PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
11.000
|
$350.000
|
$1,070.400
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
82.000
|
$25.000
|
$23.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,400.000
|
$5.000
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
24,800.000
|
$10.000
|
$11.220
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
32,364.000
|
$14.000
|
$8.670
|
|
|
BACKFILL (TY B)
|
STA
|
66.480
|
$110.000
|
$122.700
|
|
|
BLADING
|
HR
|
200.000
|
$100.000
|
$91.200
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
89,900.000
|
$1.000
|
$1.100
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
89,900.000
|
$0.350
|
$0.260
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
22,475.000
|
$0.150
|
$0.220
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
22,475.000
|
$0.150
|
$0.220
|
|
|
VEGETATIVE WATERING
|
MG
|
1,513.500
|
$20.000
|
$19.980
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
14,581.000
|
$60.000
|
$65.680
|
|
|
REWRK BSE MATL (TY B)(14")(ORD COMP)
|
SY
|
18,825.000
|
$6.500
|
$9.100
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
441.000
|
$150.000
|
$152.250
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
27,712.000
|
$2.000
|
$1.820
|
|
|
CEMENT
|
TON
|
441.000
|
$130.000
|
$141.750
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
27,712.000
|
$1.750
|
$1.710
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 2")
|
SY
|
18,483.000
|
$3.000
|
$1.730
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,040.000
|
$4.250
|
$3.240
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,919.000
|
$4.000
|
$3.630
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
584.000
|
$85.000
|
$76.730
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
279.000
|
$95.000
|
$77.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
32,155.000
|
$3.000
|
$2.740
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
7,977.000
|
$62.000
|
$66.450
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
8,001.000
|
$62.000
|
$69.600
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,400.000
|
$65.000
|
$55.360
|
|
|
CEM STABIL BKFL
|
CY
|
96.000
|
$150.000
|
$120.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
200.000
|
$4.000
|
$5.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
73.000
|
$175.000
|
$250.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
30.000
|
$185.000
|
$275.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
44.000
|
$450.000
|
$400.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
268.000
|
$350.000
|
$190.000
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
300.000
|
$550.000
|
$450.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
156.000
|
$55.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
40.000
|
$70.000
|
$80.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
4.000
|
$6,000.000
|
$3,500.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
10.000
|
$15,000.000
|
$5,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,250.000
|
$900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,450.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,450.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$2,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$500.000
|
$700.000
|
|
|
REMOV STR (SMALL)
|
EA
|
5.000
|
$2,000.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$335,000.000
|
$377,250.970
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,000.000
|
$2,199.460
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
130.000
|
$25.000
|
$29.390
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
130.000
|
$8.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$25.000
|
$25.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,305.000
|
$2.750
|
$2.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,305.000
|
$1.000
|
$0.350
|
|
|
DRIVEWAYS (ACP)
|
SY
|
330.000
|
$50.000
|
$39.420
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
190.000
|
$40.000
|
$30.660
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$400.000
|
$315.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
3.000
|
$4,000.000
|
$3,750.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
436.000
|
$8.000
|
$13.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
436.000
|
$1.100
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
872.000
|
$1.250
|
$2.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$850.000
|
$1,250.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
|
EA
|
1.000
|
$4,500.000
|
$6,450.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
761.000
|
$22.500
|
$27.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$450.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$500.000
|
$465.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$850.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$350.000
|
$265.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$60.000
|
$50.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
4,226.000
|
$3.000
|
$3.000
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$1,000.000
|
$850.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
|
EA
|
12.000
|
$650.000
|
$690.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$55.000
|
$52.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
58.000
|
$20.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
533.000
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
8,260.000
|
$0.250
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
440.000
|
$1.250
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$3.500
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
2.000
|
$75.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
4.000
|
$30.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
9,700.000
|
$0.250
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
160.000
|
$1.750
|
$1.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
172.000
|
$1.750
|
$1.550
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
320.000
|
$1.250
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,460.000
|
$0.850
|
$0.830
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,954.000
|
$0.350
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
18,858.000
|
$0.300
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
18,838.000
|
$0.300
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
50.000
|
$15.500
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$40.000
|
$55.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
120.000
|
$2.500
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
55.000
|
$4.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
296.000
|
$4.000
|
$5.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$5,200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$8,000.000
|
$8,118.750
|
|
Totals: |
$4,572,924.250
|
$4,467,052.106
|