Show Job Controls
Bid Cobra

VAL VERDE US0277 (6338-56-001)

Items: 61

County: VAL VERDE
Length: N/A
Highway: US0277
District: LAREDO
Control Number: 6338-56-001
DBE Goal: N/A
Project: RMC - 633856001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $333,505.00
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$333,505.00
$358,785.00
Over/Under Est: 7.58% $25,280.00
Over/Under Est: 14.16% $47,225.00
Amt Left: 6.12% $21,945.00

Bid Items & Bid Tabulations

61 Total 0 of 61
VAL VERDE  |  US0277  |  LAREDO  |  6338-56-001  |  02/05/2019  |  $333,505.00  |  RMC - 633856001  |  GUARDRAIL REPAIRS  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
K-BAR SERVICES, INC.
ELITE CASTLE RESOURCES LLC
REMOVING CONC (MISC)
SY 50.000 $50.000 $5.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 10.000 $60.000 $40.000 $60.000
FLOWABLE BACKFILL
CY 10.000 $150.000 $400.000 $120.000
CL C CONC (MISC)
CY 5.000 $900.000 $400.000 $800.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $125.000 $100.000 $100.000
CONC STR REPAIR (STANDARD)
SF 10.000 $100.000 $100.000 $100.000
RIPRAP (CONC)(4 IN)
CY 10.000 $900.000 $400.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $900.000 $400.000 $800.000
RETROFIT RAIL (TY T1W)
LF 50.000 $120.000 $50.000 $150.000
RETROFIT RAIL (TY T131RC)
LF 50.000 $120.000 $50.000 $150.000
RETROFIT RAIL (TY C1W)
LF 50.000 $120.000 $50.000 $100.000
RETROFIT RAIL (TY PR11)
LF 100.000 $120.000 $85.000 $120.000
RETROFIT RAIL (TY PR22)
LF 30.000 $120.000 $95.000 $120.000
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $25.000 $25.000 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 16.000 $25.000 $30.000 $25.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 16.000 $55.000 $75.000 $55.000
TERMINAL ANCHOR SECTION
EA 2.000 $300.000 $1,500.000 $200.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $500.000 $2,500.000
MTL BEAM GD FEN TRANS (T6)
EA 2.000 $900.000 $800.000 $500.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $600.000 $800.000 $800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,200.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $30.000 $55.000 $50.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $750.000 $400.000 $650.000
MTL W-BEAM GD FEN (SPECIAL)
LF 100.000 $50.000 $40.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $3.000 $2.000 $11.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $40.000 $100.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 2.000 $3,000.000 $3,300.000 $4,750.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $5,000.000 $3,000.000 $5,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,250.000 $4,000.000 $300.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,000.000 $1,000.000 $2,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 50.000 $10.000 $70.000 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 50.000 $10.000 $70.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 100.000 $10.000 $70.000 $25.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,800.000 $25.000 $24.000 $30.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $15.000 $40.000 $5.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $15.000 $25.000 $5.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $25.000 $40.000 $40.000
RAISE RAIL ELEMENT
LF 100.000 $10.000 $12.000 $8.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 150.000 $50.000 $60.000 $80.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $50.000 $150.000 $80.000
REALIGN POSTS
EA 100.000 $15.000 $15.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $10.000 $20.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $25.000 $30.000 $38.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 100.000 $60.000 $90.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $50.000 $50.000 $30.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $2,500.000 $3,300.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $600.000 $900.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 2.000 $500.000 $200.000 $500.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $50.000 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $50.000 $100.000 $100.000
REPLACE SGT STRUT
EA 10.000 $40.000 $100.000 $100.000
REPLACE SGT OBJECT MARKER
EA 10.000 $25.000 $100.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $100.000 $200.000 $250.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 50.000 $125.000 $200.000 $60.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $125.000 $200.000 $80.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 100.000 $125.000 $140.000 $100.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 5.000 $100.000 $175.000 $250.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 5.000 $100.000 $175.000 $250.000
REPAIR (TY T1 - 101R)
LF 50.000 $125.000 $200.000 $40.000
REPAIR (W-BEAM - T101 RAIL)
LF 50.000 $125.000 $200.000 $50.000
TMA
DAY 50.000 $425.000 $175.000 $200.000
Totals: $333,505.000 $358,785.000 $380,730.000