PREPARING ROW
|
AC
|
23.110
|
$35,900.000
|
$35,000.000
|
$35,000.000
|
$3,679,000.000
|
$605,833.440
|
$605,833.440
|
|
|
|
DISPOSAL OF WATER WELLS
|
EA
|
9.000
|
$10,000.000
|
$5,000.000
|
$5,000.000
|
$1,739.310
|
$4,067.850
|
$4,067.850
|
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
421.000
|
$50.000
|
$50.000
|
$50.000
|
$14.880
|
$17.830
|
$17.830
|
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
51.000
|
$110.000
|
$50.000
|
$50.000
|
$12.200
|
$14.620
|
$14.620
|
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,689.000
|
$50.000
|
$50.000
|
$50.000
|
$7.780
|
$9.320
|
$9.320
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
466.000
|
$30.000
|
$50.000
|
$50.000
|
$18.530
|
$22.200
|
$22.200
|
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
406.000
|
$50.000
|
$50.000
|
$50.000
|
$12.390
|
$14.850
|
$14.850
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,165.000
|
$18.000
|
$27.500
|
$27.500
|
$7.060
|
$8.460
|
$8.460
|
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
2,169.000
|
$30.000
|
$31.000
|
$31.000
|
$25.350
|
$6.030
|
$6.030
|
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
2,985.000
|
$25.000
|
$61.000
|
$61.000
|
$66.910
|
$28.540
|
$28.540
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,154.000
|
$68.000
|
$42.000
|
$42.000
|
$450.000
|
$38.660
|
$38.660
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
56,119.000
|
$6.400
|
$20.000
|
$20.000
|
$7.090
|
$11.530
|
$11.530
|
|
|
|
BLOCK SODDING
|
SY
|
500.000
|
$28.000
|
$23.000
|
$23.000
|
$16.370
|
$17.610
|
$17.610
|
|
|
|
ROLL SODDING
|
SY
|
55,619.000
|
$7.000
|
$5.000
|
$5.000
|
$9.770
|
$10.330
|
$10.330
|
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
56,119.000
|
$0.500
|
$1.000
|
$1.000
|
$0.550
|
$0.530
|
$0.530
|
|
|
|
FERTILIZER
|
TON
|
2.160
|
$1,250.000
|
$1,200.000
|
$1,200.000
|
$1,200.360
|
$3,035.990
|
$3,035.990
|
|
|
|
VEGETATIVE WATERING
|
MG
|
104.000
|
$25.000
|
$40.000
|
$40.000
|
$65.470
|
$123.010
|
$123.010
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
920.000
|
$112.000
|
$85.000
|
$85.000
|
$63.850
|
$310.110
|
$310.110
|
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
25.000
|
$370.000
|
$1,150.000
|
$1,150.000
|
$328.320
|
$631.870
|
$631.870
|
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
1,375.000
|
$9.500
|
$33.000
|
$33.000
|
$12.460
|
$45.630
|
$45.630
|
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
345.000
|
$5.500
|
$24.000
|
$24.000
|
$8.160
|
$13.560
|
$13.560
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
863.000
|
$125.000
|
$85.000
|
$85.000
|
$156.090
|
$264.410
|
$264.410
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,735.000
|
$9.000
|
$12.000
|
$12.000
|
$13.620
|
$20.340
|
$20.340
|
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
6,874.000
|
$5.000
|
$50.000
|
$50.000
|
$140.000
|
$14.710
|
$14.710
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
72.000
|
$150.000
|
$350.000
|
$350.000
|
$167.650
|
$237.520
|
$237.520
|
|
|
|
STRUCT EXCAV (SHAFT)
|
CY
|
5,597.000
|
$175.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
STRUCT EXCAV (LAUNCH) (SITE 1)
|
EA
|
1.000
|
$1,690,000.000
|
$5,000,000.000
|
$5,000,000.000
|
$1,750,000.000
|
$318,739.870
|
$318,739.870
|
|
|
|
STRUCT EXCAV (LAUNCH) (SITE 2)
|
EA
|
1.000
|
$6,638,000.000
|
$5,000,000.000
|
$5,000,000.000
|
$2,100,000.000
|
$457,231.590
|
$457,231.590
|
|
|
|
STRUCT EXCAV (TEE)
|
EA
|
1.000
|
$661,600.000
|
$5,000,000.000
|
$5,000,000.000
|
$2,500,000.000
|
$447,921.050
|
$447,921.050
|
|
|
|
ROCK EXCAV (SHAFT)
|
CY
|
32,233.000
|
$500.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ROCK EXCAV (ADIT)
|
CY
|
15,377.000
|
$500.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ROCK EXCAV (LAUNCH) (SITE 1)
|
EA
|
1.000
|
$5,387,000.000
|
$5,000,000.000
|
$5,000,000.000
|
$30,500,000.000
|
$18,599,803.350
|
$18,599,803.350
|
|
|
|
ROCK EXCAV (LAUNCH) (SITE 2)
|
EA
|
1.000
|
$9,526,000.000
|
$5,000,000.000
|
$5,000,000.000
|
$3,500,000.000
|
$19,440,775.190
|
$19,440,775.190
|
|
|
|
ROCK EXCAV (TEE)
|
EA
|
1.000
|
$2,149,700.000
|
$5,000,000.000
|
$5,000,000.000
|
$6,500,000.000
|
$13,154,282.980
|
$13,154,282.980
|
|
|
|
ROCK EXCAV (TUNNEL)
|
CY
|
5,899.000
|
$500.000
|
$400.000
|
$400.000
|
$320.680
|
$526.310
|
$526.310
|
|
|
|
STRUCT EXCAV (SHAFT) (ALT 1A)
|
CY
|
8,111.000
|
$120.760
|
$0.000
|
$0.000
|
$88.500
|
$0.000
|
$0.000
|
|
|
|
ROCK EXCAV (SHAFT) (ALT 1A)
|
CY
|
33,958.000
|
$474.600
|
$0.000
|
$0.000
|
$454.570
|
$0.000
|
$0.000
|
|
|
|
ROCK EXCAV (ADIT) (ALT 1A)
|
CY
|
15,953.000
|
$481.950
|
$0.000
|
$0.000
|
$738.540
|
$0.000
|
$0.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
575.000
|
$165.000
|
$800.000
|
$800.000
|
$223.500
|
$296.480
|
$296.480
|
|
|
|
FLOWABLE BACKFILL (SPECIAL)
|
CY
|
4,145.000
|
$430.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
FLOWABLE BACKFILL (SPECIAL) (ALT 1A)
|
CY
|
7,920.000
|
$225.040
|
$0.000
|
$0.000
|
$286.930
|
$0.000
|
$0.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,071.000
|
$3.000
|
$21.000
|
$21.000
|
$1.000
|
$68.950
|
$68.950
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
20,897.000
|
$35.200
|
$325.000
|
$325.000
|
$200.000
|
$285.480
|
$285.480
|
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
16.000
|
$330.000
|
$450.000
|
$450.000
|
$1,444.800
|
$1,044.080
|
$1,044.080
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
19.000
|
$704.100
|
$610.000
|
$610.000
|
$1,576.140
|
$1,139.000
|
$1,139.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$454.000
|
$535.000
|
$535.000
|
$1,416.650
|
$1,023.740
|
$1,023.740
|
|
|
|
CL C CONC (CAP)
|
CY
|
0.500
|
$1,300.000
|
$2,000.000
|
$2,000.000
|
$30,000.000
|
$24,489.180
|
$24,489.180
|
|
|
|
CL F CONC (SHAFT)
|
CY
|
18,845.000
|
$1,250.000
|
$0.000
|
$0.000
|
$1,917.000
|
$0.000
|
$0.000
|
|
|
|
CL F CONC (ADIT)
|
CY
|
5,155.000
|
$1,250.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CL F CONC (TUNNEL)
|
CY
|
1,732.000
|
$1,250.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CL F CONC (ADIT/TUNNEL CONNECTION)
|
CY
|
260.000
|
$1,250.000
|
$9,000.000
|
$9,000.000
|
$3,466.980
|
$38,409.110
|
$38,409.110
|
|
|
|
CL F CONC (PANEL) (VARIES)
|
EA
|
33.000
|
$1,400.000
|
$9,000.000
|
$9,000.000
|
$45,000.000
|
$19,738.570
|
$19,738.570
|
|
|
|
CL F CONC (BEAM)
|
LF
|
252.000
|
$150.000
|
$1,250.000
|
$1,250.000
|
$6,700.000
|
$1,687.100
|
$1,687.100
|
|
|
|
CL F CONC (ADIT) (ALT 1A)
|
CY
|
5,331.000
|
$1,208.730
|
$0.000
|
$0.000
|
$7,503.310
|
$0.000
|
$0.000
|
|
|
|
CL F CONC (TUNNEL) (ALT 1A)
|
CY
|
5,159.000
|
$419.650
|
$0.000
|
$0.000
|
$1,952.000
|
$0.000
|
$0.000
|
|
|
|
CL F CONC (SHAFT) (ALT 1B)
|
CY
|
18,845.000
|
$1,250.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.950
|
$1,650.000
|
$1,500.000
|
$1,500.000
|
$1,110.530
|
$7,340.430
|
$7,340.430
|
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
15,266.000
|
$22.000
|
$5.000
|
$5.000
|
$6.000
|
$7.550
|
$7.550
|
|
|
|
CONC BOX CULV (10 FT X 12 FT) (SPL)
|
LF
|
79.000
|
$1,950.000
|
$80,000.000
|
$80,000.000
|
$34,389.790
|
$25,050.410
|
$25,050.410
|
|
|
|
CONC BOX CULV (10 FT X 16 FT) (SPL)
|
LF
|
51.000
|
$2,320.000
|
$80,000.000
|
$80,000.000
|
$35,410.520
|
$34,459.870
|
$34,459.870
|
|
|
|
CONC BOX CULV (10 FT X 17 FT) (SPL)
|
LF
|
206.000
|
$2,410.000
|
$80,000.000
|
$80,000.000
|
$40,516.240
|
$29,363.480
|
$29,363.480
|
|
|
|
CONC BOX CULV (12 FT X 18 FT) (SPL)
|
LF
|
69.000
|
$2,700.000
|
$60,000.000
|
$60,000.000
|
$31,828.950
|
$34,153.440
|
$34,153.440
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
27.000
|
$150.000
|
$150.000
|
$150.000
|
$360.000
|
$112.060
|
$112.060
|
|
|
|
RC PIPE (60 IN)(CL V)
|
LF
|
155.000
|
$650.000
|
$5,000.000
|
$5,000.000
|
$2,673.780
|
$1,157.360
|
$1,157.360
|
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
2.000
|
$15,000.000
|
$100,000.000
|
$100,000.000
|
$43,150.000
|
$13,441.750
|
$13,441.750
|
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
2.000
|
$19,500.000
|
$100,000.000
|
$100,000.000
|
$66,500.000
|
$23,732.540
|
$23,732.540
|
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$7,000.000
|
$7,500.000
|
$7,500.000
|
$18,000.000
|
$5,091.010
|
$5,091.010
|
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$7,100.000
|
$7,500.000
|
$7,500.000
|
$22,000.000
|
$5,091.010
|
$5,091.010
|
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
1.000
|
$12,000.000
|
$25,000.000
|
$25,000.000
|
$29,000.000
|
$5,091.010
|
$5,091.010
|
|
|
|
INLET (COMPL)(PSL)(RH)(3FTX3FT)
|
EA
|
1.000
|
$5,500.000
|
$15,000.000
|
$15,000.000
|
$35,000.000
|
$11,085.390
|
$11,085.390
|
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
|
EA
|
2.000
|
$24,500.000
|
$24,000.000
|
$24,000.000
|
$51,000.000
|
$12,655.680
|
$12,655.680
|
|
|
|
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
|
EA
|
1.000
|
$24,000.000
|
$35,000.000
|
$35,000.000
|
$150,000.000
|
$31,001.320
|
$31,001.320
|
|
|
|
GRATE & FRAME
|
EA
|
4.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$8,800.000
|
$6,779.750
|
$6,779.750
|
|
|
|
GRATE AND FRAME (DIA= 96 IN) (SPL)
|
EA
|
16.000
|
$6,150.000
|
$15,000.000
|
$15,000.000
|
$5,500.000
|
$7,163.710
|
$7,163.710
|
|
|
|
GRATE AND FRAME (DIA= 48 IN)
|
EA
|
12.000
|
$4,500.000
|
$2,000.000
|
$2,000.000
|
$4,750.000
|
$4,451.810
|
$4,451.810
|
|
|
|
HATCH (11' X 16')
|
EA
|
4.000
|
$125,000.000
|
$25,000.000
|
$25,000.000
|
$47,500.000
|
$132,433.710
|
$132,433.710
|
|
|
|
JACK BOR OR TUN PIPE(18 IN)(STL CASING)
|
LF
|
54.000
|
$5,860.000
|
$2,200.000
|
$2,200.000
|
$2,299.670
|
$1,372.090
|
$1,372.090
|
|
|
|
JACK BOR OR TUN PIPE (60IN)(STL CASING)
|
LF
|
290.000
|
$1,600.000
|
$5,000.000
|
$5,000.000
|
$1.000
|
$11,525.570
|
$11,525.570
|
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$4,828.340
|
$1,500.000
|
$1,500.000
|
$1,173.120
|
$2,742.530
|
$2,742.530
|
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
$2,292.910
|
$5,926.520
|
$5,926.520
|
|
|
|
REMOV STR (PIPE)
|
LF
|
197.000
|
$25.000
|
$1,000.000
|
$1,000.000
|
$262.790
|
$64.520
|
$64.520
|
|
|
|
REMOV STR (DRILL SHAFT)
|
EA
|
1.000
|
$2,650.000
|
$7,500.000
|
$7,500.000
|
$50,000.000
|
$22,485.140
|
$22,485.140
|
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,500.000
|
$3,200.000
|
$3,200.000
|
$50,580.320
|
$12,300.260
|
$12,300.260
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$57,268,930.000
|
$60,000,000.000
|
$60,000,000.000
|
$85,000,000.000
|
$103,098,971.720
|
$103,098,971.720
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
49.000
|
$13,000.000
|
$12,000.000
|
$12,000.000
|
$46,775.520
|
$24,694.530
|
$24,694.530
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,746.000
|
$52.000
|
$50.000
|
$50.000
|
$24.500
|
$33.220
|
$33.220
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,746.000
|
$20.000
|
$18.000
|
$18.000
|
$16.000
|
$21.700
|
$21.700
|
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
16.000
|
$2.000
|
$10.000
|
$10.000
|
$8.500
|
$11.530
|
$11.530
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
16,860.000
|
$4.000
|
$8.000
|
$8.000
|
$4.250
|
$5.760
|
$5.760
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
16,860.000
|
$1.000
|
$2.000
|
$2.000
|
$1.350
|
$1.830
|
$1.830
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
224.000
|
$8.000
|
$12.000
|
$12.000
|
$10.000
|
$13.560
|
$13.560
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
224.000
|
$7.000
|
$6.000
|
$6.000
|
$4.500
|
$6.100
|
$6.100
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
12.900
|
$100.000
|
$125.000
|
$125.000
|
$226.590
|
$143.790
|
$143.790
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,175.000
|
$100.000
|
$86.000
|
$86.000
|
$68.230
|
$200.110
|
$200.110
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,260.000
|
$55.000
|
$72.000
|
$72.000
|
$65.450
|
$178.550
|
$178.550
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$65.000
|
$67.000
|
$67.000
|
$65.710
|
$171.440
|
$171.440
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
3,175.000
|
$25.000
|
$28.000
|
$28.000
|
$11.210
|
$30.250
|
$30.250
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,260.000
|
$28.000
|
$24.000
|
$24.000
|
$10.730
|
$34.420
|
$34.420
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$26.000
|
$20.000
|
$20.000
|
$10.100
|
$41.760
|
$41.760
|
|
|
|
CONC CURB (TY II)
|
LF
|
746.000
|
$45.000
|
$35.000
|
$35.000
|
$32.130
|
$24.850
|
$24.850
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,442.000
|
$65.000
|
$60.000
|
$60.000
|
$48.040
|
$47.720
|
$47.720
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,332.000
|
$72.000
|
$195.000
|
$195.000
|
$110.340
|
$284.750
|
$284.750
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
731.000
|
$105.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$4,000.000
|
$5,200.000
|
$5,200.000
|
$3,110.440
|
$3,330.380
|
$3,330.380
|
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$4,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CURB RAMPS (TY 6)
|
EA
|
2.000
|
$5,000.000
|
$5,200.000
|
$5,200.000
|
$2,663.830
|
$2,780.870
|
$2,780.870
|
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
292.000
|
$200.000
|
$115.000
|
$115.000
|
$79.550
|
$359.330
|
$359.330
|
|
|
|
CONC SIDEWALKS (5") (ALT 1A)
|
SY
|
893.000
|
$85.950
|
$0.000
|
$0.000
|
$79.580
|
$0.000
|
$0.000
|
|
|
|
CURB RAMPS (TY 2) (ALT 1A)
|
EA
|
2.000
|
$2,163.000
|
$0.000
|
$0.000
|
$3,233.970
|
$0.000
|
$0.000
|
|
|
|
CONC MEDIAN
|
SY
|
146.000
|
$300.000
|
$250.000
|
$250.000
|
$152.120
|
$170.500
|
$170.500
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$8,085.000
|
$8,085.000
|
$2,000.000
|
$1,913.980
|
$1,913.980
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$32,000.000
|
$35,700.000
|
$35,700.000
|
$36,871.750
|
$67,653.070
|
$67,653.070
|
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$8,000.000
|
$3,000.000
|
$3,000.000
|
$4,690.900
|
$3,389.880
|
$3,389.880
|
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$4,000.000
|
$4,400.000
|
$4,400.000
|
$7,130.160
|
$5,152.610
|
$5,152.610
|
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$750.000
|
$3,500.000
|
$3,500.000
|
$1,444.800
|
$1,044.090
|
$1,044.090
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,150.000
|
$3,500.000
|
$3,500.000
|
$1,923.270
|
$1,389.850
|
$1,389.850
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
530.000
|
$28.000
|
$41.000
|
$41.000
|
$29.080
|
$21.020
|
$21.020
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
60.000
|
$100.000
|
$131.000
|
$131.000
|
$52.070
|
$37.630
|
$37.630
|
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
125.000
|
$30.000
|
$35.000
|
$35.000
|
$45.970
|
$33.220
|
$33.220
|
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
1,230.000
|
$50.000
|
$77.000
|
$77.000
|
$52.540
|
$37.970
|
$37.970
|
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
40.000
|
$33.000
|
$86.000
|
$86.000
|
$61.920
|
$44.750
|
$44.750
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,950.000
|
$5.000
|
$5.000
|
$5.000
|
$4.220
|
$3.050
|
$3.050
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,470.000
|
$2.750
|
$5.000
|
$5.000
|
$4.220
|
$3.050
|
$3.050
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
50.000
|
$5.500
|
$5.000
|
$5.000
|
$8.440
|
$6.100
|
$6.100
|
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
550.000
|
$3.250
|
$5.000
|
$5.000
|
$7.040
|
$5.080
|
$5.080
|
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,100.000
|
$3.750
|
$5.000
|
$5.000
|
$7.510
|
$5.420
|
$5.420
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,500.000
|
$2,250.000
|
$2,250.000
|
$4,052.930
|
$2,928.850
|
$2,928.850
|
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$3,300.000
|
$2,900.000
|
$2,900.000
|
$4,268.720
|
$3,084.790
|
$3,084.790
|
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$720.000
|
$420.000
|
$420.000
|
$731.780
|
$528.820
|
$528.820
|
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$600.000
|
$830.000
|
$830.000
|
$1,285.310
|
$928.830
|
$928.830
|
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
218.000
|
$40.000
|
$42.000
|
$42.000
|
$245.250
|
$35.590
|
$35.590
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$1,000.000
|
$900.000
|
$900.000
|
$500.000
|
$1,694.940
|
$1,694.940
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
|
EA
|
1.000
|
$4,500.000
|
$1,320.000
|
$1,320.000
|
$500.000
|
$2,935.630
|
$2,935.630
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$120.000
|
$145.000
|
$145.000
|
$239.500
|
$427.120
|
$427.120
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
693.000
|
$0.750
|
$1.000
|
$1.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
35.000
|
$1.000
|
$1.000
|
$1.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
368.000
|
$0.650
|
$1.000
|
$1.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
22.000
|
$5.000
|
$4.500
|
$4.500
|
$33.920
|
$44.750
|
$44.750
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(DOT)
|
LF
|
23.000
|
$1.500
|
$1.000
|
$1.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
600.000
|
$0.650
|
$1.000
|
$1.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
93.000
|
$1.500
|
$6.500
|
$6.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
89.000
|
$2.500
|
$7.500
|
$7.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
356.000
|
$3.000
|
$7.500
|
$7.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
179.000
|
$2.000
|
$7.500
|
$7.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
264.000
|
$15.000
|
$15.000
|
$15.000
|
$33.920
|
$44.750
|
$44.750
|
|
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
11.000
|
$42.000
|
$45.000
|
$45.000
|
$104.840
|
$138.310
|
$138.310
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
415.000
|
$5.000
|
$2.000
|
$2.000
|
$102.790
|
$135.590
|
$135.590
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,814.000
|
$10.000
|
$3.000
|
$3.000
|
$102.790
|
$135.590
|
$135.590
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,117.000
|
$3.000
|
$2.000
|
$2.000
|
$102.790
|
$135.590
|
$135.590
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
22.000
|
$10.000
|
$7.500
|
$7.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
44.000
|
$10.000
|
$7.500
|
$7.500
|
$7.200
|
$9.490
|
$9.490
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
93.000
|
$4.000
|
$2.000
|
$2.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,216.000
|
$1.000
|
$4.000
|
$4.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
36.000
|
$8.500
|
$4.000
|
$4.000
|
$3.080
|
$4.070
|
$4.070
|
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$4,800.000
|
$9,000.000
|
$9,000.000
|
$5,056.790
|
$3,654.290
|
$3,654.290
|
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
2.000
|
$16,100.000
|
$25,000.000
|
$25,000.000
|
$20,264.670
|
$14,644.260
|
$14,644.260
|
|
|
|
TEMP TRAF SIGNALS
|
EA
|
4.000
|
$65,100.000
|
$35,000.000
|
$35,000.000
|
$85,092.840
|
$61,492.320
|
$61,492.320
|
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
3.000
|
$330.000
|
$475.000
|
$475.000
|
$788.070
|
$569.500
|
$569.500
|
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
1.000
|
$330.000
|
$475.000
|
$475.000
|
$793.230
|
$573.230
|
$573.230
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
3.000
|
$330.000
|
$475.000
|
$475.000
|
$788.070
|
$569.500
|
$569.500
|
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
1.000
|
$330.000
|
$475.000
|
$475.000
|
$797.450
|
$576.280
|
$576.280
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
3.000
|
$330.000
|
$475.000
|
$475.000
|
$788.070
|
$569.500
|
$569.500
|
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
1.000
|
$330.000
|
$475.000
|
$475.000
|
$797.450
|
$576.280
|
$576.280
|
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
3.000
|
$1,650.000
|
$1,200.000
|
$1,200.000
|
$1,510.470
|
$1,091.540
|
$1,091.540
|
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
4.000
|
$220.000
|
$200.000
|
$200.000
|
$628.580
|
$454.240
|
$454.240
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,199.000
|
$3.300
|
$5.000
|
$5.000
|
$4.690
|
$3.390
|
$3.390
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
2,265.000
|
$5.500
|
$10.000
|
$10.000
|
$12.200
|
$8.810
|
$8.810
|
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
7,535.000
|
$2.200
|
$5.000
|
$5.000
|
$4.690
|
$3.390
|
$3.390
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$15,300.000
|
$25,000.000
|
$25,000.000
|
$33,399.170
|
$24,135.910
|
$24,135.910
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
3.000
|
$8,800.000
|
$6,000.000
|
$6,000.000
|
$5,591.550
|
$4,040.730
|
$4,040.730
|
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
24.000
|
$2,750.000
|
$1,300.000
|
$1,300.000
|
$2,110.900
|
$1,525.440
|
$1,525.440
|
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$5,000.000
|
$4,400.000
|
$4,400.000
|
$8,012.050
|
$5,789.910
|
$5,789.910
|
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
5.000
|
$150.000
|
$450.000
|
$450.000
|
$731.780
|
$528.820
|
$528.820
|
|
|
|
REMOVAL OF CABLES
|
LF
|
270.000
|
$8.000
|
$3.500
|
$3.500
|
$2.810
|
$2.030
|
$2.030
|
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
1.000
|
$900.000
|
$850.000
|
$850.000
|
$1,247.780
|
$901.710
|
$901.710
|
|
|
|
REMOVAL OF CONTROL CABINET(POLE MNT)
|
EA
|
1.000
|
$1,400.000
|
$1,400.000
|
$1,400.000
|
$1,876.360
|
$1,355.950
|
$1,355.950
|
|
|
|
LITTER REMOVAL
|
CYC
|
8.000
|
$3,000.000
|
$10,700.000
|
$10,700.000
|
$6,846.300
|
$4,003.810
|
$4,003.810
|
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
12.110
|
$10,500.000
|
$100,000.000
|
$100,000.000
|
$2,283.560
|
$22,468.490
|
$22,468.490
|
|
|
|
NO. OF WORKING DAYS
|
$/D
|
120,000.000
|
$1,217.000
|
$1,216.000
|
$1,216.000
|
$1,217.000
|
$1,217.000
|
$1,217.000
|
|
|
|
TUNNEL BORING MACHINE
|
EA
|
2.000
|
$40,000,000.000
|
$30,000,000.000
|
$30,000,000.000
|
$100,000,000.000
|
$72,653,230.420
|
$72,653,230.420
|
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
225.000
|
$200.000
|
$165.000
|
$165.000
|
$193.690
|
$244.070
|
$244.070
|
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
157.000
|
$165.000
|
$148.000
|
$148.000
|
$206.740
|
$264.410
|
$264.410
|
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
98.000
|
$200.000
|
$135.000
|
$135.000
|
$206.740
|
$264.410
|
$264.410
|
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
119.000
|
$200.000
|
$160.000
|
$160.000
|
$408.050
|
$542.380
|
$542.380
|
|
|
|
BONDING COURSE
|
GAL
|
382.000
|
$5.000
|
$4.000
|
$4.000
|
$5.440
|
$10.170
|
$10.170
|
|
|
|
BORE 22' TUNNEL W/SEG LIN
|
LF
|
32,185.000
|
$8,500.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TBM HEADING PROBE HOLES
|
LF
|
6,423.000
|
$20.000
|
$165.000
|
$165.000
|
$40.610
|
$896.230
|
$896.230
|
|
|
|
TBM TUNNEL GROUT CEMENT
|
CF
|
100.000
|
$120.000
|
$33.000
|
$33.000
|
$1,577.310
|
$21.410
|
$21.410
|
|
|
|
TBM TUNNEL GROUT TIME
|
HR
|
40.000
|
$800.000
|
$5,800.000
|
$5,800.000
|
$2,450.240
|
$5,349.710
|
$5,349.710
|
|
|
|
GASSY CONDITIONS WORK STOPPAGE
|
HR
|
72.000
|
$1,500.000
|
$6,700.000
|
$6,700.000
|
$2,371.040
|
$5,342.480
|
$5,342.480
|
|
|
|
CRACK GAUGES
|
EA
|
1,664.000
|
$100.000
|
$500.000
|
$500.000
|
$46.790
|
$343.110
|
$343.110
|
|
|
|
INCLINOMETERS
|
LF
|
2,340.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
MULTI-POINT BOREHOLE EXTENSOMETERS
|
LF
|
5,718.000
|
$250.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SEISMOGRAPHS
|
EA
|
82.000
|
$250.000
|
$13,000.000
|
$13,000.000
|
$13,612.170
|
$34,452.610
|
$34,452.610
|
|
|
|
STRAIN GAUGES
|
EA
|
20.000
|
$200.000
|
$6,000.000
|
$6,000.000
|
$2,914.710
|
$6,351.250
|
$6,351.250
|
|
|
|
STRUCTURE MONITORING POINTS
|
EA
|
571.000
|
$800.000
|
$11,000.000
|
$11,000.000
|
$384.430
|
$3,524.530
|
$3,524.530
|
|
|
|
TILTMETERS
|
EA
|
66.000
|
$200.000
|
$4,325.000
|
$4,325.000
|
$1,798.380
|
$7,057.690
|
$7,057.690
|
|
|
|
UTILITY MONITORING POINTS
|
EA
|
175.000
|
$1,250.000
|
$20,000.000
|
$20,000.000
|
$9,618.300
|
$12,614.730
|
$12,614.730
|
|
|
|
VIBRATING WIRE PIEZOMETERS
|
LF
|
1,780.000
|
$150.000
|
$320.000
|
$320.000
|
$195.160
|
$647.440
|
$647.440
|
|
|
|
ADDITIONAL SHOTCRETE 2" THICK
|
SF
|
21,113.000
|
$200.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ADDITIONAL SHOTCRETE 4" THICK
|
SF
|
1,628.000
|
$100.000
|
$6.000
|
$6.000
|
$180.000
|
$23.890
|
$23.890
|
|
|
|
SPOT ROCK DOWELS (6'-10')
|
EA
|
125.000
|
$150.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SPOT ROCK DOWELS (12'-14')
|
EA
|
129.000
|
$300.000
|
$80.000
|
$80.000
|
$341.000
|
$910.640
|
$910.640
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 1A)
|
SF
|
19,453.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 1B)
|
SF
|
22,196.000
|
$100.000
|
$65.000
|
$65.000
|
$42.000
|
$37.340
|
$37.340
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 2)
|
SF
|
4,599.000
|
$100.000
|
$65.000
|
$65.000
|
$50.000
|
$78.090
|
$78.090
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 3A)
|
SF
|
40,578.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 3B)
|
SF
|
8,141.000
|
$100.000
|
$65.000
|
$65.000
|
$65.400
|
$82.360
|
$82.360
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 4)
|
SF
|
14,462.000
|
$100.000
|
$65.000
|
$65.000
|
$37.570
|
$80.380
|
$80.380
|
|
|
|
SUPP OF EXCAV (SHAFT INVERT) (TY A)
|
SF
|
2,683.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SHAFT INVERT) (TY B)
|
SF
|
3,671.000
|
$100.000
|
$65.000
|
$65.000
|
$165.000
|
$61.590
|
$61.590
|
|
|
|
SUPP OF EXCAV (SHAFT) (ROCK) (TY 1)
|
SF
|
90,030.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SHAFT) (ROCK) (TY 2)
|
SF
|
3,565.000
|
$100.000
|
$35.000
|
$35.000
|
$23.000
|
$40.150
|
$40.150
|
|
|
|
SUPP OF EXCAV (SHAFT) (SOIL) (TY 1)
|
SF
|
9,323.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SHAFT) (SOIL) (TY 2)
|
SF
|
5,169.000
|
$100.000
|
$150.000
|
$150.000
|
$420.750
|
$292.520
|
$292.520
|
|
|
|
SUPP OF EXCAV (TEE) (ROCK) (TY 1)
|
EA
|
1.000
|
$921,000.000
|
$3,000,000.000
|
$3,000,000.000
|
$6,250,000.000
|
$1,472,340.790
|
$1,472,340.790
|
|
|
|
SUPP OF EXCAV (TEE)(SOIL) (TY 1)
|
EA
|
1.000
|
$727,800.000
|
$3,000,000.000
|
$3,000,000.000
|
$7,500,000.000
|
$3,615,392.180
|
$3,615,392.180
|
|
|
|
SUPP OF EXCAV (LAUNCH) (SOIL) (SITE 1)
|
EA
|
1.000
|
$770,250.000
|
$3,000,000.000
|
$3,000,000.000
|
$5,100,000.000
|
$2,892,582.040
|
$2,892,582.040
|
|
|
|
SUPP OF EXCAV (LAUNCH) (SOIL) (SITE 2)
|
EA
|
1.000
|
$5,450,000.000
|
$3,000,000.000
|
$3,000,000.000
|
$7,500,000.000
|
$3,453,468.040
|
$3,453,468.040
|
|
|
|
SUPP OF EXCAV (LAUNCH) (ROCK) (SITE 1)
|
EA
|
1.000
|
$7,838,963.100
|
$1,000,000.000
|
$1,000,000.000
|
$12,000,000.000
|
$3,620,403.550
|
$3,620,403.550
|
|
|
|
SUPP OF EXCAV (LAUNCH) (ROCK) (SITE 2)
|
EA
|
1.000
|
$7,742,000.000
|
$800,000.000
|
$800,000.000
|
$14,250,000.000
|
$3,347,161.630
|
$3,347,161.630
|
|
|
|
ADIT PROBE HOLES
|
LF
|
2,120.000
|
$20.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ADIT TUNNEL GROUT CEMENT
|
CF
|
270.000
|
$120.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ADIT TUNNEL GROUT TIME
|
HR
|
162.000
|
$1,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CONTAMINATED GROUNDWATER COLLECTION
|
GAL
|
520,000.000
|
$2.000
|
$0.300
|
$0.300
|
$0.090
|
$0.200
|
$0.200
|
|
|
|
CONTAMINATED ROCK REMOVAL
|
CY
|
193.000
|
$150.000
|
$60.000
|
$60.000
|
$70.110
|
$59.840
|
$59.840
|
|
|
|
CONTAMINATED SOIL REMOVAL
|
CY
|
1,016.000
|
$125.000
|
$60.000
|
$60.000
|
$54.480
|
$52.680
|
$52.680
|
|
|
|
SUPP OF EXCAV (SEM TUNNEL)
|
SF
|
92,195.000
|
$100.000
|
$5.000
|
$5.000
|
$17.000
|
$7.580
|
$7.580
|
|
|
|
BORE 22' TUNNEL W/ SEG LIN (ALT 1A)
|
LF
|
31,927.000
|
$8,568.690
|
$0.000
|
$0.000
|
$4,750.980
|
$0.000
|
$0.000
|
|
|
|
GROUND MONITORING POINTS (ALT 1A)
|
EA
|
686.000
|
$496.360
|
$0.000
|
$0.000
|
$381.650
|
$0.000
|
$0.000
|
|
|
|
INCLINOMETERS (ALT 1A)
|
LF
|
2,576.000
|
$90.840
|
$0.000
|
$0.000
|
$2,013.340
|
$0.000
|
$0.000
|
|
|
|
MULTI-POINT BH EXTENSOMETERS (ALT 1A)
|
LF
|
5,858.000
|
$244.030
|
$0.000
|
$0.000
|
$540.050
|
$0.000
|
$0.000
|
|
|
|
ADDITIONAL SHOTCRETE 2" THICK (ALT 1A)
|
SF
|
21,618.000
|
$195.330
|
$0.000
|
$0.000
|
$15.000
|
$0.000
|
$0.000
|
|
|
|
SPOT ROCK DOWELS (6'-10') (ALT 1A)
|
EA
|
127.000
|
$147.640
|
$0.000
|
$0.000
|
$193.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 1A) (ALT 1A)
|
SF
|
22,110.000
|
$87.980
|
$0.000
|
$0.000
|
$75.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (ADIT) (TY 3A) (ALT 1A)
|
SF
|
40,449.000
|
$100.320
|
$0.000
|
$0.000
|
$60.070
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SFT INV) (TY A) (ALT 1A)
|
SF
|
3,758.000
|
$71.390
|
$0.000
|
$0.000
|
$120.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SFT)(ROCK)(TY 1)(ALT 1A)
|
SF
|
95,065.000
|
$94.700
|
$0.000
|
$0.000
|
$75.000
|
$0.000
|
$0.000
|
|
|
|
SUPP OF EXCAV (SFT)(SOIL)(TY 1)(ALT 1A)
|
SF
|
16,448.000
|
$56.680
|
$0.000
|
$0.000
|
$500.000
|
$0.000
|
$0.000
|
|
|
|
ADIT PROBE HOLES (ALT 1A)
|
LF
|
2,148.000
|
$19.740
|
$0.000
|
$0.000
|
$137.000
|
$0.000
|
$0.000
|
|
|
|
ADIT TUNNEL GROUT CEMENT (ALT 1A)
|
CF
|
300.000
|
$36.000
|
$0.000
|
$0.000
|
$60.000
|
$0.000
|
$0.000
|
|
|
|
ADIT TUNNEL GROUT TIME (ALT 1A)
|
HR
|
180.000
|
$900.000
|
$0.000
|
$0.000
|
$978.000
|
$0.000
|
$0.000
|
|
|
|
GROUND MONITORING POINTS (ALT 1B)
|
EA
|
687.000
|
$495.630
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CONSTRUCTION CONDITION SURVEY
|
LS
|
1.000
|
$1,000,000.000
|
$5,000,000.000
|
$5,000,000.000
|
$1,119,000.000
|
$610,380.760
|
$610,380.760
|
|
|
|
INSTALL REMOVABLE BOLLARD
|
EA
|
193.000
|
$500.000
|
$900.000
|
$900.000
|
$2,000.000
|
$753.980
|
$753.980
|
|
|
|
CONST PERIM FENCE WITH SCREEN (INSTALL)
|
LF
|
16,791.000
|
$225.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CONST PERIM FENCE WITH SCREEN (REMOVE)
|
LF
|
16,791.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CONST PERIM FENCE WITH SCREEN (MOVE)
|
LF
|
1,679.000
|
$125.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CONST PERIM FENCE W/SCN (INST) (ALT 1A)
|
LF
|
16,777.000
|
$225.190
|
$0.000
|
$0.000
|
$354.870
|
$0.000
|
$0.000
|
|
|
|
CONST PERIM FENCE W/SCN (RMV) (ALT 1A)
|
LF
|
16,777.000
|
$100.080
|
$0.000
|
$0.000
|
$19.470
|
$0.000
|
$0.000
|
|
|
|
CONST PERIM FENCE W/SCN (MOVE) (ALT 1A)
|
LF
|
1,677.000
|
$125.150
|
$0.000
|
$0.000
|
$35.050
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
7.000
|
$14,500.000
|
$45,000.000
|
$45,000.000
|
$9,526.450
|
$25,600.330
|
$25,600.330
|
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
75.000
|
$6.600
|
$5.000
|
$5.000
|
$5.630
|
$4.070
|
$4.070
|
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
1.000
|
$8,100.000
|
$7,000.000
|
$7,000.000
|
$12,552.840
|
$9,071.300
|
$9,071.300
|
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
1.000
|
$5,500.000
|
$3.000
|
$3.000
|
$14,260.320
|
$10,305.220
|
$10,305.220
|
|
|
|
CCTV MOUNT (POLE)
|
EA
|
1.000
|
$450.000
|
$200.000
|
$200.000
|
$741.160
|
$535.600
|
$535.600
|
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
1.000
|
$1,200.000
|
$5,400.000
|
$5,400.000
|
$4,428.200
|
$3,200.040
|
$3,200.040
|
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$956.940
|
$691.530
|
$691.530
|
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,620.000
|
$3.500
|
$7.000
|
$7.000
|
$9.380
|
$6.780
|
$6.780
|
|
|
|
COAXIAL CABLE
|
LF
|
75.000
|
$6.600
|
$12.000
|
$12.000
|
$11.730
|
$8.470
|
$8.470
|
|
|
|
ANTENNA (UNI-DIRECTIONAL)
|
EA
|
1.000
|
$4,850.000
|
$2,250.000
|
$2,250.000
|
$2,204.720
|
$1,593.240
|
$1,593.240
|
|
|
|
RELOCATE ITS RADIO
|
EA
|
2.000
|
$1,300.000
|
$4,500.000
|
$4,500.000
|
$6,145.080
|
$4,440.740
|
$4,440.740
|
|
|
|
ITS POLE (40 FT)(REM)
|
EA
|
1.000
|
$1,100.000
|
$800.000
|
$800.000
|
$2,495.560
|
$1,803.410
|
$1,803.410
|
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
1.000
|
$22,000.000
|
$27,000.000
|
$27,000.000
|
$39,328.460
|
$28,420.710
|
$28,420.710
|
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
1.000
|
$8,500.000
|
$8,500.000
|
$8,500.000
|
$12,299.530
|
$8,888.250
|
$8,888.250
|
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
1.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$2,758.250
|
$1,993.240
|
$1,993.240
|
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
1.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$694.250
|
$501.700
|
$501.700
|
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
1.000
|
$16,397.000
|
$30,000.000
|
$30,000.000
|
$21,728.230
|
$15,701.900
|
$15,701.900
|
|
|
|
ITS RVSD (DC ONLY) (REMOVE)
|
EA
|
1.000
|
$700.000
|
$550.000
|
$550.000
|
$956.940
|
$691.530
|
$691.530
|
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
1.000
|
$5,300.000
|
$7,000.000
|
$7,000.000
|
$59,715.090
|
$43,153.100
|
$43,153.100
|
|
|
|
VIVDS CABLING
|
LF
|
2,906.000
|
$3.300
|
$8.000
|
$8.000
|
$4.220
|
$3.050
|
$3.050
|
|
|
|
PORTABLE ROADWAY ILLUMINATION
|
DAY
|
200.000
|
$320.000
|
$500.000
|
$500.000
|
$504.000
|
$460.490
|
$460.490
|
|
|
|
ADJUST FRAME AND COVERS (TELE)
|
EA
|
1.000
|
$3,000.000
|
$1,200.000
|
$1,200.000
|
$1,173.120
|
$1,288.150
|
$1,288.150
|
|
|
|
TEMPORARY ELECTRIC GENERATOR
|
EA
|
10.000
|
$4,000,000.000
|
$100,000.000
|
$100,000.000
|
$1,572,973.720
|
$2,681,560.610
|
$2,681,560.610
|
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
150.000
|
$1,200.000
|
$3,800.000
|
$3,800.000
|
$1,625.170
|
$2,472.250
|
$2,472.250
|
|
|
|
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
|
EA
|
120.000
|
$2,200.000
|
$5,375.000
|
$5,375.000
|
$4,117.100
|
$2,491.030
|
$2,491.030
|
|
|
|
ADJUST OR RELOC WTR METER BOX
|
EA
|
1.000
|
$500.000
|
$1,300.000
|
$1,300.000
|
$942.600
|
$7,260.340
|
$7,260.340
|
|
|
|
SERVICE LINE RECONNECTION (5/8" TO 1")
|
EA
|
5.000
|
$3,800.000
|
$1,500.000
|
$1,500.000
|
$3,358.690
|
$5,033.280
|
$5,033.280
|
|
|
|
ENCASEMENT PIPE (18")STEEL
|
LF
|
75.000
|
$709.000
|
$625.000
|
$625.000
|
$1,733.520
|
$572.280
|
$572.280
|
|
|
|
ENCASEMENT PIPE (42" ) STEEL
|
LF
|
63.000
|
$600.000
|
$1,000.000
|
$1,000.000
|
$725.910
|
$1,082.500
|
$1,082.500
|
|
|
|
ENCASEMENT PIPE (54" ) STEEL
|
LF
|
370.000
|
$900.000
|
$1,750.000
|
$1,750.000
|
$1.000
|
$2,737.280
|
$2,737.280
|
|
|
|
STD PRECAST MANH W/ CIP BS 72" DIA
|
EA
|
2.000
|
$9,000.000
|
$45,000.000
|
$45,000.000
|
$20,585.510
|
$43,748.190
|
$43,748.190
|
|
|
|
REMOVE EXISTING MANHOLE
|
EA
|
2.000
|
$3,000.000
|
$6,300.000
|
$6,300.000
|
$2,383.590
|
$18,616.250
|
$18,616.250
|
|
|
|
EXTRA DEPTH OF MANHOLE 48"
|
LF
|
2.000
|
$800.000
|
$1,500.000
|
$1,500.000
|
$1,300.140
|
$1,882.310
|
$1,882.310
|
|
|
|
EXTRA DEPTH OF MANHOLE 60"
|
LF
|
12.000
|
$1,000.000
|
$1,700.000
|
$1,700.000
|
$1,408.480
|
$2,475.270
|
$2,475.270
|
|
|
|
PIPE (8") DI CLASS 350 (ALL DEPTHS)
|
LF
|
529.000
|
$210.000
|
$500.000
|
$500.000
|
$153.690
|
$296.480
|
$296.480
|
|
|
|
PIPE (24") DI CLASS 350 (ALL DEPTHS)
|
LF
|
53.000
|
$375.000
|
$800.000
|
$800.000
|
$715.080
|
$641.230
|
$641.230
|
|
|
|
CARRI PIPE (36")PVC C-900DR-14(ALL DTH)
|
LF
|
370.000
|
$695.000
|
$500.000
|
$500.000
|
$455.050
|
$655.020
|
$655.020
|
|
|
|
RESTRAINED JT PIPE (6") DI (ALL DTH)
|
LF
|
55.000
|
$160.000
|
$500.000
|
$500.000
|
$74.760
|
$268.900
|
$268.900
|
|
|
|
RESTRAINED JT PIPE (12") DI (ALL DTH)
|
LF
|
30.000
|
$250.000
|
$600.000
|
$600.000
|
$173.350
|
$420.590
|
$420.590
|
|
|
|
RESTRAINED JT PIPE (16") DI (ALL DTH)
|
LF
|
37.000
|
$300.000
|
$600.000
|
$600.000
|
$325.030
|
$586.070
|
$586.070
|
|
|
|
RESTRAINED JT PIPE (24") DI (ALL DTH)
|
LF
|
1,310.000
|
$450.000
|
$700.000
|
$700.000
|
$433.380
|
$710.180
|
$710.180
|
|
|
|
WET CONNECTION 6" DIA X 6" DIA
|
EA
|
2.000
|
$7,000.000
|
$18,000.000
|
$18,000.000
|
$5,525.590
|
$9,997.620
|
$9,997.620
|
|
|
|
WET CONNECTION 16" DIA X 12" DIA
|
EA
|
1.000
|
$9,000.000
|
$280,000.000
|
$280,000.000
|
$6,500.690
|
$13,100.310
|
$13,100.310
|
|
|
|
WET CONNECTION 24" DIA X 24" DIA
|
EA
|
4.000
|
$12,000.000
|
$31,000.000
|
$31,000.000
|
$16,251.720
|
$17,237.270
|
$17,237.270
|
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
17.900
|
$23,000.000
|
$24,000.000
|
$24,000.000
|
$8,017.510
|
$12,927.950
|
$12,927.950
|
|
|
|
PIPE 6" DIA PVC SDR26 TYPE(ALL DEPTHS)
|
LF
|
18.000
|
$625.000
|
$300.000
|
$300.000
|
$314.200
|
$213.740
|
$213.740
|
|
|
|
PIPE 8" DIA PVC SDR26 TYPE(ALL DEPTHS)
|
LF
|
542.000
|
$180.000
|
$620.000
|
$620.000
|
$370.370
|
$489.540
|
$489.540
|
|
|
|
PIPE 36" DIA PVC PS115 TYPE(ALL DEPTHS)
|
LF
|
347.000
|
$625.000
|
$1,000.000
|
$1,000.000
|
$496.770
|
$765.330
|
$765.330
|
|
|
|
VALVE (GATE)(6")
|
EA
|
6.000
|
$3,500.000
|
$2,700.000
|
$2,700.000
|
$2,708.620
|
$4,847.120
|
$4,847.120
|
|
|
|
VALVE (GATE)(8")
|
EA
|
4.000
|
$3,500.000
|
$3,700.000
|
$3,700.000
|
$3,683.720
|
$9,652.870
|
$9,652.870
|
|
|
|
VALVE (GATE)(12")
|
EA
|
3.000
|
$15,000.000
|
$6,000.000
|
$6,000.000
|
$6,609.030
|
$7,908.460
|
$7,908.460
|
|
|
|
VALVE (GATE)(16")
|
EA
|
1.000
|
$24,000.000
|
$17,000.000
|
$17,000.000
|
$15,168.270
|
$17,120.060
|
$17,120.060
|
|
|
|
VALVE (GATE)(24")
|
EA
|
4.000
|
$38,000.000
|
$51,000.000
|
$51,000.000
|
$43,337.920
|
$47,374.900
|
$47,374.900
|
|
|
|
RMV AND SALVAGE EXIST WATER VALVE
|
EA
|
11.000
|
$3,000.000
|
$4,600.000
|
$4,600.000
|
$3,900.410
|
$3,102.710
|
$3,102.710
|
|
|
|
FIRE HYDRANTS
|
EA
|
7.000
|
$10,000.000
|
$20,500.000
|
$20,500.000
|
$10,076.070
|
$17,582.010
|
$17,582.010
|
|
|
|
RMV AND DISPOSAL OF EXIST FIRE HYDRANT
|
EA
|
1.000
|
$1,500.000
|
$4,600.000
|
$4,600.000
|
$2,383.590
|
$3,792.200
|
$3,792.200
|
|
|
|
AUTO COMBO AIR/VAC RELEASE VALVE AM 2"
|
EA
|
4.000
|
$20,000.000
|
$11,600.000
|
$11,600.000
|
$28,169.650
|
$39,645.720
|
$39,645.720
|
|
|
|
CUT/PLUG EXIST WATER LINE (ALL WL SIZE)
|
EA
|
5.000
|
$6,000.000
|
$5,000.000
|
$5,000.000
|
$7,150.760
|
$3,102.710
|
$3,102.710
|
|
|
|
ABND/RMV/DISPOSE EXIST LINE (ALL TY/SZ)
|
LF
|
1,939.000
|
$6.000
|
$150.000
|
$150.000
|
$292.530
|
$62.050
|
$62.050
|
|
|
|
RESTRAIN EXIST WATERLINE (ALL TY/SZ)
|
LF
|
2.000
|
$16,000.000
|
$44,000.000
|
$44,000.000
|
$1,191.800
|
$10,687.110
|
$10,687.110
|
|
|
|
SERVICE LINE RECONNECTION (<6")
|
EA
|
1.000
|
$2,500.000
|
$25,000.000
|
$25,000.000
|
$9,751.030
|
$2,551.110
|
$2,551.110
|
|
|
|
WATERTIGHT POLY CONC MH 48" DIA
|
EA
|
3.000
|
$40,000.000
|
$58,000.000
|
$58,000.000
|
$29,253.090
|
$36,887.750
|
$36,887.750
|
|
|
|
WATERTIGHT POLY CONC MH 60" DIA
|
EA
|
1.000
|
$60,000.000
|
$94,000.000
|
$94,000.000
|
$58,506.190
|
$64,122.630
|
$64,122.630
|
|
|
|
WATERTIGHT POLY CONC DROP MH 60" DIA
|
EA
|
1.000
|
$75,000.000
|
$95,000.000
|
$95,000.000
|
$65,006.870
|
$75,843.980
|
$75,843.980
|
|
|
|
WATERTIGHT POLY CONC MH 72" DIA
|
EA
|
2.000
|
$8,250.000
|
$110,000.000
|
$110,000.000
|
$81,258.590
|
$91,012.770
|
$91,012.770
|
|
|
|
EXT DEPTH DROP POLY CONC WTRTI MH, 60IN
|
VF
|
14.000
|
$1,100.000
|
$3,600.000
|
$3,600.000
|
$5,092.210
|
$2,413.220
|
$2,413.220
|
|
|
|
ABND/RMV/DISP EXIST 2.25"WL, ALL DEPTH
|
LF
|
356.000
|
$40.000
|
$60.000
|
$60.000
|
$108.340
|
$41.370
|
$41.370
|
|
|
|
ABND/RMV/DISP EXIST 6"WL, ALL DEPTH
|
LF
|
178.000
|
$45.000
|
$60.000
|
$60.000
|
$130.010
|
$62.050
|
$62.050
|
|
|
|
ABND/RMV/DISP EXIST 6"WWL, ALL DEPTH
|
LF
|
250.000
|
$45.000
|
$60.000
|
$60.000
|
$151.680
|
$68.950
|
$68.950
|
|
|
|
ABND/RMV/DISP EXIST 8"WWL, ALL DEPTH
|
LF
|
403.000
|
$50.000
|
$110.000
|
$110.000
|
$162.520
|
$82.740
|
$82.740
|
|
|
|
TEMPORARY WL A
|
LS
|
1.000
|
$30,000.000
|
$36,000.000
|
$36,000.000
|
$71,343.760
|
$20,684.710
|
$20,684.710
|
|
|
|
BYPASS PUMPING WWL A
|
DAY
|
7.000
|
$1,990.570
|
$74,000.000
|
$74,000.000
|
$5,200.550
|
$10,342.360
|
$10,342.360
|
|
|
|
BYPASS PUMPING WWL B 1
|
DAY
|
7.000
|
$1,990.570
|
$40,000.000
|
$40,000.000
|
$1,300.140
|
$3,447.450
|
$3,447.450
|
|
|
|
BYPASS PUMPING WWL B 2
|
DAY
|
14.000
|
$1,990.570
|
$40,000.000
|
$40,000.000
|
$5,958.960
|
$3,447.450
|
$3,447.450
|
|
|
|
VENTILATION PIPE (STEEL) (30")
|
LF
|
227.000
|
$310.000
|
$11,000.000
|
$11,000.000
|
$1,350.000
|
$1,311.490
|
$1,311.490
|
|
|
|
VENTILATION PIPE (STEEL) (42")
|
LF
|
639.000
|
$182.000
|
$12,000.000
|
$12,000.000
|
$1,400.000
|
$1,816.900
|
$1,816.900
|
|
|
|
VENTILATION PIPE (STEEL) (72")
|
LF
|
224.000
|
$310.000
|
$20,000.000
|
$20,000.000
|
$3,000.000
|
$3,104.070
|
$3,104.070
|
|
|
|
VORTEX DROP PIPE (STEEL) (96")
|
LF
|
293.000
|
$412.000
|
$25,000.000
|
$25,000.000
|
$6,500.000
|
$4,450.280
|
$4,450.280
|
|
|
|
VORTEX DROP PIPE (STEEL) (120")
|
LF
|
403.000
|
$515.000
|
$30,000.000
|
$30,000.000
|
$10,500.000
|
$5,556.640
|
$5,556.640
|
|
|
|
VORTEX DROP PIPE (STEEL) (144")
|
LF
|
149.000
|
$617.000
|
$37,000.000
|
$37,000.000
|
$21,000.000
|
$6,971.750
|
$6,971.750
|
|
1
|
|
STRUCT EXCAV (SHAFT)
|
CY
|
5,597.000
|
$175.000
|
$200.000
|
$200.000
|
$0.000
|
$74.160
|
$74.160
|
|
1
|
|
ROCK EXCAV (SHAFT)
|
CY
|
32,233.000
|
$500.000
|
$250.000
|
$250.000
|
$0.000
|
$1,487.230
|
$1,487.230
|
|
1
|
|
ROCK EXCAV (ADIT)
|
CY
|
15,377.000
|
$500.000
|
$1,200.000
|
$1,200.000
|
$0.000
|
$3,336.500
|
$3,336.500
|
|
1
|
|
FLOWABLE BACKFILL (SPECIAL)
|
CY
|
4,145.000
|
$430.000
|
$100.000
|
$100.000
|
$0.000
|
$216.920
|
$216.920
|
|
1
|
|
CL F CONC (SHAFT)
|
CY
|
18,845.000
|
$1,250.000
|
$3,500.000
|
$3,500.000
|
$0.000
|
$4,071.130
|
$4,071.130
|
|
1
|
|
CL F CONC (ADIT)
|
CY
|
5,155.000
|
$1,250.000
|
$7,000.000
|
$7,000.000
|
$0.000
|
$8,016.890
|
$8,016.890
|
|
1
|
|
CL F CONC (TUNNEL)
|
CY
|
1,732.000
|
$1,250.000
|
$9,000.000
|
$9,000.000
|
$0.000
|
$11,439.240
|
$11,439.240
|
|
1
|
|
CONC SIDEWALKS (5")
|
SY
|
731.000
|
$105.000
|
$115.000
|
$115.000
|
$0.000
|
$90.410
|
$90.410
|
|
1
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$4,000.000
|
$6,150.000
|
$6,150.000
|
$0.000
|
$3,482.370
|
$3,482.370
|
|
1
|
|
BORE 22' TUNNEL W/SEG LIN
|
LF
|
32,185.000
|
$8,500.000
|
$7,200.000
|
$7,200.000
|
$0.000
|
$9,998.470
|
$9,998.470
|
|
1
|
|
GROUND MONITORING POINTS
|
EA
|
681.000
|
$500.000
|
$4,500.000
|
$4,500.000
|
$0.000
|
$3,591.920
|
$3,591.920
|
|
1
|
|
INCLINOMETERS
|
LF
|
2,340.000
|
$100.000
|
$600.000
|
$600.000
|
$0.000
|
$1,742.730
|
$1,742.730
|
|
1
|
|
MULTI-POINT BOREHOLE EXTENSOMETERS
|
LF
|
5,718.000
|
$250.000
|
$450.000
|
$450.000
|
$0.000
|
$751.860
|
$751.860
|
|
1
|
|
ADDITIONAL SHOTCRETE 2" THICK
|
SF
|
21,113.000
|
$200.000
|
$3.000
|
$3.000
|
$0.000
|
$11.930
|
$11.930
|
|
1
|
|
SPOT ROCK DOWELS (6'-10')
|
EA
|
125.000
|
$150.000
|
$60.000
|
$60.000
|
$0.000
|
$658.140
|
$658.140
|
|
1
|
|
SUPP OF EXCAV (ADIT) (TY 1A)
|
SF
|
19,453.000
|
$100.000
|
$65.000
|
$65.000
|
$0.000
|
$130.090
|
$130.090
|
|
1
|
|
SUPP OF EXCAV (ADIT) (TY 3A)
|
SF
|
40,578.000
|
$100.000
|
$65.000
|
$65.000
|
$0.000
|
$84.540
|
$84.540
|
|
1
|
|
SUPP OF EXCAV (SHAFT INVERT) (TY A)
|
SF
|
2,683.000
|
$100.000
|
$65.000
|
$65.000
|
$0.000
|
$19.090
|
$19.090
|
|
1
|
|
SUPP OF EXCAV (SHAFT) (ROCK) (TY 1)
|
SF
|
90,030.000
|
$100.000
|
$30.000
|
$30.000
|
$0.000
|
$40.150
|
$40.150
|
|
1
|
|
SUPP OF EXCAV (SHAFT) (SOIL) (TY 1)
|
SF
|
9,323.000
|
$100.000
|
$150.000
|
$150.000
|
$0.000
|
$405.370
|
$405.370
|
|
1
|
|
ADIT PROBE HOLES
|
LF
|
2,120.000
|
$20.000
|
$60.000
|
$60.000
|
$0.000
|
$100.790
|
$100.790
|
|
1
|
|
ADIT TUNNEL GROUT CEMENT
|
CF
|
270.000
|
$120.000
|
$25.000
|
$25.000
|
$0.000
|
$54.240
|
$54.240
|
|
1
|
|
ADIT TUNNEL GROUT TIME
|
HR
|
162.000
|
$1,000.000
|
$1,225.000
|
$1,225.000
|
$0.000
|
$2,883.260
|
$2,883.260
|
|
1
|
|
CONST PERIM FENCE WITH SCREEN (INSTALL)
|
LF
|
16,791.000
|
$225.000
|
$600.000
|
$600.000
|
$0.000
|
$580.690
|
$580.690
|
|
1
|
|
CONST PERIM FENCE WITH SCREEN (REMOVE)
|
LF
|
16,791.000
|
$100.000
|
$135.000
|
$135.000
|
$0.000
|
$13.260
|
$13.260
|
|
1
|
|
CONST PERIM FENCE WITH SCREEN (MOVE)
|
LF
|
1,679.000
|
$125.000
|
$85.000
|
$85.000
|
$0.000
|
$92.480
|
$92.480
|
|
Totals: |
$1,491,480,882.690
|
$844,040,714.500
|
$844,040,714.500
|
$998,890,000.003
|
$1,181,639,750.095
|
$1,181,639,750.095
|