Show Job Controls
Bid Cobra

TRAVIS VARIOUS (0914-04-377)

Items: 114

County: TRAVIS
Length: 0.0000 MILES
Highway: VARIOUS
District: AUSTIN
Control Number: 0914-04-377
DBE Goal: 0.0%
Project: C 914-4-377
Guaranty: $100,000.00
Time: 227 WORKING DAYS
Engineer's Estimate: $16,306,478.85
Date: 1:00 PM JULY 02, 2026 (in 22 days)
Contract Number: 7263202
Type: TRANSPORTATION NON-ROADWAY
Project ID: A00212065
Project Description: DUAL FEED POWER FOR DRAINAGE TUNNEL PUMP STATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MATTHEW KELLY
KEVIN MACKAN
TRAVIS VARIOUS (0914-04-377)
Project Name: N/A
Project: C 914-4-377
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: AT BOLM SUB TO PUMP STATION AND
Limits To: AT KINGSBERY SUB TO PUMP STATION
Project Description: DUAL FEED POWER FOR DRAINAGE TUNNEL PUMP STATION
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

114 Total 0 of 114
TRAVIS  |  VARIOUS  |  AUSTIN  |  0914-04-377  |  1:00 PM JULY 02, 2026  |  $16,306,478.85  |  C 914-4-377  |  TRANSPORT NON-ROADWAY  |  227 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 112.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 17.000
TREE PROTECTION (INSTALL)
LF 148.000
TREE PROTECTION (REMOVE)
LF 148.000
REMOV CONC (PAV)
SY 20.000
REMOV CONC (MOWSTRIP)
LF 112.000
REMOV CONC (MEDIANS)
SY 58.000
REMOV CONC (DRIVEWAYS)
SY 65.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 627.000
REMOV CONC (CURB RAMP)
SY 21.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 311.000
REMOV CONC (FOUNDATIONS)
SY 19.000
REMOV CONC (MISC)
SY 13.000
FURN & PLACE TOPSOIL (4")
SY 23,692.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 23,692.000
FERTILIZER
AC 4.880
VEGETATIVE WATERING
TGL 399.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 393.000
D-GR HMA TY-C PG76-22 (EXEMPT)
TON 314.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 1,100.000
TOM-C PG76-22 SAC-B
TON 1,130.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 6,547.000
PLANE & TEXT ASPH CONC PAV(2")
SY 20,000.000
FULL - DEPTH REPAIR CRCP (10")
CY 6.000
TRENCH EXCAVATION PROTECTION
LF 9,493.000
RIPRAP (CONC)(4 IN)
CY 113.000
RIPRAP (MOW STRIP)(4 IN)
CY 7.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 90.000
TMA (MOBILE OPERATION)
DAY 45.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 30.000
ROCK FILTER DAMS (REMOVE)
LF 30.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,623.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,623.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 564.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 564.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,740.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 140.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,060.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 260.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,740.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 140.000
COLORED TEXTURED CONC (4")
SY 73.000
COLORED TEXTURED CONC (6")
SY 280.000
CONC CURB & GUTTER (TY II)
LF 263.000
DRIVEWAYS (CONC) (HES)
SY 63.000
CONC SIDEWALKS (5")
SY 274.000
CURB RAMPS (TY 1)
EA 2.000
CURB RAMPS (TY 7)
EA 3.000
CONC MEDIAN
SY 56.000
CONCRETE MEDIAN (NOSE)
SY 11.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000
REMOVE METAL BEAM GUARD FENCE
LF 77.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000
REMOVE SM RD SN SUP&AM
EA 5.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,090.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,834.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,550.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,715.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 1.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 10.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 95.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 940.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 2.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 2.000
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 8.000
RE PM TY II (W) 4" (LNDP)
LF 10.000
RE PM TY II (W) 6" (BRK)
LF 1,460.000
RE PM TY II (W) 6" (SLD)
LF 6,703.000
RE PM TY II (W) 8" (SLD)
LF 136.000
RE PM TY II (W) 12" (SLD)
LF 95.000
RE PM TY II (W) 24" (SLD)
LF 940.000
RE PM TY II (W) (ARROW)
EA 7.000
RE PM TY II (W) (BIKE ARROW)
EA 2.000
RE PM TY II (W) (BIKE SYMBOL)
EA 2.000
RE PM TY II (Y) 4" (DOT)
LF 8.000
RE PM TY II (Y) 4" (SLD)
LF 1,648.000
RE PM TY II (Y) 6" (SLD)
LF 5,820.000
PAVEMENT SLER 4"
LF 1,666.000
PAVEMENT SLER 6"
LF 13,983.000
PAVEMENT SLER 12"
LF 95.000
PAVEMENT SLER 24"
LF 940.000
PAVEMENT SLER (ARROW)
EA 7.000
PAVEMENT SLER (BIKE ARROW)
EA 2.000
PAVEMENT SLER (BIKE SYMBOL)
EA 2.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,460.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 6,703.000
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
LF 1,648.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,820.000
ELIM EXT PM & MRKS (4")
LF 7,875.000
ELIM EXT PM & MRKS (8")
LF 173.000
ELIM EXT PM & MRKS (ARROW)
EA 3.000
ELIM EXT PM & MRKS (WORD)
EA 1.000
PAV SURF PREP FOR MRK (4")
LF 1,666.000
PAV SURF PREP FOR MRK (6")
LF 13,983.000
PAV SURF PREP FOR MRK (12")
LF 95.000
PAV SURF PREP FOR MRK (24")
LF 940.000
PAV SURF PREP FOR MRK (ARROW)
EA 7.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 2.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 2.000
BONDING COURSE
GAL 3,600.000
LED ROADSIDE SIGN
EA 1.000
DUCT BANK (CONC ENCASE) (TRENCH)
LF 9,485.000
DUCT BANK (STL ENCASE) (BORE)
LF 1,413.000
MANHOLE (6’X12’) (ALL DEPTHS)
EA 35.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $20,000.00
PUBLIC UTILITY FORCE ACCT WORK (NON- PART) $7,500,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $163,064.79
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $35,000.00
Total: $7,725,064.79