Show Job Controls
Bid Cobra

WALKER SH0030 (6340-77-001)

Items: 35

County: WALKER
Length: N/A
Highway: SH0030
District: BRYAN
Control Number: 6340-77-001
DBE Goal: N/A
Project: RMC - 634077001
Guaranty: N/A
Time: 730 W
Engineer's Estimate: $441,225.00
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: SPOT BASE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$441,225.00
$513,435.00
Over/Under Est: 16.37% $72,210.00

Bid Items & Bid Tabulations

35 Total 0 of 35
WALKER  |  SH0030  |  BRYAN  |  6340-77-001  |  02/05/2019  |  $441,225.00  |  RMC - 634077001  |  SPOT BASE REPAIR  |  730 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $800.000 $600.000
MOBILIZATION (CALLOUT)
EA 100.000 $200.000 $400.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,400.000 $2,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 150.000 $10.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,100.000 $1,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $18.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $50.000 $15.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $50.000 $15.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 75.000 $50.000 $25.000
RAISE RAIL ELEMENT
LF 75.000 $8.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 225.000 $45.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 10.000 $55.000 $45.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $150.000 $250.000
REALIGN POSTS
EA 450.000 $8.000 $7.000
REMOVE & REPLACE BLOCKOUT
EA 15.000 $10.000 $10.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 200.000 $10.000 $5.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 450.000 $20.000 $28.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $50.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $50.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $50.000 $10.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $2,900.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,050.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $500.000 $125.000
REPLACE SGT CABLE ASSEMBLY
EA 6.000 $75.000 $110.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $65.000 $100.000
REPLACE SGT STRUT
EA 6.000 $50.000 $100.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $30.000
REPLACE POSTS (TL-4)
EA 800.000 $80.000 $200.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $95.000 $550.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 125.000 $270.000 $30.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $345.000 $1,500.000
REPLACE CABLE (TL-4)
LF 500.000 $6.000 $3.000
REPLACE POST HARDWARE (TL-4)
EA 150.000 $20.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $100.000 $75.000
TMA (STATIONARY)
DAY 100.000 $300.000 $250.000
Totals: $441,225.000 $513,435.000