0.190
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 170,278.000 $0.250 $0.190 $0.200 $0.180 $0.200 $0.180
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 184.000 $1.000 $0.540 $0.650 $0.500 $0.750 $0.530
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 13,834.000 $0.740 $0.320 $0.370 $0.300 $0.400 $0.320
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 268.000 $1.000 $1.290 $2.000 $1.200 $3.000 $1.280
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 156.000 $82.880 $37.500 $36.000 $35.000 $35.000 $37.230
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 156.000 $94.250 $42.860 $36.000 $40.000 $35.000 $42.540
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 960.000 $18.000 $10.710 $7.500 $10.000 $5.000 $10.640
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 163,508.000 $0.250 $0.190 $0.200 $0.180 $0.200 $0.180
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 1,160.000 $3.500 $1.880 $2.500 $1.750 $3.000 $1.860
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 92.000 $1.070 $0.750 $1.250 $0.700 $1.500 $0.740
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,917.000 $0.840 $0.770 $0.850 $0.720 $1.000 $0.770
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 134.000 $6.750 $5.630 $5.000 $5.250 $5.000 $5.580
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 580.000 $5.250 $5.360 $5.000 $5.000 $5.000 $5.320
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 21,056.000 $0.760 $0.510 $0.470 $0.470 $0.450 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 21,056.000 $0.520 $0.500 $0.470 $0.470 $0.450 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 85,139.000 $0.530 $0.490 $0.470 $0.470 $0.450 $0.490
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 81,754.000 $0.530 $0.490 $0.470 $0.470 $0.450 $0.490
PREFAB PAV MRK TY C (W) (ARROW)
EA 78.000 $196.000 $191.990 $175.000 $185.000 $175.000 $191.000
PREFAB PAV MRK TY C (W) (WORD)
EA 78.000 $243.000 $254.180 $200.000 $215.000 $175.000 $225.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 480.000 $34.000 $24.640 $22.000 $20.000 $25.000 $22.000
REFL PAV MRKR TY I-C
EA 2,836.000 $3.350 $3.910 $3.650 $3.500 $3.750 $3.720
REFL PAV MRKR TY II-A-A
EA 240.000 $3.130 $3.910 $3.750 $3.500 $4.000 $3.720
REFL PAV MRKR TY II-C-R
EA 22.000 $3.350 $3.910 $3.750 $3.500 $4.000 $3.720
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 61.000 $100.000 $321.450 $150.000 $165.000 $35.000 $266.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 22.000 $100.000 $58.930 $90.000 $150.000 $150.000 $210.000
TMA (STATIONARY)
DAY 123.000 $181.000 $258.870 $125.000 $50.000 $228.000 $330.000
TMA (MOBILE OPERATION)
DAY 30.000 $171.000 $80.360 $125.000 $50.000 $578.000 $550.000
Totals: $5,968,402.135 $5,294,013.762 $5,324,596.220 $5,421,393.380 $6,197,343.795 $6,700,438.885