TRAVIS FM 1100 (1234-01-013)

Items: 77

County: TRAVIS
Length: N/A
Highway: FM 1100
District: AUSTIN
Control Number: 1234-01-013
DBE Goal: N/A
Project: STP 2023(881)HES
Guaranty: N/A
Time: 48 WORKING DAYS
Engineer's Estimate: $6,051,577.04
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,051,577.04
$4,953,190.20
Over/Under Est: -18.15% -$1,098,386.84
Over/Under Est: -16.67% -$1,008,644.58
Amt Left: 1.81% $89,742.26
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 51.19% $2,535,538.06
D. I. J. CONSTRUCTION, INC. 5.23% $259,051.85
CAVE TRUCKING, LLC 4.60% $227,846.75
ENVIRONMENTAL SAFETY SERVICES, INC. 1.44% $71,325.94
ROADWAY SPECIALTIES, INC. 1.41% $69,839.98
TRP CONSTRUCTION GROUP, LLC 0.66% $32,691.06
MURRAY CONSTRUCTION 0.21% $10,401.70
GBC GENERAL BARRICADE COMPANY LLC 0.05% $2,476.60
Total: 64.79% $3,209,171.94

Bid Items & Bid Tabulations

77 Total 0 of 77
TRAVIS  |  FM 1100  |  AUSTIN  |  1234-01-013  |  06/01/2023  |  $6,051,577.04  |  STP 2023(881)HES  |  RESURF ROADWAY  |  48 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AARON CONCRETE CONTRACTORS, LLC
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 43.000 $2,000.000 $2,500.000 $1,431.900
EXCAVATION (ROADWAY)
CY 2,197.000 $20.000 $50.000 $64.900
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,300.000 $30.000 $125.000 $82.500
BACKFILL (TY A)
STA 311.000 $300.000 $250.000 $231.000
FURNISHING AND PLACING TOPSOIL (4")
SY 16,328.000 $2.750 $1.500 $1.840
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 16,328.000 $0.850 $0.500 $0.400
VEGETATIVE WATERING
MG 129.000 $30.000 $35.000 $38.500
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 8,164.000 $2.500 $1.600 $1.300
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,443.000 $85.000 $125.000 $97.600
PRIME COAT (MULTI OPTION)
GAL 1,172.000 $7.000 $5.000 $8.000
ASPH (TIER II)
GAL 0.010 $5.000 $20.000 $141.200
AGGR(TY-PD GR-4 SAC-B)
CY 0.010 $200.000 $880.000 $289.300
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,500.000 $60.000 $54.000 $65.740
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 8,770.000 $50.000 $39.000 $47.660
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
SY 21,869.000 $3.470 $3.200 $4.880
PLANE ASPH CONC PAV(MICRO-MLLING)(2")
SY 23,693.000 $2.200 $2.400 $3.780
STRUCT EXCAV (BOX)
CY 188.000 $15.000 $50.000 $32.850
CEM STABIL BKFL
CY 206.000 $215.000 $260.000 $266.090
CUT & RESTORING PAV
SY 35.000 $185.000 $190.000 $202.580
FLOWABLE BACKFILL
CY 40.000 $250.000 $275.000 $266.090
TRENCH EXCAVATION PROTECTION
LF 75.000 $2.000 $18.000 $37.230
CL C CONC (MISC)
CY 2.000 $925.000 $2,700.000 $2,736.420
RIPRAP (CONC)(5 IN)
CY 122.000 $800.000 $820.000 $547.500
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 31.000 $250.000 $215.000 $235.400
RIPRAP (MOW STRIP)(4 IN)
CY 51.500 $780.000 $823.000 $655.910
RETROFIT RAIL (ADD HSS)
LF 199.000 $200.000 $175.000 $178.170
CONC BOX CULV (4 FT X 4 FT)
LF 87.000 $450.000 $1,500.000 $566.120
RC PIPE (CL III)(18 IN)
LF 208.000 $200.000 $150.000 $98.550
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $20,000.000 $34,000.000 $13,129.120
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $22,250.000 $39,000.000 $18,166.150
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $2,000.000 $2,300.000 $1,960.060
REMOV STR (SET)
EA 6.000 $400.000 $800.000 $546.410
REMOV STR (HEADWALL)
EA 1.000 $2,500.000 $3,800.000 $2,179.060
REMOV STR (PIPE)
LF 200.000 $32.000 $67.000 $41.610
MOBILIZATION
LS 1.000 $550,000.000 $450,000.000 $520,407.990
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,000.000 $1,300.000 $7,530.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,620.000 $4.500 $5.000 $3.780
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,620.000 $1.750 $1.300 $1.080
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,100.000 $6.000 $5.000 $3.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,100.000 $1.450 $1.300 $1.080
CONSTRUCTING DETOURS
SY 222.000 $125.000 $115.000 $188.100
DRIVEWAYS (ACP)
SY 846.800 $70.000 $70.000 $123.200
TURNOUTS (ACP)
SY 219.800 $70.000 $35.000 $50.600
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 4,939.000 $66.000 $35.000 $50.600
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $35.000 $28.000 $25.920
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,800.000 $2,300.000 $2,662.850
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 1.000 $700.000 $1,300.000 $1,198.610
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $5.000 $5.000 $4.320
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,400.000 $4,000.000 $3,685.450
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $470.000 $431.930
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $350.000 $440.000 $404.940
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $1,000.000 $1,100.000 $971.840
IN SM RD SN SUP&AM TY10BWG(2)SB(P)
EA 1.000 $1,300.000 $1,400.000 $1,295.790
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $48.000 $42.000 $37.790
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 30.000 $45.000 $100.000 $91.790
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $60.000 $106.000 $97.180
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,600.000 $1.000 $0.800 $0.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,300.000 $1.000 $0.900 $0.760
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 766.000 $1.500 $1.900 $1.770
REFL PAV MRK TY II (W) 6" (SLD)
LF 74,526.000 $0.350 $0.300 $0.240
REFL PAV MRK TY II (W) 24" (SLD)
LF 195.000 $4.640 $6.500 $5.400
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,075.000 $1.000 $0.300 $0.240
REFL PAV MRK TY II (Y) 6" (SLD)
LF 70,226.000 $1.000 $0.300 $0.240
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 65,926.000 $1.410 $1.250 $1.030
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 65,926.000 $1.200 $1.250 $1.030
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 8,600.000 $1.000 $1.250 $1.030
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 1,075.000 $1.000 $2.500 $2.110
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 4,300.000 $1.000 $1.250 $1.030
REFL PAV MRKR TY II-A-A
EA 1,707.000 $10.000 $3.800 $3.130
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 5,637.000 $225.000 $127.000 $129.500
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 700.000 $135.000 $136.000 $134.300
TOM-C PG76-22 SAC-B
TON 5,731.000 $225.000 $155.000 $160.900
BONDING COURSE
GAL 18,456.000 $7.500 $4.700 $4.640
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 124.000 $200.000 $76.000 $175.340
PREFORMED CENTERLINE RUMBLE STRIP
LF 16,940.000 $4.160 $4.200 $3.130
TMA (STATIONARY)
DAY 60.000 $300.000 $235.000 $526.010
TMA (MOBILE OPERATION)
HR 222.000 $150.000 $67.000 $116.890
Totals: $6,051,577.040 $4,953,190.200 $5,042,932.470