Control Number: 0914-00-533
DBE Goal: 0.0%
Project: C 914-00-533
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $3,546,517.66
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,546,517.66
$4,437,824.80
Over/Under Est: 25.13% $891,307.14
Over/Under Est: 88.78% $3,148,647.34
Amt Left: 50.87% $2,257,340.20
Subcontractor Percentage Amount
BECK-REIT & SONS, LTD. 30.98% $1,391,740.76
S & S BRIDGE PAINTING, INC. 10.68% $479,786.68
Total: 41.66% $1,871,527.44

Bid Items & Bid Tabulations

62 Total 0 of 62
TRAVIS  |  VA  |  AUSTIN  |  0914-00-533  |  07/10/2024  |  $3,546,517.66  |  C 914-00-533  |  BRIDGE MAINT  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
ROY JORGENSEN ASSOCIATES, INC.
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 10.000 $1,825.000 $1,490.000 $3,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 10.000 $3,100.000 $2,290.000 $4,500.000
REMOVING CONC (RIPRAP)
SY 187.000 $79.140 $187.000 $250.000
REMOVING CONC (MISC)
CY 140.000 $525.000 $230.000 $250.000
EXCAVATION (CHANNEL)
CY 357.000 $31.670 $120.000 $150.000
EXCAVATION (SPECIAL)
CY 50.000 $31.670 $120.000 $150.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 70.000 $30.000 $115.000 $250.000
BACKFILLING PAVEMENT EDGES
CY 5.000 $195.000 $545.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 45.000 $109.000 $766.000 $1,000.000
CEM STABIL BKFL
CY 6.000 $235.000 $1,200.000 $500.000
FLOWABLE BACKFILL
CY 192.000 $375.000 $1,000.000 $1,250.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 340.000 $28.670 $50.000 $80.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 4.000 $185.000 $340.000 $650.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 650.000 $300.000 $425.000 $575.000
CONC STR REPAIR (STANDARD)
SF 5.000 $264.220 $500.000 $525.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 8.000 $8,000.000 $8,000.000 $4,000.000
RIPRAP (CONC)(5 IN)
CY 24.000 $657.550 $2,045.000 $2,000.000
RIPRAP (CONC)(6 IN)
CY 4.000 $1,077.580 $2,045.000 $2,100.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 365.000 $380.480 $285.000 $400.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 578.000 $300.000 $270.000 $400.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,736.000 $230.000 $270.000 $400.000
RIPRAP (STONE PROTECTION)(21 IN)
CY 803.000 $150.000 $270.000 $400.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 652.000 $200.000 $270.000 $400.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 154.000 $265.000 $295.000 $400.000
BEDDING MATERIAL (6 IN)
CY 30.000 $300.000 $345.000 $1,000.000
RIPRAP (CEM STAB)(6 IN)
CY 3.000 $400.000 $1,145.000 $425.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 513.000 $45.630 $60.000 $80.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,820.000 $47.200 $42.000 $85.000
CLEANING AND SEALING EXIST JOINTS (SEJ)
LF 90.000 $110.000 $150.000 $100.000
CLEAN & PAINT EXIST STR (SYSTEM I)
LS 1.000 $195,850.000 $260,000.000 $225,000.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $23,980.000 $330,000.000 $325,000.000
ANCHOR BOLTS
EA 10.000 $1,400.000 $910.000 $7,500.000
RETROFIT RAIL (TY T221)
LF 360.000 $180.000 $610.000 $1,500.000
GABIONS (3' X 3')(GALV)
CY 54.000 $475.000 $280.000 $350.000
RAISING EXIST STRUCT
LS 1.000 $104,000.000 $130,000.000 $380,000.000
REMOVE STR (PILING)
EA 5.000 $300.000 $1,150.000 $3,000.000
MOBILIZATION
LS 1.000 $439,274.040 $402,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,000.000 $19,400.000 $27,500.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $90.620 $13.750 $30.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 750.000 $1.730 $2.300 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $10.290 $13.750 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $2.890 $2.300 $3.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 750.000 $11.870 $8.000 $15.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 3.000 $100.000 $920.000 $2,500.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 40.000 $90.000 $230.000 $100.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 6.000 $71.860 $300.000 $500.000
REALIGN POSTS
EA 1.000 $45.200 $1,200.000 $200.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 1.000 $10.000 $120.000 $200.000
REPLACE SGT OBJECT MARKER
EA 1.000 $46.000 $300.000 $250.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 212.000 $100.000 $95.000 $450.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 202.000 $105.790 $130.000 $195.000
BRIDGE JOINT REPAIR (ARMOR)
LF 15.000 $612.120 $1,560.000 $800.000
BRIDGE JOINT REPAIR (SEJ)
LF 110.000 $500.000 $1,152.000 $900.000
CARBON FIBER REINF POLYMER PROTECTION
SF 30.000 $159.620 $415.000 $200.000
CONCRETE BEAM REPAIR (CFRP)
EA 4.000 $20,000.000 $12,000.000 $65,000.000
FILTER FABRIC (TY 2)
SY 2,089.000 $15.000 $17.200 $15.000
REPLACE ELASTOMERIC BEARING PADS
EA 20.000 $7,750.000 $9,150.000 $16,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 260.000 $138.910 $130.000 $150.000
TMA (STATIONARY)
DAY 100.000 $333.840 $525.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 100.000 $419.690 $400.000 $1.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 427.000 $750.000 $165.000 $250.000
CLEANING SUBSTRUCTURE (ABUT)
EA 5.000 $1,500.000 $3,300.000 $2,500.000
Totals: $3,546,517.660 $4,437,824.800 $6,695,165.000