TRAVIS RM 1431 (1378-01-051)

Items: 92

County: TRAVIS
Length: N/A
Highway: RM 1431
District: AUSTIN
Control Number: 1378-01-051
DBE Goal: N/A
Project: STP 2023(989)HES
Guaranty: N/A
Time: 232 WORKING DAYS
Engineer's Estimate: $4,492,163.70
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,492,163.70
$5,205,668.65
Over/Under Est: 15.88% $713,504.95
Over/Under Est: 19.12% $858,958.83
Amt Left: 2.79% $145,453.88
$5,950,741.10
Over/Under Est: 32.47% $1,458,577.40
Amt Left: 14.31% $745,072.45
Delta: -11.21% -$599,618.57
Over/Under Est: 45.31% $2,035,201.03
Amt Left: 25.39% $1,321,696.08
Delta: -9.69% -$576,623.63
Over/Under Est: 75.54% $3,393,475.30
Amt Left: 51.48% $2,679,970.35
Delta: -20.81% -$1,358,274.27
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 22.34% $1,281,695.59
ROADWAY SPECIALTIES, INC. 2.05% $117,613.07
ENVIRONMENTAL SAFETY SERVICES, INC. 1.38% $79,173.68
D. I. J. CONSTRUCTION, INC. 1.18% $67,699.23
TEXAS TRAFFIC AND BARRICADE, LLC 0.35% $20,080.28
AREA WIDE PROTECTIVE, INC. 0.24% $13,769.33
STRIPE IT UP, LLC 0.10% $5,737.22
Total: 27.64% $1,585,768.40

Bid Items & Bid Tabulations

92 Total 0 of 92
TRAVIS  |  RM 1431  |  AUSTIN  |  1378-01-051  |  06/28/2023  |  $4,492,163.70  |  STP 2023(989)HES  |  HAZARD ELIM & SAFETY  |  232 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN UNDERGROUND INCORPORATED
AUSTIN ENGINEERING CO., INC.
FNH CONSTRUCTION, LLC
HUNTER INDUSTRIES, LTD.
AARON CONCRETE CONTRACTORS, LLC
PREPARING ROW
STA 53.000 $5,000.000 $5,350.000 $1,163.000 $8,000.000 $4,700.000 $6,500.000
REMOVING CONC (RIPRAP)
SY 3,196.000 $10.000 $14.000 $8.000 $30.000 $24.500 $50.000
REMOVING CONC (HEADWALL)
CY 10.000 $600.000 $110.000 $71.000 $500.000 $1,050.000 $2,500.000
REMOVING CONCRETE(MOW STRIP)
LF 1,199.000 $10.000 $6.500 $3.000 $20.000 $17.500 $16.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 5,748.000 $8.000 $12.000 $1.000 $20.000 $14.000 $12.000
EXCAVATION (ROADWAY)
CY 9,426.000 $17.000 $26.000 $21.000 $20.000 $38.500 $55.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 3,943.000 $20.000 $14.000 $27.000 $35.000 $38.500 $75.000
FURNISHING AND PLACING TOPSOIL (4")
SY 22,233.000 $2.000 $3.250 $2.500 $6.000 $3.880 $5.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 22,233.000 $0.300 $0.400 $0.400 $1.000 $0.350 $0.400
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 11,117.000 $0.400 $0.300 $0.310 $1.000 $0.270 $0.350
VEGETATIVE WATERING
MG 3,307.000 $12.000 $33.000 $8.000 $25.000 $31.500 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 22,233.000 $1.200 $1.250 $1.320 $5.000 $1.180 $1.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,411.000 $56.000 $77.000 $93.000 $60.000 $117.700 $150.000
PRIME COAT (MULTI OPTION)
GAL 2,170.000 $5.500 $4.500 $4.000 $6.000 $7.900 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $50.190 $100.000 $30.000 $75.000 $136.400 $108.000
PLANE ASPH CONC PAV(0" TO 2")
SY 24,564.000 $5.000 $1.500 $1.500 $6.000 $3.230 $1.500
CUT & RESTORING PAV
SY 520.000 $125.000 $150.000 $105.000 $200.000 $190.420 $650.000
TRENCH EXCAVATION PROTECTION
LF 580.000 $5.000 $10.000 $12.000 $10.000 $89.860 $25.000
TEMPORARY SPL SHORING
SF 10,551.000 $20.000 $4.750 $12.000 $35.000 $45.070 $50.000
RIPRAP (CONC)(4 IN)
CY 191.000 $635.000 $460.000 $1,400.000 $500.000 $768.150 $1,000.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 142.300 $250.000 $240.000 $310.000 $250.000 $286.700 $115.000
RIPRAP (MOW STRIP)(4 IN)
CY 172.000 $600.000 $570.000 $729.000 $550.000 $795.800 $800.000
CONC BOX CULV (3 FT X 3 FT)
LF 124.000 $420.000 $560.000 $1,335.000 $650.000 $697.830 $1,200.000
CONC BOX CULV (4 FT X 4 FT)
LF 88.000 $480.000 $540.000 $1,066.000 $700.000 $974.290 $1,600.000
CONC BOX CULV (11 FT X 11 FT)
LF 112.000 $1,500.000 $2,100.000 $3,470.000 $2,000.000 $2,898.700 $3,200.000
RC PIPE (CL III)(18 IN)
LF 200.000 $80.000 $87.000 $129.000 $85.000 $214.410 $145.000
RC PIPE (ARCH)(CL III)(DES 4)
LF 48.000 $320.000 $260.000 $315.000 $300.000 $473.490 $440.000
RC PIPE (ARCH)(CL III)(DES 5)
LF 176.000 $450.000 $480.000 $1,077.000 $400.000 $633.990 $890.000
HEADWALL (CH - PW - A - 0) (DES= 5)
EA 1.000 $10,000.000 $45,000.000 $9,008.000 $25,000.000 $30,502.270 $25,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $15,000.000 $36,000.000 $15,623.000 $25,000.000 $20,285.110 $32,000.000
WINGWALL (PW - 1) (HW=13 FT)
EA 2.000 $55,000.000 $58,000.000 $81,000.000 $60,000.000 $82,430.650 $105,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $20,000.000 $28,000.000 $12,000.000 $28,500.000 $21,133.090 $26,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $36,000.000 $46,000.000 $26,500.000 $35,000.000 $42,981.720 $42,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,250.000 $5,400.000 $2,000.000 $1,850.000 $2,907.670 $2,600.000
SET (TY II) (DES 4) (RCP) (6: 1) (P)
EA 2.000 $5,500.000 $9,100.000 $5,236.000 $6,500.000 $12,475.350 $5,100.000
SET (TY II) (DES 5) (RCP) (3: 1) (C)
EA 1.000 $6,000.000 $19,000.000 $7,600.000 $7,500.000 $19,821.680 $5,200.000
REMOV STR (SET)
EA 10.000 $600.000 $1,000.000 $1,518.000 $850.000 $1,912.100 $1,500.000
REMOV STR (PIPE)
LF 872.000 $20.000 $20.000 $36.000 $50.000 $159.630 $33.000
MOBILIZATION
LS 1.000 $400,000.000 $400,000.000 $325,000.000 $580,000.000 $444,607.270 $730,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $8,000.000 $9,500.000 $7,557.000 $8,500.000 $6,747.430 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $36.000 $35.000 $41.000 $30.000 $35.530 $45.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 131.000 $55.000 $50.000 $59.000 $50.000 $51.370 $64.000
ROCK FILTER DAMS (REMOVE)
LF 191.000 $20.000 $32.000 $12.000 $15.000 $32.650 $41.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,195.000 $6.000 $5.000 $5.000 $18.000 $4.670 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,195.000 $2.000 $0.600 $0.620 $9.000 $0.550 $0.700
DRIVEWAYS (CONC)
SY 209.000 $115.000 $130.000 $118.000 $85.000 $142.680 $130.000
DRIVEWAYS (ACP)
SY 414.000 $110.000 $150.000 $95.000 $55.000 $101.200 $110.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,630.000 $27.000 $27.000 $29.000 $25.000 $23.790 $37.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,400.000 $1,700.000 $1,731.000 $1,850.000 $1,471.550 $2,300.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $38.000 $29.000 $31.000 $50.000 $25.590 $39.000
REMOVE METAL BEAM GUARD FENCE
LF 1,145.000 $4.000 $3.500 $3.000 $3.000 $3.150 $6.700
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $370.000 $377.000 $500.000 $320.450 $172.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,500.000 $4,100.000 $4,201.000 $3,250.000 $3,571.080 $4,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $370.000 $377.000 $850.000 $320.450 $345.000
PIPE UNDERDRAINS (TY 8) (6")
LF 3,110.000 $32.000 $38.000 $71.000 $65.000 $87.310 $51.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $800.000 $1,100.000 $960.000 $1,150.000 $777.000 $980.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 9.000 $700.000 $800.000 $960.000 $850.000 $777.000 $870.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $800.000 $800.000 $960.000 $850.000 $777.000 $1,100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $64.000 $275.000 $95.000 $100.000 $77.000 $94.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 10,508.000 $0.250 $0.700 $0.500 $0.700 $0.450 $0.550
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,627.000 $0.250 $0.700 $0.500 $0.750 $0.450 $0.550
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 10,508.000 $0.250 $0.700 $0.500 $0.750 $0.450 $0.550
WK ZN PAV MRK REMOV (W)(ARROW)
EA 10.000 $175.000 $230.000 $197.000 $250.000 $167.450 $200.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,880.000 $1.000 $2.300 $0.500 $6.000 $1.630 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,406.000 $1.500 $2.300 $0.500 $6.000 $1.630 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $1.750 $2.000 $1.300 $2.000 $1.110 $1.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 10.000 $200.000 $350.000 $217.000 $350.000 $184.200 $220.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $275.000 $375.000 $340.000 $350.000 $287.810 $342.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 5,254.000 $0.300 $0.240 $0.400 $0.500 $0.360 $0.400
REFL PAV MRK TY II (W) 6" (SLD)
LF 10,508.000 $0.300 $0.350 $0.400 $0.500 $0.360 $0.400
REFL PAV MRK TY II (W) 8" (SLD)
LF 400.000 $0.550 $0.750 $0.400 $0.750 $0.450 $0.550
REFL PAV MRK TY II (W) (ARROW)
EA 12.000 $80.000 $100.000 $95.000 $100.000 $80.590 $96.000
REFL PAV MRK TY II (W) (WORD)
EA 1.000 $90.000 $120.000 $131.000 $125.000 $110.940 $132.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 4,515.000 $0.300 $0.220 $0.400 $0.500 $0.360 $0.400
REFL PAV MRK TY II (Y) 6" (SLD)
LF 11,108.000 $0.300 $0.350 $0.400 $0.500 $0.360 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,254.000 $0.750 $0.700 $0.800 $0.750 $0.730 $0.900
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,515.000 $0.750 $0.700 $0.800 $0.750 $0.730 $0.900
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 11,108.000 $0.750 $1.180 $0.800 $1.250 $0.730 $0.900
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 10,508.000 $0.800 $1.700 $2.000 $1.750 $1.500 $1.800
REFL PAV MRKR TY I-C
EA 151.000 $6.000 $14.000 $10.000 $15.000 $8.130 $9.700
REFL PAV MRKR TY II-A-A
EA 344.000 $6.000 $11.500 $10.000 $15.000 $8.130 $9.700
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 2,613.000 $115.000 $120.000 $123.000 $115.000 $141.500 $127.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 2,919.000 $135.000 $180.000 $185.000 $130.000 $152.500 $190.000
PFC-C PG76-22 SAC-A
TON 2,389.000 $185.000 $220.000 $228.000 $165.000 $217.400 $185.000
BONDING COURSE
GAL 2,169.000 $5.000 $4.500 $4.000 $6.000 $4.880 $5.000
UNDERSEAL COURSE
GAL 6,404.000 $5.000 $4.500 $4.000 $6.000 $6.700 $5.000
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 569.000 $5.000 $250.000 $97.000 $20.000 $23.800 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $11,000.000 $30,000.000 $16,500.000 $9,742.500 $16,000.000
TMA (STATIONARY)
DAY 300.000 $170.000 $180.000 $185.000 $250.000 $265.210 $600.000
TMA (MOBILE OPERATION)
HR 160.000 $95.000 $48.000 $95.000 $85.000 $83.350 $110.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,500.000 $700.000 $2,000.000 $1,000.000 $1,500.000 $3,000.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 10.000 $3,500.000 $4,000.000 $2,000.000 $1,000.000 $3,000.000 $5,300.000
Totals: $4,492,163.700 $5,205,668.650 $5,351,122.530 $5,950,741.100 $6,527,364.730 $7,885,639.000