TRAVIS IH 35 (0015-13-433)

Items: 357

County: TRAVIS
Length: 0.0000 MILES
Highway: IH 35
District: AUSTIN
Control Number: 0015-13-433
DBE Goal: 3.0%
Project: STP 2B24(253)MM
Guaranty: $100,000.00
Time: 0 X
Engineer's Estimate: $770,020,724.75
Date: 12/04/2024 (1 year ago)
Contract Number: 12243201
Type: DRAINAGE IMPROVEMENTS
Project ID: A00185024
Project Description: CONSTRUCT EAST DRAINAGE TUNNEL
Mail/Deliver Bids To: N/A
MATTHEW KELLY
KEVIN MACKAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$770,020,724.75
$844,040,714.50
Over/Under Est: 9.61% $74,019,989.75
$844,040,714.50
Over/Under Est: 9.61% $74,019,989.75
Amt Left: 0% $0.00
$998,889,999.98
Over/Under Est: 29.72% $228,869,275.23
Amt Left: 18.35% $154,849,285.48
Delta: -18.35% -$154,849,285.48
$1,181,639,750.06
Over/Under Est: 53.46% $411,619,025.31
Amt Left: 40% $337,599,035.56
Delta: -18.30% -$182,749,750.08
Over/Under Est: 53.46% $411,619,025.31
Amt Left: 40% $337,599,035.56
Delta: 0.00% $0.00

Bid Items & Bid Tabulations

357 Total 0 of 357
TRAVIS  |  IH 35  |  AUSTIN  |  0015-13-433  |  12/04/2024  |  $770,020,724.75  |  STP 2B24(253)MM  |  DRAINAGE IMPRVS  |  0 X
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
J.F. SHEA CONSTRUCTION, INC.
SAK CONSTRUCTION, LLC
DRAGADOS USA, INC.
WEBBER, LLC
FERROVIAL CONSTRUCTION US CORP.
PREPARING ROW
AC 23.110 $35,900.000 $35,000.000 $35,000.000 $3,679,000.000 $605,833.440 $605,833.440
DISPOSAL OF WATER WELLS
EA 9.000 $10,000.000 $5,000.000 $5,000.000 $1,739.310 $4,067.850 $4,067.850
REMOVING CONC (MEDIANS)
SY 421.000 $50.000 $50.000 $50.000 $14.880 $17.830 $17.830
REMOVING CONC (SIDEWALKS)
SY 51.000 $110.000 $50.000 $50.000 $12.200 $14.620 $14.620
REMOVING CONC (CURB)
LF 1,689.000 $50.000 $50.000 $50.000 $7.780 $9.320 $9.320
REMOVING CONC (CURB AND GUTTER)
LF 466.000 $30.000 $50.000 $50.000 $18.530 $22.200 $22.200
REMOVING CONC (SIDEWALK OR RAMP)
SY 406.000 $50.000 $50.000 $50.000 $12.390 $14.850 $14.850
REMOVING CONCRETE(MOW STRIP)
LF 1,165.000 $18.000 $27.500 $27.500 $7.060 $8.460 $8.460
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 2,169.000 $30.000 $31.000 $31.000 $25.350 $6.030 $6.030
EXCAVATION (SPECIAL)
CY 2,985.000 $25.000 $61.000 $61.000 $66.910 $28.540 $28.540
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,154.000 $68.000 $42.000 $42.000 $450.000 $38.660 $38.660
FURNISHING AND PLACING TOPSOIL (4")
SY 56,119.000 $6.400 $20.000 $20.000 $7.090 $11.530 $11.530
BLOCK SODDING
SY 500.000 $28.000 $23.000 $23.000 $16.370 $17.610 $17.610
ROLL SODDING
SY 55,619.000 $7.000 $5.000 $5.000 $9.770 $10.330 $10.330
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 56,119.000 $0.500 $1.000 $1.000 $0.550 $0.530 $0.530
FERTILIZER
TON 2.160 $1,250.000 $1,200.000 $1,200.000 $1,200.360 $3,035.990 $3,035.990
VEGETATIVE WATERING
MG 104.000 $25.000 $40.000 $40.000 $65.470 $123.010 $123.010
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 920.000 $112.000 $85.000 $85.000 $63.850 $310.110 $310.110
LIME (HYDRATED LIME (SLURRY))
TON 25.000 $370.000 $1,150.000 $1,150.000 $328.320 $631.870 $631.870
LIME TRT (SUBGRADE)(8")
SY 1,375.000 $9.500 $33.000 $33.000 $12.460 $45.630 $45.630
PRIME COAT (MULTI OPTION)
GAL 345.000 $5.500 $24.000 $24.000 $8.160 $13.560 $13.560
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 863.000 $125.000 $85.000 $85.000 $156.090 $264.410 $264.410
PLANE ASPH CONC PAV (2")
SY 1,735.000 $9.000 $12.000 $12.000 $13.620 $20.340 $20.340
STRUCT EXCAV (PIPE)
CY 6,874.000 $5.000 $50.000 $50.000 $140.000 $14.710 $14.710
CUT & RESTORE ASPH PAVING
SY 72.000 $150.000 $350.000 $350.000 $167.650 $237.520 $237.520
STRUCT EXCAV (SHAFT)
CY 5,597.000 $175.000 $0.000 $0.000 $0.000 $0.000 $0.000
STRUCT EXCAV (LAUNCH) (SITE 1)
EA 1.000 $1,690,000.000 $5,000,000.000 $5,000,000.000 $1,750,000.000 $318,739.870 $318,739.870
STRUCT EXCAV (LAUNCH) (SITE 2)
EA 1.000 $6,638,000.000 $5,000,000.000 $5,000,000.000 $2,100,000.000 $457,231.590 $457,231.590
STRUCT EXCAV (TEE)
EA 1.000 $661,600.000 $5,000,000.000 $5,000,000.000 $2,500,000.000 $447,921.050 $447,921.050
ROCK EXCAV (SHAFT)
CY 32,233.000 $500.000 $0.000 $0.000 $0.000 $0.000 $0.000
ROCK EXCAV (ADIT)
CY 15,377.000 $500.000 $0.000 $0.000 $0.000 $0.000 $0.000
ROCK EXCAV (LAUNCH) (SITE 1)
EA 1.000 $5,387,000.000 $5,000,000.000 $5,000,000.000 $30,500,000.000 $18,599,803.350 $18,599,803.350
ROCK EXCAV (LAUNCH) (SITE 2)
EA 1.000 $9,526,000.000 $5,000,000.000 $5,000,000.000 $3,500,000.000 $19,440,775.190 $19,440,775.190
ROCK EXCAV (TEE)
EA 1.000 $2,149,700.000 $5,000,000.000 $5,000,000.000 $6,500,000.000 $13,154,282.980 $13,154,282.980
ROCK EXCAV (TUNNEL)
CY 5,899.000 $500.000 $400.000 $400.000 $320.680 $526.310 $526.310
STRUCT EXCAV (SHAFT) (ALT 1A)
CY 8,111.000 $120.760 $0.000 $0.000 $88.500 $0.000 $0.000
ROCK EXCAV (SHAFT) (ALT 1A)
CY 33,958.000 $474.600 $0.000 $0.000 $454.570 $0.000 $0.000
ROCK EXCAV (ADIT) (ALT 1A)
CY 15,953.000 $481.950 $0.000 $0.000 $738.540 $0.000 $0.000
FLOWABLE BACKFILL
CY 575.000 $165.000 $800.000 $800.000 $223.500 $296.480 $296.480
FLOWABLE BACKFILL (SPECIAL)
CY 4,145.000 $430.000 $0.000 $0.000 $0.000 $0.000 $0.000
FLOWABLE BACKFILL (SPECIAL) (ALT 1A)
CY 7,920.000 $225.040 $0.000 $0.000 $286.930 $0.000 $0.000
TRENCH EXCAVATION PROTECTION
LF 1,071.000 $3.000 $21.000 $21.000 $1.000 $68.950 $68.950
TEMPORARY SPL SHORING
SF 20,897.000 $35.200 $325.000 $325.000 $200.000 $285.480 $285.480
DRILL SHAFT (30 IN)
LF 16.000 $330.000 $450.000 $450.000 $1,444.800 $1,044.080 $1,044.080
DRILL SHAFT (42 IN)
LF 19.000 $704.100 $610.000 $610.000 $1,576.140 $1,139.000 $1,139.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $454.000 $535.000 $535.000 $1,416.650 $1,023.740 $1,023.740
CL C CONC (CAP)
CY 0.500 $1,300.000 $2,000.000 $2,000.000 $30,000.000 $24,489.180 $24,489.180
CL F CONC (SHAFT)
CY 18,845.000 $1,250.000 $0.000 $0.000 $1,917.000 $0.000 $0.000
CL F CONC (ADIT)
CY 5,155.000 $1,250.000 $0.000 $0.000 $0.000 $0.000 $0.000
CL F CONC (TUNNEL)
CY 1,732.000 $1,250.000 $0.000 $0.000 $0.000 $0.000 $0.000
CL F CONC (ADIT/TUNNEL CONNECTION)
CY 260.000 $1,250.000 $9,000.000 $9,000.000 $3,466.980 $38,409.110 $38,409.110
CL F CONC (PANEL) (VARIES)
EA 33.000 $1,400.000 $9,000.000 $9,000.000 $45,000.000 $19,738.570 $19,738.570
CL F CONC (BEAM)
LF 252.000 $150.000 $1,250.000 $1,250.000 $6,700.000 $1,687.100 $1,687.100
CL F CONC (ADIT) (ALT 1A)
CY 5,331.000 $1,208.730 $0.000 $0.000 $7,503.310 $0.000 $0.000
CL F CONC (TUNNEL) (ALT 1A)
CY 5,159.000 $419.650 $0.000 $0.000 $1,952.000 $0.000 $0.000
CL F CONC (SHAFT) (ALT 1B)
CY 18,845.000 $1,250.000 $0.000 $0.000 $0.000 $0.000 $0.000
RIPRAP (CONC)(4 IN)
CY 1.950 $1,650.000 $1,500.000 $1,500.000 $1,110.530 $7,340.430 $7,340.430
STR STEEL (MISC NON - BRIDGE)
LB 15,266.000 $22.000 $5.000 $5.000 $6.000 $7.550 $7.550
CONC BOX CULV (10 FT X 12 FT) (SPL)
LF 79.000 $1,950.000 $80,000.000 $80,000.000 $34,389.790 $25,050.410 $25,050.410
CONC BOX CULV (10 FT X 16 FT) (SPL)
LF 51.000 $2,320.000 $80,000.000 $80,000.000 $35,410.520 $34,459.870 $34,459.870
CONC BOX CULV (10 FT X 17 FT) (SPL)
LF 206.000 $2,410.000 $80,000.000 $80,000.000 $40,516.240 $29,363.480 $29,363.480
CONC BOX CULV (12 FT X 18 FT) (SPL)
LF 69.000 $2,700.000 $60,000.000 $60,000.000 $31,828.950 $34,153.440 $34,153.440
RC PIPE (CL III)(18 IN)
LF 27.000 $150.000 $150.000 $150.000 $360.000 $112.060 $112.060
RC PIPE (60 IN)(CL V)
LF 155.000 $650.000 $5,000.000 $5,000.000 $2,673.780 $1,157.360 $1,157.360
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 2.000 $15,000.000 $100,000.000 $100,000.000 $43,150.000 $13,441.750 $13,441.750
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $19,500.000 $100,000.000 $100,000.000 $66,500.000 $23,732.540 $23,732.540
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $7,000.000 $7,500.000 $7,500.000 $18,000.000 $5,091.010 $5,091.010
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $7,100.000 $7,500.000 $7,500.000 $22,000.000 $5,091.010 $5,091.010
INLET (COMPL)(PCO)(6FT)(NONE)
EA 1.000 $12,000.000 $25,000.000 $25,000.000 $29,000.000 $5,091.010 $5,091.010
INLET (COMPL)(PSL)(RH)(3FTX3FT)
EA 1.000 $5,500.000 $15,000.000 $15,000.000 $35,000.000 $11,085.390 $11,085.390
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
EA 2.000 $24,500.000 $24,000.000 $24,000.000 $51,000.000 $12,655.680 $12,655.680
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
EA 1.000 $24,000.000 $35,000.000 $35,000.000 $150,000.000 $31,001.320 $31,001.320
GRATE & FRAME
EA 4.000 $15,000.000 $15,000.000 $15,000.000 $8,800.000 $6,779.750 $6,779.750
GRATE AND FRAME (DIA= 96 IN) (SPL)
EA 16.000 $6,150.000 $15,000.000 $15,000.000 $5,500.000 $7,163.710 $7,163.710
GRATE AND FRAME (DIA= 48 IN)
EA 12.000 $4,500.000 $2,000.000 $2,000.000 $4,750.000 $4,451.810 $4,451.810
HATCH (11' X 16')
EA 4.000 $125,000.000 $25,000.000 $25,000.000 $47,500.000 $132,433.710 $132,433.710
JACK BOR OR TUN PIPE(18 IN)(STL CASING)
LF 54.000 $5,860.000 $2,200.000 $2,200.000 $2,299.670 $1,372.090 $1,372.090
JACK BOR OR TUN PIPE (60IN)(STL CASING)
LF 290.000 $1,600.000 $5,000.000 $5,000.000 $1.000 $11,525.570 $11,525.570
ADJUSTING MANHOLES
EA 1.000 $4,828.340 $1,500.000 $1,500.000 $1,173.120 $2,742.530 $2,742.530
REMOV STR (INLET)
EA 3.000 $1,200.000 $1,500.000 $1,500.000 $2,292.910 $5,926.520 $5,926.520
REMOV STR (PIPE)
LF 197.000 $25.000 $1,000.000 $1,000.000 $262.790 $64.520 $64.520
REMOV STR (DRILL SHAFT)
EA 1.000 $2,650.000 $7,500.000 $7,500.000 $50,000.000 $22,485.140 $22,485.140
REMOV STR (SMALL)
EA 1.000 $1,500.000 $3,200.000 $3,200.000 $50,580.320 $12,300.260 $12,300.260
MOBILIZATION
LS 1.000 $57,268,930.000 $60,000,000.000 $60,000,000.000 $85,000,000.000 $103,098,971.720 $103,098,971.720
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 49.000 $13,000.000 $12,000.000 $12,000.000 $46,775.520 $24,694.530 $24,694.530
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,746.000 $52.000 $50.000 $50.000 $24.500 $33.220 $33.220
CONSTRUCTION EXITS (REMOVE)
SY 1,746.000 $20.000 $18.000 $18.000 $16.000 $21.700 $21.700
SANDBAGS FOR EROSION CONTROL
EA 16.000 $2.000 $10.000 $10.000 $8.500 $11.530 $11.530
TEMP SEDMT CONT FENCE (INSTALL)
LF 16,860.000 $4.000 $8.000 $8.000 $4.250 $5.760 $5.760
TEMP SEDMT CONT FENCE (REMOVE)
LF 16,860.000 $1.000 $2.000 $2.000 $1.350 $1.830 $1.830
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 224.000 $8.000 $12.000 $12.000 $10.000 $13.560 $13.560
BIODEG EROSN CONT LOGS (REMOVE)
LF 224.000 $7.000 $6.000 $6.000 $4.500 $6.100 $6.100
CONSTRUCTING DETOURS
SY 12.900 $100.000 $125.000 $125.000 $226.590 $143.790 $143.790
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,175.000 $100.000 $86.000 $86.000 $68.230 $200.110 $200.110
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,260.000 $55.000 $72.000 $72.000 $65.450 $178.550 $178.550
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 360.000 $65.000 $67.000 $67.000 $65.710 $171.440 $171.440
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,175.000 $25.000 $28.000 $28.000 $11.210 $30.250 $30.250
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,260.000 $28.000 $24.000 $24.000 $10.730 $34.420 $34.420
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 360.000 $26.000 $20.000 $20.000 $10.100 $41.760 $41.760
CONC CURB (TY II)
LF 746.000 $45.000 $35.000 $35.000 $32.130 $24.850 $24.850
CONC CURB & GUTTER (TY II)
LF 1,442.000 $65.000 $60.000 $60.000 $48.040 $47.720 $47.720
DRIVEWAYS (ACP)
SY 1,332.000 $72.000 $195.000 $195.000 $110.340 $284.750 $284.750
CONC SIDEWALKS (5")
SY 731.000 $105.000 $0.000 $0.000 $0.000 $0.000 $0.000
CURB RAMPS (TY 1)
EA 1.000 $4,000.000 $5,200.000 $5,200.000 $3,110.440 $3,330.380 $3,330.380
CURB RAMPS (TY 2)
EA 1.000 $4,000.000 $0.000 $0.000 $0.000 $0.000 $0.000
CURB RAMPS (TY 6)
EA 2.000 $5,000.000 $5,200.000 $5,200.000 $2,663.830 $2,780.870 $2,780.870
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 292.000 $200.000 $115.000 $115.000 $79.550 $359.330 $359.330
CONC SIDEWALKS (5") (ALT 1A)
SY 893.000 $85.950 $0.000 $0.000 $79.580 $0.000 $0.000
CURB RAMPS (TY 2) (ALT 1A)
EA 2.000 $2,163.000 $0.000 $0.000 $3,233.970 $0.000 $0.000
CONC MEDIAN
SY 146.000 $300.000 $250.000 $250.000 $152.120 $170.500 $170.500
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $8,085.000 $8,085.000 $2,000.000 $1,913.980 $1,913.980
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $32,000.000 $35,700.000 $35,700.000 $36,871.750 $67,653.070 $67,653.070
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $8,000.000 $3,000.000 $3,000.000 $4,690.900 $3,389.880 $3,389.880
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $4,000.000 $4,400.000 $4,400.000 $7,130.160 $5,152.610 $5,152.610
REMOVE RD IL ASM (SHOE-BASE)
EA 1.000 $750.000 $3,500.000 $3,500.000 $1,444.800 $1,044.090 $1,044.090
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $1,150.000 $3,500.000 $3,500.000 $1,923.270 $1,389.850 $1,389.850
CONDT (PVC) (SCH 40) (2")
LF 530.000 $28.000 $41.000 $41.000 $29.080 $21.020 $21.020
CONDT (PVC) (SCH 40) (2") (BORE)
LF 60.000 $100.000 $131.000 $131.000 $52.070 $37.630 $37.630
CONDT (PVC) (SCH 40) (3")
LF 125.000 $30.000 $35.000 $35.000 $45.970 $33.220 $33.220
CONDT (PVC) (SCH 40) (3") (BORE)
LF 1,230.000 $50.000 $77.000 $77.000 $52.540 $37.970 $37.970
CONDT (PVC) (SCH 40) (4")
LF 40.000 $33.000 $86.000 $86.000 $61.920 $44.750 $44.750
ELEC CONDR (NO.8) INSULATED
LF 3,950.000 $5.000 $5.000 $5.000 $4.220 $3.050 $3.050
ELEC CONDR (NO.6) BARE
LF 1,470.000 $2.750 $5.000 $5.000 $4.220 $3.050 $3.050
ELEC CONDR (NO.6) INSULATED
LF 50.000 $5.500 $5.000 $5.000 $8.440 $6.100 $6.100
ELEC CONDR (NO.4) BARE
LF 550.000 $3.250 $5.000 $5.000 $7.040 $5.080 $5.080
ELEC CONDR (NO.4) INSULATED
LF 1,100.000 $3.750 $5.000 $5.000 $7.510 $5.420 $5.420
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,500.000 $2,250.000 $2,250.000 $4,052.930 $2,928.850 $2,928.850
GROUND BOX TY D (162922)W/APRON
EA 10.000 $3,300.000 $2,900.000 $2,900.000 $4,268.720 $3,084.790 $3,084.790
REMOVE GROUND BOX
EA 3.000 $720.000 $420.000 $420.000 $731.780 $528.820 $528.820
REMOVE ELECTRICAL SERVICES
EA 1.000 $600.000 $830.000 $830.000 $1,285.310 $928.830 $928.830
ALUMINUM SIGNS (TY A)
SF 218.000 $40.000 $42.000 $42.000 $245.250 $35.590 $35.590
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $1,000.000 $900.000 $900.000 $500.000 $1,694.940 $1,694.940
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
EA 1.000 $4,500.000 $1,320.000 $1,320.000 $500.000 $2,935.630 $2,935.630
REMOVE SM RD SN SUP&AM
EA 37.000 $120.000 $145.000 $145.000 $239.500 $427.120 $427.120
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 693.000 $0.750 $1.000 $1.000 $3.080 $4.070 $4.070
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 35.000 $1.000 $1.000 $1.000 $3.080 $4.070 $4.070
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 368.000 $0.650 $1.000 $1.000 $3.080 $4.070 $4.070
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 22.000 $5.000 $4.500 $4.500 $33.920 $44.750 $44.750
WK ZN PAV MRK NON-REMOV (Y)6"(DOT)
LF 23.000 $1.500 $1.000 $1.000 $3.080 $4.070 $4.070
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 600.000 $0.650 $1.000 $1.000 $3.080 $4.070 $4.070
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 93.000 $1.500 $6.500 $6.500 $7.200 $9.490 $9.490
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 89.000 $2.500 $7.500 $7.500 $7.200 $9.490 $9.490
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 356.000 $3.000 $7.500 $7.500 $7.200 $9.490 $9.490
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 179.000 $2.000 $7.500 $7.500 $7.200 $9.490 $9.490
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 264.000 $15.000 $15.000 $15.000 $33.920 $44.750 $44.750
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 11.000 $42.000 $45.000 $45.000 $104.840 $138.310 $138.310
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 415.000 $5.000 $2.000 $2.000 $102.790 $135.590 $135.590
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,814.000 $10.000 $3.000 $3.000 $102.790 $135.590 $135.590
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,117.000 $3.000 $2.000 $2.000 $102.790 $135.590 $135.590
REFL PAV MRKR TY I-C
EA 22.000 $10.000 $7.500 $7.500 $7.200 $9.490 $9.490
REFL PAV MRKR TY II-A-A
EA 44.000 $10.000 $7.500 $7.500 $7.200 $9.490 $9.490
ELIM EXT PAV MRK & MRKS (4")
LF 93.000 $4.000 $2.000 $2.000 $3.080 $4.070 $4.070
ELIM EXT PAV MRK & MRKS (6")
LF 3,216.000 $1.000 $4.000 $4.000 $3.080 $4.070 $4.070
ELIM EXT PAV MRK & MRKS (24")
LF 36.000 $8.500 $4.000 $4.000 $3.080 $4.070 $4.070
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,800.000 $9,000.000 $9,000.000 $5,056.790 $3,654.290 $3,654.290
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $16,100.000 $25,000.000 $25,000.000 $20,264.670 $14,644.260 $14,644.260
TEMP TRAF SIGNALS
EA 4.000 $65,100.000 $35,000.000 $35,000.000 $85,092.840 $61,492.320 $61,492.320
VEH SIG SEC (12")LED(GRN)
EA 3.000 $330.000 $475.000 $475.000 $788.070 $569.500 $569.500
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $330.000 $475.000 $475.000 $793.230 $573.230 $573.230
VEH SIG SEC (12")LED(YEL)
EA 3.000 $330.000 $475.000 $475.000 $788.070 $569.500 $569.500
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $330.000 $475.000 $475.000 $797.450 $576.280 $576.280
VEH SIG SEC (12")LED(RED)
EA 3.000 $330.000 $475.000 $475.000 $788.070 $569.500 $569.500
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $330.000 $475.000 $475.000 $797.450 $576.280 $576.280
PED SIG SEC (LED)(COUNTDOWN)
EA 3.000 $1,650.000 $1,200.000 $1,200.000 $1,510.470 $1,091.540 $1,091.540
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 4.000 $220.000 $200.000 $200.000 $628.580 $454.240 $454.240
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,199.000 $3.300 $5.000 $5.000 $4.690 $3.390 $3.390
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,265.000 $5.500 $10.000 $10.000 $12.200 $8.810 $8.810
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 7,535.000 $2.200 $5.000 $5.000 $4.690 $3.390 $3.390
INS TRF SIG PL AM(S)1 ARM(48')
EA 1.000 $15,300.000 $25,000.000 $25,000.000 $33,399.170 $24,135.910 $24,135.910
PED POLE ASSEMBLY
EA 3.000 $8,800.000 $6,000.000 $6,000.000 $5,591.550 $4,040.730 $4,040.730
PED DETECT PUSH BUTTON (APS)
EA 24.000 $2,750.000 $1,300.000 $1,300.000 $2,110.900 $1,525.440 $1,525.440
PED DETECTOR CONTROLLER UNIT
EA 4.000 $5,000.000 $4,400.000 $4,400.000 $8,012.050 $5,789.910 $5,789.910
REMOVAL OF GROUND BOXES
EA 5.000 $150.000 $450.000 $450.000 $731.780 $528.820 $528.820
REMOVAL OF CABLES
LF 270.000 $8.000 $3.500 $3.500 $2.810 $2.030 $2.030
REMOVAL OF TIMBER POLES
EA 1.000 $900.000 $850.000 $850.000 $1,247.780 $901.710 $901.710
REMOVAL OF CONTROL CABINET(POLE MNT)
EA 1.000 $1,400.000 $1,400.000 $1,400.000 $1,876.360 $1,355.950 $1,355.950
LITTER REMOVAL
CYC 8.000 $3,000.000 $10,700.000 $10,700.000 $6,846.300 $4,003.810 $4,003.810
TREE AND BRUSH REMOVAL
AC 12.110 $10,500.000 $100,000.000 $100,000.000 $2,283.560 $22,468.490 $22,468.490
NO. OF WORKING DAYS
$/D 120,000.000 $1,217.000 $1,216.000 $1,216.000 $1,217.000 $1,217.000 $1,217.000
TUNNEL BORING MACHINE
EA 2.000 $40,000,000.000 $30,000,000.000 $30,000,000.000 $100,000,000.000 $72,653,230.420 $72,653,230.420
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 225.000 $200.000 $165.000 $165.000 $193.690 $244.070 $244.070
D-GR HMA TY-D PG76-22
TON 157.000 $165.000 $148.000 $148.000 $206.740 $264.410 $264.410
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 98.000 $200.000 $135.000 $135.000 $206.740 $264.410 $264.410
TOM-C PG76-22 SAC-B
TON 119.000 $200.000 $160.000 $160.000 $408.050 $542.380 $542.380
BONDING COURSE
GAL 382.000 $5.000 $4.000 $4.000 $5.440 $10.170 $10.170
BORE 22' TUNNEL W/SEG LIN
LF 32,185.000 $8,500.000 $0.000 $0.000 $0.000 $0.000 $0.000
TBM HEADING PROBE HOLES
LF 6,423.000 $20.000 $165.000 $165.000 $40.610 $896.230 $896.230
TBM TUNNEL GROUT CEMENT
CF 100.000 $120.000 $33.000 $33.000 $1,577.310 $21.410 $21.410
TBM TUNNEL GROUT TIME
HR 40.000 $800.000 $5,800.000 $5,800.000 $2,450.240 $5,349.710 $5,349.710
GASSY CONDITIONS WORK STOPPAGE
HR 72.000 $1,500.000 $6,700.000 $6,700.000 $2,371.040 $5,342.480 $5,342.480
CRACK GAUGES
EA 1,664.000 $100.000 $500.000 $500.000 $46.790 $343.110 $343.110
INCLINOMETERS
LF 2,340.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
MULTI-POINT BOREHOLE EXTENSOMETERS
LF 5,718.000 $250.000 $0.000 $0.000 $0.000 $0.000 $0.000
SEISMOGRAPHS
EA 82.000 $250.000 $13,000.000 $13,000.000 $13,612.170 $34,452.610 $34,452.610
STRAIN GAUGES
EA 20.000 $200.000 $6,000.000 $6,000.000 $2,914.710 $6,351.250 $6,351.250
STRUCTURE MONITORING POINTS
EA 571.000 $800.000 $11,000.000 $11,000.000 $384.430 $3,524.530 $3,524.530
TILTMETERS
EA 66.000 $200.000 $4,325.000 $4,325.000 $1,798.380 $7,057.690 $7,057.690
UTILITY MONITORING POINTS
EA 175.000 $1,250.000 $20,000.000 $20,000.000 $9,618.300 $12,614.730 $12,614.730
VIBRATING WIRE PIEZOMETERS
LF 1,780.000 $150.000 $320.000 $320.000 $195.160 $647.440 $647.440
ADDITIONAL SHOTCRETE 2" THICK
SF 21,113.000 $200.000 $0.000 $0.000 $0.000 $0.000 $0.000
ADDITIONAL SHOTCRETE 4" THICK
SF 1,628.000 $100.000 $6.000 $6.000 $180.000 $23.890 $23.890
SPOT ROCK DOWELS (6'-10')
EA 125.000 $150.000 $0.000 $0.000 $0.000 $0.000 $0.000
SPOT ROCK DOWELS (12'-14')
EA 129.000 $300.000 $80.000 $80.000 $341.000 $910.640 $910.640
SUPP OF EXCAV (ADIT) (TY 1A)
SF 19,453.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
SUPP OF EXCAV (ADIT) (TY 1B)
SF 22,196.000 $100.000 $65.000 $65.000 $42.000 $37.340 $37.340
SUPP OF EXCAV (ADIT) (TY 2)
SF 4,599.000 $100.000 $65.000 $65.000 $50.000 $78.090 $78.090
SUPP OF EXCAV (ADIT) (TY 3A)
SF 40,578.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
SUPP OF EXCAV (ADIT) (TY 3B)
SF 8,141.000 $100.000 $65.000 $65.000 $65.400 $82.360 $82.360
SUPP OF EXCAV (ADIT) (TY 4)
SF 14,462.000 $100.000 $65.000 $65.000 $37.570 $80.380 $80.380
SUPP OF EXCAV (SHAFT INVERT) (TY A)
SF 2,683.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
SUPP OF EXCAV (SHAFT INVERT) (TY B)
SF 3,671.000 $100.000 $65.000 $65.000 $165.000 $61.590 $61.590
SUPP OF EXCAV (SHAFT) (ROCK) (TY 1)
SF 90,030.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
SUPP OF EXCAV (SHAFT) (ROCK) (TY 2)
SF 3,565.000 $100.000 $35.000 $35.000 $23.000 $40.150 $40.150
SUPP OF EXCAV (SHAFT) (SOIL) (TY 1)
SF 9,323.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
SUPP OF EXCAV (SHAFT) (SOIL) (TY 2)
SF 5,169.000 $100.000 $150.000 $150.000 $420.750 $292.520 $292.520
SUPP OF EXCAV (TEE) (ROCK) (TY 1)
EA 1.000 $921,000.000 $3,000,000.000 $3,000,000.000 $6,250,000.000 $1,472,340.790 $1,472,340.790
SUPP OF EXCAV (TEE)(SOIL) (TY 1)
EA 1.000 $727,800.000 $3,000,000.000 $3,000,000.000 $7,500,000.000 $3,615,392.180 $3,615,392.180
SUPP OF EXCAV (LAUNCH) (SOIL) (SITE 1)
EA 1.000 $770,250.000 $3,000,000.000 $3,000,000.000 $5,100,000.000 $2,892,582.040 $2,892,582.040
SUPP OF EXCAV (LAUNCH) (SOIL) (SITE 2)
EA 1.000 $5,450,000.000 $3,000,000.000 $3,000,000.000 $7,500,000.000 $3,453,468.040 $3,453,468.040
SUPP OF EXCAV (LAUNCH) (ROCK) (SITE 1)
EA 1.000 $7,838,963.100 $1,000,000.000 $1,000,000.000 $12,000,000.000 $3,620,403.550 $3,620,403.550
SUPP OF EXCAV (LAUNCH) (ROCK) (SITE 2)
EA 1.000 $7,742,000.000 $800,000.000 $800,000.000 $14,250,000.000 $3,347,161.630 $3,347,161.630
ADIT PROBE HOLES
LF 2,120.000 $20.000 $0.000 $0.000 $0.000 $0.000 $0.000
ADIT TUNNEL GROUT CEMENT
CF 270.000 $120.000 $0.000 $0.000 $0.000 $0.000 $0.000
ADIT TUNNEL GROUT TIME
HR 162.000 $1,000.000 $0.000 $0.000 $0.000 $0.000 $0.000
CONTAMINATED GROUNDWATER COLLECTION
GAL 520,000.000 $2.000 $0.300 $0.300 $0.090 $0.200 $0.200
CONTAMINATED ROCK REMOVAL
CY 193.000 $150.000 $60.000 $60.000 $70.110 $59.840 $59.840
CONTAMINATED SOIL REMOVAL
CY 1,016.000 $125.000 $60.000 $60.000 $54.480 $52.680 $52.680
SUPP OF EXCAV (SEM TUNNEL)
SF 92,195.000 $100.000 $5.000 $5.000 $17.000 $7.580 $7.580
BORE 22' TUNNEL W/ SEG LIN (ALT 1A)
LF 31,927.000 $8,568.690 $0.000 $0.000 $4,750.980 $0.000 $0.000
GROUND MONITORING POINTS (ALT 1A)
EA 686.000 $496.360 $0.000 $0.000 $381.650 $0.000 $0.000
INCLINOMETERS (ALT 1A)
LF 2,576.000 $90.840 $0.000 $0.000 $2,013.340 $0.000 $0.000
MULTI-POINT BH EXTENSOMETERS (ALT 1A)
LF 5,858.000 $244.030 $0.000 $0.000 $540.050 $0.000 $0.000
ADDITIONAL SHOTCRETE 2" THICK (ALT 1A)
SF 21,618.000 $195.330 $0.000 $0.000 $15.000 $0.000 $0.000
SPOT ROCK DOWELS (6'-10') (ALT 1A)
EA 127.000 $147.640 $0.000 $0.000 $193.000 $0.000 $0.000
SUPP OF EXCAV (ADIT) (TY 1A) (ALT 1A)
SF 22,110.000 $87.980 $0.000 $0.000 $75.000 $0.000 $0.000
SUPP OF EXCAV (ADIT) (TY 3A) (ALT 1A)
SF 40,449.000 $100.320 $0.000 $0.000 $60.070 $0.000 $0.000
SUPP OF EXCAV (SFT INV) (TY A) (ALT 1A)
SF 3,758.000 $71.390 $0.000 $0.000 $120.000 $0.000 $0.000
SUPP OF EXCAV (SFT)(ROCK)(TY 1)(ALT 1A)
SF 95,065.000 $94.700 $0.000 $0.000 $75.000 $0.000 $0.000
SUPP OF EXCAV (SFT)(SOIL)(TY 1)(ALT 1A)
SF 16,448.000 $56.680 $0.000 $0.000 $500.000 $0.000 $0.000
ADIT PROBE HOLES (ALT 1A)
LF 2,148.000 $19.740 $0.000 $0.000 $137.000 $0.000 $0.000
ADIT TUNNEL GROUT CEMENT (ALT 1A)
CF 300.000 $36.000 $0.000 $0.000 $60.000 $0.000 $0.000
ADIT TUNNEL GROUT TIME (ALT 1A)
HR 180.000 $900.000 $0.000 $0.000 $978.000 $0.000 $0.000
GROUND MONITORING POINTS (ALT 1B)
EA 687.000 $495.630 $0.000 $0.000 $0.000 $0.000 $0.000
CONSTRUCTION CONDITION SURVEY
LS 1.000 $1,000,000.000 $5,000,000.000 $5,000,000.000 $1,119,000.000 $610,380.760 $610,380.760
INSTALL REMOVABLE BOLLARD
EA 193.000 $500.000 $900.000 $900.000 $2,000.000 $753.980 $753.980
CONST PERIM FENCE WITH SCREEN (INSTALL)
LF 16,791.000 $225.000 $0.000 $0.000 $0.000 $0.000 $0.000
CONST PERIM FENCE WITH SCREEN (REMOVE)
LF 16,791.000 $100.000 $0.000 $0.000 $0.000 $0.000 $0.000
CONST PERIM FENCE WITH SCREEN (MOVE)
LF 1,679.000 $125.000 $0.000 $0.000 $0.000 $0.000 $0.000
CONST PERIM FENCE W/SCN (INST) (ALT 1A)
LF 16,777.000 $225.190 $0.000 $0.000 $354.870 $0.000 $0.000
CONST PERIM FENCE W/SCN (RMV) (ALT 1A)
LF 16,777.000 $100.080 $0.000 $0.000 $19.470 $0.000 $0.000
CONST PERIM FENCE W/SCN (MOVE) (ALT 1A)
LF 1,677.000 $125.150 $0.000 $0.000 $35.050 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 7.000 $14,500.000 $45,000.000 $45,000.000 $9,526.450 $25,600.330 $25,600.330
ITS COM CBL (ETHERNET)
LF 75.000 $6.600 $5.000 $5.000 $5.630 $4.070 $4.070
CCTV FIELD EQUIPMENT (ANALOG)
EA 1.000 $8,100.000 $7,000.000 $7,000.000 $12,552.840 $9,071.300 $9,071.300
CCTV FIELD CONTROLLER
EA 1.000 $5,500.000 $3.000 $3.000 $14,260.320 $10,305.220 $10,305.220
CCTV MOUNT (POLE)
EA 1.000 $450.000 $200.000 $200.000 $741.160 $535.600 $535.600
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $1,200.000 $5,400.000 $5,400.000 $4,428.200 $3,200.040 $3,200.040
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,100.000 $1,000.000 $1,000.000 $956.940 $691.530 $691.530
CONDUIT (PREPARE)
LF 1,620.000 $3.500 $7.000 $7.000 $9.380 $6.780 $6.780
COAXIAL CABLE
LF 75.000 $6.600 $12.000 $12.000 $11.730 $8.470 $8.470
ANTENNA (UNI-DIRECTIONAL)
EA 1.000 $4,850.000 $2,250.000 $2,250.000 $2,204.720 $1,593.240 $1,593.240
RELOCATE ITS RADIO
EA 2.000 $1,300.000 $4,500.000 $4,500.000 $6,145.080 $4,440.740 $4,440.740
ITS POLE (40 FT)(REM)
EA 1.000 $1,100.000 $800.000 $800.000 $2,495.560 $1,803.410 $1,803.410
ITS POLE (50 FT)(90 MPH)
EA 1.000 $22,000.000 $27,000.000 $27,000.000 $39,328.460 $28,420.710 $28,420.710
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $8,500.000 $8,500.000 $8,500.000 $12,299.530 $8,888.250 $8,888.250
ETHERNET SWITCH (INSTALL ONLY)
EA 1.000 $900.000 $1,000.000 $1,000.000 $2,758.250 $1,993.240 $1,993.240
TERMINAL SERVER (INSTALL ONLY)
EA 1.000 $900.000 $1,000.000 $1,000.000 $694.250 $501.700 $501.700
ITS RVSD (DATA COLLECT ONLY) SYS
EA 1.000 $16,397.000 $30,000.000 $30,000.000 $21,728.230 $15,701.900 $15,701.900
ITS RVSD (DC ONLY) (REMOVE)
EA 1.000 $700.000 $550.000 $550.000 $956.940 $691.530 $691.530
VIVDS CAM ASSY FXD LNS
EA 1.000 $5,300.000 $7,000.000 $7,000.000 $59,715.090 $43,153.100 $43,153.100
VIVDS CABLING
LF 2,906.000 $3.300 $8.000 $8.000 $4.220 $3.050 $3.050
PORTABLE ROADWAY ILLUMINATION
DAY 200.000 $320.000 $500.000 $500.000 $504.000 $460.490 $460.490
ADJUST FRAME AND COVERS (TELE)
EA 1.000 $3,000.000 $1,200.000 $1,200.000 $1,173.120 $1,288.150 $1,288.150
TEMPORARY ELECTRIC GENERATOR
EA 10.000 $4,000,000.000 $100,000.000 $100,000.000 $1,572,973.720 $2,681,560.610 $2,681,560.610
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 150.000 $1,200.000 $3,800.000 $3,800.000 $1,625.170 $2,472.250 $2,472.250
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 120.000 $2,200.000 $5,375.000 $5,375.000 $4,117.100 $2,491.030 $2,491.030
ADJUST OR RELOC WTR METER BOX
EA 1.000 $500.000 $1,300.000 $1,300.000 $942.600 $7,260.340 $7,260.340
SERVICE LINE RECONNECTION (5/8" TO 1")
EA 5.000 $3,800.000 $1,500.000 $1,500.000 $3,358.690 $5,033.280 $5,033.280
ENCASEMENT PIPE (18")STEEL
LF 75.000 $709.000 $625.000 $625.000 $1,733.520 $572.280 $572.280
ENCASEMENT PIPE (42" ) STEEL
LF 63.000 $600.000 $1,000.000 $1,000.000 $725.910 $1,082.500 $1,082.500
ENCASEMENT PIPE (54" ) STEEL
LF 370.000 $900.000 $1,750.000 $1,750.000 $1.000 $2,737.280 $2,737.280
STD PRECAST MANH W/ CIP BS 72" DIA
EA 2.000 $9,000.000 $45,000.000 $45,000.000 $20,585.510 $43,748.190 $43,748.190
REMOVE EXISTING MANHOLE
EA 2.000 $3,000.000 $6,300.000 $6,300.000 $2,383.590 $18,616.250 $18,616.250
EXTRA DEPTH OF MANHOLE 48"
LF 2.000 $800.000 $1,500.000 $1,500.000 $1,300.140 $1,882.310 $1,882.310
EXTRA DEPTH OF MANHOLE 60"
LF 12.000 $1,000.000 $1,700.000 $1,700.000 $1,408.480 $2,475.270 $2,475.270
PIPE (8") DI CLASS 350 (ALL DEPTHS)
LF 529.000 $210.000 $500.000 $500.000 $153.690 $296.480 $296.480
PIPE (24") DI CLASS 350 (ALL DEPTHS)
LF 53.000 $375.000 $800.000 $800.000 $715.080 $641.230 $641.230
CARRI PIPE (36")PVC C-900DR-14(ALL DTH)
LF 370.000 $695.000 $500.000 $500.000 $455.050 $655.020 $655.020
RESTRAINED JT PIPE (6") DI (ALL DTH)
LF 55.000 $160.000 $500.000 $500.000 $74.760 $268.900 $268.900
RESTRAINED JT PIPE (12") DI (ALL DTH)
LF 30.000 $250.000 $600.000 $600.000 $173.350 $420.590 $420.590
RESTRAINED JT PIPE (16") DI (ALL DTH)
LF 37.000 $300.000 $600.000 $600.000 $325.030 $586.070 $586.070
RESTRAINED JT PIPE (24") DI (ALL DTH)
LF 1,310.000 $450.000 $700.000 $700.000 $433.380 $710.180 $710.180
WET CONNECTION 6" DIA X 6" DIA
EA 2.000 $7,000.000 $18,000.000 $18,000.000 $5,525.590 $9,997.620 $9,997.620
WET CONNECTION 16" DIA X 12" DIA
EA 1.000 $9,000.000 $280,000.000 $280,000.000 $6,500.690 $13,100.310 $13,100.310
WET CONNECTION 24" DIA X 24" DIA
EA 4.000 $12,000.000 $31,000.000 $31,000.000 $16,251.720 $17,237.270 $17,237.270
DUCTILE IRON FITTINGS
TON 17.900 $23,000.000 $24,000.000 $24,000.000 $8,017.510 $12,927.950 $12,927.950
PIPE 6" DIA PVC SDR26 TYPE(ALL DEPTHS)
LF 18.000 $625.000 $300.000 $300.000 $314.200 $213.740 $213.740
PIPE 8" DIA PVC SDR26 TYPE(ALL DEPTHS)
LF 542.000 $180.000 $620.000 $620.000 $370.370 $489.540 $489.540
PIPE 36" DIA PVC PS115 TYPE(ALL DEPTHS)
LF 347.000 $625.000 $1,000.000 $1,000.000 $496.770 $765.330 $765.330
VALVE (GATE)(6")
EA 6.000 $3,500.000 $2,700.000 $2,700.000 $2,708.620 $4,847.120 $4,847.120
VALVE (GATE)(8")
EA 4.000 $3,500.000 $3,700.000 $3,700.000 $3,683.720 $9,652.870 $9,652.870
VALVE (GATE)(12")
EA 3.000 $15,000.000 $6,000.000 $6,000.000 $6,609.030 $7,908.460 $7,908.460
VALVE (GATE)(16")
EA 1.000 $24,000.000 $17,000.000 $17,000.000 $15,168.270 $17,120.060 $17,120.060
VALVE (GATE)(24")
EA 4.000 $38,000.000 $51,000.000 $51,000.000 $43,337.920 $47,374.900 $47,374.900
RMV AND SALVAGE EXIST WATER VALVE
EA 11.000 $3,000.000 $4,600.000 $4,600.000 $3,900.410 $3,102.710 $3,102.710
FIRE HYDRANTS
EA 7.000 $10,000.000 $20,500.000 $20,500.000 $10,076.070 $17,582.010 $17,582.010
RMV AND DISPOSAL OF EXIST FIRE HYDRANT
EA 1.000 $1,500.000 $4,600.000 $4,600.000 $2,383.590 $3,792.200 $3,792.200
AUTO COMBO AIR/VAC RELEASE VALVE AM 2"
EA 4.000 $20,000.000 $11,600.000 $11,600.000 $28,169.650 $39,645.720 $39,645.720
CUT/PLUG EXIST WATER LINE (ALL WL SIZE)
EA 5.000 $6,000.000 $5,000.000 $5,000.000 $7,150.760 $3,102.710 $3,102.710
ABND/RMV/DISPOSE EXIST LINE (ALL TY/SZ)
LF 1,939.000 $6.000 $150.000 $150.000 $292.530 $62.050 $62.050
RESTRAIN EXIST WATERLINE (ALL TY/SZ)
LF 2.000 $16,000.000 $44,000.000 $44,000.000 $1,191.800 $10,687.110 $10,687.110
SERVICE LINE RECONNECTION (<6")
EA 1.000 $2,500.000 $25,000.000 $25,000.000 $9,751.030 $2,551.110 $2,551.110
WATERTIGHT POLY CONC MH 48" DIA
EA 3.000 $40,000.000 $58,000.000 $58,000.000 $29,253.090 $36,887.750 $36,887.750
WATERTIGHT POLY CONC MH 60" DIA
EA 1.000 $60,000.000 $94,000.000 $94,000.000 $58,506.190 $64,122.630 $64,122.630
WATERTIGHT POLY CONC DROP MH 60" DIA
EA 1.000 $75,000.000 $95,000.000 $95,000.000 $65,006.870 $75,843.980 $75,843.980
WATERTIGHT POLY CONC MH 72" DIA
EA 2.000 $8,250.000 $110,000.000 $110,000.000 $81,258.590 $91,012.770 $91,012.770
EXT DEPTH DROP POLY CONC WTRTI MH, 60IN
VF 14.000 $1,100.000 $3,600.000 $3,600.000 $5,092.210 $2,413.220 $2,413.220
ABND/RMV/DISP EXIST 2.25"WL, ALL DEPTH
LF 356.000 $40.000 $60.000 $60.000 $108.340 $41.370 $41.370
ABND/RMV/DISP EXIST 6"WL, ALL DEPTH
LF 178.000 $45.000 $60.000 $60.000 $130.010 $62.050 $62.050
ABND/RMV/DISP EXIST 6"WWL, ALL DEPTH
LF 250.000 $45.000 $60.000 $60.000 $151.680 $68.950 $68.950
ABND/RMV/DISP EXIST 8"WWL, ALL DEPTH
LF 403.000 $50.000 $110.000 $110.000 $162.520 $82.740 $82.740
TEMPORARY WL A
LS 1.000 $30,000.000 $36,000.000 $36,000.000 $71,343.760 $20,684.710 $20,684.710
BYPASS PUMPING WWL A
DAY 7.000 $1,990.570 $74,000.000 $74,000.000 $5,200.550 $10,342.360 $10,342.360
BYPASS PUMPING WWL B 1
DAY 7.000 $1,990.570 $40,000.000 $40,000.000 $1,300.140 $3,447.450 $3,447.450
BYPASS PUMPING WWL B 2
DAY 14.000 $1,990.570 $40,000.000 $40,000.000 $5,958.960 $3,447.450 $3,447.450
VENTILATION PIPE (STEEL) (30")
LF 227.000 $310.000 $11,000.000 $11,000.000 $1,350.000 $1,311.490 $1,311.490
VENTILATION PIPE (STEEL) (42")
LF 639.000 $182.000 $12,000.000 $12,000.000 $1,400.000 $1,816.900 $1,816.900
VENTILATION PIPE (STEEL) (72")
LF 224.000 $310.000 $20,000.000 $20,000.000 $3,000.000 $3,104.070 $3,104.070
VORTEX DROP PIPE (STEEL) (96")
LF 293.000 $412.000 $25,000.000 $25,000.000 $6,500.000 $4,450.280 $4,450.280
VORTEX DROP PIPE (STEEL) (120")
LF 403.000 $515.000 $30,000.000 $30,000.000 $10,500.000 $5,556.640 $5,556.640
VORTEX DROP PIPE (STEEL) (144")
LF 149.000 $617.000 $37,000.000 $37,000.000 $21,000.000 $6,971.750 $6,971.750
1
STRUCT EXCAV (SHAFT)
CY 5,597.000 $175.000 $200.000 $200.000 $0.000 $74.160 $74.160
1
ROCK EXCAV (SHAFT)
CY 32,233.000 $500.000 $250.000 $250.000 $0.000 $1,487.230 $1,487.230
1
ROCK EXCAV (ADIT)
CY 15,377.000 $500.000 $1,200.000 $1,200.000 $0.000 $3,336.500 $3,336.500
1
FLOWABLE BACKFILL (SPECIAL)
CY 4,145.000 $430.000 $100.000 $100.000 $0.000 $216.920 $216.920
1
CL F CONC (SHAFT)
CY 18,845.000 $1,250.000 $3,500.000 $3,500.000 $0.000 $4,071.130 $4,071.130
1
CL F CONC (ADIT)
CY 5,155.000 $1,250.000 $7,000.000 $7,000.000 $0.000 $8,016.890 $8,016.890
1
CL F CONC (TUNNEL)
CY 1,732.000 $1,250.000 $9,000.000 $9,000.000 $0.000 $11,439.240 $11,439.240
1
CONC SIDEWALKS (5")
SY 731.000 $105.000 $115.000 $115.000 $0.000 $90.410 $90.410
1
CURB RAMPS (TY 2)
EA 1.000 $4,000.000 $6,150.000 $6,150.000 $0.000 $3,482.370 $3,482.370
1
BORE 22' TUNNEL W/SEG LIN
LF 32,185.000 $8,500.000 $7,200.000 $7,200.000 $0.000 $9,998.470 $9,998.470
1
GROUND MONITORING POINTS
EA 681.000 $500.000 $4,500.000 $4,500.000 $0.000 $3,591.920 $3,591.920
1
INCLINOMETERS
LF 2,340.000 $100.000 $600.000 $600.000 $0.000 $1,742.730 $1,742.730
1
MULTI-POINT BOREHOLE EXTENSOMETERS
LF 5,718.000 $250.000 $450.000 $450.000 $0.000 $751.860 $751.860
1
ADDITIONAL SHOTCRETE 2" THICK
SF 21,113.000 $200.000 $3.000 $3.000 $0.000 $11.930 $11.930
1
SPOT ROCK DOWELS (6'-10')
EA 125.000 $150.000 $60.000 $60.000 $0.000 $658.140 $658.140
1
SUPP OF EXCAV (ADIT) (TY 1A)
SF 19,453.000 $100.000 $65.000 $65.000 $0.000 $130.090 $130.090
1
SUPP OF EXCAV (ADIT) (TY 3A)
SF 40,578.000 $100.000 $65.000 $65.000 $0.000 $84.540 $84.540
1
SUPP OF EXCAV (SHAFT INVERT) (TY A)
SF 2,683.000 $100.000 $65.000 $65.000 $0.000 $19.090 $19.090
1
SUPP OF EXCAV (SHAFT) (ROCK) (TY 1)
SF 90,030.000 $100.000 $30.000 $30.000 $0.000 $40.150 $40.150
1
SUPP OF EXCAV (SHAFT) (SOIL) (TY 1)
SF 9,323.000 $100.000 $150.000 $150.000 $0.000 $405.370 $405.370
1
ADIT PROBE HOLES
LF 2,120.000 $20.000 $60.000 $60.000 $0.000 $100.790 $100.790
1
ADIT TUNNEL GROUT CEMENT
CF 270.000 $120.000 $25.000 $25.000 $0.000 $54.240 $54.240
1
ADIT TUNNEL GROUT TIME
HR 162.000 $1,000.000 $1,225.000 $1,225.000 $0.000 $2,883.260 $2,883.260
1
CONST PERIM FENCE WITH SCREEN (INSTALL)
LF 16,791.000 $225.000 $600.000 $600.000 $0.000 $580.690 $580.690
1
CONST PERIM FENCE WITH SCREEN (REMOVE)
LF 16,791.000 $100.000 $135.000 $135.000 $0.000 $13.260 $13.260
1
CONST PERIM FENCE WITH SCREEN (MOVE)
LF 1,679.000 $125.000 $85.000 $85.000 $0.000 $92.480 $92.480
Totals: $1,491,480,882.690 $844,040,714.500 $844,040,714.500 $998,890,000.003 $1,181,639,750.095 $1,181,639,750.095