VICTORIA US 87 (0143-10-052)

Items: 22

County: VICTORIA
Length: N/A
Highway: US 87
District: YOAKUM
Control Number: 0143-10-052
DBE Goal: N/A
Project: NH 1802(473)
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $2,248,288.25
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND RESURFACING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,248,288.25
$2,084,719.95
Over/Under Est: -7.28% -$163,568.30
Over/Under Est: -4.35% -$97,688.98
Amt Left: 3.16% $65,879.32

Bid Items & Bid Tabulations

22 Total 0 of 22
VICTORIA  |  US 87  |  YOAKUM  |  0143-10-052  |  07/11/2018  |  $2,248,288.25  |  NH 1802(473)  |  PAVMT REPAIR AND RESURF  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
BACKFILL (TY A)
STA 452.820 $125.000 $98.100 $100.000
BLADING
HR 10.000 $100.000 $85.500 $75.000
PRIME COAT (MULTI OPTION)
GAL 7,548.000 $3.000 $3.260 $3.500
D-GR HMA TY-D SAC-B PG70-22
TON 24,344.000 $75.000 $71.950 $77.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $50.000 $49.290 $47.000
MOBILIZATION
LS 1.000 $190,000.000 $133,099.630 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $2,354.970 $2,500.000
RUMBLE STRIPS (SHOULDER)
LF 90,564.000 $0.200 $0.180 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 11,320.000 $0.200 $0.210 $0.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 45,282.000 $0.200 $0.210 $0.210
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,800.000 $0.500 $0.330 $0.330
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 45,282.000 $0.250 $0.210 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,396.000 $1.250 $1.250 $0.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,800.000 $0.600 $0.600 $0.600
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 162.000 $20.000 $32.000 $32.000
REFL PAV MRKR TY II-A-A
EA 36.000 $5.000 $3.200 $3.200
REFL PAV MRKR TY II-C-R
EA 656.000 $4.000 $3.200 $3.200
REFL PAV MRK AWT (W) (4")(SLD)(125 MIL)
LF 45,282.000 $0.450 $0.310 $0.310
REFL PAV MRK AWT (W) (4")(BRK)(125 MIL)
LF 11,320.000 $0.450 $0.870 $0.870
REFL PAV MRK AWT (Y) (4")(SLD)(125 MIL)
LF 46,107.000 $0.450 $0.310 $0.310
TMA (STATIONARY)
EA 1.000 $10,000.000 $5,304.250 $4,000.000
TMA (MOBILE OPERATION)
DAY 12.000 $500.000 $135.310 $20.000
Totals: $2,248,288.250 $2,084,719.952 $2,150,599.270