|
|
PREPARING ROW
|
STA
|
115.700
|
$2,420.000
|
$1,000.000
|
$1,332.000
|
$3,000.000
|
$1,517.000
|
$1,650.000
|
$2,800.000
|
$6,067.000
|
$2,033.000
|
$1,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
683.000
|
$16.900
|
$10.000
|
$23.000
|
$16.000
|
$12.500
|
$15.000
|
$14.000
|
$17.000
|
$200.000
|
$16.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
11,196.000
|
$7.500
|
$2.200
|
$2.420
|
$6.000
|
$3.500
|
$5.250
|
$4.500
|
$4.000
|
$7.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,930.000
|
$11.000
|
$9.000
|
$13.410
|
$16.500
|
$14.000
|
$12.500
|
$14.000
|
$16.000
|
$40.000
|
$36.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
6,617.000
|
$12.000
|
$6.000
|
$10.080
|
$10.000
|
$15.000
|
$17.500
|
$25.000
|
$16.000
|
$12.000
|
$19.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
51,673.000
|
$1.700
|
$1.200
|
$0.880
|
$1.200
|
$2.000
|
$1.350
|
$1.650
|
$2.500
|
$1.300
|
$1.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
3,620.000
|
$0.350
|
$0.300
|
$0.240
|
$0.300
|
$0.290
|
$0.320
|
$0.280
|
$0.240
|
$0.240
|
$0.240
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
48,053.000
|
$0.350
|
$0.300
|
$0.240
|
$0.300
|
$0.290
|
$0.320
|
$0.280
|
$0.240
|
$0.240
|
$0.240
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
24,939.000
|
$0.260
|
$0.300
|
$0.220
|
$0.300
|
$0.270
|
$0.280
|
$0.260
|
$0.220
|
$0.220
|
$0.220
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
24,939.000
|
$0.250
|
$0.300
|
$0.220
|
$0.300
|
$0.270
|
$0.280
|
$0.260
|
$0.220
|
$0.220
|
$0.220
|
|
|
VEGETATIVE WATERING
|
MG
|
1,280.700
|
$22.000
|
$32.000
|
$29.970
|
$20.000
|
$13.000
|
$8.000
|
$25.000
|
$20.000
|
$15.000
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
51,673.000
|
$1.700
|
$1.200
|
$2.280
|
$1.200
|
$1.130
|
$1.250
|
$1.350
|
$1.700
|
$1.500
|
$1.700
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
6,422.000
|
$64.700
|
$57.000
|
$48.730
|
$47.000
|
$55.500
|
$52.000
|
$56.000
|
$61.000
|
$46.000
|
$69.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
258.000
|
$150.000
|
$156.000
|
$168.000
|
$150.000
|
$170.000
|
$175.000
|
$220.000
|
$175.000
|
$161.000
|
$200.000
|
|
|
LIME TRT (NEW BASE)(10")
|
SY
|
23,114.000
|
$2.600
|
$3.200
|
$2.620
|
$5.500
|
$7.000
|
$4.500
|
$5.250
|
$3.700
|
$4.770
|
$3.500
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
6,934.000
|
$5.300
|
$2.800
|
$3.950
|
$3.000
|
$3.000
|
$3.000
|
$3.750
|
$2.800
|
$2.750
|
$4.060
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
36,392.000
|
$3.300
|
$2.100
|
$2.800
|
$2.000
|
$2.100
|
$2.100
|
$0.100
|
$2.500
|
$2.000
|
$0.110
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
50.000
|
$85.000
|
$130.000
|
$107.910
|
$125.000
|
$132.000
|
$130.000
|
$220.000
|
$150.000
|
$125.000
|
$162.350
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,400.000
|
$78.500
|
$66.000
|
$67.770
|
$66.000
|
$68.000
|
$84.000
|
$74.000
|
$75.000
|
$75.000
|
$67.110
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
1,885.000
|
$90.000
|
$77.000
|
$76.170
|
$77.000
|
$75.000
|
$88.000
|
$86.000
|
$75.000
|
$70.000
|
$77.930
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
343.000
|
$120.000
|
$95.000
|
$106.530
|
$96.000
|
$98.000
|
$115.000
|
$120.000
|
$103.000
|
$92.500
|
$106.070
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
4,423.000
|
$100.000
|
$95.000
|
$106.530
|
$96.000
|
$98.000
|
$115.000
|
$114.000
|
$103.000
|
$92.500
|
$107.820
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
200.000
|
$30.000
|
$26.000
|
$19.080
|
$40.000
|
$30.000
|
$10.000
|
$35.000
|
$17.000
|
$27.520
|
$28.560
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10,200.000
|
$3.000
|
$1.600
|
$1.730
|
$2.000
|
$3.000
|
$1.700
|
$2.000
|
$1.500
|
$1.250
|
$1.300
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
14.200
|
$355.000
|
$450.000
|
$335.000
|
$350.000
|
$338.380
|
$360.000
|
$400.000
|
$440.000
|
$335.000
|
$391.910
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
564.000
|
$383.000
|
$480.000
|
$414.770
|
$630.000
|
$375.000
|
$385.000
|
$450.000
|
$400.000
|
$452.650
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
26.000
|
$400.000
|
$480.000
|
$441.020
|
$540.000
|
$443.880
|
$400.000
|
$675.000
|
$450.000
|
$355.850
|
$300.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
689.000
|
$120.000
|
$130.000
|
$157.510
|
$155.000
|
$123.080
|
$125.000
|
$110.000
|
$170.000
|
$120.000
|
$233.330
|
|
|
RAIL (TY T221)
|
LF
|
136.000
|
$90.000
|
$87.000
|
$143.330
|
$185.000
|
$71.560
|
$70.000
|
$110.000
|
$150.000
|
$89.110
|
$251.470
|
|
|
RAIL (TY PR1)
|
LF
|
579.000
|
$70.000
|
$62.000
|
$65.470
|
$60.000
|
$76.410
|
$80.000
|
$75.000
|
$64.000
|
$65.470
|
$268.130
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
400.000
|
$75.000
|
$50.000
|
$51.600
|
$50.000
|
$53.470
|
$48.000
|
$58.000
|
$57.000
|
$51.600
|
$69.500
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
280.000
|
$60.000
|
$40.000
|
$43.410
|
$65.000
|
$66.250
|
$45.000
|
$64.000
|
$46.000
|
$125.000
|
$120.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
49.000
|
$96.000
|
$82.000
|
$101.010
|
$105.000
|
$168.980
|
$62.000
|
$115.000
|
$105.000
|
$140.000
|
$200.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
5.000
|
$127.000
|
$122.000
|
$252.540
|
$190.000
|
$474.590
|
$200.000
|
$325.000
|
$260.000
|
$250.000
|
$280.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
259.000
|
$210.000
|
$113.000
|
$154.520
|
$200.000
|
$147.550
|
$140.000
|
$135.000
|
$210.000
|
$375.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
24.000
|
$400.000
|
$141.000
|
$242.980
|
$220.000
|
$488.340
|
$200.000
|
$240.000
|
$270.000
|
$500.000
|
$500.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
90.000
|
$1,152.900
|
$1,240.000
|
$690.720
|
$600.000
|
$900.000
|
$950.000
|
$1,100.000
|
$825.000
|
$4,600.000
|
$1,700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,356.000
|
$76.400
|
$36.000
|
$44.500
|
$60.000
|
$55.000
|
$45.000
|
$57.000
|
$53.000
|
$100.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
689.000
|
$82.500
|
$44.000
|
$56.310
|
$75.000
|
$65.000
|
$55.000
|
$72.000
|
$61.000
|
$125.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
785.000
|
$104.600
|
$56.000
|
$69.280
|
$105.000
|
$85.000
|
$55.000
|
$100.000
|
$88.000
|
$130.000
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
65.000
|
$145.000
|
$73.000
|
$95.350
|
$115.000
|
$100.000
|
$85.000
|
$115.000
|
$115.000
|
$145.000
|
$195.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
6.000
|
$4,887.000
|
$2,900.000
|
$4,914.210
|
$3,500.000
|
$3,400.000
|
$4,200.000
|
$4,200.000
|
$5,400.000
|
$3,350.000
|
$3,300.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$6,000.000
|
$3,500.000
|
$5,753.720
|
$4,500.000
|
$4,237.680
|
$4,500.000
|
$5,000.000
|
$5,700.000
|
$4,235.000
|
$4,100.000
|
|
|
INLET (COMPL)(PSL)(SL)(5FTX5FT)
|
EA
|
1.000
|
$6,000.000
|
$3,700.000
|
$5,187.220
|
$4,000.000
|
$3,948.910
|
$4,000.000
|
$4,500.000
|
$5,700.000
|
$3,905.000
|
$6,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
4.000
|
$6,300.000
|
$3,400.000
|
$6,006.260
|
$4,500.000
|
$3,179.050
|
$3,700.000
|
$6,200.000
|
$5,800.000
|
$3,565.000
|
$5,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,000.000
|
$4,700.000
|
$6,245.150
|
$5,000.000
|
$4,514.030
|
$5,000.000
|
$7,400.000
|
$6,300.000
|
$5,030.000
|
$6,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$5,000.000
|
$8,800.000
|
$5,589.920
|
$4,500.000
|
$3,063.750
|
$7,000.000
|
$7,000.000
|
$5,700.000
|
$10,000.000
|
$13,861.610
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$4,500.000
|
$7,900.000
|
$5,589.920
|
$7,000.000
|
$3,063.760
|
$9,000.000
|
$8,000.000
|
$5,700.000
|
$15,000.000
|
$14,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$6,500.000
|
$11,800.000
|
$7,262.110
|
$11,000.000
|
$4,129.430
|
$9,500.000
|
$15,000.000
|
$7,500.000
|
$19,000.000
|
$8,500.000
|
|
|
WINGWALL (FW - S) (HW=12 FT)
|
EA
|
1.000
|
$28,500.000
|
$32,000.000
|
$20,062.270
|
$40,000.000
|
$15,348.940
|
$36,000.000
|
$33,000.000
|
$25,000.000
|
$35,000.000
|
$24,415.190
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
1.000
|
$5,960.000
|
$10,100.000
|
$6,688.790
|
$7,000.000
|
$4,255.350
|
$6,000.000
|
$6,200.000
|
$6,700.000
|
$8,657.600
|
$9,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
1.000
|
$10,000.000
|
$10,400.000
|
$6,688.790
|
$7,000.000
|
$4,751.400
|
$6,500.000
|
$7,000.000
|
$6,700.000
|
$9,450.570
|
$10,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (P)
|
EA
|
1.000
|
$11,000.000
|
$13,500.000
|
$6,688.790
|
$6,500.000
|
$5,115.140
|
$6,000.000
|
$6,500.000
|
$6,700.000
|
$10,300.620
|
$9,051.050
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
16.000
|
$1,050.000
|
$720.000
|
$1,155.050
|
$1,700.000
|
$1,000.250
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,475.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
47.000
|
$952.200
|
$845.000
|
$1,155.050
|
$1,800.000
|
$1,098.450
|
$1,000.000
|
$1,300.000
|
$1,200.000
|
$1,630.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,690.000
|
$1,150.000
|
$1,155.050
|
$2,200.000
|
$1,488.060
|
$1,200.000
|
$1,700.000
|
$1,200.000
|
$1,985.000
|
$1,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$2,100.000
|
$2,525.360
|
$6,000.000
|
$2,363.590
|
$3,000.000
|
$2,900.000
|
$2,700.000
|
$2,665.000
|
$3,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$3,000.000
|
$2,700.000
|
$1,260.050
|
$2,500.000
|
$5,825.550
|
$2,200.000
|
$1,500.000
|
$1,600.000
|
$1,583.330
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
78.000
|
$458.800
|
$180.000
|
$787.530
|
$600.000
|
$399.940
|
$200.000
|
$275.000
|
$750.000
|
$66.760
|
$1,200.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
9.000
|
$1,405.000
|
$300.000
|
$1,260.050
|
$1,200.000
|
$1,268.490
|
$1,100.000
|
$1,900.000
|
$1,300.000
|
$314.060
|
$13,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,990.000
|
$15.700
|
$13.000
|
$4.200
|
$22.000
|
$9.860
|
$11.000
|
$11.500
|
$5.000
|
$4.390
|
$140.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
2.000
|
$1,000.000
|
$860.000
|
$1,624.230
|
$2,500.000
|
$2,431.930
|
$1,000.000
|
$1,200.000
|
$500.000
|
$578.070
|
$800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$891,151.170
|
$300,000.000
|
$678,116.480
|
$700,000.000
|
$800,000.000
|
$790,000.000
|
$800,000.000
|
$800,000.000
|
$1,314,000.000
|
$1,122,779.380
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$8,750.000
|
$1,000.000
|
$2,868.500
|
$3,900.000
|
$4,000.000
|
$15,500.000
|
$14,000.000
|
$10,000.000
|
$1,700.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
293.000
|
$24.300
|
$23.000
|
$18.380
|
$22.000
|
$22.560
|
$22.500
|
$24.000
|
$19.000
|
$18.380
|
$18.380
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
197.000
|
$40.000
|
$42.000
|
$36.690
|
$40.000
|
$40.510
|
$40.000
|
$44.000
|
$37.000
|
$36.690
|
$36.690
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
490.000
|
$7.900
|
$11.000
|
$6.000
|
$11.000
|
$10.460
|
$11.000
|
$12.000
|
$6.500
|
$6.000
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
250.000
|
$13.900
|
$12.000
|
$27.750
|
$11.000
|
$11.280
|
$12.000
|
$12.000
|
$28.000
|
$27.760
|
$27.760
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
250.000
|
$7.300
|
$9.000
|
$6.000
|
$9.000
|
$8.720
|
$9.000
|
$10.000
|
$6.000
|
$6.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,675.000
|
$2.280
|
$2.100
|
$2.000
|
$2.200
|
$2.100
|
$2.100
|
$2.250
|
$2.500
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,675.000
|
$0.400
|
$0.500
|
$0.250
|
$0.500
|
$0.510
|
$0.550
|
$0.500
|
$0.250
|
$0.250
|
$0.250
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
150.000
|
$35.000
|
$66.000
|
$31.500
|
$80.000
|
$50.000
|
$25.000
|
$80.000
|
$25.000
|
$86.820
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
570.000
|
$7.800
|
$6.900
|
$21.000
|
$20.000
|
$10.000
|
$15.000
|
$14.000
|
$25.000
|
$8.770
|
$75.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
150.000
|
$15.500
|
$7.600
|
$15.750
|
$45.000
|
$15.000
|
$25.000
|
$18.000
|
$25.000
|
$33.330
|
$75.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
649.000
|
$17.830
|
$18.000
|
$16.800
|
$21.000
|
$21.740
|
$21.000
|
$32.000
|
$19.000
|
$18.370
|
$29.000
|
|
|
CONC CURB (TY F3)
|
LF
|
400.000
|
$240.000
|
$188.000
|
$84.000
|
$200.000
|
$218.400
|
$145.000
|
$210.000
|
$90.000
|
$150.890
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,371.000
|
$32.800
|
$30.000
|
$36.960
|
$30.000
|
$39.590
|
$25.000
|
$55.000
|
$35.000
|
$24.320
|
$36.380
|
|
|
CONC SIDEWALKS (6")
|
SY
|
6,052.000
|
$63.500
|
$55.000
|
$42.000
|
$70.000
|
$43.950
|
$47.500
|
$52.000
|
$53.000
|
$45.000
|
$46.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
14.000
|
$1,871.000
|
$1,150.000
|
$1,155.050
|
$1,300.000
|
$1,116.060
|
$1,250.000
|
$1,800.000
|
$1,300.000
|
$1,838.500
|
$900.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,043.000
|
$18.710
|
$19.000
|
$16.200
|
$18.000
|
$16.790
|
$18.000
|
$20.000
|
$17.000
|
$20.000
|
$16.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,400.000
|
$1,440.000
|
$1,752.170
|
$1,400.000
|
$1,297.590
|
$1,400.000
|
$1,500.000
|
$1,300.000
|
$1,252.170
|
$1,252.170
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
15.000
|
$941.300
|
$850.000
|
$875.000
|
$900.000
|
$906.740
|
$850.000
|
$1,000.000
|
$900.000
|
$875.000
|
$875.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
140.000
|
$21.660
|
$20.000
|
$17.170
|
$19.000
|
$17.790
|
$19.000
|
$21.000
|
$17.000
|
$17.170
|
$17.170
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,043.000
|
$1.700
|
$2.100
|
$1.000
|
$2.000
|
$1.040
|
$2.100
|
$2.250
|
$1.000
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$134.000
|
$133.000
|
$125.000
|
$150.000
|
$129.540
|
$150.000
|
$150.000
|
$130.000
|
$125.000
|
$125.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
19.000
|
$2,223.000
|
$2,200.000
|
$2,160.000
|
$2,100.000
|
$2,238.340
|
$2,250.000
|
$2,300.000
|
$2,100.000
|
$2,160.000
|
$2,160.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$663.600
|
$212.000
|
$200.000
|
$200.000
|
$207.250
|
$250.000
|
$235.000
|
$200.000
|
$200.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,800.000
|
$8,600.000
|
$7,000.000
|
$9,000.000
|
$7,253.890
|
$7,500.000
|
$9,000.000
|
$7,000.000
|
$7,763.310
|
$7,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,300.000
|
$1,550.000
|
$850.000
|
$1,500.000
|
$880.830
|
$900.000
|
$1,600.000
|
$800.000
|
$850.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,490.000
|
$800.000
|
$500.000
|
$1,000.000
|
$518.140
|
$800.000
|
$850.000
|
$600.000
|
$500.000
|
$500.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
1,500.000
|
$20.000
|
$22.000
|
$25.000
|
$20.000
|
$20.000
|
$27.000
|
$20.000
|
$24.000
|
$30.000
|
$26.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,500.000
|
$10.000
|
$5.300
|
$15.000
|
$15.000
|
$15.000
|
$12.000
|
$7.500
|
$12.000
|
$14.500
|
$10.750
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
11.000
|
$220.000
|
$154.000
|
$175.000
|
$150.000
|
$181.350
|
$150.000
|
$175.000
|
$180.000
|
$175.000
|
$175.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
2.000
|
$215.000
|
$165.000
|
$213.000
|
$160.000
|
$220.730
|
$160.000
|
$185.000
|
$220.000
|
$213.000
|
$213.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$309.500
|
$303.000
|
$355.000
|
$300.000
|
$367.880
|
$300.000
|
$340.000
|
$360.000
|
$355.000
|
$355.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
57.000
|
$10.800
|
$24.000
|
$28.500
|
$20.000
|
$28.790
|
$21.000
|
$22.000
|
$23.000
|
$45.000
|
$22.390
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
68.000
|
$16.800
|
$17.000
|
$27.000
|
$15.000
|
$27.270
|
$15.000
|
$16.000
|
$16.000
|
$45.000
|
$15.680
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
347.000
|
$11.130
|
$35.000
|
$30.500
|
$30.000
|
$30.810
|
$30.000
|
$32.000
|
$33.000
|
$45.000
|
$32.470
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
640.000
|
$0.900
|
$2.400
|
$2.100
|
$2.000
|
$2.120
|
$2.050
|
$2.300
|
$2.300
|
$2.100
|
$2.240
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$934.800
|
$1,900.000
|
$1,130.000
|
$1,500.000
|
$1,141.410
|
$1,400.000
|
$1,450.000
|
$1,800.000
|
$1,130.000
|
$1,455.670
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$439.900
|
$395.000
|
$410.810
|
$400.000
|
$425.710
|
$400.000
|
$450.000
|
$420.000
|
$410.810
|
$410.810
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$468.950
|
$530.000
|
$515.930
|
$500.000
|
$534.650
|
$525.000
|
$600.000
|
$520.000
|
$515.930
|
$515.930
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$790.000
|
$794.000
|
$789.540
|
$750.000
|
$818.180
|
$800.000
|
$900.000
|
$800.000
|
$789.540
|
$789.540
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
55.000
|
$367.270
|
$371.000
|
$261.350
|
$350.000
|
$270.830
|
$400.000
|
$400.000
|
$270.000
|
$261.350
|
$261.350
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$357.000
|
$371.000
|
$398.000
|
$350.000
|
$412.440
|
$400.000
|
$410.000
|
$400.000
|
$398.000
|
$398.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$93.300
|
$80.000
|
$75.000
|
$100.000
|
$77.720
|
$80.000
|
$90.000
|
$80.000
|
$75.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
34.000
|
$23.500
|
$10.000
|
$12.450
|
$10.000
|
$12.900
|
$10.000
|
$11.000
|
$13.000
|
$12.450
|
$12.450
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
90.000
|
$58.500
|
$34.000
|
$39.900
|
$35.000
|
$41.350
|
$33.000
|
$40.000
|
$40.000
|
$39.900
|
$39.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,959.000
|
$0.790
|
$0.700
|
$0.660
|
$0.700
|
$0.670
|
$0.750
|
$0.720
|
$0.700
|
$0.660
|
$0.670
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,002.000
|
$3.200
|
$3.050
|
$2.880
|
$3.000
|
$2.440
|
$2.400
|
$3.200
|
$3.000
|
$2.880
|
$2.440
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
400.000
|
$6.900
|
$6.300
|
$5.880
|
$7.000
|
$6.400
|
$6.500
|
$6.500
|
$6.000
|
$5.880
|
$6.440
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
26.000
|
$104.200
|
$82.000
|
$77.000
|
$100.000
|
$100.000
|
$90.000
|
$87.000
|
$78.000
|
$77.000
|
$100.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
14.000
|
$123.900
|
$106.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$115.000
|
$100.000
|
$100.000
|
$100.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
28.000
|
$35.600
|
$32.000
|
$30.000
|
$60.000
|
$55.000
|
$40.000
|
$34.000
|
$30.000
|
$30.000
|
$55.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,740.000
|
$0.520
|
$0.330
|
$0.310
|
$0.400
|
$0.360
|
$0.400
|
$0.350
|
$0.320
|
$0.310
|
$0.360
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
24,564.000
|
$0.420
|
$0.310
|
$0.290
|
$0.400
|
$0.340
|
$0.400
|
$0.330
|
$0.300
|
$0.290
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,558.000
|
$0.340
|
$0.320
|
$0.300
|
$0.400
|
$0.360
|
$0.400
|
$0.340
|
$0.300
|
$0.300
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
25,016.000
|
$0.320
|
$0.320
|
$0.300
|
$0.400
|
$0.340
|
$0.400
|
$0.350
|
$0.300
|
$0.300
|
$0.340
|
|
REFL PAV MRKR TY I-C
|
EA
|
403.000
|
$3.250
|
$3.050
|
$2.880
|
$4.000
|
$4.000
|
$4.050
|
$3.350
|
$3.000
|
$2.880
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
721.000
|
$3.160
|
$3.050
|
$2.880
|
$4.000
|
$3.440
|
$4.050
|
$3.350
|
$3.000
|
$2.880
|
$3.440
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
34.000
|
$4.150
|
$3.200
|
$3.000
|
$4.000
|
$4.000
|
$6.100
|
$3.500
|
$3.000
|
$3.000
|
$4.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
3.000
|
$22,000.000
|
$7,600.000
|
$3,800.000
|
$7,000.000
|
$3,838.380
|
$8,000.000
|
$7,500.000
|
$7,500.000
|
$3,800.000
|
$7,166.380
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$16,700.000
|
$10,800.000
|
$11,000.000
|
$10,000.000
|
$11,111.110
|
$10,000.000
|
$10,500.000
|
$10,500.000
|
$11,000.000
|
$10,189.700
|
|
|
TEMP TRAF SIGNALS
|
EA
|
4.000
|
$25,000.000
|
$11,300.000
|
$11,300.000
|
$10,000.000
|
$11,414.140
|
$11,500.000
|
$10,500.000
|
$11,000.000
|
$11,300.000
|
$10,637.600
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
4.000
|
$249.800
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.930
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
8.000
|
$250.000
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.920
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$251.700
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.930
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
16.000
|
$269.000
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.920
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$240.000
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.930
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$240.000
|
$356.000
|
$270.000
|
$300.000
|
$272.730
|
$310.000
|
$325.000
|
$340.000
|
$270.000
|
$335.920
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
10.000
|
$566.310
|
$775.000
|
$730.000
|
$700.000
|
$737.370
|
$700.000
|
$750.000
|
$750.000
|
$730.000
|
$732.320
|
|
|
BACK PLATE (12")(3 SEC)ALUM
|
EA
|
4.000
|
$97.000
|
$125.000
|
$120.000
|
$150.000
|
$121.210
|
$110.000
|
$125.000
|
$120.000
|
$120.000
|
$117.570
|
|
|
BACK PLATE (12")(4 SEC)ALUM
|
EA
|
2.000
|
$125.300
|
$215.000
|
$120.000
|
$200.000
|
$121.210
|
$190.000
|
$200.000
|
$220.000
|
$120.000
|
$203.800
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
1,686.000
|
$1.500
|
$2.400
|
$2.000
|
$2.000
|
$2.020
|
$2.050
|
$2.350
|
$2.300
|
$2.000
|
$2.240
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
2,430.000
|
$1.680
|
$3.600
|
$2.300
|
$3.000
|
$2.320
|
$3.050
|
$3.400
|
$3.400
|
$2.300
|
$3.360
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
112.000
|
$2.410
|
$4.800
|
$2.500
|
$4.000
|
$2.530
|
$4.100
|
$4.500
|
$4.500
|
$2.500
|
$4.480
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
417.000
|
$1.200
|
$2.400
|
$2.200
|
$2.000
|
$2.220
|
$2.050
|
$2.400
|
$2.300
|
$2.200
|
$2.240
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$6,892.900
|
$9,400.000
|
$8,100.000
|
$8,000.000
|
$8,181.820
|
$9,500.000
|
$8,800.000
|
$9,000.000
|
$8,100.000
|
$8,846.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$2,093.710
|
$2,700.000
|
$2,300.000
|
$2,500.000
|
$2,323.230
|
$2,500.000
|
$2,600.000
|
$2,600.000
|
$2,300.000
|
$2,519.430
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
1.000
|
$1,500.000
|
$2,600.000
|
$1,900.000
|
$2,500.000
|
$1,919.190
|
$2,500.000
|
$2,400.000
|
$2,500.000
|
$1,900.000
|
$2,463.440
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
10.000
|
$702.400
|
$1,000.000
|
$810.000
|
$900.000
|
$818.180
|
$900.000
|
$950.000
|
$1,000.000
|
$810.000
|
$962.980
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$3,300.000
|
$3,320.000
|
$2,900.000
|
$3,000.000
|
$2,929.290
|
$3,000.000
|
$3,300.000
|
$3,200.000
|
$2,900.000
|
$3,135.290
|
|
|
VEH LP DETECT (SAWCUT)(14 AWG)(BLK)
|
LF
|
1,525.000
|
$6.500
|
$8.300
|
$17.000
|
$6.000
|
$17.170
|
$6.100
|
$7.250
|
$8.000
|
$17.000
|
$6.720
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
6.000
|
$141.000
|
$178.000
|
$90.000
|
$200.000
|
$90.910
|
$175.000
|
$180.000
|
$170.000
|
$90.000
|
$167.960
|
|
|
REPLACE OF SIGNAL RELATED SIGNS
|
EA
|
6.000
|
$14.000
|
$356.000
|
$320.000
|
$300.000
|
$323.230
|
$325.000
|
$375.000
|
$340.000
|
$320.000
|
$335.920
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$96.000
|
$80.000
|
$75.780
|
$1,000.000
|
$76.000
|
$200.000
|
$175.000
|
$100.000
|
$75.000
|
$250.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
108.000
|
$3.000
|
$11.000
|
$3.000
|
$9.000
|
$3.030
|
$9.500
|
$10.000
|
$10.000
|
$3.000
|
$10.080
|
|
|
JACKING OR BORING 16 IN. PIPE, CLS 250
|
EA
|
130.000
|
$450.000
|
$636.000
|
$650.000
|
$450.000
|
$564.960
|
$800.000
|
$1.000
|
$750.000
|
$505.000
|
$674.350
|
|
|
ADJUSTING WATER METERS
|
EA
|
51.000
|
$100.000
|
$122.000
|
$232.000
|
$300.000
|
$745.610
|
$240.000
|
$400.000
|
$340.000
|
$450.000
|
$2,100.000
|
|
|
ENCASEMENT PIPE 32 DIA., TYPE STEEL
|
LF
|
2,150.000
|
$200.000
|
$175.000
|
$238.000
|
$145.000
|
$216.340
|
$260.000
|
$180.000
|
$150.000
|
$225.000
|
$300.000
|
|
|
PIPE 2"DIA HDP,ALL DPTHS,INC EXC & BKFL
|
LF
|
170.000
|
$100.000
|
$100.000
|
$110.000
|
$30.000
|
$40.930
|
$112.000
|
$35.000
|
$34.000
|
$39.800
|
$80.000
|
|
|
PIPE 8"DIA DI,ALL DPTHS,INC EXC & BKFIL
|
LF
|
110.000
|
$80.000
|
$71.000
|
$75.000
|
$60.000
|
$138.130
|
$80.000
|
$165.000
|
$92.000
|
$65.000
|
$100.000
|
|
|
PIPE 12"DIA DI,ALL DPTHS, INC EXC & BKF
|
LF
|
30.000
|
$90.000
|
$171.000
|
$175.000
|
$75.000
|
$177.070
|
$185.000
|
$320.000
|
$117.000
|
$93.000
|
$150.000
|
|
|
PIPE 16"DIA DI,ALL-DPTHS, INC EXC & BKF
|
LF
|
9,500.000
|
$110.000
|
$83.000
|
$85.000
|
$93.000
|
$105.530
|
$100.000
|
$96.000
|
$110.000
|
$97.250
|
$180.000
|
|
|
DUCTILE IRON FITTINGS 4" THROUGH 24"
|
TON
|
7.500
|
$9,500.000
|
$12,000.000
|
$9,600.000
|
$11,000.000
|
$15,427.690
|
$10,000.000
|
$13,000.000
|
$11,000.000
|
$8,635.000
|
$8,500.000
|
|
|
WET CONNECTION 16 DIA X 16 DIA
|
EA
|
1.000
|
$3,500.000
|
$12,000.000
|
$3,800.000
|
$15,000.000
|
$5,108.790
|
$4,200.000
|
$17,000.000
|
$6,500.000
|
$6,500.000
|
$5,300.000
|
|
|
ADDITIONAL BURY DEPTH
|
LF
|
110.000
|
$100.000
|
$45.000
|
$48.000
|
$55.000
|
$38.660
|
$55.000
|
$80.000
|
$140.000
|
$345.000
|
$500.000
|
|
|
FIRE HYDRANT BARREL EXTENSIONS
|
LF
|
65.000
|
$150.000
|
$350.000
|
$311.000
|
$315.000
|
$388.330
|
$350.000
|
$500.000
|
$740.000
|
$585.000
|
$510.000
|
|
|
REFLECTORIZED PVMNT MRKRS (TYPE II-B-B)
|
EA
|
18.000
|
$20.000
|
$3.200
|
$50.000
|
$4.000
|
$25.000
|
$16.000
|
$10.500
|
$3.300
|
$3.000
|
$3.000
|
|
|
CON EXIST DBLE LAT SVC TO NW(1 1/2"DIA)
|
EA
|
1.000
|
$1,200.000
|
$2,000.000
|
$1,765.000
|
$2,000.000
|
$2,003.760
|
$1,800.000
|
$1,800.000
|
$1,800.000
|
$1,915.000
|
$2,500.000
|
|
|
CON EXIST SNGL LAT SVC TO NW(1 1/2"DIA)
|
EA
|
41.000
|
$1,000.000
|
$1,600.000
|
$1,235.000
|
$1,500.000
|
$1,810.880
|
$1,300.000
|
$1,400.000
|
$1,500.000
|
$1,700.000
|
$2,600.000
|
|
|
CON EXIST SNGL LAT SVC TO NW (2"DIA)
|
EA
|
8.000
|
$1,000.000
|
$1,800.000
|
$1,326.000
|
$1,800.000
|
$2,345.590
|
$1,500.000
|
$1,700.000
|
$1,800.000
|
$1,925.000
|
$2,700.000
|
|
|
CON EXIST SNGL LAT SVC TO NW (3"DIA)
|
EA
|
1.000
|
$1,200.000
|
$1,900.000
|
$1,470.000
|
$2,000.000
|
$4,572.520
|
$1,600.000
|
$1,900.000
|
$3,300.000
|
$1,590.000
|
$2,500.000
|
|
|
TEMP HDPE WTRLN,2" DIA,COMPLETE IN PLC
|
LF
|
2,000.000
|
$100.000
|
$38.000
|
$15.000
|
$20.000
|
$27.190
|
$15.500
|
$40.000
|
$20.000
|
$4.500
|
$46.000
|
|
|
TEMP HDPE WTRLN, 6" DIA,COMPLETE IN PLC
|
LF
|
6,000.000
|
$150.000
|
$42.000
|
$19.000
|
$25.000
|
$42.270
|
$20.000
|
$42.000
|
$23.000
|
$9.600
|
$29.000
|
|
|
REMV & SALVG EXISTING FIRE HYDRANTS
|
EA
|
7.000
|
$2,000.000
|
$385.000
|
$450.000
|
$500.000
|
$1,397.780
|
$500.000
|
$535.000
|
$900.000
|
$455.000
|
$1,000.000
|
|
|
REMV & SALVG EXIST GATE VALVES-ALL SZS
|
EA
|
10.000
|
$500.000
|
$335.000
|
$350.000
|
$500.000
|
$1,397.830
|
$400.000
|
$535.000
|
$650.000
|
$460.000
|
$1,000.000
|
|
|
TEMP LN STOP ALL SIZES, COMP IN PLACE
|
EA
|
1.000
|
$25,000.000
|
$19,000.000
|
$30,000.000
|
$15,000.000
|
$13,564.660
|
$35,500.000
|
$15,000.000
|
$30,000.000
|
$13,600.000
|
$1,400.000
|
|
|
PIPE 6" DIA HDPE(ALL DPTHS)(EXC&BACKFL)
|
LF
|
350.000
|
$70.000
|
$55.000
|
$70.000
|
$50.000
|
$60.300
|
$80.000
|
$30.000
|
$82.000
|
$35.500
|
$80.000
|
|
|
WET CONNECTION 6"DIA X 6"DIA
|
EA
|
2.000
|
$1,200.000
|
$3,800.000
|
$1,500.000
|
$5,500.000
|
$4,758.580
|
$1,600.000
|
$4,500.000
|
$5,000.000
|
$4,110.000
|
$4,000.000
|
|
|
WET CONNECTION 8"DIA X 8"DIA
|
EA
|
3.000
|
$2,500.000
|
$3,300.000
|
$2,000.000
|
$6,000.000
|
$4,875.310
|
$2,200.000
|
$4,000.000
|
$5,000.000
|
$4,485.000
|
$5,000.000
|
|
|
VALVE (GATE)(6")
|
EA
|
23.000
|
$1,400.000
|
$1,100.000
|
$1,050.000
|
$1,000.000
|
$1,382.150
|
$1,200.000
|
$1,600.000
|
$1,300.000
|
$1,570.000
|
$950.000
|
|
|
VALVE (GATE)(8")
|
EA
|
1.000
|
$2,000.000
|
$1,400.000
|
$1,300.000
|
$1,500.000
|
$1,674.870
|
$1,500.000
|
$1,900.000
|
$1,900.000
|
$1,935.000
|
$1,600.000
|
|
|
VALVE (GATE)(12")
|
EA
|
1.000
|
$5,000.000
|
$2,300.000
|
$2,500.000
|
$3,000.000
|
$2,593.210
|
$2,700.000
|
$2,900.000
|
$3,000.000
|
$2,985.000
|
$3,000.000
|
|
|
VALVE (GATE)(16")
|
EA
|
12.000
|
$10,000.000
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
$6,531.960
|
$6,500.000
|
$7,000.000
|
$9,000.000
|
$7,185.000
|
$6,000.000
|
|
|
FIRE HYDRANTS
|
EA
|
18.000
|
$4,500.000
|
$2,600.000
|
$3,000.000
|
$3,000.000
|
$3,380.050
|
$3,500.000
|
$3,000.000
|
$4,400.000
|
$2,750.000
|
$3,500.000
|
|
|
DRAIN VALVE ASSEMBLIES
|
EA
|
5.000
|
$5,000.000
|
$2,400.000
|
$4,000.000
|
$2,500.000
|
$3,287.600
|
$4,500.000
|
$5,500.000
|
$2,500.000
|
$1,850.000
|
$2,700.000
|
|
|
AUTO COMBO AIR/VAC RELEASE VALVE ASSMBL
|
EA
|
7.000
|
$5,000.000
|
$2,300.000
|
$2,700.000
|
$3,000.000
|
$3,044.400
|
$2,900.000
|
$6,000.000
|
$4,500.000
|
$3,300.000
|
$3,600.000
|
|
Totals: |
$9,451,928.600
|
$6,648,303.620
|
$7,150,897.259
|
$7,878,727.500
|
$7,941,131.111
|
$7,969,692.050
|
$8,490,208.290
|
$8,625,834.230
|
$9,242,083.130
|
$11,227,793.812
|