Bid Cobra

SUPP OF EXCAV (TEE)(SOIL) (TY 1)

Engineer's Estimate

Average: $727,800.00
Maximum: $727,800.00
Minimum: $727,800.00

Bid Information

Average Bid: $4,146,156.87