VICTORIA US 59 (0088-05-091)

Items: 46

County: VICTORIA
Length: N/A
Highway: US 59
District: YOAKUM
Control Number: 0088-05-091
DBE Goal: N/A
Project: NH 2018(506)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $8,977,357.15
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$8,977,357.15
$9,267,866.66
Over/Under Est: 3.24% $290,509.51
Over/Under Est: 15.05% $1,350,773.30
Amt Left: 11.44% $1,060,263.79

Bid Items & Bid Tabulations

46 Total 0 of 46
VICTORIA  |  US 59  |  YOAKUM  |  0088-05-091  |  02/02/2018  |  $8,977,357.15  |  NH 2018(506)  |  ACP OVERLAY  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
BACKFILL (TY B)
STA 1,010.490 $80.000 $61.350 $68.000
BLADING
HR 40.000 $100.000 $71.820 $99.510
PRIME COAT (MULTI OPTION)
GAL 16,843.000 $2.200 $2.770 $2.500
AGGR(TY-PB GR-4 SAC-B)
CY 4,367.000 $60.000 $64.030 $50.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 193,119.000 $2.200 $2.660 $2.600
D-GR HMA TY-D SAC-B PG70-22
TON 60,065.000 $60.000 $61.800 $73.000
PFC (ASPHALT) PG76-22
TON 1,538.000 $90.000 $103.980 $117.500
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 24,095.000 $90.000 $103.980 $117.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,746.000 $60.000 $47.210 $58.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,932.000 $1.750 $2.380 $1.000
PLANE ASPH CONC PAV (2")
SY 301,498.000 $1.000 $1.010 $1.000
PLANE ASPH CONC PAV (0" TO 3 1/2")
SY 50,733.000 $1.650 $1.010 $1.000
PLANE ASPH CONC PAV (3 1/2")
SY 119,348.000 $1.500 $1.370 $1.000
CLEANING AND SEALING EXISTING JOINTS
LF 9,465.000 $11.000 $10.000 $19.150
HEADER TYPE EXPANSION JOINT
CF 303.600 $345.000 $302.000 $312.000
JOINT SEALANT
LF 667.000 $12.000 $14.000 $10.750
MOBILIZATION
LS 1.000 $780,000.000 $544,839.490 $547,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $2,280.490 $2,300.000
RUMBLE STRIPS (SHOULDER)
LF 199,456.000 $0.100 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 99,702.000 $0.100 $0.130 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 503,381.000 $0.100 $0.130 $0.180
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 73,480.000 $0.150 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 24,520.000 $0.500 $0.600 $0.650
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,456.000 $0.100 $0.130 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 487,763.000 $0.100 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 4,280.000 $1.000 $0.750 $0.500
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
LF 2,792.000 $1.000 $0.750 $0.800
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 18,865.000 $0.600 $0.650 $0.800
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 6,400.000 $1.500 $2.000 $1.850
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 2,140.000 $2.000 $2.000 $1.850
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 940.000 $0.300 $0.320 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 38,294.000 $0.300 $0.340 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,456.000 $0.300 $0.400 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 53,861.000 $0.300 $0.340 $0.300
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 698.000 $2.000 $2.500 $2.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 204.000 $8.000 $15.000 $18.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $175.000 $215.000 $332.500
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 28.000 $20.000 $19.000 $33.300
REFL PAV MRKR TY I-C
EA 106.000 $3.300 $3.500 $3.600
REFL PAV MRKR TY II-A-A
EA 904.000 $3.000 $3.500 $3.600
REFL PAV MRKR TY II-C-R
EA 2,762.000 $3.000 $3.500 $3.600
ASPHALT PLUG EXP JOINT
CF 476.530 $400.000 $228.000 $370.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,000.000 $8,118.750 $9,400.000
REFL PAV MRK AWT (W) (6")(SLD)(125 MIL)
LF 103,145.000 $0.450 $0.800 $0.500
REFL PAV MRK AWT (W) (6")(BRK)(125 MIL)
LF 24,211.000 $0.450 $0.800 $0.500
REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL)
LF 96,840.000 $0.450 $0.800 $0.500
Totals: $8,977,357.150 $9,267,866.662 $10,328,130.450