Show Job Controls
Bid Cobra

TRAVIS FM 1626 (1539-02-034)

Items: 86

County: TRAVIS
Length: N/A
Highway: FM 1626
District: AUSTIN
Control Number: 1539-02-034
DBE Goal: N/A
Project: STP 2022(341)HES
Guaranty: N/A
Time: 103 WORKING DAYS
Engineer's Estimate: $2,233,249.06
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$2,233,249.06
$2,285,064.75
Over/Under Est: 2.32% $51,815.69
Over/Under Est: 2.47% $55,190.84
Amt Left: 0.15% $3,375.15
Over/Under Est: 19.12% $427,093.19
Amt Left: 16.42% $375,277.50
Delta: -16.25% -$371,902.35
$2,674,962.86
Over/Under Est: 19.78% $441,713.80
Amt Left: 17.06% $389,898.11
Delta: -0.55% -$14,620.61
Over/Under Est: 21.98% $490,771.78
Amt Left: 19.21% $438,956.09
Delta: -1.83% -$49,057.98

Bid Items & Bid Tabulations

86 Total 0 of 86
TRAVIS  |  FM 1626  |  AUSTIN  |  1539-02-034  |  02/04/2022  |  $2,233,249.06  |  STP 2022(341)HES  |  HAZARD ELIM & SAFETY  |  103 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
LONE STAR SITEWORK, LLC
AARON CONCRETE CONTRACTORS, L.P.
DIGG COMMERCIAL, LLC
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 39.000 $3,000.000 $3,000.000 $500.000 $750.000 $2,403.000 $6,410.260
REMOVING CONC (DRIVEWAYS)
SY 134.000 $20.000 $20.000 $41.000 $40.000 $72.000 $37.800
EXCAVATION (ROADWAY)
CY 2,424.000 $12.000 $20.000 $19.300 $27.000 $27.000 $12.190
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,029.000 $20.000 $24.000 $26.000 $38.000 $21.000 $25.210
FURNISHING AND PLACING TOPSOIL (4")
SY 16,520.000 $1.500 $1.250 $5.000 $1.800 $5.000 $1.890
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 16,520.000 $0.250 $0.200 $0.250 $0.200 $1.000 $0.220
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 16,520.000 $0.150 $0.200 $0.250 $0.200 $1.000 $0.220
VEGETATIVE WATERING
MG 29.000 $35.000 $15.000 $85.000 $35.000 $150.000 $53.430
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 16,520.000 $1.500 $1.000 $1.000 $1.100 $4.000 $0.990
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 1,598.000 $55.000 $49.000 $69.000 $81.000 $60.000 $55.780
PRIME COAT (MULTI OPTION)
GAL 1,591.000 $4.500 $4.350 $4.800 $5.000 $6.000 $5.450
TOM (ASPHALT) PG 76-22
TON 67.100 $150.000 $180.000 $172.000 $188.000 $173.000 $123.750
TOM-C (AGGREGATE) SAC-A
TON 1,045.100 $190.000 $180.000 $172.000 $188.000 $173.000 $123.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 100.000 $60.000 $200.000 $195.000 $215.000 $196.000 $91.610
CUT & RESTORING PAV
SY 39.000 $120.000 $225.000 $95.000 $590.000 $112.000 $171.910
TRENCH EXCAVATION PROTECTION
LF 60.000 $5.000 $1.000 $10.000 $52.000 $3.000 $25.000
TEMPORARY SPL SHORING
SF 7.000 $50.000 $40.000 $100.000 $350.000 $500.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 85.000 $475.000 $500.000 $455.500 $570.000 $695.000 $800.000
CMP (GAL STL 24 IN)
LF 64.000 $110.000 $95.000 $94.000 $185.000 $176.000 $130.000
CMP AR (GAL STL DES 3)
LF 28.000 $100.000 $150.000 $94.000 $340.000 $198.000 $165.000
CONC BOX CULV (5 FT X 3 FT)
LF 120.000 $450.000 $450.000 $611.500 $595.000 $665.000 $700.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 120.000 $160.000 $150.000 $234.000 $223.000 $182.000 $250.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 807.000 $175.000 $160.000 $269.000 $250.000 $190.000 $250.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $9,000.000 $15,000.000 $11,385.000 $19,000.000 $12,690.000 $18,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 5.000 $1,900.000 $1,600.000 $1,895.000 $2,400.000 $2,200.000 $3,000.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 2.000 $1,750.000 $1,500.000 $1,875.000 $5,500.000 $2,610.000 $5,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 3.000 $2,500.000 $2,800.000 $1,895.000 $2,100.000 $2,932.000 $4,500.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 24.000 $3,000.000 $2,800.000 $5,240.000 $5,500.000 $4,200.000 $5,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $1,500.000 $1,200.000 $3,100.000 $5,000.000 $2,500.000
REMOV STR (SET)
EA 30.000 $425.000 $200.000 $500.000 $570.000 $995.000 $1,500.000
REMOV STR (PIPE)
LF 1,020.000 $15.000 $20.000 $12.000 $22.000 $33.000 $35.000
MOBILIZATION
LS 1.000 $175,000.000 $225,000.000 $54,100.000 $240,000.000 $200,000.000 $286,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $17,500.000 $1,450.000 $6,500.000 $4,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 532.000 $45.000 $35.000 $40.000 $41.000 $68.000 $38.500
ROCK FILTER DAMS (REMOVE)
LF 532.000 $8.000 $20.000 $23.000 $24.000 $8.000 $22.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 235.000 $3.000 $4.000 $4.300 $4.400 $4.000 $4.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 235.000 $1.000 $1.000 $0.850 $0.900 $1.000 $0.830
BIODEG EROSN CONT LOGS (REMOVE)
LF 961.000 $1.000 $1.000 $0.600 $0.600 $1.000 $0.550
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 961.000 $5.000 $6.000 $5.700 $5.900 $6.000 $5.500
CONSTRUCTING DETOURS
SY 118.000 $70.000 $20.000 $76.000 $78.000 $126.000 $51.670
CONSTRUCTING DETOURS (TY 1)
SY 1,932.000 $70.000 $60.000 $66.000 $77.000 $99.000 $61.870
DRIVEWAYS (CONC)
SY 282.000 $75.000 $80.000 $96.000 $103.000 $133.000 $125.000
DRIVEWAYS (ACP)
SY 243.000 $50.000 $115.000 $138.000 $103.000 $128.000 $42.130
MTL W-BEAM GD FEN (TIM POST)
LF 1,550.000 $25.000 $30.000 $30.500 $31.010 $36.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 147.000 $2.000 $10.000 $11.500 $12.000 $8.000 $11.320
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,000.000 $4,000.000 $4,090.000 $4,200.000 $3,900.000 $3,648.420
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $200.000 $300.000 $345.000 $350.000 $864.000 $339.600
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $250.000 $275.000 $300.000 $315.000 $560.000 $291.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $650.000 $700.000 $730.000 $790.000 $910.000 $698.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $750.000 $700.000 $860.000 $1,100.000 $980.000 $822.800
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $800.000 $710.000 $900.000 $790.000 $1,273.000 $866.800
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 21.000 $375.000 $610.000 $400.000 $702.000 $500.000 $382.800
REMOVE SM RD SN SUP&AM
EA 32.000 $85.000 $100.000 $107.000 $105.000 $360.000 $101.200
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $60.000 $60.000 $85.000 $70.000 $88.000 $81.400
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 21.000 $40.000 $25.000 $37.000 $30.000 $40.000 $35.200
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,472.000 $4.000 $6.000 $4.000 $4.000 $3.000 $3.740
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 3,801.000 $4.000 $0.750 $2.900 $3.000 $3.000 $2.750
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 5,152.000 $3.000 $0.750 $2.900 $3.000 $3.000 $2.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $2.000 $4.000 $2.900 $3.000 $5.000 $1.760
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 110.000 $8.000 $12.000 $11.500 $12.000 $9.000 $8.550
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $130.000 $750.000 $172.000 $175.000 $210.000 $275.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $150.000 $750.000 $172.000 $175.000 $260.000 $275.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,352.000 $0.600 $1.150 $0.900 $1.000 $0.700 $0.850
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 1,702.000 $0.600 $1.250 $0.900 $1.000 $0.750 $0.850
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 6,806.000 $0.600 $1.150 $0.900 $1.000 $0.760 $0.850
REFL PAV MRKR TY I-C
EA 5.000 $8.000 $10.000 $11.500 $12.000 $30.000 $7.700
REFL PAV MRKR TY II-A-A
EA 178.000 $8.000 $6.000 $9.200 $9.400 $45.000 $7.700
ELIM EXT PAV MRK & MRKS (4")
LF 15,990.000 $1.000 $0.600 $0.650 $0.700 $0.500 $0.670
ELIM EXT PAV MRK & MRKS (8")
LF 78.000 $5.000 $1.500 $3.450 $3.500 $2.000 $1.760
ELIM EXT PAV MRK & MRKS (24")
LF 69.000 $10.000 $4.000 $5.750 $5.900 $2.000 $3.740
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $150.000 $115.000 $172.000 $175.000 $110.000 $84.700
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $150.000 $115.000 $172.000 $175.000 $120.000 $84.700
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $7,000.000 $15,000.000 $10,143.000 $12,900.000 $11,454.000 $11,825.000
FULL - WIDTH MOWING
CYC 2.000 $5,000.000 $700.000 $1,860.000 $970.000 $1,000.000 $8,250.000
LITTER REMOVAL
CYC 2.000 $2,000.000 $400.000 $2,887.000 $2,700.000 $1,100.000 $4,194.240
CLEANING / SWEEPING (SPOT)
MI 3.000 $1,000.000 $400.000 $1,500.000 $940.000 $3,000.000 $1,440.960
TREE TRIMMING / BRUSH REMOVAL
MI 0.736 $15,692.000 $30,000.000 $11,000.000 $7,600.000 $6,000.000 $26,250.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 3,007.900 $115.000 $88.000 $92.000 $100.000 $92.000 $85.270
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 497.300 $95.000 $135.000 $126.000 $137.000 $126.000 $97.440
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 783.800 $105.000 $145.000 $144.000 $156.000 $144.000 $97.450
BONDING COURSE
GAL 782.000 $3.250 $2.750 $3.000 $3.300 $6.000 $3.200
UNDERSEAL COURSE
GAL 3,835.000 $3.250 $3.050 $3.400 $3.650 $6.000 $3.620
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 360.000 $80.000 $75.000 $200.000 $98.000 $88.000 $111.190
TMA (STATIONARY)
DAY 180.000 $150.000 $175.000 $275.000 $267.000 $330.000 $332.200
TMA (MOBILE OPERATION)
HR 80.000 $60.000 $60.000 $310.000 $100.000 $65.000 $110.730
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $4,355.000 $550.000 $600.000 $1,200.000 $3,000.000 $4,000.000
Totals: $2,233,249.062 $2,285,064.750 $2,288,439.900 $2,660,342.250 $2,674,962.860 $2,724,020.855