Show Job Controls
Bid Cobra

TRAVIS RM 1431 (1378-01-050)

Items: 108

County: TRAVIS
Length: 0.0000 MILES
Highway: RM 1431
District: AUSTIN
Control Number: 1378-01-050
DBE Goal: 7.5%
Project: STP 2025(153)HES
Guaranty: $100,000.00
Time: 147 WORKING DAYS
Engineer's Estimate: $8,767,592.29
Date: 04/03/2025 (1 year ago)
Contract Number: 4253033
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184597
Contract Type: Federal
Project Description: INSTALL CONTINUOUS TURN LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
KYLE RUSSELL
JEREMY MIKES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,767,592.29
$7,905,115.95
Over/Under Est: -9.84% -$862,476.34
Over/Under Est: 1.23% $107,666.66
Amt Left: 12.27% $970,143.00
$9,377,969.81
Over/Under Est: 6.96% $610,377.52
Amt Left: 18.63% $1,472,853.86
Delta: -5.66% -$502,710.86
Over/Under Est: 10% $876,963.28
Amt Left: 22% $1,739,439.62
Delta: -2.84% -$266,585.76
Over/Under Est: 48.29% $4,233,477.01
Amt Left: 64.46% $5,095,953.35
Delta: -34.80% -$3,356,513.73
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 26.10% $2,069,197.04
AUSTIN UNDERGROUND INCORPORATED 9.51% $753,948.81
ENVIRONMENTAL SAFETY SERVICES, INC. 2.26% $179,171.85
STRIPE IT UP, LLC 1.84% $145,874.43
Total: 39.71% $3,148,192.13

Bid Items & Bid Tabulations

108 Total 0 of 108
TRAVIS  |  RM 1431  |  AUSTIN  |  1378-01-050  |  04/03/2025  |  $8,767,592.29  |  STP 2025(153)HES  |  HAZARD ELIM & SAFETY  |  147 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS ROAD LLC
AUSTIN ENGINEERING CO., INC.
DAN WILLIAMS COMPANY
JORDAN FOSTER CONSTRUCTION, LLC
AARON CONCRETE CONTRACTORS, LLC
PREPARING ROW
STA 72.000 $5,350.000 $3,950.000 $3,500.000 $7,500.000 $8,000.000 $1,600.000
REMOV CONC (MOWSTRIP)
LF 3,355.000 $6.500 $6.000 $5.000 $5.000 $5.500 $8.000
REMOV CONC (RIPRAP)
SY 3,880.000 $14.000 $9.000 $4.500 $18.000 $13.000 $7.500
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 7,984.000 $12.000 $4.500 $5.000 $6.000 $4.000 $9.500
EXCAV (ROADWAY)
CY 18,766.000 $26.000 $25.000 $28.000 $38.000 $34.000 $27.000
EMBANK (FNL)(OC)(TY B)
CY 5,736.000 $15.000 $17.000 $29.000 $25.000 $25.000 $17.000
EMBANK (FNL)(OC)(TY C1)
CY 8,260.000 $60.000 $79.000 $56.000 $75.000 $42.000 $105.000
FURN & PLACE TOPSOIL (4")
SY 46,017.000 $3.000 $3.500 $2.500 $2.250 $3.800 $8.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 46,716.000 $0.300 $0.250 $0.250 $0.230 $0.150 $0.300
DRILL SEED (PERM_RURAL_CLAY)
SY 46,716.000 $0.400 $0.300 $0.350 $0.280 $0.150 $0.350
VEGETATIVE WATERING
TGL 784.000 $33.000 $27.000 $40.000 $15.000 $52.000 $35.000
SOIL RET BLKT(SL_MOD_SAND_SHORT)
SY 46,716.000 $1.250 $1.200 $1.300 $1.100 $1.450 $1.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,717.000 $83.000 $80.000 $85.000 $90.000 $110.000 $140.000
PRIME COAT(MC-30 OR AE-P)
GAL 2,728.000 $4.500 $3.900 $4.000 $3.650 $3.500 $3.700
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 3,001.000 $140.000 $114.000 $127.000 $115.000 $108.000 $129.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 5,913.000 $150.000 $140.000 $155.000 $135.000 $132.000 $157.000
PFC-C PG76-22 SAC-A
TON 3,627.000 $220.000 $184.000 $205.000 $185.000 $175.000 $202.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,400.000 $65.000 $66.000 $72.000 $62.000 $64.000 $78.000
PLANE ASPH CONC PAV(0" TO 2")
SY 38,565.000 $1.500 $2.000 $2.000 $2.000 $2.000 $2.500
STRUCT EXCAV (BOX)
CY 1,684.000 $6.000 $14.000 $68.000 $1.000 $14.000 $122.000
CUT & RESTORING PAV
SY 325.000 $150.000 $170.000 $223.000 $185.000 $1,420.000 $1,815.000
CEM STABIL BKFL
CY 296.000 $101.000 $200.000 $275.000 $250.000 $215.000 $450.000
TRENCH EXCAVATION PROTECTION
LF 539.000 $10.000 $18.000 $45.000 $3.000 $48.000 $22.000
TEMPORARY SPL SHORING
SF 19,539.000 $4.750 $6.000 $9.000 $15.000 $1.350 $38.000
RIPRAP (CONC)(4 IN)
CY 693.000 $500.000 $540.000 $770.000 $650.000 $830.000 $836.000
RIPRAP (MOW STRIP)(4 IN)
CY 244.000 $570.000 $560.000 $785.000 $800.000 $795.000 $825.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 175.000 $235.000 $250.000 $250.000 $250.000 $350.000 $262.000
CONC BOX CULV (4 FT X 4 FT)
LF 111.000 $540.000 $560.000 $635.000 $785.000 $725.000 $2,400.000
CONC BOX CULV (5 FT X 5 FT)
LF 98.000 $633.000 $720.000 $815.000 $975.000 $890.000 $2,900.000
CONC BOX CULV (8 FT X 4 FT)
LF 131.000 $894.000 $1,500.000 $1,450.000 $1,400.000 $1,700.000 $5,800.000
CONC BOX CULV (10 FT X 8 FT)
LF 199.000 $2,200.000 $2,000.000 $1,875.000 $1,900.000 $2,070.000 $4,100.000
RC PIPE (CL III)(18 IN)
LF 595.000 $87.000 $85.000 $136.000 $95.000 $120.000 $164.000
RC PIPE (CL III)(24 IN)
LF 59.000 $136.000 $100.000 $186.000 $150.000 $180.000 $215.000
RC PIPE (CL III)(30 IN)
LF 97.000 $164.000 $130.000 $218.000 $140.000 $175.000 $280.000
RC PIPE (CL III)(36 IN)
LF 48.000 $213.000 $190.000 $365.000 $225.000 $285.000 $342.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $4,800.000 $4,400.000 $5,225.000 $8,500.000 $8,600.000 $7,300.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX3FT)
EA 1.000 $13,500.000 $5,800.000 $6,600.000 $10,000.000 $11,000.000 $9,900.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $34,000.000 $23,000.000 $22,700.000 $15,000.000 $17,000.000 $32,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $28,000.000 $20,000.000 $26,600.000 $20,000.000 $24,000.000 $35,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $36,000.000 $21,000.000 $28,500.000 $20,000.000 $21,000.000 $36,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $46,000.000 $29,000.000 $70,000.000 $35,000.000 $42,000.000 $66,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $95,483.000 $64,000.000 $160,000.000 $60,000.000 $114,250.000 $102,000.000
WINGWALL (SW - 0) (HW=5 FT)
EA 1.000 $15,000.000 $14,000.000 $19,700.000 $15,000.000 $22,000.000 $31,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $883.000 $2,600.000 $2,600.000 $2,400.000 $2,200.000 $2,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,637.000 $3,000.000 $3,900.000 $2,500.000 $3,000.000 $2,400.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $5,400.000 $2,700.000 $4,300.000 $2,500.000 $2,600.000 $2,650.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $3,000.000 $3,400.000 $3,000.000 $2,500.000 $2,600.000 $2,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,100.000 $6,400.000 $4,600.000 $2,800.000 $2,800.000 $5,200.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $3,000.000 $7,300.000 $6,100.000 $3,500.000 $5,300.000 $4,700.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,700.000 $8,500.000 $10,000.000 $7,000.000 $7,000.000 $5,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $5,950.000 $9,600.000 $14,500.000 $8,000.000 $8,600.000 $14,200.000
REMOV STR (SET)
EA 22.000 $550.000 $690.000 $800.000 $1,000.000 $450.000 $350.000
REMOV STR (PIPE)
LF 1,282.000 $20.000 $18.000 $27.000 $35.000 $14.000 $24.000
REMOV STR (BOX CULVERT)
LF 569.000 $70.000 $25.000 $175.000 $50.000 $35.000 $86.000
MOBILIZATION
LS 1.000 $880,000.000 $454,000.000 $345,000.000 $930,000.000 $950,000.000 $1,050,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $9,500.000 $9,000.000 $9,800.000 $35,000.000 $25,100.000 $2,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $16,000.000 $24,000.000 $15,000.000 $18,800.000 $9,000.000
TMA (STATIONARY)
DAY 200.000 $180.000 $89.000 $230.000 $175.000 $595.000 $230.000
TMA (MOBILE OPERATION)
DAY 30.000 $48.000 $47.000 $95.000 $650.000 $1,100.000 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 75.000 $35.000 $33.000 $39.000 $30.500 $35.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 674.000 $50.000 $41.000 $48.000 $38.000 $45.000 $49.000
ROCK FILTER DAMS (REMOVE)
LF 749.000 $32.000 $20.000 $25.000 $18.000 $19.000 $24.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 7,597.000 $5.000 $6.500 $7.000 $6.000 $5.400 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 7,597.000 $0.600 $1.100 $1.000 $1.000 $0.550 $1.400
DRIVEWAYS (CONC)
SY 149.000 $130.000 $150.000 $186.000 $125.000 $200.000 $182.000
DRIVEWAYS (ACP)
SY 2,929.000 $90.000 $85.000 $94.000 $80.000 $90.000 $97.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,037.000 $27.000 $31.000 $36.000 $32.000 $23.000 $37.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,700.000 $1,750.000 $2,000.000 $1,900.000 $1,450.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 3,430.000 $3.500 $5.300 $6.000 $5.000 $2.700 $6.300
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $370.000 $137.000 $61.000 $150.000 $270.000 $163.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $4,100.000 $4,000.000 $4,500.000 $4,500.000 $3,200.000 $4,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $300.000 $270.000 $302.000 $250.000 $260.000 $320.000
PIPE UNDERDRAINS (TY 6) (6")
LF 2,614.000 $38.000 $40.000 $24.000 $35.000 $26.000 $52.000
PIPE UNDERDRAINS (TY 8) (6")
LF 600.000 $30.000 $47.000 $20.000 $47.000 $30.000 $51.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $1,100.000 $948.000 $1,000.000 $875.000 $865.000 $1,100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 56.000 $21.500 $40.000 $44.000 $36.000 $38.000 $47.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 10.000 $275.000 $550.000 $617.000 $500.000 $344.000 $650.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 10.000 $350.000 $550.000 $617.000 $500.000 $344.000 $650.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 14,276.000 $0.750 $0.350 $0.400 $0.350 $0.350 $0.400
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 14.000 $102.000 $82.000 $185.000 $150.000 $80.000 $93.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,569.000 $1.000 $0.400 $0.400 $0.350 $0.380 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,276.000 $1.000 $0.400 $0.400 $0.350 $0.350 $0.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,168.000 $1.290 $1.100 $1.500 $1.350 $1.100 $0.950
WK ZN PAV MRK REMOV (W)(ARROW)
EA 6.000 $230.000 $220.000 $185.000 $150.000 $215.000 $330.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 17.000 $175.000 $165.000 $247.000 $200.000 $160.000 $193.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $200.000 $192.000 $370.000 $300.000 $190.000 $300.000
RE PM TY II (W) 6" (BRK)
LF 3,560.000 $0.240 $0.440 $0.400 $0.360 $0.440 $0.400
RE PM TY II (W) 6" (SLD)
LF 14,240.000 $0.350 $0.400 $0.400 $0.340 $0.380 $0.400
RE PM TY II (W) 8" (DOT)
LF 57.000 $0.750 $2.200 $4.500 $3.900 $2.150 $0.400
RE PM TY II (W) 8" (SLD)
LF 600.000 $0.750 $0.600 $2.500 $2.000 $0.600 $0.400
RE PM TY II (W) 12" (SLD)
LF 30.000 $2.500 $2.200 $49.000 $40.000 $2.150 $2.500
RE PM TY II (W) (ARROW)
EA 17.000 $80.000 $80.000 $92.000 $75.000 $78.000 $93.000
RE PM TY II (W) (WORD)
EA 2.000 $100.000 $104.000 $166.000 $135.000 $100.000 $93.000
RE PM TY II (Y) 6" (BRK)
LF 3,460.000 $0.220 $0.450 $0.400 $0.360 $0.440 $0.400
RE PM TY II (Y) 6" (SLD)
LF 14,140.000 $0.350 $0.380 $0.400 $0.340 $0.380 $0.400
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 14,240.000 $1.700 $1.400 $1.600 $1.350 $1.350 $1.800
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,560.000 $0.700 $1.100 $1.000 $0.800 $1.100 $0.900
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,460.000 $0.700 $1.100 $1.000 $0.800 $1.100 $0.850
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 14,140.000 $1.250 $1.100 $1.000 $0.700 $1.100 $0.850
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 2,848.000 $5.750 $6.000 $6.000 $5.000 $6.000 $25.000
REFL PAV MRKR TY I-C
EA 178.000 $14.000 $5.750 $12.000 $9.750 $5.700 $8.500
REFL PAV MRKR TY II-A-A
EA 354.000 $11.500 $5.750 $9.000 $7.750 $5.700 $8.500
ELIM EXT PM & MRKS (4")
LF 32,121.000 $1.170 $0.350 $0.150 $0.300 $0.350 $0.400
UNDERSEAL COURSE
GAL 10,746.000 $4.500 $4.450 $5.000 $4.000 $5.150 $5.800
BONDING COURSE
GAL 4,836.000 $4.500 $3.850 $4.000 $3.450 $3.550 $4.000
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 22,169.000 $10.000 $5.000 $7.000 $3.750 $5.750 $8.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $700.000 $750.000 $1,500.000 $515.000 $840.000 $1,630.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 10.000 $4,000.000 $4,050.000 $2,500.000 $800.000 $840.000 $4,400.000
Totals: $8,767,592.290 $7,905,115.950 $8,875,258.950 $9,377,969.810 $9,644,555.570 $13,001,069.300
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $60,000.00