PREPARING ROW
|
STA
|
43.000
|
$2,000.000
|
$2,500.000
|
$1,431.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,197.000
|
$20.000
|
$50.000
|
$64.900
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,300.000
|
$30.000
|
$125.000
|
$82.500
|
|
|
BACKFILL (TY A)
|
STA
|
311.000
|
$300.000
|
$250.000
|
$231.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,328.000
|
$2.750
|
$1.500
|
$1.840
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
16,328.000
|
$0.850
|
$0.500
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
129.000
|
$30.000
|
$35.000
|
$38.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
8,164.000
|
$2.500
|
$1.600
|
$1.300
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
2,443.000
|
$85.000
|
$125.000
|
$97.600
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,172.000
|
$7.000
|
$5.000
|
$8.000
|
|
|
ASPH (TIER II)
|
GAL
|
0.010
|
$5.000
|
$20.000
|
$141.200
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
0.010
|
$200.000
|
$880.000
|
$289.300
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,500.000
|
$60.000
|
$54.000
|
$65.740
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
8,770.000
|
$50.000
|
$39.000
|
$47.660
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
|
SY
|
21,869.000
|
$3.470
|
$3.200
|
$4.880
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(2")
|
SY
|
23,693.000
|
$2.200
|
$2.400
|
$3.780
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
188.000
|
$15.000
|
$50.000
|
$32.850
|
|
|
CEM STABIL BKFL
|
CY
|
206.000
|
$215.000
|
$260.000
|
$266.090
|
|
|
CUT & RESTORING PAV
|
SY
|
35.000
|
$185.000
|
$190.000
|
$202.580
|
|
|
FLOWABLE BACKFILL
|
CY
|
40.000
|
$250.000
|
$275.000
|
$266.090
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
75.000
|
$2.000
|
$18.000
|
$37.230
|
|
|
CL C CONC (MISC)
|
CY
|
2.000
|
$925.000
|
$2,700.000
|
$2,736.420
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
122.000
|
$800.000
|
$820.000
|
$547.500
|
|
|
RIRRAP (STONE COMMON)(DRY)(15 IN)
|
CY
|
31.000
|
$250.000
|
$215.000
|
$235.400
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
51.500
|
$780.000
|
$823.000
|
$655.910
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
199.000
|
$200.000
|
$175.000
|
$178.170
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
87.000
|
$450.000
|
$1,500.000
|
$566.120
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
208.000
|
$200.000
|
$150.000
|
$98.550
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$20,000.000
|
$34,000.000
|
$13,129.120
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$22,250.000
|
$39,000.000
|
$18,166.150
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,000.000
|
$2,300.000
|
$1,960.060
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$400.000
|
$800.000
|
$546.410
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$2,500.000
|
$3,800.000
|
$2,179.060
|
|
|
REMOV STR (PIPE)
|
LF
|
200.000
|
$32.000
|
$67.000
|
$41.610
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$550,000.000
|
$450,000.000
|
$520,407.990
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$7,000.000
|
$1,300.000
|
$7,530.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,620.000
|
$4.500
|
$5.000
|
$3.780
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,620.000
|
$1.750
|
$1.300
|
$1.080
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,100.000
|
$6.000
|
$5.000
|
$3.780
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,100.000
|
$1.450
|
$1.300
|
$1.080
|
|
|
CONSTRUCTING DETOURS
|
SY
|
222.000
|
$125.000
|
$115.000
|
$188.100
|
|
|
DRIVEWAYS (ACP)
|
SY
|
846.800
|
$70.000
|
$70.000
|
$123.200
|
|
|
TURNOUTS (ACP)
|
SY
|
219.800
|
$70.000
|
$35.000
|
$50.600
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
4,939.000
|
$66.000
|
$35.000
|
$50.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$35.000
|
$28.000
|
$25.920
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,800.000
|
$2,300.000
|
$2,662.850
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
1.000
|
$700.000
|
$1,300.000
|
$1,198.610
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$5.000
|
$5.000
|
$4.320
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,400.000
|
$4,000.000
|
$3,685.450
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$470.000
|
$431.930
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$350.000
|
$440.000
|
$404.940
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
4.000
|
$1,000.000
|
$1,100.000
|
$971.840
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SB(P)
|
EA
|
1.000
|
$1,300.000
|
$1,400.000
|
$1,295.790
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$48.000
|
$42.000
|
$37.790
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
30.000
|
$45.000
|
$100.000
|
$91.790
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$60.000
|
$106.000
|
$97.180
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,600.000
|
$1.000
|
$0.800
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,300.000
|
$1.000
|
$0.900
|
$0.760
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
766.000
|
$1.500
|
$1.900
|
$1.770
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
74,526.000
|
$0.350
|
$0.300
|
$0.240
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
195.000
|
$4.640
|
$6.500
|
$5.400
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
1,075.000
|
$1.000
|
$0.300
|
$0.240
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
70,226.000
|
$1.000
|
$0.300
|
$0.240
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
65,926.000
|
$1.410
|
$1.250
|
$1.030
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
65,926.000
|
$1.200
|
$1.250
|
$1.030
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
8,600.000
|
$1.000
|
$1.250
|
$1.030
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,075.000
|
$1.000
|
$2.500
|
$2.110
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
4,300.000
|
$1.000
|
$1.250
|
$1.030
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,707.000
|
$10.000
|
$3.800
|
$3.130
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
5,637.000
|
$225.000
|
$127.000
|
$129.500
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
700.000
|
$135.000
|
$136.000
|
$134.300
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
5,731.000
|
$225.000
|
$155.000
|
$160.900
|
|
|
BONDING COURSE
|
GAL
|
18,456.000
|
$7.500
|
$4.700
|
$4.640
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
124.000
|
$200.000
|
$76.000
|
$175.340
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
16,940.000
|
$4.160
|
$4.200
|
$3.130
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$300.000
|
$235.000
|
$526.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
222.000
|
$150.000
|
$67.000
|
$116.890
|
|
Totals: |
$6,051,577.040
|
$4,953,190.200
|
$5,042,932.470
|